PARTIAL DEMOLITION & RE-PURPOSE OF BUILDINGS · city of hagerstown washington county, md for...

4
ADC MAP 10, B10 & C10 Sheet Index Vicinity Map Approvals 1/89 SCS MD-ENG-6A USDA Phone No. 1-800-257-7777 UTILITY NOTIFICATION The Soil Conservation District makes no representation as to the existence or nonexistence of any utilities at the construction site. Shown on these construction drawings are those utilities which have been identified. It is the responsibility of the landowners or operators and contractors to assure themselves that no hazard exists or damage will occur to utilities. It is suggested that Miss Utility be contacted at: CU. YDS. OF FILL. CU. YDS. OF EXCAVATION AND APPROXIMATELY EXCAVATION AND FILL AS SHOWN ON THESE PLANS HAS BEEN COMPUTED TO BE APPROXIMATELY ACRES AND THE TOTAL AMOUNT OF DISTURBED AREA QUANTITY THE TOTAL AREA TO BE DISTURBED SHOWN ON THESE PLANS HAS BEEN DETERMINED TO BE APPROXIMATELY 3.0 215 2,300 SCALE: 1" = 2000' 20 WEST BALTIMORE STREET, GREENCASTLE, PENNSYLVANIA 17225 128 SOUTH POTOMAC STREET, HAGERSTOWN, MARYLAND 21740 &,9,/ (1*,1((56 Ŷ 6859(<256 Ŷ /$1'6&$3( $5&+,7(&76 Ŷ /$1' 3/$11(56 SSOCIATES, INC. F REDERICK EIBERT A S & (301) 416-7478 (301) 791-3650 (717) 597-1007 FAX (301) 739-4956 C 101 NORTH HANOVER STREET, CARLISLE, PENNSYLVANIA 17013 2014 Situate along the North side of Commonwealth Avenue City of Hagerstown Washington County, MD for PARTIAL DEMOLITION & RE-PURPOSE OF BUILDINGS 9%25 TYPE NUMBER TITLE C-001 SHEET 1 COVER SHEET C-101 SHEET 2 DEMOLITION & UTILITY PLAN C-102 SHEET 3 GRADING, DRAINAGE & EROSION SEDIMENT CONTROL PLAN C-501 SHEET 4 CONSTRUCTION DETAILS & NOTES Date: By: WASHINGTON COUNTY SOIL CONSERVATION DISTRICT SOIL EROSION AND SEDIMENT CONTROL PLAN APPROVAL (PLAN IS VALID FOR TWO YEARS FROM DATE OF APPROVAL) DATE OWNER / DEVELOPERS CERTIFICATION "I/We certify all/any parties responsible for clearing, grading, construction and/or development will; be done pursuant to this plan and responsible personnel involved in the construction project will have a Certificate of Training at a Maryland Dept. of the Environment approved training program for the control of soil erosion and sediment." PRINTED NAME SIGNATURE Professional Certification I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of Maryland. License No. Expiration Date: OWNER/DEVELOPER: Board of Education of Washington County 10435 Downville Pike Hagerstown, MD 21740 ATTN: Rob Rollins PHONE: 301.766.2982 EMail: [email protected] DATE OWNER / DEVELOPERS CERTIFICATION "I/we certify that all grading on this site will be done in accordance with the current grading requirements as set forth in the Washington County Grading Ordinance." PRINTED NAME SIGNATURE City Engineer DATE Stormwater Management for this development is hereby waived based upon the submitted stormwater plan. 3-26-2014 R.H. Rollins III 3-26-2014 R.H. Rollins III & C-001 COVER SHEET 01 04 05/16/14 ENGINEER / ARCHITECT DESIGN CERTIFICATION I hereby certify this plan for soil erosion and sediment control has been designed in accordance with local ordinances, COMAR 26.17.01.07, and Maryland Standards and Specifications for Soil Erosion and Sediment Control. DATE SIGNATURE REG. NO.

Transcript of PARTIAL DEMOLITION & RE-PURPOSE OF BUILDINGS · city of hagerstown washington county, md for...

Page 1: PARTIAL DEMOLITION & RE-PURPOSE OF BUILDINGS · city of hagerstown washington county, md for partial demolition & re-purpose of buildings 9%25 type number title c-001 sheet 1 cover

ADC MAP 10, B10 & C10

Sheet Index

Vicinity MapApprovals

1/89 SCS

MD-ENG-6A USDA

Phone No. 1-800-257-7777

UTILITY NOTIFICATION

The Soil Conservation District makes no representation as to the existence

or nonexistence of any utilities at the construction site. Shown on these

construction drawings are those utilities which have been identified. It is

the responsibility of the landowners or operators and contractors to assure

themselves that no hazard exists or damage will occur to utilities. It is

suggested that Miss Utility be contacted at:

CU. YDS. OF FILL.

CU. YDS. OF EXCAVATION AND APPROXIMATELY

EXCAVATION AND FILL AS SHOWN ON THESE PLANS

HAS BEEN COMPUTED TO BE APPROXIMATELY

ACRES AND THE TOTAL AMOUNT OF

DISTURBED AREA QUANTITY

THE TOTAL AREA TO BE DISTURBED SHOWN ON THESE

PLANS HAS BEEN DETERMINED TO BE APPROXIMATELY

3.0

215

2,300

SCALE: 1" = 2000'

20 WEST BALTIMORE STREET, GREENCASTLE, PENNSYLVANIA 17225

128 SOUTH POTOMAC STREET, HAGERSTOWN, MARYLAND 21740

CIVIL ENGINEERS ■ SURVEYORS ■ LANDSCAPE ARCHITECTS ■ LAND PLANNERS

SSOCIATES, INC.

FREDERICK

EIBERT

A

S &

(301) 416-7478(301) 791-3650

(717) 597-1007

FAX (301) 739-4956

C

101 NORTH HANOVER STREET, CARLISLE, PENNSYLVANIA 17013

2014

Situate along the North side of Commonwealth Avenue

City of Hagerstown

Washington County, MD

for

PARTIAL DEMOLITION & RE-PURPOSE OF BUILDINGS

TYPE NUMBER TITLE

C-001 SHEET 1 COVER SHEET

C-101 SHEET 2 DEMOLITION & UTILITY PLAN

C-102 SHEET 3 GRADING, DRAINAGE & EROSION SEDIMENT CONTROL PLAN

C-501 SHEET 4 CONSTRUCTION DETAILS & NOTES

Date:

By:

WASHINGTON COUNTY SOIL CONSERVATION DISTRICT

SOIL EROSION AND SEDIMENT CONTROL PLAN APPROVAL

(PLAN IS VALID FOR TWO YEARS FROM DATE OF APPROVAL)

DATE

OWNER / DEVELOPERS CERTIFICATION

"I/We certify all/any parties responsible for clearing, grading, construction

and/or development will; be done pursuant to this plan and responsible

personnel involved in the construction project will have a Certificate of

Training at a Maryland Dept. of the Environment approved training program

for the control of soil erosion and sediment."

PRINTED NAME

SIGNATURE

Professional Certification

I hereby certify that these documents

were prepared or approved by me,

and that I am a duly licensed

professional engineer under the laws

of the State of Maryland.

License No.

Expiration Date:

OWNER/DEVELOPER:

Board of Education of Washington County

10435 Downville Pike

Hagerstown, MD 21740

ATTN: Rob Rollins

PHONE: 301.766.2982

EMail: [email protected]

DATE

OWNER / DEVELOPERS CERTIFICATION

"I/we certify that all grading on this site will be done in accordance with the

current grading requirements as set forth in the Washington County Grading

Ordinance."

PRINTED NAME

SIGNATURE

City Engineer DATE

Stormwater Management for this development is hereby waived based

upon the submitted stormwater plan.

3-26-2014 R.H. Rollins III

3-26-2014 R.H. Rollins III

&

C-001

COVER

SHEET

01 04

05/16/14

ENGINEER / ARCHITECT DESIGN CERTIFICATION

I hereby certify this plan for soil erosion and sediment control has been

designed in accordance with local ordinances, COMAR 26.17.01.07, and

Maryland Standards and Specifications for Soil Erosion and Sediment

Control.

DATE SIGNATUREREG. NO.

Page 2: PARTIAL DEMOLITION & RE-PURPOSE OF BUILDINGS · city of hagerstown washington county, md for partial demolition & re-purpose of buildings 9%25 type number title c-001 sheet 1 cover

&

Professional Certification

I hereby certify that these documents were

prepared or approved by me, and that I am a

duly licensed professional engineer under the

laws of the State of , License

C-101

02 04

05/16/14

0

1 inch = ft.

( IN FEET )

GRAPHIC SCALE

50 25

50

50 100 200

LEGEND - DEMO AREAS

EXISTING BUILDING

(TO BE REMOVED)

EXISTING ASPHALT

& CONCRETE

(TO BE REMOVED)

SAWCUT

DEMOLITION PLAN UTILITY PLAN

CITY OF HAGERSTOWN UTILITIES DEPARTMENT WATER DIVISION

This approval is for the design and layout of the proposed water system

improvements. All water system improvements shall be constructed to the

standards in effect at the time of construction. This approval does not

guarantee availability of water service. Water service is available subject to

conformance with all policies and standards in effect at the time of

application for service, payment of fees and approval of the water service

application. The Water Division does not guarantee a specific water

pressure or flow at any meter or fire hydrant. This approval is valid for a

period of one year.

SIGNATURE DATE

NOTE:

1. UTILITIES AS SHOWN ON THIS PLAN HAVE BEEN SHOWN PER EXISTING

BASE MAPPING PROVIDED TO FSA BY WCPS. FSA HAS FIELD VERIFIED

AND FIELD LOCATED VISIBLE STRUCTURES AND UTILITY LOCATIONS.

PRIOR TO STARTING WORK, CONTRACTOR TO CONTACT MISS UTILITY

AND HAVE ALL UTILITIES LOCATED AS EXACT LOCATIONS OF

UNDERGROUND UTILITIES HAVE NOT BEEN VERIFIED.

2. ALL UTILITIES 30" OR DEEPER SHALL BE CAPPED & ABANDONED IN PLACE.

ALL UTILITIES 30" DEEP OR ABOVE SHALL BE REMOVED. (SEE RHL

ENGINEERING PLAN SHEET P1.1)

EXISTING ASPHALT

& CONCRETE

(TO BE REPLACED, SEE

DETAIL 2 / SHEET C-102)

CONTRACTOR NOTES:

1

CONTRACTOR TO TEST PIT EXISTING WATERLINE AND INSTALL 4" WATER

VAULT (CITY DETAIL W-019), SEE DETAIL 7 SHEET C-501.

2

EXISTING WATER METER TO BE REMOVED. CONTRACTOR TO EXCAVATE

METER AREA, PRIOR TO METER REMOVAL, TO DETERMINE MATERIALS

REQUIRED TO BE SECURED IN ORDER TO RECONNECT THE WATER MAIN

THAT WILL SERVE THE EXISTING BUILDING THAT REMAINS.

3

EXISTING WATERLINE WITHIN EXISTING BUILDING FOOTPRINT TO REMAIN,

SEE MECH. PLANS FOR DETAILS.

4

CAP EXISTING WATER CONNECTION

5

CAP EXISTING SEWER CONNECTION

6

ABANDON EXISTING WATER & SEWER LATERALS IN PLACE

7

CAP EXISTING GAS CONNECTION

8

CAP EXISTING BOILER CONNECTION

9

DISCONNECT OVERHEAD POWER & COMMUNICATION LINE

10

CONTRACTOR TO REMOVE GENERATOR, COORDINATE

RELOCATION/REPURPOSING WITH WCPS.

11

REMOVE EXISTING STORM DRAIN

STRUCTURES & CAP ALL PIPES IN PLACE

12

REMOVE EXISTING UNDERGROUND TANK SAWCUT

PAVEMENT 3' AROUND EDGE OF CONCRETE

(SEE SHEET C-102 DETAIL 2 FOR

PAVEMENT RESTORATION)

13

INSTALL 6" SAN. SEWER CLEANOUT

(SEE SHEET C-501 DETAIL 9)

14

CONTRACTOR TO INSTALL 8"x8"x3"

TEE TO PROVIDE WATER TO

WASH GARAGE & CREDIT UNION.

15

CONTRACTOR TO INSTALL

3"x3"x

3

4

" TEE

16

PROPOSED

3

4

" WATER LATERAL

17

PROPOSED 3" WATER LATERAL

18

PROPOSED JUNCTION BOX

(SEE MEP PLANS FOR DETAILS)

19

PROPOSED (1) 3"C (FIBER)

(SEE MEP PLANS FOR DETAILS)

20

PROPOSED (1) 3"C (ANTENINA)

& (1) 3"C (FIBER)

(SEE MEP PLANS FOR DETAILS)

WATER & SEWER USAGE

(WATER PROVIDED BY CITY OF HAGERSTOWN)

(SEWER PROVIDED BY CITY OF HAGERSTOWN)

EXSITING ALLOCATION - 2,983 gp d

PROPOSED ALLOCATION - 2,983 gpd

Page 3: PARTIAL DEMOLITION & RE-PURPOSE OF BUILDINGS · city of hagerstown washington county, md for partial demolition & re-purpose of buildings 9%25 type number title c-001 sheet 1 cover

0

1 inch = ft.

( IN FEET )

GRAPHIC SCALE

50 25

50

50 100 200

SUBGRADE PREPARATION

PRIOR TO THE CONSTRUCTION OF FOUNDATIONS, FLOOR SLABS, OR PAVEMENTS, OR THE PLACEMENT OF FILL IN ANY STRUCTURAL OR

PAVEMENT AREAS, ALL ORGANIC MATERIALS, FROZEN, WET, SOFT OR LOOSE SOILS, AND OTHER DELETERIOUS MATERIALS SHOULD BE

REMOVED AND WASTED. IF ROCK IS ENCOUNTERED IN THE SUBGRADE, REMOVE AN ADDITIONAL 6 INCHES BELOW SUBGRADE AND

BACKFILL WITH COMPACTED CR-6 CRUSHED STONE CUSHION.

AFTER THE SUBGRADE IN CUTS AND FILLS HAS BEEN FINALLY SHAPED TO THE SPECIFIED CROSS SECTION, IT SHALL BE CAREFULLY AND

THOROUGHLY PROOF ROLLED WITH A 20 TON ROLLER OR EQUIVALENT TO DETERMINE SOFT OF UNSUITABLE AREAS. PRIOR TO PAVING

SOFT OR UNSUITABLE AREAS SHALL BE REMOVED AND BACKFILLED WITH SUITABLE MATERIAL TO THE SPECIFIED DENSITY.

(OVER-EXCAVATION TO BE MONITORED AND APPROVED BY OWNER'S GEOTECHNICAL ENGINEER PRIOR TO REMOVAL).

FILL IN STRUCTURAL AND PAVEMENT AREAS SHOULD BE PLACED IN LIFTS WHICH ARE EIGHT INCHES OR LESS IN LOOSE THICKNESS.

MATERIAL 1 FT. BELOW THE TOP OF SUBGRADE SHALL BE COMPACTED TO NOT LESS THAN 92% OF THE MAXIMUM DRY DENSITY AS

SPECIFIED IN T 180. MATERIAL IN THE TOP 1 FT. SHALL BE COMPACTED TO NOT LESS THAN 97% OF THE MAXIMUM DRY DENSITY. IN

BUILDING AREAS, THE FILL SHOULD EXTEND A MINIMUM OF TEN FEET BEYOND BUILDING LINES WHERE FLOOR SLABS ARE CONSTRUCTED

ON FILL.

STANDARD UTILITY EROSION AND SEDIMENT CONTROL NOTES:

1. CONTRACTOR TO ONLY OPEN UP LENGTH OF TRENCH THAT CAN BE CONSTRUCTED AND BACKFILLED IN ONE WORKING DAY IN PAVED

AREAS.

2. CONTRACTOR TO PLACE EXCAVATED MATERIAL IN A DUMP TRUCK AND HAVE HAULED TO AN APPROVED LOCATION IN ORDER TO WASTE

MATERIALS FROM PAVED AREAS

3. CONTRACTOR TO BACKFILL TRENCH WITH APPROVED MATERIALS AND STABILIZE DISTURBED AREAS THE SAME WORKING DAY.

4. IN AREAS WHERE THE CONSTRUCTION TAKES PLACE OUTSIDE OF THE EXISTING ROADBED, CONTRACTOR TO INSTALL SILT FENCE

ALONG THE DOWNHILL SIDE OF THE TRENCH BEFORE BEGINNING CONSTRUCTION AND PLACE EXCAVATED MATERIAL FROM THE

TRENCH ON THE UPHILL SIDE.

5. IF DEWATERING OF THE TRENCH IS REQUIRED, CONTRACTOR TO PUMP WATER TO A FILTER BAG TO DEWATER.

6. CONTRACTOR TO SWEEP STREETS OF ANY DEBRIS OR SEDIMENTS CAUSED BY CONSTRUCTION OPERATIONS AND DISPOSE OF AT AN

APPROVED LOCATION.

7. CONTRACTOR TO STABILIZE ALL DISTURBED AREAS WITH SEED & MULCH OR APPROPRIATE STREET REPAIR.

SEQUENCE OF CONSTRUCTION

1. Pre-Construction Notification - Contractor shall notify the Washington Co. Soil

Conservation District (301-797-6821, ext. 3), Washington County D.P.W. Engineering

& Construction (240-313-2400) and the Design Engineer (301-791-3650) at least five

(5) days prior to start of any work shown on these plans to schedule a

pre-construction meeting. The Contractor and/or Owner shall have the “third party

qualified professional” at the pre-construction meeting in accordance with “WASH.

CO. PLAN REVIEW & PERMITTING NOTES: Note 2 shown on sheet 1.

2. Install stabilized construction entrance.

3. Install inlet protection on existing inlets.

4. Install perimeter silt fence and filter log.

5. Contractor to demolish buildings, foundations & pavement.

6. Contractor to fill site to grades shown on this plan.

7. Spread topsoil and stabilize per the permanent seeding specifications.

8. Post-Construction Notification - Notify the Washington County Soil Conservation

District (301-797-6821, ext. 3) and Washington County D.P.W. Engineering &

Construction (240-313-2400) at least five (5) days prior to the removal of any

sediment control features to schedule a final site closeout review meeting.

9. Once W.C.S.C.D. approval is granted, perimeter controls can be removed and final

stabilization in those areas shall be completed.

TEMPORARY SEEDING SUMMARY

HARDINESS ZONE (FIGURE B.3): 6b

SEED MIXTURE (TABLE B.1)

FERTILIZER

RATE

(10-20-20)

LIME RATE

NO. SPECIES

APPLICATION

RATE (lb/ac)

SEEDING DATES

SEEDING

DEPTHS

1

Barley96

Zone 6b: Mar 1-May 15/Aug 1-Oct 15

1"

436 lb/ac.

(10 lb/1000 s.f.)

2 tons/ac.

(90 lb/1000 s.f.)

PERMANENT SEEDING SUMMARY

HARDINESS ZONE (FIGURE B.3): 6b

SEED MIXTURE (TABLE B.1)

FERTILIZER RATE (10-20-20)

LIME RATE

NO. SPECIES

APPLICATION

RATE (lb/ac)

SEEDING DATES

SEEDING

DEPTH

N P205 K20

6

Tall Fescue 40

Zone 6b:

Mar 1-May 15/Aug 1-Oct 15

1/4"-1/2"

45 lb/ac.

(1 lb/1000 s.f.)

90 lb/ac.

(2 lb/1000 s.f.)

90 lb/ac.

(2 lb/1000 s.f.)

2 tons/ac.

(90 lb/1000 s.f.)

Perennial Ryegrass25

White Clover 5

SOIL EROSION, SEDIMENT CONTROL & SEEDING NOTES

1. All soil erosion/sediment control measures shall comply with the “2011 Maryland Standards and

Specifications for Soil Erosion and Sediment Control” and the provisions of the approved plan.

2. All grading and stabilization shall comply with the “2011 Maryland Standards and Specifications for

Soil Erosion and Sediment Control”, “Section B - Grading and Stabilization” and the provisions of the

approved plan.

3. All soil erosion and sediment control practices (BMP's) are to be constructed and/or installed prior to

or at the initiation of grading in accordance with “2011 Maryland Standards and Specifications for

Soil Erosion and Sediment Control”, and the approved plan.

4. A grading unit is the maximum contiguous area allowed to be graded at a given time and is limited to

20 acres. Work may proceed to a subsequent grading unit when at least 50 percent of the disturbed

area in the preceding grading unit has been stabilized and approved by the enforcement authority

and/or the Washington County Soil Conservation District (approval authority). Unless otherwise

specified and approved by the approval authority, no more than 30 acres cumulatively may be

disturbed at a given time.

5. For initial soil disturbance or re-disturbance, temporary or permanent stabilization must be

completed within:

a) Three (3) calendar days as to the surface of all perimeter dikes, swales, ditches, perimeter

slopes, and all slopes steeper than 3 horizontal to 1 vertical (3:1); and

b) Seven (7) calendar days as to all other disturbed or graded areas on the project site not

under active grading.

6. Stockpiles must be stabilized in accordance within the 7 day stabilization requirement, as well as,

Standard B-4-1 Incremental Stabilization and Standard B-4-4 Temporary Stabilization (as

applicable).

7. All constructed channels and swales shall have specified treatment installed to the design flow depth

completed downstream to upstream as construction progresses. An installation detail shall be

shown on the plans.

8. All storm drain and sanitary sewer lines not in paved areas are to be mulched and seeded within 3

days of initial backfill unless otherwise specified on plans.

9. Electric Power, telephone, and gas lines are to be compacted, seeded, and mulched within 3 days

after initial backfill unless otherwise specified on plans.

10. No slope shall be greater than 2:1.

11. As required by Section B, of the Maryland Standards and Specifications for Soil Erosion and

Sediment Control, “Adequate Vegetative Stabilization”, is defined as 95 percent ground cover. The

Washington County Soil Conservation District requires the project adhere to this for scheduling of

the Final Site Closeout Review, and/or release of the site for soil erosion and sediment control.

For sites 1.0 acre or more, the following are required:

A. Maryland Department of the Environment, General Permit for Stormwater Associated with a Construction

Activity, NPDES Permit Number MDR10, State Discharge Permit Number 09GP, or an Individual Permit.

B. The Maryland Department of the Environment

(General/Individual Permit - Notice of Intent- NOI) application and permit shall be posted and/or available

on-site at all times.

C. During construction, all soil erosion and sediment control practices (BMP's) shall be inspected and

recorded on the “Standard Inspection Form”, “General Permit for Stormwater Associated with Construction

Activity” per the Maryland Department of the Environment (General/Individual Permit - Notice of Intent -

NOI).

D. Following construction and release of the site for soil erosion and sediment control by the Washington

County Soil Conservation District( i.e., all portions of a site have been permanently stabilized, and all

stormwater discharges from construction sites that are authorized by the permit are eliminated) the

authorized permittee shall submit the Maryland Department of the Environment, General/Individual Permit

- Notice of Termination-NOT.

&

Professional Certification

I hereby certify that these documents were

prepared or approved by me, and that I am a

duly licensed professional engineer under the

laws of the State of , License

C-102

03 04

05/16/14

SECTION

NOT TO SCALE

GRAVEL DIAPHRAGM

PA

VE

ME

NT

1'-0"

1'-0"

DEPTH

GEOTEXTILE FABRIC

ALL SIDES & BOTTOM

# 57 STONE OR

APPROVED EQUIVALENT

GRASS AREA

1

NOTE:

1. UTILITIES AS SHOWN ON THIS PLAN HAVE BEEN SHOWN PER EXISTING

BASE MAPPING PROVIDED TO FSA BY WCPS. FSA HAS FIELD VERIFIED

AND FIELD LOCATED VISIBLE STRUCTURES AND UTILITY LOCATIONS.

PRIOR TO STARTING WORK, CONTRACTOR TO CONTACT MISS UTILITY

AND HAVE ALL UTILITIES LOCATED AS EXACT LOCATIONS OF

UNDERGROUND UTILITIES HAVE NOT BEEN VERIFIED.

2. ALL UTILITIES 30" OR DEEPER SHALL BE CAPPED & ABANDONED IN

PLACE. ALL UTILITIES 30" DEEP OR ABOVE SHALL BE REMOVED. (SEE

RHL ENGINEERING PLAN SHEET P1.1)

APPROVED SUBGRADE

95% MODIFIED PROCTED

MD-SHA GRADED

AGGREGATE BASE

TACK COAT

(REQUIRED IF SURFACE IS

NOT APPLIED TO BASE WITHIN

8 HOURS OF BASE COURSE

CONSTRUCTION)

2"

4"

6"

HOT MIX SUPERPAVE 12.5 mm FOR SURFACE-PG 64-22

SECTION

NOTES:

The Asphalt Binder shall conform to AASHTO MP1-93 Table 1, Standard Specification for Performance Graded Asphalt

Binder. Superpave mix designs shall be in conformance with AASHTO PP28-95, Standard Practice for Superpave

Volumetric Design for HMA. The Performance Grading shall be achieved by the use of Neat Asphalt with polymer

modification when needed.

HOT MIX SUPERPAVE 19.0 mm FOR BASE-PG 64-22

NOT TO SCALE

PAVEMENT - RESTORATION

2

Page 4: PARTIAL DEMOLITION & RE-PURPOSE OF BUILDINGS · city of hagerstown washington county, md for partial demolition & re-purpose of buildings 9%25 type number title c-001 sheet 1 cover

PROFILE

EXISTING PAVEMENT

EARTH FILL

PIPE (SEE NOTE 2)

PLAN VIEW

EXISTING

GROUND

MOUNTABLE BERM

(6 IN MIN.)

3 FT

EDGE OF

EXISTINGPAVEMENT

50 FT MIN.

50 FT MIN.

LENGTH *

SCE

MIN. 6 IN OF 2 TO 3 IN

AGGREGATE OVER LENGTH

AND WIDTH OF ENTRANCE

NONWOVEN

GEOTEXTILE

CONSTRUCTION SPECIFICATIONS

1. PLACE STABILIZED CONSTRUCTION ENTRANCE IN ACCORDANCE WITH THE APPROVED PLAN. VEHICLES MUST

TRAVEL OVER THE ENTIRE LENGTH OF THE SCE. USE MINIMUM LENGTH OF 50 FEET (*30 FEET FOR SINGLE

RESIDENCE LOT). USE MINIMUM WIDTH OF 10 FEET. FLARE SCE 10 FEET MINIMUM AT THE EXISTING ROAD TO

PROVIDE A TURNING RADIUS.

2. PIPE ALL SURFACE WATER FLOWING TO OR DIVERTED TOWARD THE SCE UNDER THE ENTRANCE, MAINTAINING

POSITIVE DRAINAGE. PROTECT PIPE INSTALLED THROUGH THE SCE WITH A MOUNTABLE BERM WITH 5:1 SLOPES

AND A MINIMUM OF 12 INCHES OF STONE OVER THE PIPE. PROVIDE PIPE AS SPECIFIED ON APPROVED PLAN. WHEN

THE SCE IS LOCATED AT A HIGH SPOT AND HAS NO DRAINAGE TO CONVEY, A PIPE IS NOT NECESSARY. A

MOUNTABLE BERM IS REQUIRED WHEN SCE IS NOT LOCATED AT A HIGH SPOT.

3. PREPARE SUBGRADE AND PLACE NONWOVEN GEOTEXTILE, AS SPECIFIED IN SECTION H-1 MATERIALS.

4. PLACE CRUSHED AGGREGATE (2 TO 3 INCHES IN SIZE) OR EQUIVALENT RECYCLED CONCRETE (WITHOUT REBAR)

AT LEAST 6 INCHES DEEP OVER THE LENGTH AND WIDTH OF THE SCE.

5. MAINTAIN ENTRANCE IN A CONDITION THAT MINIMIZES TRACKING OF SEDIMENT. ADD STONE OR MAKE OTHER

REPAIRS AS CONDITIONS DEMAND TO MAINTAIN CLEAN SURFACE, MOUNTABLE BERM, AND SPECIFIED DIMENSIONS.

IMMEDIATELY REMOVE STONE AND/OR SEDIMENT SPILLED, DROPPED, OR TRACKED ONTO ADJACENT ROADWAY BY

VACUUMING, SCRAPING, AND/OR SWEEPING. WASHING ROADWAY TO REMOVE MUD TRACKED ONTO PAVEMENT IS

NOT ACCEPTABLE UNLESS WASH WATER IS DIRECTED TO AN APPROVED SEDIMENT CONTROL PRACTICE.

STANDARD SYMBOL

MARYLAND D EPARTME NT OF ENVIRON MENT

WATER MANAGEME NT ADMINISTR ATION

MARYLAND STANDA RDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CON TROL

2011

U.S. DEPARTME NT OF AGRICULTURE

NATURAL RESOURCES CON SERVATION SERVI CE

8 FT

MIN.

1

JOINING ADJACENT SECTIONS

OF GEOTEXTILE

SECTION A-A

SFOP

ISOMETRIC VIEW

SUPPORT

FRAME

2 IN x 4 IN

STAPLE

POST

LATHE

NAILS

2 IN x 4 IN ACROSS

TOP OF STONE

WOVEN SLIT FILM

GEOTEXTILE

CONSTRUCTION SPECIFICATIONS

1. USE NOMINAL 2 INCH X 4 INCH LUMBER.

2. USE WOVEN SLIT FILM GEOTEXTILE, AS SPECIFIED IN SECTION H-1 MATERIALS.

3. PROVIDE MANUFACTURER CERTIFICATION TO THE AUTHORIZED REPRESENTATIVE OF THE INSPECTION/ENFORCEMENT

AUTHORITY SHOWING THAT THE GEOTEXTILE USED MEETS THE REQUIREMENTS IN SECTION H-1 MATERIALS.

4. SPACE UPRIGHT SUPPORTS NO MORE THAN 10 FEET APART.

5. PROVIDE A TWO FOOT OPENING BETWEEN EVERY SET OF SUPPORTS AND PLACE STONE IN THE OPENING OVER

GEOTEXTILE.

6. KEEP SILT FENCE TAUT AND SECURELY STAPLE TO THE UPSLOPE SIDE OF UPRIGHT SUPPORTS. EXTEND GEOTEXTILE

UNDER 2x4.

7. WHERE TWO SECTIONS OF GEOTEXTILE ADJOIN: OVERLAP, FOLD, AND STAPLE TO POST IN ACCORDANCE WITH THIS DETAIL.

ATTACH LATHE.

8. PROVIDE A MASTIC SEAL BETWEEN PAVEMENT, GEOTEXTILE, AND 2x4 TO PREVENT SEDIMENT-LADEN WATER FROM

ESCAPING BENEATH SILT FENCE INSTALLATION.

9. SECURE BOARDS TO PAVEMENT WITH 40D 5 INCH MINIMUM LENGTH NAILS.

10. REMOVE ACCUMULATED SEDIMENT AND DEBRIS WHEN BULGES DEVELOP IN SILT FENCE OR WHEN SEDIMENT REACHES

25% OF FENCE HEIGHT. REPLACE GEOTEXTILE IF TORN. MAINTAIN WATER TIGHT SEAL ALONG BOTTOM. REPLACE STONE IF

DISPLACED.

MASTIC SEAL

STANDARD SYMBOL

MARYLAND DEPARTMENT OF ENVIRONMENT

WATER MANAGEMENT ADMINISTRATION

MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL

2011

U.S. DEPARTMENT OF AGRICULTURE

NATURAL RESOURCES CONSERVATION SERVICE

MASTIC SEAL

WOVEN SLIT FILM

GEOTEXTILE SILT

FENCE

LATHE

3

POSTS

CROSS SECTION

STEP 1

STEP 2

UNDISTURBED

GROUND

8 IN MIN. DEPTH

INTO GROUND

FENCE POST DRIVEN

A MIN. OF 16 IN INTO

THE GROUND

JOINING TWO ADJACENT SILT

FENCE SECTIONS (TOP VIEW)

6 FT MAX.

CENTER TO CENTER

36 IN MIN. FENCE POST LENGTH

DRIVEN MIN. 16 IN INTO GROUND

36 IN MIN. FENCE

POST LENGTH

STEP 3

STAPLE

FENCE POST 18 IN MIN.

ABOVE GROUND

TWIST POSTS TOGETHERSTAPLE

STAPLE

STAPLE

STAPLE STAPLE

STAPLESTAPLE

16 IN MIN. HEIGHT OF

WOVEN SLIT FILM GEOTEXTILE

WOVEN SLIT FILM

GEOTEXTILE

EMBED GEOTEXTILE

MIN. OF 8 IN VERTICALLY INTO

THE GROUND. BACKFILL AND

COMPACT THE SOIL ON BOTH

SIDES OF GEOTEXTILE.

SF

STANDARD SYMBOL

MARYLAND DEPARTMENT OF ENVIRONMENT

WATER MANAGEMENT ADMINISTRATION

MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL

2011

U.S. DEPARTMENT OF AGRICULTURE

NATURAL RESOURCES CONSERVATION SERVICE

FINAL

CONFIGURATION

2

12 IN MIN.

AREA TO BE

PROTECTED

SECTION

PLAN

AREA TO BE

PROTECTED

WORK AREA

ISOMETRIC VIEW

TRENCH INTO

GROUND 4 IN MIN.

45°

3 IN.

OR

WOOD MULCH OR COMPOST

TO

1

2

HEIGHT OF LOG

MULCH OR COMPOST

FOR UNTRENCHED

LOGS

SHEET FLOW

FILTER LOG

*

THIS APPLICATION MAY NOT BE USED

WITH LOGS SMALLER THAN 12 IN.

2 IN x 2 IN

STAKES

12 IN

MIN.

AREA TO BE

PROTECTED

SECTION

3 IN.

FILTER LOG

2 IN x 2 IN

STAKES

FILTER LOG

45°

TRENCH INTO

GROUND 4 IN MIN.

FL-18

STANDARD SYMBOL

MARYLAND DEPARTMENT OF ENVIRONMENT

WATER MANAGEMENT ADMINISTRATION

MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL

2011

U.S. DEPARTMENT OF AGRICULTURE

NATURAL RESOURCES CONSERVATION SERVICE

ENTRENCHED INSTALLATION

*

UNTRENCHED INSTALLATION

CONSTRUCTION SPECIFICATIONS

1. PRIOR TO INSTALLATION, CLEAR ALL OBSTRUCTIONS

INCLUDING ROCKS, CLODS, AND DEBRIS GREATER THAN

ONE INCH THAT MAY INTERFERE WITH PROPER FUNCTION

OF FILTER LOG.

2. FILL LOG NETTING UNIFORMLY WITH COMPOST

(IN ACCORDANCE WITH SECTION H-1 MATERIALS),

OR OTHER APPROVED BIODEGRADABLE MATERIAL

TO DESIRED LENGTH SUCH THAT LOGS DO NOT DEFORM.

3. INSTALL FILTER LOGS PERPENDICULAR TO THE FLOW

DIRECTION AND PARALLEL TO THE SLOPE WITH THE

BEGINNING AND END OF THE INSTALLATION POINTING

SLIGHTLY UP THE SLOPE CREATING A "J" SHAPE AT

EACH END TO PREVENT BYPASS.

4. FOR UNTRENCHED INSTALLATION BLOW OR HAND PLACE

MULCH OR COMPOST ON UPHILL SIDE OF THE SLOPE ALONG LOG.

5. STAKE FILTER LOG EVERY 4 FEET OR CLOSER ALONG ENTIRE

LENGTH OF LOG OR TRENCH LOG INTO GROUND A MINIMUM

OF 4 INCHES AND STAKE LOG EVERY 8 FEET OR CLOSER.

6. USE STAKES WITH A MINIMUM NOMINAL CROSS SECTION OF 2X2 INCH AND OF SUFFICIENT LENGTH TO ATTAIN A MINIMUM

OF 12 INCHES INTO THE GROUND AND 3 INCHES PROTRUDING ABOVE LOG.

7. WHEN MORE THAN ONE LOG IS NEEDED, OVERLAP ENDS 12 INCHES MINIMUM AND STAKE.

8. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO A DEPTH OF

1

2

THE EXPOSED HEIGHT OF LOG AND REPLACE MULCH.

REPLACE FILTER LOG IF TORN. REINSTALL FILTER LOG IF UNDERMINING OR DISLODGING OCCURS. REPLACE CLOGGED

FILTER LOGS. FOR PERMANENT APPLICATIONS, ESTABLISH AND CONTINUOUSLY MEET REQUIREMENTS FOR ADEQUATE

VEGETATIVE ESTABLISHMENT IN ACCORDANCE WITH SECTION B-4 VEGETATIVE STABILIZATION.

4

FLOW

NAILING

STRIP

FLOW

18 IN

12 IN

6 IN MIN.

16 IN MIN.

2 IN x 4 IN FRAMING

TYPE A

GALVANIZED

HARDWARE

CLOTH

TOP ELEVATION

NOTCH ELEVATION

36 IN

CHAIN LINK

FENCE POSTS

TYPE B

NOTCH

ELEVATION

TOP ELEVATION

SECTION FOR TYPE A AND B

36 IN

TYPE A MAXIMUM DRAINAGE AREA =

1

4

ACRE

TYPE B MAXIMUM DRAINAGE AREA = 1 ACRE

9 GAUGE CHAIN

LINK FENCE (TYP.)

WOVEN SLIT FILM

GEOTEXTILE

18 IN INTO GROUND

ISOMETRIC VIEW

EDGE OF ROADWAY OR TOP

OF EARTH DIKE

EXCAVATE, BACKFILL AND

COMPACT EARTH (TYP.)

POST DRIVEN

INTO GROUND

MARYLAND DEPARTMENT OF ENVIRONMENT

WATER MANAGEMENT ADMINISTRATION

MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL

SIP

STANDARD SYMBOL

2011

U.S. DEPARTMENT OF AGRICULTURE

NATURAL RESOURCES CONSERVATION SERVICE

WOVEN

SLIT FILM

GEOTEXTILE

CONSTRUCTION SPECIFICATIONS

1. USE WOVEN SLIT FILM GEOTEXTILE AS SPECIFIED IN SECTION H-1 MATERIALS.

2. EXCAVATE COMPLETELY AROUND THE INLET TO A DEPTH OF 18 INCHES BELOW THE NOTCH ELEVATION.

3. FOR TYPE A, USE NOMINAL 2 INCH X 4 INCH CONSTRUCTION GRADE LUMBER POSTS, DRIVEN 1 FOOT INTO THE

GROUND AT EACH CORNER OF THE INLET. PLACE NAIL STRIPS BETWEEN THE POSTS ON THE ENDS OF THE INLET.

ASSEMBLE THE TOP PORTION OF THE 2X4 FRAME AS SHOWN. STRETCH

1

2

INCH GALVANIZED HARDWARE CLOTH

TIGHTLY AROUND THE FRAME AND FASTEN SECURELY. FASTEN GEOTEXTILE SECURELY TO THE HARDWARE CLOTH

WITH TIES SPACED EVERY 24 INCHES AT THE TOP AND MID SECTION. EMBED GEOTEXTILE AND HARDWARE CLOTH A

MINIMUM OF 18 INCHES BELOW THE WEIR CREST. THE ENDS OF THE GEOTEXTILE MUST MEET AT A POST, BE

OVERLAPPED AND FOLDED, THEN FASTENED TO THE POST.

FOR TYPE B, USE 2

3

8

INCH DIAMETER GALVANIZED STEEL POSTS OF 0.095 INCH WALL THICKNESS AND 6 FOOT

LENGTH, DRIVEN A MINIMUM OF 36 INCHES BELOW THE WEIR CREST AT EACH CORNER OF THE STRUCTURE.

FASTEN 9 GAUGE OR HEAVIER CHAIN LINK FENCE, 42 INCHES IN HEIGHT, SECURELY TO THE FENCE POSTS WITH

WIRE TIES. FASTEN GEOTEXTILE SECURELY TO THE CHAIN LINK FENCE WITH TIES SPACED EVERY 24 INCHES AT

THE TOP AND MID SECTION. EMBED GEOTEXTILE AND CHAIN LINK FENCE A MINIMUM OF 18 INCHES BELOW THE

WEIR CREST.

4. BACKFILL AROUND THE INLET IN LOOSE 4 INCH LIFTS AND COMPACT UNTIL SOIL IS LEVEL WITH THE NOTCH

ELEVATION ON THE ENDS AND TOP ELEVATION ON THE SIDES.

5. STORM DRAIN INLET PROTECTION REQUIRES FREQUENT MAINTENANCE. REMOVE ACCUMULATED SEDIMENT AFTER

EACH RAIN EVENT TO MAINTAIN FUNCTION AND AVOID PREMATURE CLOGGING. IF INLET PROTECTION DOES NOT

COMPLETELY DRAIN WITHIN 24 HOURS AFTER A STORM EVENT, IT IS CLOGGED. WHEN THIS OCCURS, REMOVE

ACCUMULATED SEDIMENT AND CLEAN, OR REPLACE GEOTEXTILE AND STONE.

6

CROSS SECTION

INLET GRATE

WIRE TIES

6 IN

6 IN

6 IN

6 IN

OVERLAP

6 IN

6 IN

PLAN / CUT AWAY VIEW

NONWOVEN GEOTEXTILE

AGIP

3

4

TO 1

1

2

IN STONE

3

4

TO 1

1

2

IN STONE

NONWOVEN GEOTEXTILE

CONSTRUCTION SPECIFICATIONS

1. USE NONWOVEN GEOTEXTILE AS SPECIFIED IN SECTION H-1 MATERIALS.

2. LIFT GRATE AND WRAP WITH NONWOVEN GEOTEXTILE TO COMPLETELY COVER ALL OPENINGS. SECURE WITH WIRE

TIES AND SET GRATE BACK IN PLACE.

3. PLACE CLEAN

3

4

TO 1

1

2

INCH STONE OR EQUIVALENT RECYCLED CONCRETE 6 INCHES THICK ON THE GRATE.

4. STORM DRAIN INLET PROTECTION REQUIRES FREQUENT MAINTENANCE. REMOVE ACCUMULATED SEDIMENT

AFTER EACH RAIN EVENT TO MAINTAIN FUNCTION AND AVOID PREMATURE CLOGGING. IF INLET PROTECTION DOES

NOT COMPLETELY DRAIN WITHIN 24 HOURS AFTER A STORM EVENT, IT IS CLOGGED. WHEN THIS OCCURS, REMOVE

ACCUMULATED SEDIMENT AND CLEAN, OR REPLACE GEOTEXTILE AND STONE.

MAXIMUM DRAINAGE AREA = 1 ACRE

STANDARD SYMBOL

MARYLAND DEPARTMENT OF ENVIRONMENT

WATER MANAGEMENT ADMINISTRATION

MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL

2011

U.S. DEPARTMENT OF AGRICULTURE

NATURAL RESOURCES CONSERVATION SERVICE

1

4

IN HARDWARE CLOTH

1

4

IN GALVANIZED

HARDWARE CLOTH

5

MARCH 2009

EXIST. " W/L

NOTES:

1. VAULT, LADDER AND DOOR TO BE ACQUIRED BY

OWNER/DEVELOPER AND DELIVERED TO SITE AND SET

THE VAULT. (USE A.C. MILLER "HAGERSTOWN STANDARD"

ONLY). THE TOP OF THE VAULT MUST BE REMOVABLE.

2. CONTRACTOR TO INSTALL ALL VALVE BOXES, PIPE TO

VAULT AND PRECAST VAULT.

3. CONTRACTOR TO BACKFILL AROUND VAULT UP TO

BOTTOM OF PIPE IMMEDIATELY AFTER VAULT IS SET.

4. NO BENDS PERMITTED BETWEEN THE MAIN VALVE AND

THE VAULT.

5. ENTIRE ASSEMBLY TO BE PRESSURE TESTED FROM THE

MAIN TO UPSTREAM O.S.&Y. VALVE TO CITY OF

HAGERSTOWN WATER DIVISION STANDARDS.

6. ALL JOINTS BETWEEN THE MAIN AND METER ASSEMBLY

TO BE RESTRAINED.

7. TOP OF VAULT EXCLUDING THE TOP OF SLAB TO BE

LEVEL IN ALL DIRECTIONS 1"±. PIPING AND VAULT TO BE

PERPENDICULAR TO WATER MAIN. MAXIMUM ALLOWABLE

HORIZ. OR VERT. DEFLECTION IS 1" PER 10'.

8. FOR INSTALLATION REQUIRING A "WET TAP" ON EXISTING

MAINS, THE MATERIALS AND INSTALLATION TO BE MADE

BY CITY OF HAGERSTOWN WATER & SEWER

DEPARTMENT.

9. CONTRACTOR SHALL CORE DRILL THE PIPE INTO AND

OUT OF THE VAULT FOR THE METER INSTALLATION. THE

METER SHALL SET 1'-0" OFF OF THE FLOOR OF THE

VAULT.

10. VAULT SHALL BE SEALED WATER TIGHT.

8"x8" TAPPING SLEEVE & 8"

TAPPING VALVE BY CITY OF

HAGERSTOWN WATER AND SEWER

DEPARTMENT

WATER AND SEWER DEPARTMENTCITY OF HAGERSTOWN

PLATE W-019

8

8

8

8

8

7

8

FINISH GRADE

LINE POSTS - 2

3

8

"

OUTSIDE DIAMETER

CORNER POSTS - 4"

OUTSIDE DIAMETER MAX.

1

5

8

" OUTSIDE

DIAMETER TOP RAIL

FIXED ARM WITH 3

STRANDS OF BARBED WIRE

BOTTOM RAIL OR

TENSION WIRE

CONCRETE

FOOTING

SECURE

SIDE

NOTES:

Galvanized or Vinyl coated Chain Link Fence (or approved equivalent per Architect).

NOT TO SCALE

PERIMETER FENCE (6ft High Security)

SECTION

8

CITY OF HAGERSTOWN UTILITIES DEPARTMENT WATER DIVISION

This approval is for the design and layout of the proposed water system

improvements. All water system improvements shall be constructed to the

standards in effect at the time of construction. This approval does not

guarantee availability of water service. Water service is available subject to

conformance with all policies and standards in effect at the time of

application for service, payment of fees and approval of the water service

application. The Water Division does not guarantee a specific water

pressure or flow at any meter or fire hydrant. This approval is valid for a

period of one year.

SIGNATURE DATE

&

Professional Certification

I hereby certify that these documents were

prepared or approved by me, and that I am a

duly licensed professional engineer under the

laws of the State of , License

C-501

04 04

05/16/14

SECTION

NOT TO SCALE

SANITARY SEWER CLEANOUT

5

3

4

"

3"

BRASS PLUG

(COUNTERSUNK)

6" CLEANOUT

(PANELLA INDUSTRIES OR EQUAL)

TOP VIEW

9