New Waste Building, Connon Bridge
E05284
SUEZ Recycling and Recovery UK Ltd
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge i
February 2021
Report No. Date.
E05284-CLB-00-XX-RP-GT-002 15 February 2021
Project
New Waste Building, Connon Bridge
Client Name
SUEZ Recycling and Recovery UK Ltd
Issue Date Status Comments
29 May 2020 S02P01 For Information
28 February 2021 S02 P02 Client comments
15 February 2021 S02 P03 Revised development plan
Report Prepared by:
Nick Edwards
BSc (Hons) MSc FGS
Geotechnical Engineer
Approved for Issue by:
Tim Thornburn
BSc (Hons) PgDip
Principal Geotechnical Engineer
Issuing Office
The Cocoa House, 129 Cumberland Road, Bristol, BS1 6UY
Tel: +44 (0)117 929 2244
X GF Suite, Bickleigh House, Park Five Business Centre, Exeter, EX2 7HU
Tel: +44 (0)1392 369098
7 Hatchers Mews, Bermondsey Street, London, SE1 3GS
Tel: +44(0)20 7939 0959
This report is provided for the benefit of the Client. We do not accept responsibility in the event that the report contents are
used in whole or in part by a third party and we exercise no duty of care to any such third party. © Clarkebond (UK) Limited
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge ii
February 2021
Contents
Executive Summary .......................................................................................................................... iv
1 Introduction ............................................................................................................................ 1
1.1 Introduction and Brief ................................................................................................................ 1
1.2 Proposals .................................................................................................................................... 1
1.3 Scope of Works ........................................................................................................................... 1
1.4 Limitations .................................................................................................................................. 1
2 Site Setting .............................................................................................................................. 2
2.1 Location and Description ............................................................................................................ 2
2.2 Geology....................................................................................................................................... 3
2.3 Hydrology and Hydrogeology ..................................................................................................... 3
3 Site Investigation ..................................................................................................................... 4
3.1 General ....................................................................................................................................... 4
3.2 Trial Pitting ................................................................................................................................. 4
3.3 Sample Collection and Analysis .................................................................................................. 4
4 Ground Conditions ................................................................................................................... 6
4.1 General ....................................................................................................................................... 6
4.2 Strata Encountered .................................................................................................................... 6
4.3 Groundwater .............................................................................................................................. 6
4.4 Contamination Indications ......................................................................................................... 6
5 Geotechnical Assessment ......................................................................................................... 7
5.1 Introduction ................................................................................................................................ 7
5.2 Foundation Assessment ............................................................................................................. 7
5.2.1 Foundation Design Principles .........................................................................................7
5.2.2 Foundations ....................................................................................................................7
5.3 Shrinkable Soils ........................................................................................................................... 7
5.4 Floor Slab .................................................................................................................................... 7
5.5 Retaining Walls ........................................................................................................................... 8
5.6 Concrete protection ................................................................................................................... 9
5.7 Excavations ................................................................................................................................. 9
5.8 Pavement Design ........................................................................................................................ 9
6 Contamination Assessment .................................................................................................... 11
6.1 Summary .................................................................................................................................. 11
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge iii
February 2021
6.2 Tier 1 Generic Quantitative Risk Assessment - Soil Risks to Humans ...................................... 11
6.2.1 General ........................................................................................................................ 11
6.2.2 Metals .......................................................................................................................... 12
6.2.3 Organics – TPH ............................................................................................................. 12
6.2.4 Organics – PAHs ........................................................................................................... 13
7 Waste Assessment ................................................................................................................. 14
8 Summary ............................................................................................................................... 16
Appendices
A Proposed Development Plan
B Exploratory Hole Plan
C Exploratory Hole Logs
D Geotechnical Test Certificates
E Chemical Test Certificates
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge iv
February 2021
Executive Summary
Client SUEZ Recycling and Recovery UK Ltd
Site Location The site is located 8km south west of Liskeard at approximate National Grid Reference 217677
062155 (Postcode: PL14 4NP).
Proposed
Development
The proposed development comprises a new waste transfer building north of the existing Refuse
Transfer Station (RTS) building, a new pump room and firefighting water tank to the west and
redevelopment of the existing clinical waste building.
Site History
The site was agricultural greenfield up until the development of the adjacent landfill in the early
1990s. Associated with the landfill development were ancillary buildings indicated on the 2001
mapping, more recently becoming a recycling centre from 2010 until present day.
Ground
Conditions
Superficial Deposits: None
Bedrock Geology: Saltash Formation.
Thin veneer of surface Made Ground over silty gravel of the weathered slate bedrock.
No groundwater was encountered during the investigation.
Hydrogeology
& Hydrology
Bedrock Geology: Secondary A aquifer
No Source Protection Zones within 500m of the site
No surface water within 250m of the site.
Investigation
Works
Six trial pits, geotechnical and chemical laboratory testing. No access to the northern part of
the site due to slopes and vegetation.
Geotechnical
Considerations
Traditional spread foundations constructed at a minimum depth of 0.75m within competent
natural strata. A safe bearing capacity of 150kPa would be appropriate for the weathered slate.
Foundations constructed on intact bedrock can be designed to a safe bearing capacity of 250kPa.
Soils are non-shrinkable.
Design Sulphate Class DS-1 and ACEC class AC-1s. For low rise construction on mass concrete
foundations, this corresponds to a concrete type of GEN1.
A ground bearing floor slab will be suitable. Full radon protection measures are required.
Design CBR of 5%.
Conventional mechanical backhoe excavators should prove suitable for excavation within the
weathered Saltash Formation.
Contamination
Considerations
Comparison of the results against Generic Assessment Criteria (GAC) revealed no elevated
concentrations and risks to human health or the environment are unlikely to be present. No
asbestos was detected.
No remedial actions are required.
Waste
Categorisation
for Disposal
The Saltash Formation soils are likely to class as Inert waste.
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge page 1 of 16
February 2021
1 Introduction
1.1 Introduction and Brief
Clarkebond (UK) Limited was commissioned by SUEZ Recycling and Recovery UK Ltd to undertake
a Phase 2 Ground Investigation for a proposed New Waste Building at an existing Refuse Transfer
Station at Connon Bridge, Liskeard. This report builds upon the initial findings of the Phase 1
Assessment which was undertaken in March 2020.
1.2 Proposals
The new facility is to comprise of a new waste transfer station north west of the existing building
to provide additional waste material handling/storage capacity. It is also proposed to construct a
clinical waste building adjacent to the north east elevation of the building. All of the bays are
covered and within the enclosed building and the building fully enclosed with an automated door
rapid roller shutter door to be fully compliant with regulations. A new fire water tank is proposed
to the west of the existing building. Upgrades to the drainage are also included. A plan showing
the proposed development is included as Appendix A.
1.3 Scope of Works
The objectives of the investigation were to determine the sub-surface conditions in respect of:
• Geotechnical recommendations including foundations for proposed structures,
floor slabs, soil shrinkability, excavation stability, dewatering and buried
concrete classes
• A conceptual site model and contamination generic risk assessment
(GQRA)Contamination assessment to consider potential significant pollutant
linkages arising from the historic land uses on and off site to support any
planning applications and the design process.
• An outline waste classification for surplus soils.
1.4 Limitations
This report is provided for the benefit only of the party to whom it is addressed and we do not
accept responsibility to any third party for the whole or any part of the contents and we exercise
no duty of care in relation to this report to any third party.
Where intrusive investigations have been completed, information, comments and opinions given
in this report are based on the ground conditions encountered during the site work and on the
results of laboratory and field tests performed during the investigation. However, subsoils are
inherently variable and hidden from view such that no investigation can be exhaustive to the
extent that all soil conditions are revealed. Conditions may therefore be present beneath the site
that were not apparent in the data reviewed as part of this assessment. In particular, it should be
noted that groundwater levels vary due to seasonal and other effects, and may at times differ to
those measured during the investigation.
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge page 2 of 16
February 2021
2 Site Setting
2.1 Location and Description
The site is located 8km south west of Liskeard at approximate National Grid Reference 217677
062155 (Postcode: PL14 4NP as shown in Figure 2.1.
Figure 2.1 Site Location
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge page 3 of 16
February 2021
The area of the proposed development is approximately triangular in shape and lies to the north
of the existing building. The building has been cut into an existing slope and therefore the site
slopes at approximately 1 in 10 to the east. Semi-mature species of trees were observed on-site
along the western boundary.
The site is bounded to the north and east by the historic landfill, to the south by the access road
with agricultural farmland beyond and to the west by B3359 with farmland beyond.
2.2 Geology
The British Geological Survey Digital Geological Map of Great Britain at 1:50,000 scale indicates
that the site is directly underlain by bedrock of the Saltash Formation (slate and siltstone).
2.3 Hydrology and Hydrogeology
There are two surface water features within 500m of the site. These features include a river WB
catchment on site for the West Looe River and 408m north is the West Looe River. Therefore the
potential risk to such receptors is deemed to be moderate.
Guidance from the Environment Agency indicates that the bedrock strata is designated as a
Secondary A aquifer. As such the groundwater sensitivity is regarded as high.
There are no active groundwater abstractions that lie within 500m of the site boundary. There is
an historic groundwater abstraction located 5m east of the site boundary.
The site is not located within 500m of a Source Protection Zone (SPZ).
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge page 4 of 16
February 2021
3 Site Investigation
3.1 General
An intrusive site investigation using mechanically excavated trial pits was carried out by
Clarkebond Ltd to determine sub-surface conditions and allow recovery of samples for laboratory
geotechnical and chemical testing. Access to the northern part of the site was not possible due
to steep slopes and vegetation. In situ CBR tests and trial pits were intended to be undertaken in
this area.
A plan showing the trial pit locations is presented in Appendix B.
3.2 Trial Pitting
Six trial pits (designated TP01 to TP06) were excavated to depths of ranging from 1.90m BGL to
2.30m BGL using a JCB 3CX on 30th April 2020.
The trial pits were logged by a geotechnical engineer and samples were taken from the resulting
spoil for geotechnical and chemical analysis. On completion the pits were backfilled with
excavated spoil and compacted.
Detailed trial pits logs and photographs are included in Appendix C.
3.3 Sample Collection and Analysis
Samples obtained during the investigation were subjected to geotechnical and chemical testing
at appropriate UKAS accredited laboratories.
Samples were submitted for geotechnical laboratory testing to characterise the engineering
properties of the soil. The following testing was scheduled on selected samples:
• 3 x Moisture Contents.
• 4 x BRE SD1 Greenfield suite.
• 3 x Particle Size Distributions.
• 3 x 2.5kg CBR mould compaction tests
• 1 x 4.5kg compaction.
Testing was carried out in accordance with the procedures outlined in BS EN ISO 14688-1:2018,
14688-2:2018 and 14689:2018 (i.e. Eurocode 7). Geotechnical laboratory test data is presented
in Appendix D.
Soil samples were sent for chemical analysis to i2 Analytical to be analysed for:
• Six full suites comprising arsenic, cadmium, copper, chromium, lead, mercury,
nickel, selenium, zinc, Speciated PAH, speciated Total Petroleum Hydrocarbons
(TPHCWG), Soil organic matter content (SOM), pH and soluble sulphate.
• Six samples were subject to asbestos screens and ID.
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge page 5 of 16
February 2021
• One soil sample was also submitted for waste acceptance criteria (WAC)
testing to assist with determining the acceptability for landfill classes of the
soil.
Environmental sample collection was carried out in accordance with Clarkebond Standard
Operating Procedures and BS EN ISO 22475-1:2006.
The chemical laboratory test results are presented in Appendix E.
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge page 6 of 16
February 2021
4 Ground Conditions
4.1 General
The results of this investigation were consistent with the anticipated geology. A veneer of Made
Ground overlying weathered gravel, cobbles and boulders of weak slate overlying weak thinly
bedded slate of the Saltash Formation.
The following table provides a summary of the strata encountered and the depth to the base of
each stratum in metres encountered in the exploratory holes.
Table 4.1 Typical Strata
Stratum Depth to Base (m bgl)
TP01 TP02 TP03 TP04 TP05 TP06
Made Ground 0.30 0.15 0.55 0.25 0.20 0.60
Gravel and cobbles of weak slate 1.50 1.40 1.30 1.30 1.20 1.70
Gravel, cobbles and boulders of weak
slate 1.80* - 1.90* -
1.90 2.10*
Weak, thinly bedded Slate. - 2.30* - 2.30* 2.30* -
Groundwater Dry Dry Dry Dry Dry Dry
*refusal at base of hole
4.2 Strata Encountered
Made Ground
The Made Ground typically comprised pale orange / pink / grey slightly clayey, angular, fine to
coarse slate gravel.
Saltash Formation
The Made Ground was underlain by the solid geology of the Saltash Formation. This was
weathered to slightly silty angular gravel, cobbles and boulders of slate. This was underlain by
weak, thinly bedded slate.
4.3 Groundwater
No groundwater was encountered during the investigation.
4.4 Contamination Indications
There were no visual or olfactory indications of contamination or asbestos noted during the site
works.
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge page 7 of 16
February 2021
5 Geotechnical Assessment
5.1 Introduction
The proposed development comprises a new waste transfer building north of the existing Refuse
Transfer Station (RTS) building, a new pump room and firefighting water tank to the west and
redevelopment of the existing clinical waste building. An access road will be constructed in the
west of the site. Upgrades to the drainage are also included.
A proposed development plan is included in Appendix A.
5.2 Foundation Assessment
5.2.1 Foundation Design Principles
The two primary factors controlling the performance of foundations are bearing capacity and
settlement. Usually the settlement tolerances of the structure are considerably less than the
settlement that would be expected as the ultimate bearing capacity of the soils is approached.
Therefore it is usually tolerable settlement that dictates the bearing pressure for foundation
design. In general, the ultimate bearing capacity is usually divided by a safety factor of 3 for an
allowable bearing capacity in order to maintain total settlement within tolerable limits for most
structures, which is generally accepted to be 25mm. However, it should be noted that total
settlements are usually less than this value as the average actual imposed load will be less than
the design load.
All foundations should be inspected by a suitably qualified and competent person to ensure that
foundations are placed in competent material capable of supporting the intended loads and
below any desiccated clay soils.
5.2.2 Foundations
Traditional foundations will be suitable, and should be taken down through any soft or loose
materials and constructed in competent natural strata at a minimum foundation depth of 0.75m
below existing ground level. A safe bearing capacity of 150kPa would be appropriate for the
weathered slate. Foundations constructed on intact bedrock can be designed to a safe bearing
capacity of 250kPa.
Total settlements for foundations designed to the above pressures are likely to be in the order of
15 to 25mm, most of which would occur during construction. There would be a reduction in
settlements with foundation depth, as the soil strength increases. Imposing a lower bearing
pressure than the safe bearing capacity would also reduce settlement.
5.3 Shrinkable Soils
The soils encountered on site are non-shrinkable.
5.4 Floor Slab
A ground bearing floor slab would be appropriate.
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge page 8 of 16
February 2021
The site lies in a high radon area and full radon protection measures are required for new buildings
or extensions.
Guidance from the HSE states that radon surveys should be conducted in any workplace where
its location and characteristics suggest that elevated levels may be found and significant
exposures to employees and/or other persons are possible. Inexpensive surveys can be carried
out by leaving small plastic passive detectors in rooms or occupied locations of interest. The PHE
website contains up-to-date details of validated laboratories capable of supplying such detectors
for undertaking radon measurements. Delivery and return of the dosemeters is usually by post.
The Building Regulations 2004 (England, includes 2010 and 2013 amendments), the Building
Regulations 2010 (Wales, includes 2017 amendments), the Building (Scotland) Regulations 2004
and Building Regulations (Northern Ireland) 2000, supported by BRE report BR211 describe where
new buildings and extensions (workplaces and dwellings) might need to incorporate protective
measures installed during construction.
Since even new buildings with protective measures may have high radon levels, employers must
still test as described above.
There is also a former landfill to the east of the site, which has an active gas management system.
The existing RTS building has full radon protection measures installed. These comprise:
• 1200 gauge polyethene membrane, tape sealed. Minimum 150mm overlaps.
• Radon control sumps.
• 110mm dia plastic pipe with sealed joints to terminate above ground level.
These details should be incorporated within the proposed building.
5.5 Retaining Walls
It is understood that a reinforced concrete cantilever retaining will be constructed to
accommodate the development.
Design parameters are presented in Table 5.1.
Table 5.1 Design Parameters for Retaining Wall Design (unfactored)
Soil Type
Characteristic Values Bulk
Density
kNm3
Friction
Angle
Effective
Cohesion
kPa
Weathered slate 32 0 19
Intact slate 34 0 20
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge page 9 of 16
February 2021
5.6 Concrete protection
Buried concrete classification is based on guidelines provided in BRE Special Digest 1 (BRE, 2005).
Chemical Analysis was undertaken on four soil samples for pH, water soluble sulphate, total
sulphate and total sulphur. An assessment for total potential sulphate indicates that the soils are
not considered to be pyritic and the design class should be based on soluble sulphates.
The pH values were 6.8 to 7.1 with water soluble sulphate concentrations of 7mg/l to 12mg/l
Therefore it is recommended that a Design Class of DS1 and AC1s should be assumed for buried
concrete in accordance with BRE Special Digest 1 assuming natural ground and static groundwater
conditions.
For low rise construction on mass concrete foundations, this corresponds to a concrete type of
GEN1. It is recommended that the concrete supplier confirm the necessary concrete type based
on its intended use and the chemical test results in Appendix E.
5.7 Excavations
Conventional mechanical backhoe excavators should prove suitable for excavation within the
weathered Saltash Formation.
The weathered soils were recovered as gravel and cobble sized fragments and may be subject to
spalling and collapse within excavations and concrete should be poured as soon as possible and
temporary support may be required. Entry into shallow excavations by personnel should be
minimised, and excavation stability should be assessed by suitably qualified and experienced staff
and shoring used when required. Entry into deeper excavations should not be permitted unless
full support is provided.
No groundwater was encountered during the investigation undertaken in April 2020.
5.8 Pavement Design
Laboratory CBR tested was undertaken on three recompacted samples. This gave CBR values of
18% to 47%. The results indicate that where the weathered slate is excavated and re-compacted,
it would provide a suitable formation for road construction.
For the in situ weathered slate, equilibrium CBR values for various materials are given in Interim
Advice Note 73/06 "Design Guidance for Road Pavement Foundations (Draft HD25)" produced by
the Highways Agency and these are summarised in Table 5.2 assuming a high water table and thin
pavement construction.
Table 5.2 Typical CBR Values
Soil Type PI (%) Equilibrium CBR (%)
Heavy clay 50-70 2
Silty clay 30 3
Sandy clay 10-20 3-4
Silt - 1
Sands and gravels > 5%
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge page 10 of 16
February 2021
The near surface soils are predominantly gravel of the weathered slate. Based on Table 5.2 it is
recommended that a design CBR of 5% is adopted for these soils.
All Topsoil / Made Ground should be removed and the formation level should be proof rolled to
identify any loose or soft spots, which should be removed and replaced with compacted granular
fill. The conditions prevailing at the time of construction will affect the CBR of the sub-grade soil
and its strength. Research has shown the importance of the equilibrium moisture content of the
sub-grade. The relationship between soil suction and the moisture content shows that a soil that
becomes wet during construction will retain water and will therefore be weaker under the
pavement in the equilibrium condition than a foundation that has remained dry, particularly for
soils of low to medium plasticity. Consequently the formation level will also need to be protected
during inclement weather from deterioration; all slopes should be trimmed to falls to shed rain
water and the surface sealed to limit infiltration.
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge page 11 of 16
February 2021
6 Contamination Assessment
6.1 Summary
Comparison of the results against Generic Assessment Criteria (GAC) revealed no elevated
concentrations and risks to human health or the environment are unlikely to be present.
No asbestos was detected.
No remedial actions are required.
No access to the northern part of the site was possible, however the ground conditions were
consistent over the remainder of the site and excluding any materials that may have been
imported to this area, significantly differing ground conditions are not expected in the north of
the site.
A standard H&S personal hygiene plan should suffice (wearing of gloves, washing of hands before
eating etc). Excessive dust generation should be avoided.
Details of the test results and comparison with guideline values is presented in the following
sections.
6.2 Tier 1 Generic Quantitative Risk Assessment - Soil Risks to Humans
6.2.1 General
A generic quantitative risk assessment (GQRA) has been undertaken using the geochemical results
for the soil samples retained from the site. The approach to human health risk assessment
adopted in this report is consistent with the Environment Agency’s Model Procedures (CLR11) and other relevant guidance (including SR3, BS10175:2001 and NPPF).
The laboratory soil data has been compared to relevant and applicable critical concentrations as
outlined in the guidance. These criteria can be either Generic Assessment Criteria (GAC) or Site
Specific Assessment Criteria (SSAC). For the purpose of this generic quantitative risk assessment,
GAC will be used. The GACs been derived from the following:
• DEFRA C4SL Health Criteria Values (March 2014),
• Cl:AIRE/EIC/AGS Soil Generic Assessment Criteria for Human Health Risk
assessment, January 2010 and
• The LQM/CIEH S4ULs for Human Health Risk Assessment. Ref: S4UL3269,
released January 2015, Land Quality Press, Nottingham
The site is non-residential therefore a ‘commercial’ end use has been assumed for the
assessment.
To ascertain a preliminary assessment of the contaminative nature of the near surface materials
across the site, seven soil samples were retained during the site investigation works and
submitted for laboratory analysis.
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge page 12 of 16
February 2021
The chemical analysis was undertaken at i2 Analytical laboratories. The results are included in
Appendix E.
6.2.2 Metals
Table 6.1 summarises the results of heavy metal concentrations within the soil samples compared
to GAC values.
Table 6.1 Values for Metals in Soils
Determinant GAC Concentration Range No. samples
tested
No. samples
exceed GAC Min Max
Arsenic 640 20 28 6 0
Boron (w/s) 240000 <0.2 <0.2 6 0
Cadmium 190 <0.2 <0.2 6 0
Chromium (total) 8600 36 51 6 0
Copper 68000 0 <4 0 0
Lead 2330 19 49 6 0
Mercury 58 21 31 6 0
Nickel 980 <0.3 <0.3 6 0
Selenium 12000 47 65 6 0
Zinc 730000 <1 <1 6 0
Results in mg/kg . GACs are LQM GAC unless stated otherwise.
6.2.3 Organics – TPH
Table 6.2 summarises the results of Speciated Hydrocarbons concentrations within the soil
samples compared to GAC values.
Table 6.2 Values for Speciated Hydrocarbons in Soils
Determinant GAC Concentration Range No. samples
tested
No. samples
exceed GAC Min Max
EC>5-6 Aliphatic 1000000 <0.1 <0.1 6 0
EC>6-8 Aliphatic 1000000 <0.1 <0.1 6 0
EC>8-10 Aliphatic 41000 <0.1 <0.1 6 0
EC>10-12 Aliphatic 41000 <1 <1 6 0
EC>12-16 Aliphatic 41000 <2 <2 6 0
EC>16-35 Aliphatic 81000 <10 <10 6 0
EC>35-44 Aliphatic 81000 0 <8.4 0 0
EC>5-7 Aromatic 180000 <0.1 <0.1 6 0
EC>7-8 Aromatic 180000 <0.1 <0.1 6 0
EC>8-10 Aromatic 16000 <0.1 <0.1 6 0
EC>10-12 Aromatic 16000 <1 <1 6 0
EC>12-16 Aromatic 16000 <2 <2 6 0
EC>16-21 Aromatic 12000 <10 <10 6 0
EC>21-35 Aromatic 12000 <10 <10 6 0
EC>35-44 Aromatic 12000 <8.4 <8.4 6 0
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge page 13 of 16
February 2021
Results in mg/kg. GACs are LQM S4UL for SOM of 1% unless stated otherwise.
6.2.4 Organics – PAHs
Table 6.3 summarises the results of speciated Poly Aromatic Hydrocarbons (PAH) concentrations
within the soil samples compared to GAC values.
Table 6.3 Values for Speciated PAH in Soils
Determinant GAC Concentration Range No. samples
tested
No. samples
exceed GAC Min Max
Acenaphthene 39000 <0.1 <0.1 6 0
Acenaphthylene 39000 <0.1 <0.1 6 0
Anthracene 200000 <0.1 <0.1 6 0
Benz(a)anthracene 89 <0.1 <0.1 6 0
Benzo(a)pyrene 13 <0.1 <0.1 6 0
Benzo(b)fluoranthene 92 <0.1 <0.1 6 0
Benzo(ghi)perylene 590 <0.05 <0.05 6 0
Benzo(k)fluoranthene 130 <0.1 <0.1 6 0
Chrysene 130 <0.05 <0.05 6 0
Dibenz(a,h)anthracene 12 <0.1 <0.1 6 0
Fluoranthene 8100 <0.1 <0.1 6 0
Fluorene 26000 <0.1 <0.1 6 0
Indeno(1,2,3-cd)pyrene 56 <0.1 <0.1 6 0
Naphthalene 13000 <0.05 <0.05 6 0
Phenanthrene 8100 <0.1 <0.1 6 0
Pyrene 20000 <0.1 <0.1 6 0
Results in mg/kg. GACs are LQM S4UL for SOM of 1% unless stated otherwise.
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge page 14 of 16
February 2021
7 Waste Assessment
Assessment (including WAC) testing has been undertaken on a sample of the weathered slate.
The results are included in Appendix E.
The sample met the inert criteria.
All producers of waste have a duty of care to ensure that any waste they produce is handled safely
and within the law. They must check that anyone they pass waste on to is authorised to take it.
This includes the authorised site earmarked to handle the waste and any haulier (licensed waste
carrier) used to transport the waste between the sites.
Records of all waste transferred or received must keep for at least two years.
In order to prevent excessive costs and reduce the environmental impact of the development, it
is recommended that removal of wastes from the site, including waste soils, is kept to a minimum
by:
• firstly trying to balance cut/fill earthworks operations
• and then by employing U1 Waste Exemptions (use of waste in construction)
• and/or Definition of Waste: Industry Code of Practice (DoWCoP) assessment,
• exporting to a soil treatment hub,
• with the last resort being disposal to a licensed waste disposal site (subject to
Landfill Tax).
Clarkebond’s DoWCoP Qualified Persons can assist with these assessments.
Transfer for Reuse on Another Site
Surplus soils become waste as soon as they leave site, unless they are being transferred to another
“development” or “construction” site for reuse. Such transfer means that such soils do not class
as waste, provided that a waste assessment is completed (e.g. by a DoWCoP Qualified Person) to
prove compliance within the 4nr (DoWCoP type) factors.
Soil types can be transferred as follows:
• Utilising DoWCoP: Currently only natural soils can be transferred via a
DoWCoP.
• Utilising U1 Waste Exemption: Limited quantities of both natural soils and
Made Ground can be transferred via a U1, provided that they pose no risks to
humans, or the environment.
Certain other materials may also be reused on other “Construction” sites by employing a U1
Waste Exemption.
Disposal to Licensed Waste Sites
To evaluate the various on-site soils for potential off-site disposal, soils are classified in accordance
with the Hazardous Waste Directive (HWD) that enables the provision of a European Waste
Catalogue (EWC) Code for use during offsite disposal and a Hazardous or Non-Hazardous
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge page 15 of 16
February 2021
Classification. Non-Hazardous material is suitable for disposal in a Non-Hazardous landfill;
however, disposal to an Inert Landfill requires further Waste Acceptance Criteria (WAC) testing in
accordance with BS EN 12457–3. Material classed as Hazardous also requires WAC testing to
assign a suitable hazardous classification.
The Landfill Regulations require that all Hazardous and Non-Hazardous solid waste must be
treated prior to offsite disposal to landfill. You can define ‘treatment’ by using the following ‘three-point test’. All three criteria must be satisfied for all of the waste to qualify as being
treated:
1. It must be a physical, thermal, chemical or biological process including sorting.
2. It must change the characteristics of the waste.
3. It must do so in order to:
a. Reduce its volume; or
b. Reduce its hazardous nature; or
c. Facilitate its handling; or
d. Enhance recovery.
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge page 16 of 16
February 2021
8 Summary
Traditional spread foundations constructed at a minimum depth of 0.75m within competent
natural strata. A safe bearing capacity of 150kPa would be appropriate for the weathered slate.
Foundations constructed on intact bedrock can be designed to a safe bearing capacity of 250kPa.
Soils are non-shrinkable.
Design Sulphate Class DS-1 and ACEC class AC-1s. For low rise construction on mass concrete
foundations, this corresponds to a concrete type of GEN1.
A ground bearing floor slab will be suitable. Full radon protection measures are required.
Design CBR of 5%.
Conventional mechanical backhoe excavators should prove suitable for excavation within the
weathered Saltash Formation.
Comparison of the results against Generic Assessment Criteria (GAC) revealed no elevated
concentrations and risks to human health or the environment are unlikely to be present.
No remedial actions are required.
The Saltash Formation soils are likely to class as Inert waste.
MULTIDISIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge Appendices
February 2021
Appendices
A Proposed Development Plan
B Exploratory Hole Plan
C Exploratory Hole Logs
D Geotechnical Test Certificates
E Chemical Test Certificates
MULTIDISIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge Appendices
February 2021
A Proposed Development Plan
metres20100
SUEZ recycling and recovery UK - Connon Bridge, Liskeard
March 20 20.028
check all dimensions on sitefeatures shown on this survey may not delineate legal boundariessurvey aligned to magnetic northcontours set at 0.5m intervalsgrid set to 20m intervalslevels and coordinates set to OSGB36© 2020 Quadrant surveys Ltd
key
bl bed levelcl cover levelel eaves levelfl floor levelfp fence postfpt filter point
metres
100
159.46
mh cl 157.92
mh cl 159.41
160.82 160.55
159.92159.39
160.14
160.88
161.57
161.91
161.85
161.83
162.01
162.14
mh cl 161.34
mh cl 161.23
mh cl 160.37
mh cl 160.55
159.91160.08
159.96
mh cl 160.14
160.56
160.38
160.37
160.33
160.34160.52
160.79
160.81160.52162.26
162.16
mh cl 162.03
161.89
161.85
161.50
160.22160.07
159.72
mh cl 159.60159.37162.36
161.76
mh cl 160.66
mh cl 160.74
mh cl 160.69
160.92
159.08
159.27159.08
158.72
158.75
158.24
158.80
158.90
158.81
158.84
158.82
mh cl 158.49
mh cl 158.58
mh cl 158.60
el 160.34
rl 162.86
160.32
160.36
rl 162.41
rl 162.41
160.79
ic 157.31
157.54
157.34
157.64
158.07158.33
158.00158.28
mh cl 158.06
159.33 159.15
159.15
159.62
159.63
159.53
159.36
157.40
157.39
157.39
157.41
mh cl 157.46
mh cl 157.41
157.24
157.16
gy 157.23
158.18
mh cl 158.10
158.06
157.55
156.60
155.83 156.56
157.11
157.48
157.59
157.41157.45
mh cl 157.35
157.41
157.45 tow 157.54
tow 157.55
el 161.00
el 160.36el 161.00
el 166.00
155.83
156.57
mh cl 156.31
156.58
156.81
156.80
156.86
156.80
156.95
156.87
156.40
mh cl 156.67
156.11
156.14
156.18
156.32
mh cl 156.27
156.33
156.36
gy 156.31156.30
mh cl 156.28
mh cl 156.41
156.51
sv 156.52
156.41
156.25
156.34
155.91
mh cl 155.79
156.70156.63
156.88
157.15
157.35
157.70157.66
157.70
157.84
158.04157.83
159.26159.40
159.09
158.72
158.17
158.00
157.67
157.38
158.14
158.77
159.71
el 160.95
rl 167.66
mh cl 160.18
159.55
157.67
157.85
157.83
mh cl 157.85
gy 157.87
mh cl 157.79157.76
157.86
160.10
160.56
161.23
el 166.01
157.70
157.67
157.73
158.39
157.74
157.66
157.62
mh cl 157.68tow 159.54
tow 160.02
tow 159.61
157.68158.30
159.01
160.33159.65
161.72
162.50
162.65
162.35
162.43
157.70
157.72
157.70
157.68
157.70
159.72
159.36
158.42
157.18
157.55
157.55
156.91
156.66156.31
156.49
156.87
156.83
156.86158.11
mh cl 157.25
mh cl 156.83
mh cl 156.74
mh cl 156.75
156.23
156.43
156.58
156.65
156.81
156.54
156.72
157.13
157.44
157.79157.96
156.48
156.62
155.76
156.33
156.80
156.91
157.23
157.42
tow 158.37
tow 157.64
156.40
156.71
mh cl 156.33
156.06
156.04
156.57
156.32
156.06
tow 157.14
154.29154.35
154.85
154.84
155.43
155.34
156.20
156.21
157.53156.72
155.92
154.83
154.07
154.43
155.22
156.18
156.70
157.60
158.44
154.97
157.69
159.09
mh cl 157.11
el 160.33
rl 162.88
156.89
156.81
ic 157.09
157.14
157.14
ic 157.08157.11 157.23
el 160.37rl 162.41
gy 157.08
157.78
157.83
158.11
158.15
158.16
158.60
157.05
157.11157.09
ic 157.12gy 157.14
157.21
157.18
gy 157.18
gy 157.21
157.21
157.19
mh cl 157.21
158.75
158.59
157.76
tow 158.44
157.40
158.37158.31
el 160.39
rl 162.42
156.85
156.00
156.22
157.07
157.08
mh cl 157.15
mh cl 157.17
mh cl 155.83
156.28
155.02
154.75
154.24
156.25
157.02157.45
157.48
158.20
157.62
154.98156.21
155.92154.75
154.32155.42
155.14154.07
153.45154.34
153.27
153.11153.50153.95
154.13
154.59
155.05
155.01
155.68
154.58
154.39
154.06
153.60
153.91
150.75
151.22
151.56
152.42
152.90
152.95
152.58
152.17
151.54
153.83
153.84
153.49
153.09
153.42
153.34
153.08
152.71
152.30
152.72
152.50
152.29
152.04
151.68
150.97
150.48
149.73
149.96
150.40
150.94
151.64
151.54
150.67
152.36
152.60
152.23152.05
152.53tow 155.64
tow 153.00
el 166.02
tow 162.17
157.06
157.07
156.86
156.88157.74
157.28
157.12
157.24
156.99
157.01
156.90
156.85
156.73
158.27
159.25
160.45
160.68
160.83
160.86
160.89160.95
161.64
161.57
161.65
161.51160.97
160.94
160.77
160.24
160.47
160.07
159.92
159.89
159.84
159.65
159.46159.25
158.16
157.59 157.27
157.01
157.03
157.12
157.31
157.55
157.96
158.65
158.41
158.70
158.62
158.57
159.80
159.68
158.50
159.95
158.28157.85
157.49
157.24
156.36
156.34
156.35
156.34
156.06
156.07
156.40
159.64
158.69
158.12
157.89
157.58
157.38
157.14
156.89
156.53
156.41
156.26
156.30
156.46
156.49
156.46
156.42
156.31
156.25
156.70
156.67
155.93
157.41
157.37
157.34 157.12
155.72
157.34
157.27
157.13
157.13
157.10
157.16
157.18
157.09
157.10
157.16
157.07
157.18
157.37
157.21157.23
160.05
160.34
160.54
160.68
160.76
160.80
160.83
160.56160.58
160.74
160.68
160.64
160.65
160.14
156.37
156.72
157.04
157.39
157.67
158.02
158.06158.15
158.09
158.23
158.29
158.23
158.44
158.89
159.17
159.47
159.90
160.29
160.82
161.04
160.24
159.67
mh cl 158.01
157.63
157.74
157.81
157.99
157.83
157.85
157.79
162.78
162.57
162.09
161.45
160.35
159.11
158.11
163.05
162.84163.22166.32163.86
163.87
163.58
163.62
163.57
163.41
163.13
162.82
161.93
162.06
163.99
166.86
164.82
163.76
162.53
161.50
161.20161.63
163.97
164.92
165.05
164.34
161.70
161.63
161.17
156.52
156.53
156.51
156.66
156.92
156.81
156.54
155.82
155.86
155.78
155.74
mh cl 154.28
155.13155.07
154.93
mh cl 157.32
mh cl 157.05
mh cl 155.53
mh cl 156.56
mh cl 156.55
157.81
mh cl 157.72
mh cl 152.69
mh cl 157.86
167.87
rl 167.65
sv 157.49
157.72
157.82
gy 157.86
157.61
157.39
gy 156.89
gy 156.42
156.37
gy 156.37156.40
gy 156.41
156.42
156.41
156.10
156.21
156.30
154.67
154.53
154.17
154.21
154.17
154.09
154.23
154.44
157.06
157.06
157.46
157.07
157.05
157.04
157.39
157.39
157.39
157.54
158.01
157.91
157.20
157.14
157.06
156.90
156.74
156.61
156.50
156.64
162.85
163.68
162.88
163.52
162.80
163.25
162.80
163.21
162.64
163.01
162.34
162.79
161.62
161.80
160.93
160.74
159.90
159.79
158.91
157.97157.73
159.33
159.65
159.64
159.38
159.48
158.69
161.63
162.08
160.62
159.48
158.91
158.58
159.98161.57
163.02164.37
164.08
163.69
163.58
163.95
163.89
163.71
160.36
160.22
159.36
159.17
159.49
159.68
160.20
160.99
162.72
161.69
160.55
159.83
159.55
158.86
158.14
157.88
157.54
157.25
156.93
156.44
156.32
156.39
156.40
154.14
156.37
156.28
157.15
156.85
156.68
156.64
156.62
157.09
157.16
157.20
157.56
157.54
157.60
157.63
fl 158.01
157.73
157.77157.86
158.48
158.50
159.00
158.83
159.43
159.64
159.87
160.27
160.20
160.11
160.83
160.89
160.81
161.01
161.19
161.38
161.71
161.80
161.38
161.54
161.75
161.81
161.53
161.98
161.79
161.62
161.18
161.26
161.99160.85
160.78 160.64160.50
161.17
161.20
161.27
161.31
161.28
161.24
161.21
161.18
160.92
161.13
161.44
161.46
161.15160.93
160.96
161.17
161.47
161.36161.14
160.98
161.00
161.48
161.36 161.00
157.25158.04
158.91159.72160.18
160.57
160.75
160.24
160.26
mh cl 159.71
mh cl 159.70
mh cl 159.72
mh cl 159.75
mh cl 159.79
mh cl 159.82
mh cl 159.85
160.85
160.55
160.34
160.43
160.20
159.97
159.92
160.13
160.40
160.38
160.14
159.87
159.86
160.09
160.36
160.34
160.04159.84
159.84160.02
160.28
160.51
160.51
160.56
160.32 160.08
159.76
160.18
159.89
159.88160.12
160.65
160.43
159.35
159.31
159.28
159.24158.99
159.08
159.11
159.13158.85
158.80
158.79
158.73
159.21
158.72
158.69
158.65
155.09mh cl 155.20
155.44
156.02
157.66
157.21156.80
157.62
157.41
156.65
155.79
154.78
153.94
154.54
154.92
mh cl 157.01
157.41157.99
157.34
154.59
154.09
154.07
154.68
155.28
155.76
156.32
157.12
158.20
156.45
156.26
156.41
156.66
156.57
156.37
155.96
155.47
156.68
156.91
156.77
156.88
156.86
156.93
157.07
157.19
157.10
mh cl 157.12
157.42
157.62
157.53
157.57
157.35 157.45
157.38
156.99 157.08
157.10
157.09
156.96
157.11
156.99
154.52154.28
154.15
153.84 153.56
153.37
153.30
153.83
153.83
153.80
153.81
153.78
153.82
153.28
153.32
153.43
153.82
153.91
154.03
154.37
154.85
154.72
154.71
154.47
154.25
153.99
153.81
154.92
155.00
155.12
155.26
155.51
153.91
154.64
154.60
154.99
155.18
156.09
155.91
155.13
154.58
154.75
155.19
155.05
153.79
153.57
153.31
152.93
152.67
152.05
151.70
151.41
150.53
150.01
149.45
148.97148.20
148.81
149.75
152.15
152.71
152.99
153.44
153.45153.54
153.21
152.83
152.49
151.73
150.56
149.18
148.44
151.41tow 151.45
150.97
151.94
152.60
153.42
153.86
154.22
154.77
154.40
153.56
153.08
152.43
151.66
151.57
150.46
152.13
151.34
153.03
154.06
154.18
154.12
154.01
154.51
154.53
154.57
154.29
gy 154.38
157.23
157.37
157.72158.12
158.46 157.38
gy 157.15
157.16
157.19
157.16
157.10
157.18
157.35
156.00
155.98
155.89
156.54
156.53
156.61
156.36
156.25
156.09 155.03
155.06
155.41
155.05
155.22
156.29
156.53
156.60
156.65
156.86
156.87
157.44
158.00
157.70
157.28
157.86
159.53
159.82
158.75158.69
158.05
158.08
157.97
158.10
158.15
164.65
164.55
164.60
164.59
158.21
158.20
158.17
157.73
157.78
157.88
157.76
157.78
157.76
157.74
157.77
157.72
157.73
157.04
concrete
tarmac
tarmac
concrete
tarmac
tarmac
traffic island
tarmac
pavement
traffic calming
traffic calming
traffic calming
gate
gate
gate
barrier
recyclingsite office
up
up
bol
gate
fence
fencefence
fence
fence
fence
fence
fence
fence
fence
fence
fence
fence
retaining wall
retaining wall
kerb
dropped kerb
dropped kerb
overhead cables
kerb
kerb dropped kerb
kerb
kerbkerb
kerb
kerbkerb
kerb
kerb
kerb
kerb
kerb
kerb
kerb
kerb
kerb
kerb
kerb
drainage gully
drainage gully
drainage gully
kerb
kerb
drainage gully
bol
bol
bol
rwp
rwp
rwp
rwp
car park
concretepaving
concretepaving
smoking areaup
concrete
concreteconcrete
rough ground
rough ground
gate
top of bank
top of bank
top of bank
top of bank
top of bank
top of bank
stream
stream
retaining wall
stream
rough ground
rough ground
rough ground
rough ground
rough ground
rough ground
grass
grass
grass
concretepaving
railing
platform
platform
SUEZrecycling and recovery UK
Connon Bridge
lp
lp
tp
tp
top of bank
top of bank
top of banktop of bank
top of banktop of bank
bottom of bank
bottom of bank
bottom of bank
bottom of bank
bottom of bank
bottom of bank
fencefence
fencefence
fence
fence
tp
over
head
cable
s
bottom of bank
bottom of bank
bottom of bank
bottom of bank
bottom of bank
bottom of bank
bottom of bank
top of bank
top of bank
top of bank
top of bank
top of bank
top of bank
bottom of bank
top of bank
bottom of bank
bottom of bank
bottom of bank
bottom of bank
top of bank
top of bank
top of bank
top of bank
top of bank
top of bank
top of bank
bottom of bank retaining walltp
fence
gateweighbridgeret
aining
wall
retain
ing w
all
kerbtraffic calming
traffic calming
traffic calming
top of bank
top of bank
top of bank
top of bank
top of bank top of bank
bottom of bank
bottom of bank
bottom of bank
bottom of bank
container
container
container
gate
concrete
concrete
recycling center
traffic barrier
traffic barrier
drainage gully
kerb
traffic barrier
traffic barrier
drainage gully
traffic barrier
traffic barrier
traffic barrier
gate
gate
concrete
top of bank
top of bank
top of bank
top of bank
bottom of bank
bottom of bank
bottom of bank
concrete
concrete
up
retaining wall
retaining wall
bottom of bank
overgrown
overgrown
overgrown
overgrown
overgrown
overgrown
tarmac
tarmac
tarmac
tarmac
tarmac
gravel
tarmac
lp
top of bank
top of bank
traffic barrier
fence
fence
fence
gate
kerb
hedge
hedge
hedge
lp lp
bolrs
rs
rs
lp
lp/rs
rs
lp
rs
gate lp
fence
fence
fence
fence
fence
container
hedge
rough ground
rough ground
rough ground
rough ground
rough ground water
container
container
public recycling area
grass
grass
grass
grass
grass
grass
grass
bottom of bank
bottom of bank
bottom of bank
fence
unkept grass
unkept grass
rough ground
rough ground
rough ground
rough ground
rough ground
rough ground
top of bank
top of bank
top of bank
bottom of bank
bottom of bank
bottom of bank
unkept grass
unkept grass
unkept grass
StationEastingNorthing LevelA 217679.25662018.598160.010B 217722.72062015.860157.406
A 160.01
B 157.41
K2
K1
K3
Z=161.731
Z=160.898
Z=164.205
165.5
3
165.3
2
164.8
7
164.9
2
164.
43
164.
16
164.3
2
163.
96
163.
75
163.
66
163.12
162.77
162.55
162.36
162.05
161.91
161.73
161.60
161.54
161.53
161.66
161.43
161.32
161.28
161.20
161.09
160.84
160.75
160.32
160.41
159.97
159.89
159.62
159.54
159.52
159.27
159.32
159.69
164.61
165.09
161.82
161.
86
161.56
161.75
162.
0316
2.12
162.
37
162.
72
163.
21
163.4
5
163.7
9
164.1
9
164.5
9
164.9
2
165.5
5
160.42
160.47
160.73
161.00
161.39
161.87
162.31
162.31
162.43
162.51
162.64
162.42162.40
162.
3716
1.97
161.90
162.07
162.
6816
2.71
162.
92
163.
25
163.
74
163.
99
164.5
8
165.0
4
165.3
9
165.63
165.
75
166.1
0
166.4
7
Sign
163.66163.11
162.66
163.
2316
3.14
163.02
162.18162.14
161.92162.17
162.25
161.87
161.38
161.48
161.44
161.94
161.74
161.13161.01
160.86
160.61
160.46
160.63
160.31
160.11
159.77159.53
159.53
159.16
161.18 161.20161.06
161.03
161.00
160.87
160.71
160.60
160.40
160.13
159.66
159.45
159.33
159.29
159.21
159.06
158.98
159.05
159.21
159.28
159.38
159.73
160.05
160.43
160.77
160.87
160.95
161.01
161.05
161.15
161.29
161.
3816
1.41
161.
47
161.
69
161.
9416
2.18
162.
5516
2.63
162.9
8
163.4
8
163.9
5
164.3
3
164.8
5
159.23 MHCL:159.27
Gravel
164.9
0
164.4
9
163.9
4
163.3
1
162.8
9
162.4
5
162.
29
162.
09
161.
92
161.
57
161.
44
161.
4116
1.34
161.27
161.
26
161.37
162.01
161.58162.86
162.85 161.92
Sign
165.0
0
164.4
6
164.0
2
163.5
6
163.0
4
162.
74
162.
64
162.
3716
2.19
161.
92
161.
76
161.
67
161.
54
161.48
161.33
161.20
161.22
161.18
161.06
160.96
160.66
160.27
159.92
159.53
159.52
159.46
159.25 159.10
159.12
159.08
159.19
159.57
159.68
159.6
8
159.67
159.66
159.6
7
159.70
PO
159.77
160.29
160.73
161.02
161.15
161.20
161.26
161.37
161.43
161.46161.49
161.54161.63
161.
6516
1.72
161.
8016
1.90
162.
0216
2.30
162.
64
162.9
4
163.1
6
163.4
2
163.6
8
164.1
6
164.5
8
164.8
7
165.4
4
159.78
159.84
159.83
160.09
160.57
160.94
161.05
161.26
161.28
161.39
161.56161.54
161.
6116
1.63
161.
51
162.60
161.36
161.5
4
Sign
163.3
7
163.6
4
Sign
161.02
161.08
SpeedRamp
SpeedRamp
SpeedRamp
WhealWash
WhealWash
TarmacRoad
TarmacRoad
TarmacRoad
Gravel
S
ENANCE / E
K3
K4
Z=164.205
Z=166.332
168.
95
168.53168.28
168.1
2
168.0
2
167.06
167.34
167.29
165.
92
165.87
165.5
3
165.3
2
164.8
7
164.9
2
164.61
165.09
165.59
166.05
166.24
166.29
166.35
167.52
167.37
167.32
167.24
167.15
166.99
166.78
166.61
164.5
9
164.9
2
165.5
5
166.1
2
166.39
166.55
166.69
166.89
167.14
167.21167.27
165.3
9
165.63
165.
75
166.1
0
166.4
7
163.4
8
163.9
5
164.3
3
164.8
5
165.4
3
165.8
5
166.0
8
166.1
6
166.18166.25
166.30
166.43
166.42
166.62
166.69
166.84
166.96
167.00
167.13
167.26
167.37
Exposed Duct
167.39
167.29
167.27
167.14
167.00
166.95
166.80
166.63
166.43
166.33
166.30
166.28
166.25
166.21
166.05
165.4
6
164.9
0
164.4
9
163.9
4
163.3
1
167.51
167.42
167.32
167.25
167.20
167.09
166.95
166.82
166.61
166.46
166.36
166.28
166.25
166.2
3
166.1
4
165.9
1
165.5
6
165.0
0
164.4
6
164.0
2
164.1
6
164.5
8
164.8
7
165.4
4
166.0
5
166.1
9 166.24
166.36
166.55166.59
166.80
167.06
168.27
168.09
167.88
167.91
167.53
167.21
167.62167.95
168.11
168.
29
168.54
167.57
167.52
166.47
166.53
167.17 167.17 167.40167.48
167.54
167.68
167.36
167.40
167.53
167.67
167.72 167.87
167.85
167.94
168.10
167.68167.73
167.95
167.95
168.02
166.
51 166.
77
167.01
167.
40
167.85
167.85
167.29
168.24
168.06
167.97
167.92
168.33
168.58
PO
167.96
167.87
167.72
167.56
167.57
167.50
167.41
166.7
3
BHCover=167.78
Dense Vegetation
Dense Vegetation
167.75
167.13
167.93
168.34
168.56
169.04
169.31
169.68 169.53
169.28
SpeedRamp
TarmacRoad
Gravel
Gravel
NEN
S
CDM RESIDUAL RISKSThe work shown on this drawing is both familiar to the designersand routinely safely built in similar circumstances by competentcontractors.Risks are not considered significant.Relevant data is included in the Pre-Construction Information PackSigned: Date:
© T
his d
raw
ing
may
not
be
copi
ed w
ithou
t prio
r writ
ten
perm
issio
n
Drawing Title
Drawing Status
Client
Project
Revisions
Rev Detail DateChkBy
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
clarkebond
Bristol Exeter London
GF Suite, Bickleigh House,Park Five Business Centre,Sowton, Exeter EX2 7HUtel +44 (0) 1392 369098fax +44 (0) 1392 369100e-mail [email protected] www.clarkebond.com
Drawn Checke Sheet Si e
DateScale
Drg o
ClarkeBon Project o
one evel RoleTy eProject riginator
Status
MULTIDISIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge Appendices
February 2021
B Exploratory Hole Plan
Key
Client
Project
Drawing Title
Purpose of Issue
Clarkebond Project No. Status
Project Originator Volume Level Type Role Dwg No.
CLK XX XX DR GE 0001
Scale Date Revision
Drawn Checked Sheet Size
CONTRACTOR TO CHECK ALL DIMENSIONS AND REPORT ALL ERRORS AND OMISSIONS
TO THE ENGINEER.
DO NOT SCALE THIS DRAWING FOR CONSTRUCTION PURPOSES.
Information
E05284 S2
E05284
SUEZ Recycling and Recovery UK
Proposed Waste Transfer Building
04/05/2020N/A
P1
TT A3
Connon Bridge, Liskeard
Trial Pit Location Plan
Machine Excavated Trial Pit
Hole Locations Approximate. Sizes exaggerated for clarity.
TP01
TP04
TP02
TP03
TP05
TP06
No access
possible
MULTIDISIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge Appendices
February 2021
C Exploratory Hole Logs
Samples and In Situ Tes ng
Depth (m)
0.10
Type
ES
Results
Depth(m)
0.30
1.50
1.80
Level(m OD)
162.20
161.00
160.70
Legend Stratum Descrip on
MADE GROUNDPale orange / pink / grey slightly clayey angular ne to coarse slate gravel.Pale pink orange grey slightly silty angular GRAVEL AND COBBLES of weak slate. WEATHERED SALTASH FORMATION
Pink grey slightly silty angular tabular GRAVEL, COBBLES and BOULDERS of weak slate.WEATHERED SALTASH FORMATION
End of Pit at 1.80m
Water Strike
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
Well
Trial Pit LogTrial Pit No.:
TP01Project Name: Connon Bridge Co-Ordinates: 217664 E 62133 N Start: 30/04/2020
Project Number: E05284 Ground Level (m OD): 162.50 End: 30/04/2020
General Remarks: Logged By:
Stability:
No groundwater encountered. Some overbreak below 1.50m. TTApproved By:
TTScale:1:25
Shoring: None Method/Plant Used: JCB 3CX Sheet 1 of 1
Samples and In Situ Tes ng
Depth (m)
0.60 - 1.00
1.00
Type
B
DS
Results
Depth(m)
0.15
1.40
2.30
Level(m OD)
161.75
160.50
159.60
Legend Stratum Descrip on
MADE GROUNDGrey very clayey angular ne to coarse slate gravel.Pale pink orange grey slightly silty angular GRAVEL AND COBBLES of weak slate. WEATHERED SALTASH FORMATION
Weak very thinly to thinly bedded closely fractured pink grey SLATE. Recovered as silty angular tabular gravel, cobbles and boulders. SALTASH FORMATION
End of Pit at 2.30m
Water Strike
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
Well
Trial Pit LogTrial Pit No.:
TP02Project Name: Connon Bridge Co-Ordinates: 217648 E 62154 N Start: 30/04/2020
Project Number: E05284 Ground Level (m OD): 161.90 End: 30/04/2020
General Remarks: Logged By:
Stability:
No groundwater encountered. Pit stable. TTApproved By:
TTScale:1:25
Shoring: None Method/Plant Used: JCB 3CX Sheet 1 of 1
Samples and In Situ Tes ng
Depth (m)
0.10
0.70
1.00
Type
ES
ES
DS
Results
Depth(m)
0.55
1.30
1.90
Level(m OD)
162.65
161.90
161.30
Legend Stratum Descrip on
MADE GROUNDGrey clayey angular ne to coarse slate gravel.
Pale pink orange grey slightly silty angular GRAVEL AND COBBLES of weak slate. WEATHERED SALTASH FORMATION
Pink grey slightly silty angular tabular GRAVEL, COBBLES and BOULDERS of weak slate. WEATHERED SALTASH FORMATION
End of Pit at 1.90m
Water Strike
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
Well
Trial Pit LogTrial Pit No.:
TP03Project Name: Connon Bridge Co-Ordinates: 217663 E 62120 N Start: 30/04/2020
Project Number: E05284 Ground Level (m OD): 163.20 End: 30/04/2020
General Remarks: Logged By:
Stability:
No groundwater encountered. Pit stable. TTApproved By:
TTScale:1:25
Shoring: None Method/Plant Used: JCB 3CX Sheet 1 of 1
Samples and In Situ Tes ng
Depth (m)
0.10
0.90 - 1.201.00
Type
ES
BDS
Results
Depth(m)
0.25
1.30
2.30
Level(m OD)
161.25
160.20
159.20
Legend Stratum Descrip on
MADE GROUNDMADE GROUND: Grey clayey angular ne to coarse slate gravel.Pale pink orange grey slightly silty angular GRAVEL AND COBBLES of weak slate. WEATHERED SALTASH FORMATION
Weak very thinly to thinly bedded closely fractured pink grey SLATE. Recovered as silty angular tabular gravel, cobbles and boulders. SALTASH FORMATION
End of Pit at 2.30m
Water Strike
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
Well
Trial Pit LogTrial Pit No.:
TP04Project Name: Connon Bridge Co-Ordinates: 217662 E 62151 N Start: 30/04/2020
Project Number: E05284 Ground Level (m OD): 161.50 End: 30/04/2020
General Remarks: Logged By:
Stability:
No groundwater encountered. Some overbreak below 1.30m. Hard digging in slate.
TTApproved By:
TTScale:1:25
Shoring: None Method/Plant Used: JCB 3CX Sheet 1 of 1
Samples and In Situ Tes ng
Depth (m)
0.50
1.00 - 1.20
1.20
Type
ES
B
DS
Results
Depth(m)
0.20
1.20
1.90
2.30
Level(m OD)
159.90
158.90
158.20
157.80
Legend Stratum Descrip on
MADE GROUNDPale orange / pink / grey slightly clayey angular ne to coarse slate gravel.Pale pink orange grey slightly silty angular GRAVEL AND COBBLES of weak slate. WEATHERED SALTASH FORMATION
Pink grey slightly silty angular tabular GRAVEL, COBBLES and BOULDERS of weak slate. WEATHERED SALTASH FORMATION
Weak very thinly to thinly bedded closely fractured pink grey SLATE. Recovered as silty angular tabular gravel, cobbles and boulders. SALTASH FORMATION
End of Pit at 2.30m
Water Strike
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
Well
Trial Pit LogTrial Pit No.:
TP05Project Name: Connon Bridge Co-Ordinates: 217668 E 62168 N Start: 30/04/2020
Project Number: E05284 Ground Level (m OD): 160.10 End: 30/04/2020
General Remarks: Logged By:
Stability:
No groundwater encountered. Some overbreak below 1.90m. Hard digging in slate.
TTApproved By:
TTScale:1:25
Shoring: None Method/Plant Used: JCB 3CX Sheet 1 of 1
Samples and In Situ Tes ng
Depth (m)
0.10
Type
ES
Results
Depth(m)
0.20
0.60
1.70
2.10
Level(m OD)
158.50
158.10
157.00
156.60
Legend Stratum Descrip on
MADE GROUNDGrey clayey angular ne to coarse slate gravel.MADE GROUNDPale orange / pink / grey slightly clayey angular gravel and cobbles of weak slate.
Pale pink orange grey slightly silty angular GRAVEL AND COBBLES of weak slate. WEATHERED SALTASH FORMATION
Pink grey slightly silty angular tabular GRAVEL, COBBLES and BOULDERS of weak slate. WEATHERED SALTASH FORMATION
End of Pit at 2.10m
Water Strike
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
Well
Trial Pit LogTrial Pit No.:
TP06Project Name: Connon Bridge Co-Ordinates: 217689 E 62155 N Start: 30/04/2020
Project Number: E05284 Ground Level (m OD): 158.70 End: 30/04/2020
General Remarks: Logged By:
Stability:
No groundwater encountered. Some overbreak below 1.70m. TTApproved By:
TTScale:1:25
Shoring: None Method/Plant Used: JCB 3CX Sheet 1 of 1
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
E05284-CLK-00-XX-RP-GT-0002 Connon Bridge Page 1 of 12
May 2020
TP01
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
E05284-CLK-00-XX-RP-GT-0002 Connon Bridge Page 2 of 12
May 2020
TP01
TP01
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
E05284-CLK-00-XX-RP-GT-0002 Connon Bridge Page 3 of 12
May 2020
TP02
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
E05284-CLK-00-XX-RP-GT-0002 Connon Bridge Page 4 of 12
May 2020
TP02
TP02
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
E05284-CLK-00-XX-RP-GT-0002 Connon Bridge Page 5 of 12
May 2020
TP03
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
E05284-CLK-00-XX-RP-GT-0002 Connon Bridge Page 6 of 12
May 2020
TP03
TP03
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
E05284-CLK-00-XX-RP-GT-0002 Connon Bridge Page 7 of 12
May 2020
TP04
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
E05284-CLK-00-XX-RP-GT-0002 Connon Bridge Page 8 of 12
May 2020
TP04
TP04
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
E05284-CLK-00-XX-RP-GT-0002 Connon Bridge Page 9 of 12
May 2020
TP05
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
E05284-CLK-00-XX-RP-GT-0002 Connon Bridge Page 10 of 12
May 2020
TP05
TP05
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
E05284-CLK-00-XX-RP-GT-0002 Connon Bridge Page 11 of 12
May 2020
TP06
MULTIDISCIPLINARY ENGINEERING CONSULTANTS
E05284-CLK-00-XX-RP-GT-0002 Connon Bridge Page 12 of 12
May 2020
TP06
TP06
MULTIDISIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge Appendices
February 2021
D Geotechnical Test Certificates
NO
Ref.
David Trowbridge (Laboratory Manager)
Dan Ayre (Quality Manager)
Matt Stokes (Senior Technician)
3
Client Address GF Suite, Bickleigh House, Park Five Buisiness Centre, Sowton, Exeter, EX2 7HU
B6.2BS1377: Part 4: 1990: Clause 7 - Determination of the California Bearing Ratio - 4.5kg
method - UKAS Accredited
The results contained within this report only relate to the samples tested, as received from the client.
This certificate shall not be reproduced except in full, without prior written approval of the
laboratory.
Sampling not performed by South West Geotechnical laboratory staff. Results apply to the samples as received.
8260
Accredited to
ISO/IEC
17025:2017
Approved Signatories:
BS1377: Part 2: 1990: Clause 9.2 / 9.3 - Particle Size Distribution - UKAS Accredited
Report Revision No. 1
Test Report
3
12418
Connon Bridge, Liskeard
ClarkeBond Exeter
No. of Tests /
Report No.
0
06/05/20
29/05/20
South West Geotechnical Ltd
Unit 3 Brooklands,
Howden Road,
Tiverton,
Devon
EX16 5HW
T5636
DT
Sampled by SWG lab staff?
Job No:
3
Date Received:
Job Name:
Client Name:
Client Job No:
Date Sent:
Transmittal Number:
Senders Initials:
Test Detail
A1 BS1377: Part 2: 1990: Clause 3 - Moisture Content - UKAS Accredited
A9
3.6.1.3 Quality Forms/LQ016-03
Version 13 - DA
Issued 28/06/2019
T5636 Test Report & Valuation Page 1 of 1
T5636 Test Report.pdf Page 1 of 8
mc Passing LL PL PI Particle
Cl.3.2
425µm
Cl5.3 Cl5.4
density
% % % % % Mg/m3
B 0.60 1.00 - 13 - - - - -
B 0.90 1.20 - 12 - - - - -
B 1.00 1.20 - 12 - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
Summary of Classification Test Results
Unit 3 Brooklands,
Howden Road,
Tiverton,
Devon
EX16 5HW
Project No. Project Name
12418 Connon Bridge, Liskeard
Client Job No. Client8260
Accredited to
ISO/IEC
17025:201712418 Clarke Bond
Hole No.
Sample
Soil Description RemarksType Top Base Ref
TP02 Pinkish brown very silty very sandy GRAVEL
TP04 Pinkish brown very silty very sandy GRAVEL with cobble
TP05 Pinkish brown very silty very sandy GRAVEL
1
29/05/2020Dan Ayre - Quality
ManagerKL001R Index Summary
Preparation Clauses: Particle Density (BS1377:Part 1: 1990: CL7.4.4) Atterberg Limits (BS1377:Part 1: 1990: CL7.4.3) Moisture Content (BS1377: Part 1: 1990: CL7.3.3 & 7.4.2)
Key
Atterberg Limits BS1377-2:1990 Particle density BS1377-2:1990
4pt cone (CL.4.3) unless : sp - small pyknometer CL.8.3
1pt - single point test (CL.4.4) gj - gas jar CL.8.2
4.2.3 - Natural
4.2.4 - Sieved
Moisture Content (mc) %
Date Approved By Page No.
T5636 Test Report.pdf Page 2 of 8
3.45
mm
mm
mm
mm
PARTICLE SIZE DISTRIBUTIONProject No. 12418
Borehole/Pit No. TP02
Project Name Connon Bridge, Liskeard Sample No. -
Soil Description Pinkish brown very silty very sandy GRAVEL Depth, m 0.60
Specimen
Reference2
Specimen
Depthm Sample Type B
Test Method BS1377:Part 2:1990, clause 9.2
Sieving SedimentationDry Mass of sample, g 2689
Particle Size
mm% Passing
Particle Size
mm% Passing
Sample Proportions % dry mass
Very coarse 0
Gravel 56
Sand 18
37.5 100 Fines <0.063mm 26
28 88
20 72 Grading Analysis
14 64 D100 37.5
10 58 D60 11.1
6.3 52 D30 0.201
5 50 D10
3.35 48 Uniformity Coefficient
2 44 Curvature Coefficient
1.18 40
0.63 36 Remarks
0.425 34 Preparation and testing in accordance with
BS1377 unless noted below0.3 32
0.2 30 Preparation and testing in accordance with
BS1377 - Deviation to standard as insufficient
material provided in order to meet the
minimum mass requirement
0.15 29
0.063 26
8260
Accredited to
ISO/IEC
17025:2017Approved by Date Sheet ID:
Dan Ayre - Quality Manager 29/05/2020KL002R
PSD
÷÷ø
öççè
æ
1m
m
SILT
Fine Medium Coarse
SAND
Fine Medium Coarse
GRAVEL
Fine Medium CoarseCLAY COBBLES BOULDERS
0
10
20
30
40
50
60
70
80
90
100
0.001 0.01 0.1 1 10 100 1000
Perc
enta
ge P
assin
g %
Particle Size mm
T5636 Test Report.pdf Page 3 of 8
3.45
mm
mm
mm
mm
PARTICLE SIZE DISTRIBUTIONProject No. 12418
Borehole/Pit No. TP04
Project Name Connon Bridge, Liskeard Sample No. -
Soil Description Pinkish brown very silty very sandy GRAVEL with cobble Depth, m 0.90
Specimen
Reference2
Specimen
Depthm Sample Type B
Test Method BS1377:Part 2:1990, clause 9.2
Sieving SedimentationDry Mass of sample, g 3608
Particle Size
mm% Passing
Particle Size
mm% Passing
Sample Proportions % dry mass
Very coarse 14
75 100 Gravel 40
63 86 Sand 20
50 81
37.5 74 Fines <0.063mm 26
28 69
20 63 Grading Analysis
14 59 D100 75
10 55 D60 15.1
6.3 52 D30 0.173
5 50 D10
3.35 49 Uniformity Coefficient
2 46 Curvature Coefficient
1.18 43
0.63 38 Remarks
0.425 36 Preparation and testing in accordance with
BS1377 unless noted below0.3 33
0.2 31 Preparation and testing in accordance with
BS1377 - Deviation to standard as insufficient
material provided in order to meet the
minimum mass requirement
0.15 29
0.063 26
8260
Accredited to
ISO/IEC
17025:2017Approved by Date Sheet ID:
Dan Ayre - Quality Manager 29/05/2020KL002R
PSD
÷÷ø
öççè
æ
1m
m
SILT
Fine Medium Coarse
SAND
Fine Medium Coarse
GRAVEL
Fine Medium CoarseCLAY COBBLES BOULDERS
0
10
20
30
40
50
60
70
80
90
100
0.001 0.01 0.1 1 10 100 1000
Perc
enta
ge P
assin
g %
Particle Size mm
T5636 Test Report.pdf Page 4 of 8
3.45
mm
mm
mm
mm
PARTICLE SIZE DISTRIBUTIONProject No. 12418
Borehole/Pit No. TP05
Project Name Connon Bridge, Liskeard Sample No. -
Soil Description Pinkish brown very silty very sandy GRAVEL Depth, m 1.00
Specimen
Reference2
Specimen
Depthm Sample Type B
Test Method BS1377:Part 2:1990, clause 9.2
Sieving SedimentationDry Mass of sample, g 4904
Particle Size
mm% Passing
Particle Size
mm% Passing
Sample Proportions % dry mass
Very coarse 0
Gravel 56
Sand 22
50 100
37.5 92 Fines <0.063mm 22
28 91
20 78 Grading Analysis
14 72 D100 50
10 62 D60 8.76
6.3 55 D30 0.441
5 52 D10
3.35 49 Uniformity Coefficient
2 44 Curvature Coefficient
1.18 39
0.63 33 Remarks
0.425 30 Preparation and testing in accordance with
BS1377 unless noted below0.3 28
0.2 26 Preparation and testing in accordance with
BS1377 - Deviation to standard as insufficient
material provided in order to meet the
minimum mass requirement
0.15 25
0.063 22
8260
Accredited to
ISO/IEC
17025:2017Approved by Date Sheet ID:
Dan Ayre - Quality Manager 29/05/2020KL002R
PSD
÷÷ø
öççè
æ
1m
m
SILT
Fine Medium Coarse
SAND
Fine Medium Coarse
GRAVEL
Fine Medium CoarseCLAY COBBLES BOULDERS
0
10
20
30
40
50
60
70
80
90
100
0.001 0.01 0.1 1 10 100 1000
Perc
enta
ge P
assin
g %
Particle Size mm
T5636 Test Report.pdf Page 5 of 8
Unit 3 Brooklands, Howden Road, Tiverton, Devon, EX16 5HW
Condition
Details days
days
mm
Mg/m3
Mg/m3 kg
Mg/m3 kPa
%
California Bearing Ratio (CBR) Project No. 12418
BS1377 : Part 4 : 1990, clause 7 Borehole/Pit No. TP02
-
Soil Description Pinkish brown very silty very sandy GRAVEL Depth m 0.60 - 1.00
- m Sample Type
Project Name Connon Bridge, Liskeard Sample No.
B
Client Clarke Bond KeyLAB ID SWG1202005067
Client Job No. -Specimen
Depth
Specimen Preparation in accordance with BS1377:Part 1:1990 CL7.6.5
REMOULDED Soaking details Not soaked
Recompacted with specified standard effort using 4.5kg rammerPeriod of soaking
Time to surface
Amount of swell
recorded
Material retained on 20mm sieve removed (%) 22Dry density after
soaking
Initial Specimen details Bulk density 2.25 Surcharge applied 6
Dry density 1.99 4
Moisture
content13
Curve
correction
applied
CBR Values, % Moisture
Content2.5mm 5mm HighestAccepted CBR
%
TOP No 7.5 11 1118
15
BASE Yes 15 18 18 14 8260
Accredited to
ISO/IEC 17025:2017Note: If the top and bottom CBR results are <10% different from the average then the average CBR is
reported. If the CBR results are >10% different from the average result, the highest value is accepted.
Test specific remarks Date ApprovedLab Sheet
Reference
29/05/20 Dan Ayre - Quality Manager KL010R CBR
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
0 1 2 3 4 5 6 7 8
Forc
e A
pplie
d k
N
Penetration mm
Force v Penetration Plots
Top data
Top values
Top correction
Base data
Base values
Base
Correction
T5636 Test Report.pdf Page 6 of 8
Unit 3 Brooklands, Howden Road, Tiverton, Devon, EX16 5HW
Condition
Details days
days
mm
Mg/m3
Mg/m3 kg
Mg/m3 kPa
%
California Bearing Ratio (CBR) Project No. 12418
BS1377 : Part 4 : 1990, clause 7 Borehole/Pit No. TP04
-
Soil Description Pinkish brown very silty very sandy GRAVEL with cobble Depth m 0.90 - 1.20
- m Sample Type
Project Name Connon Bridge, Liskeard Sample No.
B
Client Clarke Bond KeyLAB ID SWG1202005068
Client Job No. -Specimen
Depth
Specimen Preparation in accordance with BS1377:Part 1:1990 CL7.6.5
REMOULDED Soaking details Not soaked
Recompacted with specified standard effort using 4.5kg rammerPeriod of soaking
Time to surface
Amount of swell
recorded
Material retained on 20mm sieve removed (%) 30Dry density after
soaking
Initial Specimen details Bulk density 2.25 Surcharge applied 6
Dry density 2.00 4
Moisture
content12
Curve
correction
applied
CBR Values, % Moisture
Content2.5mm 5mm HighestAccepted CBR
%
TOP No 17 23 2347
15
BASE No 43 47 47 13 8260
Accredited to
ISO/IEC 17025:2017Note: If the top and bottom CBR results are <10% different from the average then the average CBR is
reported. If the CBR results are >10% different from the average result, the highest value is accepted.
Test specific remarks Date ApprovedLab Sheet
Reference
29/05/20 Dan Ayre - Quality Manager KL010R CBR
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
0 1 2 3 4 5 6 7 8
Forc
e A
pplie
d k
N
Penetration mm
Force v Penetration Plots
Top data
Top values
Top correction
Base data
Base values
Base
Correction
T5636 Test Report.pdf Page 7 of 8
Unit 3 Brooklands, Howden Road, Tiverton, Devon, EX16 5HW
Condition
Details days
days
mm
Mg/m3
Mg/m3 kg
Mg/m3 kPa
%
California Bearing Ratio (CBR) Project No. 12418
BS1377 : Part 4 : 1990, clause 7 Borehole/Pit No. TP05
-
Soil Description Pinkish brown very silty very sandy GRAVEL Depth m 1.00 - 1.20
- m Sample Type
Project Name Connon Bridge, Liskeard Sample No.
B
Client Clarke Bond KeyLAB ID SWG1202005069
Client Job No. -Specimen
Depth
Specimen Preparation in accordance with BS1377:Part 1:1990 CL7.6.5
REMOULDED Soaking details Not soaked
Recompacted with specified standard effort using 4.5kg rammerPeriod of soaking
Time to surface
Amount of swell
recorded
Material retained on 20mm sieve removed (%) 24Dry density after
soaking
Initial Specimen details Bulk density 2.29 Surcharge applied 6
Dry density 2.04 4
Moisture
content13
Curve
correction
applied
CBR Values, % Moisture
Content2.5mm 5mm HighestAccepted CBR
%
TOP No 22 28 2842
14
BASE No 41 42 42 13 8260
Accredited to
ISO/IEC 17025:2017Note: If the top and bottom CBR results are <10% different from the average then the average CBR is
reported. If the CBR results are >10% different from the average result, the highest value is accepted.
Test specific remarks Date ApprovedLab Sheet
Reference
29/05/20 Dan Ayre - Quality Manager KL010R CBR
0.00
2.00
4.00
6.00
8.00
10.00
12.00
0 1 2 3 4 5 6 7 8
Forc
e A
pplie
d k
N
Penetration mm
Force v Penetration Plots
Top data
Top values
Top correction
Base data
Base values
Base
Correction
T5636 Test Report.pdf Page 8 of 8
MULTIDISIPLINARY ENGINEERING CONSULTANTS
Phase 2 Ground Investigation
E05284-CLB-00-XX-RP-GT-002 Connon Bridge Appendices
February 2021
E Chemical Test Certificates
Tim Thornburn
t: 01923 225404f: 01923 237404
e: [email protected] e:
Project / Site name: Samples received on: 05/05/2020
Your job number: E05284 Samples instructed on: 05/05/2020
Your order number: P09382 Analysis completed by: 13/05/2020
Report Issue Number: 1 Report issued on: 13/05/2020
Samples Analysed:
Signed:
Head of Reporting Section
For & on behalf of i2 Analytical Ltd.
Standard Geotechnical, Asbestos and Chemical Testing Laboratory located at: ul. Pionierów 39, 41 -711 Ruda Śląska, Poland.
Accredited tests are defined within the report, opinions and interpretations expressed herein are outside the scope of accreditation.
Standard sample disposal times, unless otherwise agreed with the laboratory, are : soils - 4 weeks from reportingleachates - 2 weeks from reportingwaters - 2 weeks from reportingasbestos - 6 months from reporting
Excel copies of reports are only valid when accompanied by this PDF certificate.
Any assessments of compliance with specifications are based on actual analytical results with no contribution from uncertainty of measurement. Application of uncertainty of measurement would provide a range within which the true result lies. An estimate of measurement uncertainty can be provided on request.
10 soil samples
Connon Bridge
Karolina Marek
Clarkebond129 Cumberland RoadBristolBS1 6UY
i2 Analytical Ltd.7 Woodshots Meadow,Croxley Green Business Park,Watford, Herts, WD18 8YS
Analytical Report Number : 20-98485
This certificate should not be reproduced, except in full, without the express permission of the laboratory.
The results included within the report are representative of the samples submitted for analysis.
Iss No 20-98485-1 Connon Bridge E05284.XLS
Page 1 of 7
Analytical Report Number: 20-98485
Project / Site name: Connon Bridge
Lab Sample Number 1504673 1504674 1504675 1504676 1504677Sample Reference TP01 TP02 TP03 TP03 TP03Sample Number None Supplied None Supplied None Supplied None Supplied None SuppliedDepth (m) 0.10 1.00 0.10 0.70 1.00Date Sampled 30/04/2020 30/04/2020 30/04/2020 30/04/2020 30/04/2020Time Taken None Supplied None Supplied None Supplied None Supplied None Supplied
Analytical Parameter
(Soil Analysis)
Un
its
Lim
it of
de
tectio
n
Accre
dita
tion
Sta
tus
Stone Content % 0.1 NONE < 0.1 < 0.1 < 0.1 < 0.1 < 0.1Moisture Content % N/A NONE 16 10 9.7 8.9 9.9Total mass of sample received kg 0.001 NONE 0.80 0.90 1.0 1.0 0.90
Asbestos in Soil Type N/A ISO 17025 Not-detected - Not-detected Not-detected -
General Inorganics
pH - Automated pH Units N/A MCERTS 7.4 6.8 7.8 7.2 7.0Total Sulphate as SO4 % 0.005 MCERTS - < 0.005 - - 0.010Water Soluble SO4 16hr extraction (2:1 Leachate Equivalent) g/l 0.00125 MCERTS 0.011 0.0089 0.0083 0.010 0.011Water Soluble SO4 16hr extraction (2:1 Leachate Equivalent) mg/l 1.25 MCERTS - 8.9 - - 11.1Total Sulphur % 0.005 MCERTS - < 0.005 - - 0.007Organic Matter % 0.1 MCERTS 1.8 - 0.5 0.3 -
Speciated PAHs
Naphthalene mg/kg 0.05 MCERTS < 0.05 - < 0.05 < 0.05 -Acenaphthylene mg/kg 0.05 MCERTS < 0.05 - < 0.05 < 0.05 -Acenaphthene mg/kg 0.05 MCERTS < 0.05 - < 0.05 < 0.05 -Fluorene mg/kg 0.05 MCERTS < 0.05 - < 0.05 < 0.05 -Phenanthrene mg/kg 0.05 MCERTS < 0.05 - < 0.05 < 0.05 -Anthracene mg/kg 0.05 MCERTS < 0.05 - < 0.05 < 0.05 -Fluoranthene mg/kg 0.05 MCERTS < 0.05 - < 0.05 < 0.05 -Pyrene mg/kg 0.05 MCERTS < 0.05 - < 0.05 < 0.05 -Benzo(a)anthracene mg/kg 0.05 MCERTS < 0.05 - < 0.05 < 0.05 -Chrysene mg/kg 0.05 MCERTS < 0.05 - < 0.05 < 0.05 -Benzo(b)fluoranthene mg/kg 0.05 MCERTS < 0.05 - < 0.05 < 0.05 -Benzo(k)fluoranthene mg/kg 0.05 MCERTS < 0.05 - < 0.05 < 0.05 -Benzo(a)pyrene mg/kg 0.05 MCERTS < 0.05 - < 0.05 < 0.05 -Indeno(1,2,3-cd)pyrene mg/kg 0.05 MCERTS < 0.05 - < 0.05 < 0.05 -Dibenz(a,h)anthracene mg/kg 0.05 MCERTS < 0.05 - < 0.05 < 0.05 -Benzo(ghi)perylene mg/kg 0.05 MCERTS < 0.05 - < 0.05 < 0.05 -
Total PAH
Speciated Total EPA-16 PAHs mg/kg 0.8 MCERTS < 0.80 - < 0.80 < 0.80 -
Heavy Metals / Metalloids
Arsenic (aqua regia extractable) mg/kg 1 MCERTS 27 - 24 20 -Cadmium (aqua regia extractable) mg/kg 0.2 MCERTS < 0.2 - < 0.2 < 0.2 -Chromium (hexavalent) mg/kg 4 MCERTS < 4.0 - < 4.0 < 4.0 -Chromium (aqua regia extractable) mg/kg 1 MCERTS 42 - 45 49 -Copper (aqua regia extractable) mg/kg 1 MCERTS 49 - 23 28 -Lead (aqua regia extractable) mg/kg 1 MCERTS 27 - 28 30 -Mercury (aqua regia extractable) mg/kg 0.3 MCERTS < 0.3 - < 0.3 < 0.3 -Nickel (aqua regia extractable) mg/kg 1 MCERTS 50 - 58 60 -Selenium (aqua regia extractable) mg/kg 1 MCERTS < 1.0 - < 1.0 < 1.0 -Zinc (aqua regia extractable) mg/kg 1 MCERTS 110 - 100 110 -
This certificate should not be reproduced, except in full, without the express permission of the laboratory.
The results included within the report are representative of the samples submitted for analysis.
Iss No 20-98485-1 Connon Bridge E05284.XLS
Page 2 of 7
Analytical Report Number: 20-98485
Project / Site name: Connon Bridge
Lab Sample Number 1504673 1504674 1504675 1504676 1504677Sample Reference TP01 TP02 TP03 TP03 TP03Sample Number None Supplied None Supplied None Supplied None Supplied None SuppliedDepth (m) 0.10 1.00 0.10 0.70 1.00Date Sampled 30/04/2020 30/04/2020 30/04/2020 30/04/2020 30/04/2020Time Taken None Supplied None Supplied None Supplied None Supplied None Supplied
Analytical Parameter
(Soil Analysis)
Un
its
Lim
it of
de
tectio
n
Accre
dita
tion
Sta
tus
Monoaromatics & Oxygenates
Benzene µg/kg 1 MCERTS < 1.0 - < 1.0 < 1.0 -Toluene µg/kg 1 MCERTS < 1.0 - < 1.0 < 1.0 -Ethylbenzene µg/kg 1 MCERTS < 1.0 - < 1.0 < 1.0 -p & m-xylene µg/kg 1 MCERTS < 1.0 - < 1.0 < 1.0 -o-xylene µg/kg 1 MCERTS < 1.0 - < 1.0 < 1.0 -MTBE (Methyl Tertiary Butyl Ether) µg/kg 1 MCERTS < 1.0 - < 1.0 < 1.0 -
Petroleum Hydrocarbons
TPH-CWG - Aliphatic >EC5 - EC6 mg/kg 0.001 MCERTS < 0.001 - < 0.001 < 0.001 -TPH-CWG - Aliphatic >EC6 - EC8 mg/kg 0.001 MCERTS < 0.001 - < 0.001 < 0.001 -TPH-CWG - Aliphatic >EC8 - EC10 mg/kg 0.001 MCERTS < 0.001 - < 0.001 < 0.001 -TPH-CWG - Aliphatic >EC10 - EC12 mg/kg 1 MCERTS < 1.0 - < 1.0 < 1.0 -TPH-CWG - Aliphatic >EC12 - EC16 mg/kg 2 MCERTS < 2.0 - < 2.0 < 2.0 -TPH-CWG - Aliphatic >EC16 - EC21 mg/kg 8 MCERTS < 8.0 - < 8.0 < 8.0 -TPH-CWG - Aliphatic >EC21 - EC35 mg/kg 8 MCERTS < 8.0 - < 8.0 < 8.0 -TPH-CWG - Aliphatic > EC35 - EC44 mg/kg 8.4 NONE < 8.4 - < 8.4 < 8.4 -
TPH-CWG - Aliphatic (EC5 - EC35) mg/kg 10 MCERTS < 10 - < 10 < 10 -
TPH-CWG - Aromatic >EC5 - EC7 mg/kg 0.001 MCERTS < 0.001 - < 0.001 < 0.001 -TPH-CWG - Aromatic >EC7 - EC8 mg/kg 0.001 MCERTS < 0.001 - < 0.001 < 0.001 -TPH-CWG - Aromatic >EC8 - EC10 mg/kg 0.001 MCERTS < 0.001 - < 0.001 < 0.001 -TPH-CWG - Aromatic >EC10 - EC12 mg/kg 1 MCERTS < 1.0 - < 1.0 < 1.0 -TPH-CWG - Aromatic >EC12 - EC16 mg/kg 2 MCERTS < 2.0 - < 2.0 < 2.0 -TPH-CWG - Aromatic >EC16 - EC21 mg/kg 10 MCERTS < 10 - < 10 < 10 -TPH-CWG - Aromatic >EC21 - EC35 mg/kg 10 MCERTS < 10 - < 10 < 10 -TPH-CWG - Aromatic > EC35 - EC44 mg/kg 8.4 NONE < 8.4 - < 8.4 < 8.4 -
TPH-CWG - Aromatic (EC5 - EC35) mg/kg 10 MCERTS < 10 - < 10 < 10 -
This certificate should not be reproduced, except in full, without the express permission of the laboratory.
The results included within the report are representative of the samples submitted for analysis.
Iss No 20-98485-1 Connon Bridge E05284.XLS
Page 3 of 7
Analytical Report Number: 20-98485
Project / Site name: Connon Bridge
Lab Sample Number
Sample Reference
Sample Number
Depth (m)
Date Sampled
Time Taken
Analytical Parameter
(Soil Analysis)
Un
its
Lim
it of
de
tectio
n
Accre
dita
tion
Sta
tus
Stone Content % 0.1 NONE
Moisture Content % N/A NONE
Total mass of sample received kg 0.001 NONE
Asbestos in Soil Type N/A ISO 17025
General Inorganics
pH - Automated pH Units N/A MCERTSTotal Sulphate as SO4 % 0.005 MCERTSWater Soluble SO4 16hr extraction (2:1 Leachate Equivalent) g/l 0.00125 MCERTSWater Soluble SO4 16hr extraction (2:1 Leachate Equivalent) mg/l 1.25 MCERTS
Total Sulphur % 0.005 MCERTS
Organic Matter % 0.1 MCERTS
Speciated PAHs
Naphthalene mg/kg 0.05 MCERTS
Acenaphthylene mg/kg 0.05 MCERTS
Acenaphthene mg/kg 0.05 MCERTS
Fluorene mg/kg 0.05 MCERTS
Phenanthrene mg/kg 0.05 MCERTS
Anthracene mg/kg 0.05 MCERTS
Fluoranthene mg/kg 0.05 MCERTS
Pyrene mg/kg 0.05 MCERTS
Benzo(a)anthracene mg/kg 0.05 MCERTS
Chrysene mg/kg 0.05 MCERTS
Benzo(b)fluoranthene mg/kg 0.05 MCERTS
Benzo(k)fluoranthene mg/kg 0.05 MCERTS
Benzo(a)pyrene mg/kg 0.05 MCERTS
Indeno(1,2,3-cd)pyrene mg/kg 0.05 MCERTS
Dibenz(a,h)anthracene mg/kg 0.05 MCERTS
Benzo(ghi)perylene mg/kg 0.05 MCERTS
Total PAH
Speciated Total EPA-16 PAHs mg/kg 0.8 MCERTS
Heavy Metals / Metalloids
Arsenic (aqua regia extractable) mg/kg 1 MCERTS
Cadmium (aqua regia extractable) mg/kg 0.2 MCERTS
Chromium (hexavalent) mg/kg 4 MCERTS
Chromium (aqua regia extractable) mg/kg 1 MCERTS
Copper (aqua regia extractable) mg/kg 1 MCERTS
Lead (aqua regia extractable) mg/kg 1 MCERTS
Mercury (aqua regia extractable) mg/kg 0.3 MCERTS
Nickel (aqua regia extractable) mg/kg 1 MCERTS
Selenium (aqua regia extractable) mg/kg 1 MCERTS
Zinc (aqua regia extractable) mg/kg 1 MCERTS
1504678 1504679 1504680 1504681 1504682TP04 TP04 TP05 TP05 TP06
None Supplied None Supplied None Supplied None Supplied None Supplied0.10 1.00 0.70 1.20 0.10
30/04/2020 30/04/2020 30/04/2020 30/04/2020 30/04/2020None Supplied None Supplied None Supplied None Supplied None Supplied
< 0.1 < 0.1 < 0.1 < 0.1 < 0.17.4 7.8 9.5 8.4 120.90 1.0 1.1 1.1 0.90
Not-detected - Not-detected - Not-detected
8.2 7.1 7.1 7.0 8.0- 0.006 - < 0.005 -
0.015 0.012 0.0074 0.0073 0.021
- 11.9 - 7.3 -- < 0.005 - < 0.005 -
0.6 - 0.4 - 1.0
< 0.05 - < 0.05 - < 0.05< 0.05 - < 0.05 - < 0.05< 0.05 - < 0.05 - < 0.05< 0.05 - < 0.05 - < 0.05< 0.05 - < 0.05 - < 0.05< 0.05 - < 0.05 - < 0.05< 0.05 - < 0.05 - < 0.05< 0.05 - < 0.05 - < 0.05< 0.05 - < 0.05 - < 0.05< 0.05 - < 0.05 - < 0.05< 0.05 - < 0.05 - < 0.05< 0.05 - < 0.05 - < 0.05< 0.05 - < 0.05 - < 0.05< 0.05 - < 0.05 - < 0.05< 0.05 - < 0.05 - < 0.05< 0.05 - < 0.05 - < 0.05
< 0.80 - < 0.80 - < 0.80
24 - 25 - 28< 0.2 - < 0.2 - < 0.2< 4.0 - < 4.0 - < 4.0
36 - 51 - 4122 - 19 - 2721 - 28 - 31
< 0.3 - < 0.3 - < 0.347 - 65 - 56
< 1.0 - < 1.0 - < 1.097 - 120 - 110
This certificate should not be reproduced, except in full, without the express permission of the laboratory.
The results included within the report are representative of the samples submitted for analysis.
Iss No 20-98485-1 Connon Bridge E05284.XLS
Page 4 of 7
Analytical Report Number: 20-98485
Project / Site name: Connon Bridge
Lab Sample Number
Sample Reference
Sample Number
Depth (m)
Date Sampled
Time Taken
Analytical Parameter
(Soil Analysis)
Un
its
Lim
it of
de
tectio
n
Accre
dita
tion
Sta
tus
Monoaromatics & Oxygenates
Benzene µg/kg 1 MCERTS
Toluene µg/kg 1 MCERTS
Ethylbenzene µg/kg 1 MCERTS
p & m-xylene µg/kg 1 MCERTS
o-xylene µg/kg 1 MCERTS
MTBE (Methyl Tertiary Butyl Ether) µg/kg 1 MCERTS
Petroleum Hydrocarbons
TPH-CWG - Aliphatic >EC5 - EC6 mg/kg 0.001 MCERTS
TPH-CWG - Aliphatic >EC6 - EC8 mg/kg 0.001 MCERTS
TPH-CWG - Aliphatic >EC8 - EC10 mg/kg 0.001 MCERTS
TPH-CWG - Aliphatic >EC10 - EC12 mg/kg 1 MCERTS
TPH-CWG - Aliphatic >EC12 - EC16 mg/kg 2 MCERTS
TPH-CWG - Aliphatic >EC16 - EC21 mg/kg 8 MCERTS
TPH-CWG - Aliphatic >EC21 - EC35 mg/kg 8 MCERTSTPH-CWG - Aliphatic > EC35 - EC44 mg/kg 8.4 NONE
TPH-CWG - Aliphatic (EC5 - EC35) mg/kg 10 MCERTS
TPH-CWG - Aromatic >EC5 - EC7 mg/kg 0.001 MCERTS
TPH-CWG - Aromatic >EC7 - EC8 mg/kg 0.001 MCERTS
TPH-CWG - Aromatic >EC8 - EC10 mg/kg 0.001 MCERTS
TPH-CWG - Aromatic >EC10 - EC12 mg/kg 1 MCERTS
TPH-CWG - Aromatic >EC12 - EC16 mg/kg 2 MCERTS
TPH-CWG - Aromatic >EC16 - EC21 mg/kg 10 MCERTS
TPH-CWG - Aromatic >EC21 - EC35 mg/kg 10 MCERTSTPH-CWG - Aromatic > EC35 - EC44 mg/kg 8.4 NONE
TPH-CWG - Aromatic (EC5 - EC35) mg/kg 10 MCERTS
1504678 1504679 1504680 1504681 1504682TP04 TP04 TP05 TP05 TP06
None Supplied None Supplied None Supplied None Supplied None Supplied0.10 1.00 0.70 1.20 0.10
30/04/2020 30/04/2020 30/04/2020 30/04/2020 30/04/2020None Supplied None Supplied None Supplied None Supplied None Supplied
< 1.0 - < 1.0 - < 1.0< 1.0 - < 1.0 - < 1.0< 1.0 - < 1.0 - < 1.0< 1.0 - < 1.0 - < 1.0< 1.0 - < 1.0 - < 1.0< 1.0 - < 1.0 - < 1.0
< 0.001 - < 0.001 - < 0.001< 0.001 - < 0.001 - < 0.001< 0.001 - < 0.001 - < 0.001< 1.0 - < 1.0 - < 1.0< 2.0 - < 2.0 - < 2.0< 8.0 - < 8.0 - < 8.0< 8.0 - < 8.0 - < 8.0< 8.4 - < 8.4 - < 8.4
< 10 - < 10 - < 10
< 0.001 - < 0.001 - < 0.001< 0.001 - < 0.001 - < 0.001< 0.001 - < 0.001 - < 0.001< 1.0 - < 1.0 - < 1.0< 2.0 - < 2.0 - < 2.0< 10 - < 10 - < 10< 10 - < 10 - < 10< 8.4 - < 8.4 - < 8.4
< 10 - < 10 - < 10
This certificate should not be reproduced, except in full, without the express permission of the laboratory.
The results included within the report are representative of the samples submitted for analysis.
Iss No 20-98485-1 Connon Bridge E05284.XLS
Page 5 of 7
Analytical Report Number : 20-98485
Project / Site name: Connon Bridge
Lab Sample
Number
Sample
Reference
Sample
NumberDepth (m) Sample Description *
1504673 TP01 None Supplied 0.10 Light brown loam and clay with gravel and vegetation.1504674 TP02 None Supplied 1.00 Light brown clay.1504675 TP03 None Supplied 0.10 Brown clay.1504676 TP03 None Supplied 0.70 Brown clay.1504677 TP03 None Supplied 1.00 Brown clay.1504678 TP04 None Supplied 0.10 Brown clay and sand with gravel.1504679 TP04 None Supplied 1.00 Brown clay.1504680 TP05 None Supplied 0.70 Brown clay.1504681 TP05 None Supplied 1.20 Brown clay.1504682 TP06 None Supplied 0.10 Brown loam and clay with gravel and vegetation.
* These descriptions are only intended to act as a cross check if sample identities are questioned. The major constituent of the sample is intended to act with respect to MCERTS validation. The laboratory is accredited for sand, clay and loam (MCERTS) soil types. Data for unaccredited types of solid should be interpreted with care.
Stone content of a sample is calculated as the % weight of the stones not passing a 10 mm sieve. Results are not corrected for stone content.
This certificate should not be reproduced, except in full, without the express permission of the laboratory.
The results included within the report are representative of the samples submitted for analysis.
Iss No 20-98485-1 Connon Bridge E05284.XLS
Page 6 of 7
Analytical Report Number : 20-98485
Project / Site name: Connon Bridge
Water matrix abbreviations: Surface Water (SW) Potable Water (PW) Ground Water (GW) Process Water (PrW)
Analytical Test Name Analytical Method Description Analytical Method ReferenceMethod
number
Wet / Dry
Analysis
Accreditation
Status
Asbestos identification in soil Asbestos Identification with the use of polarised light microscopy in conjunction with disperion staining techniques.
In house method based on HSG 248 A001-PL D ISO 17025
BTEX and MTBE in soil (Monoaromatics)
Determination of BTEX in soil by headspace GC-MS.
In-house method based on USEPA8260 L073B-PL W MCERTS
Hexavalent chromium in soil Determination of hexavalent chromium in soil by extraction in water then by acidification, addition of 1,5 diphenylcarbazide followed by colorimetry.
In-house method L080-PL W MCERTS
Metals in soil by ICP-OES Determination of metals in soil by aqua-regia digestion followed by ICP-OES.
In-house method based on MEWAM 2006 Methods for the Determination of Metals in Soil.
L038-PL D MCERTS
Moisture Content Moisture content, determined gravimetrically. (30 oC)
In house method. L019-UK/PL W NONE
Organic matter (Automated) in soil Determination of organic matter in soil by oxidising with potassium dichromate followed by titration with iron (II) sulphate.
In house method. L009-PL D MCERTS
pH in soil (automated) Determination of pH in soil by addition of water followed by automated electrometric measurement.
In house method. L099-PL D MCERTS
Speciated EPA-16 PAHs in soil Determination of PAH compounds in soil by extraction in dichloromethane and hexane followed by GC-MS with the use of surrogate and internal standards.
In-house method based on USEPA 8270 L064-PL D MCERTS
Stones content of soil Standard preparation for all samples unless otherwise detailed. Gravimetric determination of stone > 10 mm as % dry weight.
In-house method based on British Standard Methods and MCERTS requirements.
L019-UK/PL D NONE
Sulphate, water soluble, in soil (16hr extraction)
Determination of water soluble sulphate by ICP-OES. Results reported directly (leachate equivalent) and corrected for extraction ratio (soil equivalent).
In house method. L038-PL D MCERTS
Total Sulphate in soil as % Determination of total sulphate in soil by extraction with 10% HCl followed by ICP-OES.
In house method. L038-PL D MCERTS
Total Sulphur in soil as % Determination of total sulphur in soil by extraction with aqua-regia, potassium bromide/bromate followed by ICP-OES.
In house method. L038-PL D MCERTS
TPH in (Soil) Determination of TPH bands by HS-GC-MS/GC-FID In-house method, TPH with carbon banding and silica gel split/cleanup.
L076-PL D NONE
TPHCWG (Soil) Determination of hexane extractable hydrocarbons in soil by GC-MS/GC-FID.
In-house method with silica gel split/clean up.
L088/76-PL W MCERTS
For method numbers ending in 'UK' analysis have been carried out in our laboratory in the United Kingdom.
For method numbers ending in 'PL' analysis have been carried out in our laboratory in Poland.
Soil analytical results are expressed on a dry weight basis. Where analysis is carried out on as-received the results obtained are multiplied by a moisture
correction factor that is determined gravimetrically using the moisture content which is carried out at a maximum of 30oC.
This certificate should not be reproduced, except in full, without the express permission of the laboratory.
The results included within the report are representative of the samples submitted for analysis.
Iss No 20-98485-1 Connon Bridge E05284.XLS
Page 7 of 7
Tim Thornburn
t: 01923 225404f: 01923 237404
e: [email protected] e:
Project / Site name: Samples received on: 05/05/2020
Your job number: E05284 Samples instructed on: 07/05/2020
Your order number: P09382 Analysis completed by: 15/05/2020
Report Issue Number: 1 Report issued on: 15/05/2020
Samples Analysed:
Signed:
PL Head of Reporting Team
For & on behalf of i2 Analytical Ltd.
Standard Geotechnical, Asbestos and Chemical Testing Laboratory located at: ul. Pionierów 39, 41 -711 Ruda Śląska, Poland.
Accredited tests are defined within the report, opinions and interpretations expressed herein are outside the scope of accreditation.
Standard sample disposal times, unless otherwise agreed with the laboratory, are : soils - 4 weeks from reportingleachates - 2 weeks from reportingwaters - 2 weeks from reportingasbestos - 6 months from reporting
Excel copies of reports are only valid when accompanied by this PDF certificate.
Any assessments of compliance with specifications are based on actual analytical results with no contribution from uncertainty of measurement. Application of uncertainty of measurement would provide a range within which the true result lies. An estimate of measurement uncertainty can be provided on request.
10:1 WAC sample
Connon Bridge
Karolina Marek
Clarkebond129 Cumberland RoadBristolBS1 6UY
i2 Analytical Ltd.7 Woodshots Meadow,Croxley Green Business Park,Watford, Herts, WD18 8YS
Analytical Report Number : 20-98853
This certificate should not be reproduced, except in full, without the express permission of the laboratory.
The results included within the report are representative of the samples submitted for analysis.
Iss No 20-98853-1 Connon Bridge E05284
Page 1 of 5
i2 Analytical7 Woodshots Meadow Telephone: 01923 225404Croxley Green Business Park Fax: 01923 237404Watford, WD18 8YS email:[email protected]
Report No:
Client:
Location
Sampling Date
Sample ID
Depth (m)
Solid Waste Analysis
TOC (%)** 0.3 3% 5% 6%
Loss on Ignition (%) ** 1.1 -- -- 10%
BTEX (µg/kg) ** < 10 6000 -- --Sum of PCBs (mg/kg) ** < 0.007 1 -- --
Mineral Oil (mg/kg) < 10 500 -- --
Total PAH (WAC-17) (mg/kg) 1.2 100 -- --
pH (units)** 7.8 -- >6 --
Acid Neutralisation Capacity (mol / kg) 0.33 -- To be evaluated To be evaluated
Arsenic * 0.0011 < 0.0110 0.5 2 25
Barium * 0.0042 0.0370 20 100 300
Cadmium * < 0.0001 < 0.0008 0.04 1 5
Chromium * 0.0012 0.011 0.5 10 70
Copper * 0.0052 0.046 2 50 100
Mercury * < 0.0005 < 0.0050 0.01 0.2 2
Molybdenum * < 0.0004 < 0.0040 0.5 10 30
Nickel * 0.0008 0.0066 0.4 10 40
Lead * < 0.0010 < 0.010 0.5 10 50
Antimony * < 0.0017 < 0.017 0.06 0.7 5
Selenium * < 0.0040 < 0.040 0.1 0.5 7
Zinc * 0.0093 0.081 4 50 200
Chloride * 1.9 17 800 15000 25000
Fluoride 0.17 1.5 10 150 500
Sulphate * 4.5 40 1000 20000 50000
TDS* 26 220 4000 60000 100000
Phenol Index (Monohydric Phenols) * < 0.010 < 0.10 1 - -
Leach Test Information
Stone Content (%) < 0.1
Sample Mass (kg) 1.0
Dry Matter (%) 91
Moisture (%) 8.9
Landfill WAC analysis (specifically leaching test results) must not be used for hazardous waste classification purposes as defined by the Waste (England and Wales) Regulations 2011 (as amended) and EA Guidance WM3.
This analysis is only applicable for landfill acceptance criteria (The Environmental Permitting (England and Wales) Regulations) and does not give any indication as to whether a waste may be hazardous or non-hazardous.
Results are expressed on a dry weight basis, after correction for moisture content where applicable. *= UKAS accredited (liquid eluate analysis only)
Stated limits are for guidance only and i2 cannot be held responsible for any discrepancies with current legislation ** = MCERTS accredited
mg/kg
DOC 8.07 70.9 500 800 1000
Eluate Analysis
(BS EN 12457 - 2 preparation utilising end over end leaching procedure)
10:1 10:1 Limit values for compliance leaching test
using BS EN 12457-2 at L/S 10 l/kg (mg/kg)
mg/l
30/04/2020
Inert WasteLandfill
Stable Non-reactive
HAZARDOUSwaste in non-
hazardousLandfill
HazardousWaste Landfill
TP03
0.70
Connon Bridge
Lab Reference (Sample Number) 1506492 / 1506493Landfill Waste Acceptance Criteria
Limits
Waste Acceptance Criteria Analytical Results20-98853
CLARKEBOND
This certificate should not be reproduced, except in full, without the express permission of the laboratory.
The results included within the report are representative of the samples submitted for analysis.
Iss No 20-98853-1 Connon Bridge E05284
Page 2 of 5
Analytical Report Number : 20-98853
Project / Site name: Connon Bridge
Lab Sample
Number
Sample
Reference
Sample
NumberDepth (m) Sample Description *
1506492 TP03 None Supplied 0.70 Brown clay.
* These descriptions are only intended to act as a cross check if sample identities are questioned. The major constituent of the sample is intended to act with respect to MCERTS validation. The laboratory is accredited for sand, clay and loam (MCERTS) soil types. Data for unaccredited types of solid should be interpreted with care.
Stone content of a sample is calculated as the % weight of the stones not passing a 10 mm sieve. Results are not corrected for stone content.
This certificate should not be reproduced, except in full, without the express permission of the laboratory.
The results included within the report are representative of the samples submitted for analysis.
Iss No 20-98853-1 Connon Bridge E05284
Page 3 of 5
Analytical Report Number : 20-98853
Project / Site name: Connon Bridge
Water matrix abbreviations: Surface Water (SW) Potable Water (PW) Ground Water (GW) Process Water (PrW)
Analytical Test Name Analytical Method Description Analytical Method ReferenceMethod
number
Wet / Dry
Analysis
Accreditation
Status
Acid neutralisation capacity of soil Determination of acid neutralisation capacity by addition of acid or alkali followed by electronic probe.
In-house method based on Guidance an Sampling and Testing of Wastes to Meet Landfill Waste Acceptance""
L046-PL W NONE
BS EN 12457-2 (10:1) Leachate Prep 10:1 (as recieved, moisture adjusted) end over end extraction with water for 24 hours. Eluate filtered prior to analysis.
In-house method based on BSEN12457-2. L043-PL W NONE
BTEX in soil (Monoaromatics) Determination of BTEX in soil by headspace GC-MS.
In-house method based on USEPA8260 L073B-PL W MCERTS
Chloride 10:1 WAC Determination of Chloride colorimetrically by discrete analyser.
In house based on MEWAM Method ISBN 0117516260.
L082-PL W ISO 17025
Dissolved organic carbon 10:1 WAC Determination of dissolved inorganic carbon in leachate by TOC/DOC NDIR Analyser.
In-house method based on Examination of Water and Wastewater 20th Edition: Clesceri, Greenberg & Eaton
L037-PL W NONE
Fluoride 10:1 WAC Determination of fluoride in leachate by 1:1ratio with a buffer solution followed by Ion Selective Electrode.
In-house method based on Use of Total Ionic Strength Adjustment Buffer for Electrode Determination"
L033B-PL W ISO 17025
Loss on ignition of soil @ 450oC Determination of loss on ignition in soil by gravimetrically with the sample being ignited in a muffle furnace.
In house method. L047-PL D MCERTS
Metals in leachate by ICP-OES Determination of metals in leachate by acidification followed by ICP-OES.
In-house method based on MEWAM 2006 Methods for the Determination of Metals in Soil""
L039-PL W ISO 17025
Mineral Oil (Soil) C10 - C40 Determination of mineral oil fraction extractable hydrocarbons in soil by GC-MS/GC-FID.
In-house method with silica gel split/clean up.
L076-PL D NONE
Moisture Content Moisture content, determined gravimetrically. (30 oC)
In house method. L019-UK/PL W NONE
Monohydric phenols 10:1 WAC Determination of phenols in leachate by distillation followed by colorimetry.
In-house method based on Examination of Water and Wastewater 20th Edition: Clesceri, Greenberg & Eaton
L080-PL W ISO 17025
PCB's By GC-MS in soil Determination of PCB by extraction with acetone and hexane followed by GC-MS.
In-house method based on USEPA 8082 L027-PL D MCERTS
pH at 20oC in soil Determination of pH in soil by addition of water followed by electrometric measurement.
In house method. L005-PL W MCERTS
Speciated WAC-17 PAHs in soil Determination of PAH compounds in soil by extraction in dichloromethane and hexane followed by GC-MS with the use of surrogate and internal standards.
In-house method based on USEPA 8270. MCERTS accredited except Coronene.
L064-PL D NONE
Stones content of soil Standard preparation for all samples unless otherwise detailed. Gravimetric determination of stone > 10 mm as % dry weight.
In-house method based on British Standard Methods and MCERTS requirements.
L019-UK/PL D NONE
Sulphate 10:1 WAC Determination of sulphate in leachate by ICP-OES In-house method based on MEWAM 1986 Methods for the Determination of Metals in Soil""
L039-PL W ISO 17025
Total dissolved solids 10:1 WAC Determination of total dissolved solids in water by electrometric measurement.
In-house method based on Examination of Water and Wastewater 20th Edition: Clesceri, Greenberg & Eaton
L004-PL W ISO 17025
This certificate should not be reproduced, except in full, without the express permission of the laboratory.
The results included within the report are representative of the samples submitted for analysis.
Iss No 20-98853-1 Connon Bridge E05284
Page 4 of 5
Analytical Report Number : 20-98853
Project / Site name: Connon Bridge
Water matrix abbreviations: Surface Water (SW) Potable Water (PW) Ground Water (GW) Process Water (PrW)
Analytical Test Name Analytical Method Description Analytical Method ReferenceMethod
number
Wet / Dry
Analysis
Accreditation
Status
Total organic carbon (Automated) in soil
Determination of organic matter in soil by oxidising with potassium dichromate followed by titration with iron (II) sulphate.
In house method. L009-PL D MCERTS
For method numbers ending in 'UK' analysis have been carried out in our laboratory in the United Kingdom.
For method numbers ending in 'PL' analysis have been carried out in our laboratory in Poland.
Soil analytical results are expressed on a dry weight basis. Where analysis is carried out on as-received the results obtained are multiplied by a moisture
correction factor that is determined gravimetrically using the moisture content which is carried out at a maximum of 30oC.
This certificate should not be reproduced, except in full, without the express permission of the laboratory.
The results included within the report are representative of the samples submitted for analysis.
Iss No 20-98853-1 Connon Bridge E05284