Photo by Roger Winstead.

41
The Solar Path North Carolina Association of Higher Education Facilities Officers Annual Conference March 7-8 th , 2012 Photo by Roger Winstead.

description

The Solar Path North Carolina Association of Higher Education Facilities Officers Annual Conference March 7-8 th , 2012. Photo by Roger Winstead. NC State University and Renewables. Solar Center Continuing Education DSIRE Database Advanced Energy FREEDM Energy Management - PowerPoint PPT Presentation

Transcript of Photo by Roger Winstead.

Page 1: Photo by Roger Winstead.

The Solar PathNorth Carolina Association of Higher Education Facilities OfficersAnnual Conference March 7-8th, 2012

Photo by Roger Winstead.

Page 2: Photo by Roger Winstead.

NC State University and Renewables

• Solar Center Continuing Education• DSIRE Database• Advanced Energy• FREEDM• Energy Management• Sustainability Office

Page 3: Photo by Roger Winstead.

Solar on NC State Campus

75.6 kW

6 kW

3 kW

30 solar thermal panels + 112 pool heating collectors

8 solar thermal panels40 kW

Page 4: Photo by Roger Winstead.

NEXT 40 YEARS - CLIMATE NEUTRALITY

Page 5: Photo by Roger Winstead.

2008 Greenhouse Gas Inventory

Page 6: Photo by Roger Winstead.

HOW NC STATE COMPARES

Page 7: Photo by Roger Winstead.

Impact of Near Term Strategies

20% GHG reduction in 2015

Page 8: Photo by Roger Winstead.

04/19/23

Energy Key Performance Indicator: BTUs/GSF

Page 9: Photo by Roger Winstead.

2015 Goal = 30% reduction of energy use compared to 2003

2015 Goal = 30% reduction of energy use compared to 2003

ENERGY CONSERVATIONENERGY CONSERVATION

2015 Goal

Page 10: Photo by Roger Winstead.

PYRAMID OF CONSERVATIONTHE POWER OF ONE

Diagram: Minnesota Power: http://www.mnpower.com/powerofone/one_home/index.htm

If behavior change can account for 5% of

electricity reduction, how much $ will NC

State save?

Page 11: Photo by Roger Winstead.

Why solar?

• Student demand• Research opportunities• Public perception• Clean, renewable energy• Climate Action Plan

Page 12: Photo by Roger Winstead.

Why not solar?

• High relative cost for carbon reduction• Efficiency first• Perception: New technology• Perception: Onerous process

Page 13: Photo by Roger Winstead.

The Solar Path

• Use this procedure when a viable project is identified

• Contains many of the forms needed • Very similar across state funded

organizations

Page 14: Photo by Roger Winstead.

Procedure Diagram

• Insert diagram here

Page 15: Photo by Roger Winstead.

Frequently Asked Questions

• Glare• Liability• Wind• Roof warranty

Page 16: Photo by Roger Winstead.

Solar Power for your University

• Replicate our procedure• Contact us for more information

Page 17: Photo by Roger Winstead.

Intern Project: Site Suitability Survey

• Description of the project

Page 18: Photo by Roger Winstead.

10 criteria

• Impediments• Orientation• Pitch• Visibility• Shade

Rooftop Access

Roof Install Date

Roof Type

Roof Area

BTUs/ GSF

Page 19: Photo by Roger Winstead.

Impediments

Any object on the roof that impedes placement of a solar array either through

Physical presenceCasting of a shadow

Page 20: Photo by Roger Winstead.

High Impediments - Dabney

50%< Roof Impeded

Page 21: Photo by Roger Winstead.

Low Impediments - Witherspoon

25%> Roof Impeded

Page 22: Photo by Roger Winstead.

Orientation

Determined along the long axis of the building

Ideal Orientation is E-W

Page 23: Photo by Roger Winstead.

Carmichael gymnasium

N

Page 24: Photo by Roger Winstead.

Visibility

Determined by Walk-By Site AssessmentLow = >25% of roof visibleMedium = 25% - 75% of roof visibleHigh = > 75% of roof visible

Page 25: Photo by Roger Winstead.

Low Visibility - Dabney

Page 26: Photo by Roger Winstead.

High visibility - Jw isenhour tennis center

Page 27: Photo by Roger Winstead.

Shading

Extent to which objects cast a shadow on rooftops

Low: >25% ShadedMedium: 25% - 75% ShadedHigh: <75% Shaded

Page 28: Photo by Roger Winstead.

High shading - Turner House

Page 29: Photo by Roger Winstead.

Low Shading - Centennial sub station

Page 30: Photo by Roger Winstead.

Rooftop Access

Availability of perimeter space for crane use

Low: If materials can’t be stored on roof or no reasonable crane accessMedium: 1-2 sides availableHigh: 3+ sides available

Page 31: Photo by Roger Winstead.

Low - lEazar hall

• Materials can’t be stored on roof and no reasonable crane access points

Page 32: Photo by Roger Winstead.

High - mckimmon center

• 3 crane access points

Page 33: Photo by Roger Winstead.

Roof Install date & Type

• Date of most recent roof install• Type of roof currently installed

Page 34: Photo by Roger Winstead.

wood deck with Asphalt shingles

Page 35: Photo by Roger Winstead.

Wood deck with Slate Shingles

Page 36: Photo by Roger Winstead.

Epdm

EPDM rubber stands for Ethylene Propylene Diene Monomer (M-class)

Page 37: Photo by Roger Winstead.

Coal Tar Pitch

Page 38: Photo by Roger Winstead.

Roof Area

• Measured in ft^2

Page 39: Photo by Roger Winstead.

conclusion

• This project was almost completely student led

• There are several existing systems on NCSU’s campus

• Rooftops evaluated based on 10 criteria

Page 41: Photo by Roger Winstead.

Sponsors