Patrick Wruck Suite 410, 900 Howe Street Commission ......Patrick Wruck Commission Secretary...

2
Patrick Wruck Commission Secretary [email protected] bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 File 59283 | WECC Confirmation of BCH Bucket 2 Items Completion 1 of 1 August 2, 2019 Sent via eFile BC HYDRO MRS RELIABILITY COORDINATOR REGISTRATION EXHIBIT A2-1 Mr. Fred James Chief Regulatory Officer Regulatory & Rates Group British Columbia Hydro and Power Authority 16th Floor – 333 Dunsmuir Street Vancouver, BC V6B 5R3 [email protected] Re: British Columbia Hydro and Power Authority – Application for Reliability Coordinator Registration with the Mandatory Reliability Standards Program – Project No. 1598978 Dear Mr. James: Commission staff submit the following document for the record in this proceeding: Western Electricity Coordinating Council Completion Notice for BCHA RC Certification Bucket Items Dated July 31, 2019 Sincerely, Original Signed By: Patrick Wruck Commission Secretary /nd Enclosure

Transcript of Patrick Wruck Suite 410, 900 Howe Street Commission ......Patrick Wruck Commission Secretary...

Page 1: Patrick Wruck Suite 410, 900 Howe Street Commission ......Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada

Patrick Wruck Commission Secretary [email protected] bcuc.com

Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102

File 59283 | WECC Confirmation of BCH Bucket 2 Items Completion 1 of 1

August 2, 2019 Sent via eFile

BC HYDRO MRS RELIABILITY COORDINATOR

REGISTRATION EXHIBIT A2-1 Mr. Fred James Chief Regulatory Officer Regulatory & Rates Group British Columbia Hydro and Power Authority 16th Floor – 333 Dunsmuir Street Vancouver, BC V6B 5R3 [email protected] Re: British Columbia Hydro and Power Authority – Application for Reliability Coordinator Registration

with the Mandatory Reliability Standards Program – Project No. 1598978 Dear Mr. James: Commission staff submit the following document for the record in this proceeding:

Western Electricity Coordinating Council Completion Notice for BCHA RC Certification Bucket Items

Dated July 31, 2019 Sincerely, Original Signed By: Patrick Wruck Commission Secretary /nd Enclosure

Page 2: Patrick Wruck Suite 410, 900 Howe Street Commission ......Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada

Completion Notice of BCHA RC Certification Bucket Items

July 31, 2019

155 North 400 West | Suite 200 | Sa lt Lake City, Utah 84103

Ms. Kristine Bienert Director, Compliance and MRS British Columbia Utilities Commission 900 Howe Street, Suite 410 Vancouver, BC Canada V6Z 2N3

Subject: Completion Notice for BCHA RC Certification Bucket Items

Dear Ms. Bienert:

This letter notifies the British Columbia Utilities Commission (BCUC) that the British Columbia Hydro and Power Authority (BCHA) has completed all Bucket 2 items to the satisfaction of the Certification Team. A list of the Bucket 2 items was identified in the Report submitted to the BCUC on July 2, 2019. Based on the information given to the Certification Team, there are no outstanding items.

Sincerely,

Branden Sudduth Vice President, Reliability Planning and Performance Analysis

cc: Ian Homer, BCUC Arun Siva, BCUC Asher Steed, BCHA Tim Reynolds, WECC Ruben Arredondo, WECC Julie Blair, WECC

WECC Electric Reliability and Security for the West

A2-1

NHIDO
BCH MRS RC Registration