(Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the...

41
UNIVERSITY OF CALICUT (Pareeksha Bhavan – B.Tech. Branch) RIGHT TO SERVICE ACT – Details of duties and responsibilities of staff  Ref:- 1. U.O. No. 14840/2016/Admn. Dated 23.12.2016.   2. E-mail received from VC's office dated 23.12.2016. -------- Name of Department : B.Tech. Branch, Pareeksha Bhavan Name of Branch Head: Sri. Velayudhan Kallepurath Designation : Deputy Registrar (JCE-VI) contact Number (Office):  0494 2407234 Sri. Velayudhan Kallepurath Deputy Registrar (JCE-VI) Sri. Narayanan. K. Assistant Registrar-IV Smt. Sivadamini. K.V. Assistant Registrar-V Smt. Mini. K.V. Assistant Registrar-XXI EE-VI EE-III EE-I & II EE-VII EE-IV EE-X (RV Section) EE-VIII EE-V EE-XI (RV Section) EE-IX  EE XII (D.C. Preparation) Preparation and monitoring the post exam schedule Monitoring and ensuring that replies are sent in three days to the letters from the Hon’ble Chancellor / Secretary to the Govt. and such higher authorities.  Monitoring that reply to queries under RTI Act are furnished within the stipulated time.

Transcript of (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the...

Page 1: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

UNIVERSITY OF CALICUT(Pareeksha Bhavan – B.Tech. Branch)

RIGHT TO SERVICE ACT – Details of duties and responsibilities of staff 

  Ref:­ 1. U.O. No. 14840/2016/Admn. Dated 23.12.2016.   2. E­mail received from VC's office dated 23.12.2016.

­­­­­­­­

Name of Department : B.Tech. Branch, Pareeksha Bhavan

Name of Branch Head: Sri. Velayudhan Kallepurath 

Designation : Deputy Registrar (JCE­VI)

contact Number (Office):  0494 2407234

Sri. Velayudhan KallepurathDeputy Registrar (JCE­VI)

Sri. Narayanan. K. Assistant Registrar­IV

Smt. Sivadamini. K.V.Assistant Registrar­V

Smt. Mini. K.V.Assistant Registrar­XXI

EE­VIEE­III EE­I & II

EE­VIIEE­IV EE­X (RV Section)

EE­VIIIEE­V EE­XI (RV Section)

EE­IX  EE XII 

(D.C. Preparation)

Preparation and monitoring the post exam schedule

Monitoring and ensuring that replies are sent in three days to the letters from the Hon’ble Chancellor / Secretary to the Govt. and such higher authorities. 

Monitoring that reply to queries under RTI Act are furnished within the stipulated time.

Page 2: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

Personal Wing

Section Officer  ­ Sri. Sreemurugan Pillai K.K.

Phone No. ­ 0494 2407467

1. Sri. Manikantan  P.T.

Selection Grade Assistant 

ID No.­ 3796

1. Bill works related to the revaluation remuneration for picking out /defacing of answer scripts for revaluation. 

2. Getting sanction for the annual approval for the Chairpersons/Branch Co ordinators/CV camp Directors. 

3. Forwarding currents to the related sections. Other DDFS file works related to the seat.

4. E­mail related works such as:

a) Take printouts of e­mails and distribute the same to the sections concerned.

b) Replies to the emails received in the B Tech Branch.

c) Communicating pass board meetings, meeting of finalisation of scheme and modalities of valuation.

d) Forward the pass statistics to the chairpersons concerned for pass board minutes.

e) Any other e­mail related works directed by JCEs.

f) Forward the count of registered candidates of various semesters to the Chairpersons concerned for getting the practical examination schedule.

5.   Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes to the accounts branch for the CV camp closure)

2. Sri. Abdul Gafoor T.P.

Senior Grade Assistant

ID No.­3845

1. CV camp fixation

2. Collection of scripts forwarded by colleges in the Pareeksha Bhavan after the last Examination. 

3. Preparation of answer script distribution of entire B Tech. Examinations

4. 2nd revaluation distribution for valuation, collection, payment of revaluation preparation of CV camp report (mark received basis)

5. Distribution of articles received by route officer.

6. Sending answer scripts to outside University for valuation.

7. All the file works related with the non DDFS items as and when needed.

3. Smt. Vani Varma  P.K.

Assistant Section Officer

1. Preparation of teachers panel for valuation

2. Processing of currents received in personal wing of B.Tech.

Page 3: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

ID No.­3549  3. Collection of seniority list of examiners 

4. Appointment of examiners to 6 CV camps, monitoring of camps. Distribution of panel of examiners.

5. Establishment works.

4. Smt. Dini M.

Assistant 

ID No.­4234

1. Works related to appointing examiners for the conduct of practical Examination as per the schedule given by the chairpersons.

2. To assist the work related with preparation of practical schedule for every semester (all branches) and despatch with Assistant­2 seat.

3. Preparation of replies to RTI and LA.

4. Preparation of weekly report regarding results/RV/DC.

5. Preparation of monthly report of RTS.

6. Transfer and posting.

7. DCB statement consolidation 

8. In addition to this give assistance to all works in this section. 

9. To assist the work related with distribution of articles received by Route Officer 

5. Sri. Selvakumar S.

Assistant Section Officer (Route Officer)

ID No.­3521

1. All works of Route Officer in B.Tech. Branch ­ Collection of answerscripts/RV scripts/ Marks and Distribution of answerscripts for every semester from CV camps (6 Nos.) 

2. Preparation of practical schedule for every semester (All branches) and despatch 

3. Assistance to other 3 seats for office work, especially camp co­ordination work 

4. Arrangement of vehicle for CV camps

6. Sri. Thami P.P. 

Clerical Assistant 

(Steno to JCE­VI)

ID No.­2867

1. General tappal works related to JCE.VI

2. Preparation of CLR Sheet rolls 

3. Forwarding and receiving files, currents from various offices 

4. Distribution of internal/practical marks of various semesters and forwarding of the receipt of internal/practical marks of each semester and each paper

5. Attending phone calls to JCE­VI.

7. Smt. Ramani V.K.

Computer Asst. Sel. Gr.

ID No.­3651

1. All Tappal works (Tappals received from Central Tappal and directly received in the Branch)

2. Scanning and forwarding scanned documents to various 

Page 4: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

sections 

8. Smt. Sreejamol E.T. Computer Asst. Gr. IID No.­3714

1. All typing works related to the B.Tech. Branch 

9. Sri. Bijeesh K.Computer Asst. Gr. IID No.­3660

1. All Despatch works related to the B.Tech. Branch 

2. Preparation of salary/attendance statement (Regular staff & Provisional Assistants) and forwarding to CE’s office 

10. Sri. Krishnan. T.Office AttendantID No. ­ 3054

Works   related   to   Office   Attendant   for   JCE­VI,   Personal Wing and Tappal

EE­I

Section Officer  ­ (Vacant)

Phone No.­0494 2407471

1. Sri. Abdul Latheef. C.K.

Assistant Section Officer

ID No.­3403 

1. All works related to the I & II Semester B.Tech. Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of practical marks received from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners and comparison of the same, decoding and entry in the system 

Taking   tabulation   register   of   the   concerned examinations   and   verification   of   the   marks   in   the counter with TRs.  

Tabulation and finalization of results after Pass Board meeting and checking moderation effected.

Publishing results,   issuing press release to publish the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2. All other general work pertaining to semester I & II in respect of the following Colleges. 

Page 5: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

1. Jawaharlal College of Engg., Lakkidi.2. Thejus Engg. College, Erumappetty.3. Global Institute of Architecture4. Jyothi Engg. College, Cheruthuruthy5. Ammini College, Mankara6. Eranad Knowledge City Campus7. MES College of Architecture, Kakkodi.

Such as,

Verification of qualification / Matriculation of students

Genuineness verification of Marklists

SMP cases 

Verification of  application  for  duplicate  marklists  and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction. 

Preparation of DCB 

Maintenance of minutes book and TRs

In addition  to   this,   each  Assistant/SO has   to  attend any additional / urgent work assigned by the JCE.

2. Smt. Simi. T.

Assistant Section Officer

ID No.­3381 

1. All works related to the I & II Semester B.Tech. Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of practical marks received from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners and comparison of the same, decoding and entry in the system 

Taking   tabulation   register   of   the   concerned examinations   and   verification   of   the   marks   in   the counter with TRs.  

Tabulation and finalization of results after Pass Board meeting and checking moderation effected.

Publishing results,   issuing press release to publish the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing 

Page 6: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

of revised marklists after revaluation

2. All other general work pertaining to semester I & II in respect of the following Colleges. 

1. MES College of Engg., Kuttippuram (B.Tech./B.Arch)

2. MET’s School of Engg., Mala.3. Sree Ernakulathappan College of Engg.4. NSS College of Engg., Palakkad5. Sneha College of Arch.6. Nirmala College 7. GEC Thrissur (Part­time EC, ME, CS)8. Govt. Engg. College, Sreekrishnapuram

Such as,

Verification of qualification / Matriculation of students

Genuineness verification of Marklists

SMP cases 

Verification of  application  for  duplicate  marklists  and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In addition  to   this,   each  Assistant/SO has   to  attend any additional / urgent work assigned by the JCE.

3. Smt. Rajula Chandra E.K.Assistant ID No.­4439

1. All works related to the I & II Semester B.Tech. Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of practical marks received from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners and comparison of the same, decoding and entry in the system 

Taking   tabulation   register   of   the   concerned examinations   and   verification   of   the   marks   in   the counter with TRs.  

Tabulation and finalization of results after Pass Board meeting and checking moderation effected.

Publishing results,   issuing press release to publish the result and RV date.

Issuing of marklists to exam centres 

Page 7: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2. All other general work pertaining to semester I & II in respect of the following Colleges. 

1. Aryanet Institute of Tech., Mundur, Palakkad2. AWH Engg. College, Kuttikkattoor3. Sahrdaya College of Engg., Kodakara4. GEC, Calicut5. IET, Kohinoor6. Malabar College, Desamangalam.7. Sreepathy Institute of Mgmt. & Tech., Koottanad 

Such as,

Verification of qualification / Matriculation of students

Genuineness verification of Marklists

SMP cases 

Verification of  application  for  duplicate  marklists  and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction. 

Preparation of DCB 

Maintenance of minutes book and TRs

In addition  to   this,   each  Assistant/SO has   to  attend any additional / urgent work assigned by the JCE.

EE.II

Section Officer – Smt. Sandhya. S. Menon

Phone No.­ 0494 2407468

1. Smt. Remya. K.AssistantID No.­4321

1. All works related to the I & II Semester B.Tech. Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of practical marks received from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners and comparison of the same, decoding and entry in the system 

Page 8: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

Taking   tabulation   register   of   the   concerned examinations   and   verification   of   the   marks   in   the counter with TRs.  

Tabulation and finalization of results after Pass Board meeting and checking moderation effected.

Publishing results,   issuing press release to publish the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2. All other general work pertaining to semester I & II in respect of the following colleges. 

1. Al Ameen Engg. College, Kulappully2. Axis College of Engg., Murikkingal 3. Govt. Engg. College, Thrissur4. M. Dasan Institute of Tech., 5. Devaki Amma’s Guruvayoorappan college, 

Chelembra6. Part­time B.Tech. (EEE Branch)7. Focus Institute of Science & Tech., Poomala. 8. Veda Vyasa Institute of Tech., Karadparamba. 

Such as,

Verification of qualification / Matriculation of students

Genuineness verification of Marklists

SMP cases 

Verification of  application  for  duplicate  marklists  and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In addition  to   this,   each  Assistant/SO has   to  attend any additional / urgent work assigned by the JCE.

2. Smt. Simi. V.V.Assistant ID No.­ 4457

1. All works related to the I & II Semester B.Tech. Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of practical marks received from examination 

Page 9: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners and comparison of the same, decoding and entry in the system 

Taking   tabulation   register   of   the   concerned examinations   and   verification   of   the   marks   in   the counter with TRs.  

Tabulation and finalization of results after Pass Board meeting and checking moderation effected.

Publishing results,   issuing press release to publish the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2. All other general work pertaining to semester I & II in respect of the following colleges. 

1. KMCT Engg. College, Manassery2. KMCT Engg. College for Women, Manassery 3. Royal College of Engg., Akkikavu4. Vidya Academy of Science & Tech., Thalakkottukara 5. Prime College of Engg. for Women, Kodumbu6. Part­time B.Tech. (Civil Branch)7. KMCT College of Arch., 8. Avani Institute of Design, Puthiyara 9. Cochin College of Engg. & Tech., Murikkingal 

Such as,

Verification of qualification / Matriculation of students

Genuineness verification of Marklists

SMP cases 

Verification of  application  for  duplicate  marklists  and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRsIn addition  to   this,   each  Assistant/SO has   to  attend any additional / urgent work assigned by the JCE.

3. Smt. Sheela PaulAssistant Section OfficerID No. ­ 3452

1. All works related to the I & II Semester B.Tech. Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

Page 10: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of practical marks received from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners and comparison of the same, decoding and entry in the system 

Taking   tabulation   register   of   the   concerned examinations   and   verification   of   the   marks   in   the counter with TRs.  

Tabulation and finalization of results after Pass Board meeting and checking moderation effected.

Publishing results,   issuing press release to publish the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2. All other general work pertaining to semester I & II in respect of the following colleges. 

1. MEA Engg. College, Perinthalmanna2. Nehru College of Engg. & Research Centre, Pampadi3. Holy Grace Academy of Eng.,Mala4. IES College of Engg., Chittilappilly. 5. Palakkad Institute of Science & Tech., Muthalamada6. Universal College of Engg., Vallivattom.7. Al Salama Institute of Arch., Perinthalmanna8. Part­time B.Tech. (Chemical Branch)9. TIBA 

Such as,

Verification of qualification / Matriculation of students

Genuineness verification of Marklists

SMP cases 

Verification of  application  for  duplicate  marklists  and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In addition  to   this,   each  Assistant/SO has   to  attend any additional / urgent work assigned by the JCE.

Page 11: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

EE.IIISection Officer – Sri. Ajayakumar. T.K.

Phone No.­ 0494 2407479

1. Sri. Roopesh C.Assistant  ID No. ­ 4161

1.  All  works   related  to  the  III  Semester  B.Tech.  Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date. 

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2.   All   other   general   work   pertaining   to   semester   III   in respect of the following branches. 

1. Electronics & Commn. Engg.

2. Instrumentation & Control Engg.

3. Production Engg.Such as,

Verification   of   qualification   /   Matriculation   of   lateral entry candidates registered 

Genuineness verification of Marklists

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Page 12: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

2. Smt. Usha. K.N.Senior Grade Assistant ID No.­ 3782

1.  All  works   related  to  the  III  Semester  B.Tech.  Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2.   All   other   general   work   pertaining   to   semester   III   in respect of the following branches. 

1. Information Technology 2. Electrical & Electronics Engg.3. Applied Electronics & Instrumentation Engg.4. Chemical Engg.5. Aeronautical Engg.6. Biomedical Engg.7. Biotechnology 8. Automobile Engg.9. Architecture

Such as,

Verification   of   qualification   /   Matriculation   of   lateral entry candidates registered 

Page 13: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

Genuineness verification of Marklists

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

3. Sri. Sandeep. K. Assistant ID No.­ 3102

1.  All  works   related  to  the  III  Semester  B.Tech.  Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2.   All   other   general   work   pertaining   to   semester   III   in respect of the following branches. 

1. Computer Science & Engg.2. Civil Engg.3. Printing TEchnolgy 

Such as,

Verification   of   qualification   /   Matriculation   of   lateral entry candidates registered 

Genuineness verification of Marklists

Page 14: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

4. Sri. Sudheerdas M.Clerical AssistantID No.­ 3598

1.  All  works   related  to  the  III  Semester  B.Tech.  Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2.   All   other   general   work   pertaining   to   semester   III   in respect of the following branches. 

1. Mechanical Engg.

2. Mechatronics Such as,

Genuineness verification of Marklists

SMP cases 

Verification   of   application   for   duplicate   marklists   and 

Page 15: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

EE.IV

Section Officer – Smt. Sreedevi. P.V.

Phone No.­ 0494 2407472

1. Smt. Sincy. C.R.AssistantID No. ­ 4089

1.  All  works   related   to   the  IV Semester  B.Tech.  Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2.   All   other   general   work   pertaining   to   semester   IV   in respect of the following branches. 

1. Computer Science & Engg.2. Electrical & Electronics Engg.

Such as,

Genuineness verification of Marklists

Page 16: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

2. Smt. Baby C.Assistant ID No. 4088

1.  All  works   related   to   the  IV Semester  B.Tech.  Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2.   All   other   general   work   pertaining   to   semester   IV   in respect of the following branches. 

1. Mechanical Engg.2. Applied Electronics & Instrumentation Engg.3. Information Technology 

Such as,

Genuineness verification of Marklists

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Page 17: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

3. Sri. Ajith Nayar. R.Assistant Section OfficerID No. ­ 3591

1.  All  works   related   to   the  IV Semester  B.Tech.  Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2.   All   other   general   work   pertaining   to   semester   IV   in respect of the following branches. 

1. Electronics and Communication Engg.2. Production Engg.3. Printing Technology 4. Aeronautical Engg.5. B.Arch.

Such as,

Genuineness verification of Marklists

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Special Moderation

Page 18: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

4. Smt. Sajla P. Assistant ID No. ­ 4083

1.  All  works   related   to   the  IV Semester  B.Tech.  Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2.   All   other   general   work   pertaining   to   semester   IV   in respect of the following branches. 

1. Chemical Engg.2. Biotechnology 3. Instrumentation & Control Engg.4. Biomedical Engg.5. Civil Engg.6. Mechatronics Engg.7. Automobile Engg.

Such as,

Genuineness verification of Marklists

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Special Moderation

Page 19: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRsIn   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

EE.V

Section Officer – Sri. Abdul Sathar. P.P.

Phone No. ­ 0494 2407480

1. Smt. Swapna K.O. Assistant Section OfficerID No. ­ 3437  

1.  All  works   related   to   the  V  Semester  B.Tech.  Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2. All other general work pertaining to semester V in respect of the following branches. 

1. Electronics & Communication Engg.2. Production Engineering 3. Part­time Electronics & Communication Engg.4. B.Arch.

Such as,

Genuineness verification of Marklists

SMP cases 

Verification   of   application   for   duplicate   marklists   and 

Page 20: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

2. Sri. Ummer Farook. A.V.Senior Grade Assistant ID No. ­ 3814

1.  All  works   related   to   the  V  Semester  B.Tech.  Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2. All other general work pertaining to semester V in respect of the following branches. 

1. Mechanical Engg.2. Information Technology 3. Aeronautical Engg.4. Biotechnology 5. Biomedical Engg.6. Chemical Engg.7. Mechanical Engg. (Part­time) 

Such as,

Genuineness verification of Marklists

SMP cases 

Verification   of   application   for   duplicate   marklists   and 

Page 21: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

3. Smt. Divya SasidharanAssistant ID No. ­ 4284

1.  All  works   related   to   the  V  Semester  B.Tech.  Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2. All other general work pertaining to semester V in respect of the following branches. 

1. Electrical & Electronics Engg.2. Applied Electronics & Instrumentation 3. Instrumentation & Control Engg.4. Printing Technology 5. Automobile Engg.6. Part­time Electrical & Electrical Engg.

Such as,

Genuineness verification of Marklists

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Page 22: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

4. Sri. Jaison. J. Thundiyil AssistantID No. ­ 4102

1.  All  works   related   to   the  V  Semester  B.Tech.  Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2. All other general work pertaining to semester V in respect of the following branches. 

1. Civil Engg.2. Part­time Civil Engg.3. Computer Science 4. Mechatronics 5. Computer Science (Part­time) 

Such as,

Genuineness verification of Marklists

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Special Moderation

Page 23: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

5 Sri. Anilkumar T.K.Office AttendantID No. ­ 4399

Works related to Office Attendant for EE­ I to EE­V

EE.VI

Section Officer – Sri. Mohamed Ali. O.

Phone No. ­ 0494 2407481

1. Smt. Divya. K.AssistantID No. ­ 4320

1.  All  works   related   to   the VI  Semester  B.Tech.  Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2.   All   other   general   work   pertaining   to   semester   VI   in respect of the following branches. 

1. Electronics & Communication Engg.2. Automobile Engg.3. Chemical Engg.4. Biotechnology Engg.5. Instrumentation & Control Engg.

Page 24: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

6. Production Engg.7. Printing Technology 8. Aeronautical Engg.9. B.Arch. 

Such as,

Genuineness verification of Marklists

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

2. Sri. Sreeju. K.S.AssistantID No. ­ 4285

1.  All  works   related   to   the VI  Semester  B.Tech.  Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2.   All   other   general   work   pertaining   to   semester   VI   in respect of the following branches. 

1. Civil Engg.2. Computer Science & Engg.

Such as,

Page 25: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

Genuineness verification of Marklists

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

3. Sri. Subramanian ThottiyilSenior Grade AssistantID No. ­ 3792

1.  All  works   related   to   the VI  Semester  B.Tech.  Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2.   All   other   general   work   pertaining   to   semester   VI   in respect of the following branches. 

1. Automobile Engg.2. Mechanical Engg.3. Applied Electronics & Instrumentation Engg.4. Biomedical Engg. 5. Biotechnology 6. Aeronautical Engg. 

Such as,

Genuineness verification of Marklists

Page 26: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

4. Sri. Sakeena. T.AssistantID No. ­ 4120

1.  All  works   related   to   the VI  Semester  B.Tech.  Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2.   All   other   general   work   pertaining   to   semester   VI   in respect of the following branches. 

1. Electrical & Electronics Engg.2. Information Technology 3. Instrumentation & Control Engg.4. Printing Technology 5. Production Engg.6. Mechatronics

Such as,

Genuineness verification of Marklists

Page 27: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

EE.VII

Section Officer – Smt. Haseena. T. 

Phone No. ­ 0494 2407473

1. Smt. Mallika. S.Senior Grade Assistant ID No. ­ 3795

1. All  works related to the VII  Semester B.Tech. Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2.  All   the  above  works   related   to   interim   supplementary examination (conducted for VII and VIII semesters only) 3.   All   other   general   work   pertaining   to   semester   VII   in respect of the following branches. 

1. Mechanical Engg.2. Mechanical Eng. (Part­time)

Page 28: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

3. Applied Electronics & Instrumentation Engg.4. Automobile Engg.5. Biotechnology6. Aeronautical Engg.7. B.Arch.

Such as,

Genuineness verification of Marklists

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRsIn   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

2. Smt. Deepthi. T.AssistantID No. ­ 4101

1. All  works related to the VII  Semester B.Tech. Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2.  All   the  above  works   related   to   interim   supplementary examination (conducted for VII and VIII semesters only) 3.   All   other   general   work   pertaining   to   semester   VII   in 

Page 29: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

respect of the following branches. 1. Computer Science 2. Computer Science (Part­time)3. Information Technology 4. Chemical Engg.5. Biomedical Engg.6. Printing Technology7. Instrumentation & Control Engg.

Such as,

Genuineness verification of Marklists

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

3. Smt. Sajina Kareem AssistantID No. ­ 4194

1. All  works related to the VII  Semester B.Tech. Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2.  All   the  above  works   related   to   interim   supplementary 

Page 30: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

examination (conducted for VII and VIII semesters only) 

3.   All   other   general   work   pertaining   to   semester   VII   in respect of the following branches. 

1. Electronics & Communication Engg.2. Electronics & Communication Engg. (Part­time)3. Production Engg.

Such as,

Genuineness verification of Marklists

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

4. Sri. Sanoj. S.S.Senior Grade Assistant ID No. 3961

1. All  works related to the VII  Semester B.Tech. Regular/ Supplementary Examination such as 

Preparation of question paper covers 

Releasing of hall tickets

False   numbering   of   answerscripts,   detaching counterfoils,   verifying   and   checking   the   counters, bundling of answerscripts and dispatch to CV camps. 

Entering of  practical  marks  received  from examination centres in the system

Entering   marks   in   the   counter   from   the   CV   camp   / examiners  and comparison of   the same,  decoding and entry in the system 

Taking tabulation register of the concerned examinations and verification of the marks in the counter with TRs.  

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.   

Issuing of marklists to exam centres 

Furnishing   details   of   revaluation   such   as   false   nos., marks awarded, name of examiner, name of camp etc. to RV sections

Effecting revaluation in the system and TR and releasing of revised marklists after revaluation

2.  All   the  above  works   related   to   interim   supplementary examination (conducted for VII and VIII semesters only) 

3.   All   other   general   work   pertaining   to   semester   VII   in respect of the following branches. 

1. Civil Engg.

Page 31: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

2. Civil Engg. (Part­time)3. Electrical & Electronics Engg.4. Electrical & Electronics Engg. (Part­time)

Such as,

Genuineness verification of Marklists

SMP cases 

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Special Moderation

Grace marks – NSS, NCC, Sports etc. 

Name correction

Preparation of DCB 

Maintenance of minutes book and TRs

In   addition   to   this,   each  Assistant/SO  has   to   attend   any additional / urgent work assigned by the JCE.

5 Sri. Anand Kumar. K.Office AttendantID No. ­ 4400

Works   related   to  Office  Attendant   for  EE­  VI,  EE.VII   and EE.X

EE.VIII

Section Officer – Sri. Sivadasan. P.

Phone No. ­ 0494 2407482

1. Vacant  Verification   of   applications   and   making   proposal   for Degree Certificates

Genuineness verification, official transcript

Issue of provisional certificate and consolidated marklist

Finalization of rank and issue of rank certificate

Issue of detailed consolidated marklist

Issue of miscellaneous certificates

Preparation of question paper covers

All works related to the entering of internal, external and practical marks received from examination centres

SMP cases

Issuing of marklists to exam centres

Releasing of revised marklists after revaluation

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Effecting grace mark and revise marklist accordingly

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Page 32: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Granting special moderation.

Preparation of DCB 

Maintenance of minutes book and TRs 

All other general work pertaining to semester VIII in respect of the following branches. 

1. Electronics & Communication Engg.

2. Part­time Electronics & Communication Engg.

3. Instrumentation & Control Engg.

4. Printing Technology 

In addition to this, each Assistant/SO has to attend any additional / urgent work assigned by the JCE.

2. Smt. Haseena R.P.Assistant ID No. 4492

Verification   of   applications   and   making   proposal   for Degree Certificates

Genuineness verification, official transcript

Issue of provisional certificate and consolidated marklist

Finalization of rank and issue of rank certificate

Issue of detailed consolidated marklist

Issue of miscellaneous certificates

Preparation of question paper covers

All works related to the entering of internal, external and practical marks received from examination centres

SMP cases

Issuing of marklists to exam centres

Releasing of revised marklists after revaluation

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Effecting grace mark and revise marklist accordingly

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Granting special moderation. 

Preparation of DCB 

Maintenance of minutes book and TRs

All other general work pertaining to semester VIII in respect of the following branch. 

Page 33: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

1. Electronics & Communication Engg.

In addition to this, each Assistant/SO has to attend any additional / urgent work assigned by the JCE.

3. Smt. Mary GeethaAssistant Section OfficerID No. ­ 3466

Verification   of   applications   and   making   proposal   for Degree Certificates

Genuineness verification, official transcript

Issue of provisional certificate and consolidated marklist

Finalization of rank and issue of rank certificate

Issue of detailed consolidated marklist

Issue of miscellaneous certificates

Preparation of question paper covers

All works related to the entering of internal, external and practical marks received from examination centres

SMP cases

Issuing of marklists to exam centres

Releasing of revised marklists after revaluation

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Effecting grace mark and revise marklist accordingly

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Granting special moderation. 

Preparation of DCB 

Maintenance of minutes book and TRs

All other general work pertaining to semester VIII in respect of the following branches. 

1. Civil Engg.

2. Civil Engg. (Part­time)

In addition to this, each Assistant/SO has to attend any additional / urgent work assigned by the JCE.

4. Sri. Rasheen. A. KareemAssistant Section OfficerID No. ­ 3101

Verification   of   applications   and   making   proposal   for Degree Certificates

Genuineness verification, official transcript

Issue of provisional certificate and consolidated marklist

Finalization of rank and issue of rank certificate

Issue of detailed consolidated marklist

Page 34: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

Issue of miscellaneous certificates

Preparation of question paper covers

All works related to the entering of internal, external and practical marks received from examination centres

SMP cases

Issuing of marklists to exam centres

Releasing of revised marklists after revaluation

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Effecting grace mark and revise marklist accordingly

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Granting special moderation. 

Preparation of DCB 

Maintenance of minutes book and TRs

All other general work pertaining to semester VIII in respect of the following branches. 

1. Computer Science & Engg.

2. Computer Science & Engg. (Part­time)

In addition to this, each Assistant/SO has to attend any additional / urgent work assigned by the JCE.

EE.IX

Section Officer – Sri. Deepak George  

Phone No. ­ 0494 2407483

1. Smt. Savitha K.M.AssistantID No. ­ 4294

Verification   of   applications   and   making   proposal   for Degree Certificates

Genuineness verification, official transcript

Issue of provisional certificate and consolidated marklist

Finalization of rank and issue of rank certificate

Issue of detailed consolidated marklist

Issue of miscellaneous certificates

Preparation of question paper covers

All works related to the entering of internal, external and practical marks received from examination centres

Page 35: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

SMP cases

Issuing of marklists to exam centres

Releasing of revised marklists after revaluation

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Effecting grace mark and revise marklist accordingly

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Granting special moderation. 

Preparation of DCB 

Maintenance of minutes book and TRs

All other general work pertaining to semester VIII in respect 

of the following branches. 

1. Applied Electronics & Instrumentation Engg.

2. Aeronautical Engg.

3. Automobile Engg.

4. Mechanical Engg. (Axis, Ammini, Veda Vyasa, Thejus, 

Cochin, GEC Sreekrishnapuram, NSS College & Vidya 

Academy) 

In addition to this, each Assistant/SO has to attend any 

additional / urgent work assigned by the JCE.

2. Smt. Sreelekha. K.Assistant Section OfficerID No. ­ 3467

Verification   of   applications   and   making   proposal   for Degree Certificates

Genuineness verification, official transcript

Issue of provisional certificate and consolidated marklist

Finalization of rank and issue of rank certificate

Issue of detailed consolidated marklist

Issue of miscellaneous certificates

Preparation of question paper covers

All works related to the entering of internal, external and practical marks received from examination centres

SMP cases

Issuing of marklists to exam centres

Releasing of revised marklists after revaluation

Verification   of   application   for   duplicate   marklists   and 

Page 36: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

preparation of the same. 

Effecting grace mark and revise marklist accordingly

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Granting special moderation. 

Preparation of DCB 

Maintenance of minutes book and TRs

All other general work pertaining to semester VIII in respect 

of the following branches. 

1. Mechanical Engg.

2. Biomedical Engg.

In addition to this, each Assistant/SO has to attend any 

additional / urgent work assigned by the JCE.

3. Sri. Asif M.T.Assistant ID No. ­ 4485

Verification   of   applications   and   making   proposal   for Degree Certificates

Genuineness verification, official transcript

Issue of provisional certificate and consolidated marklist

Finalization of rank and issue of rank certificate

Issue of detailed consolidated marklist

Issue of miscellaneous certificates

Preparation of question paper covers

All works related to the entering of internal, external and practical marks received from examination centres

SMP cases

Issuing of marklists to exam centres

Releasing of revised marklists after revaluation

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Effecting grace mark and revise marklist accordingly

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Granting special moderation. 

Preparation of DCB 

Page 37: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

Maintenance of minutes book and TRs

All other general work pertaining to semester VIII in respect of the following branches. 

1. B.Arch. (VIII, IX, X Semesters)2. Biotechnology 3. Chemical Engg.4. Information Technology 5. Production Engg. 

In addition to this, each Assistant/SO has to attend any additional / urgent work assigned by the JCE.

4. Sri. Arun S.AssistantID No. ­ 4508

Verification   of   applications   and   making   proposal   for Degree Certificates

Genuineness verification, official transcript

Issue of provisional certificate and consolidated marklist

Finalization of rank and issue of rank certificate

Issue of detailed consolidated marklist

Issue of miscellaneous certificates

Preparation of question paper covers

All works related to the entering of internal, external and practical marks received from examination centres

SMP cases

Issuing of marklists to exam centres

Releasing of revised marklists after revaluation

Verification   of   application   for   duplicate   marklists   and preparation of the same. 

Effecting grace mark and revise marklist accordingly

Tabulation and  finalization of   results  after  Pass  Board meeting and checking moderation effected.

Publishing   results,   issuing  press   release   to  publish   the result and RV date.

Granting special moderation. 

Preparation of DCB 

Maintenance of minutes book and TRs

All other general work pertaining to semester VIII in respect of the following branch. 

1. Electrical & Electronics Engg.

In addition to this, each Assistant/SO has to attend any additional / urgent work assigned by the JCE.

5. Sri. Prasanth P.Assistant ID No. ­ 3016

Revising of Provisional Certificate, Consolidated Marklist and effecting of Class Change according to new formula 

Page 38: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

for students (60000+ approximately) of 2012­13, 2013­14,   2014­15   academic   years   as   per   U.O.   No. 595/2016/PB dated 31.10.2016.

6. Sri. Subramanian. P.Office AttendantID No. ­ 3056

Works   related   to  Office  Attendant   for  EE.VIII,   EE.IX   and EE.XII.

EE.X (Revaluation)Section Officer – Sri. Venugopalan. K.P.Phone No. ­ Nil 

1. Sri. Ratna Singh T.Clerical Assistant ID No. ­ 2878

1. Random checking of the applications for revaluation.2. Updating of the list of register numbers (Indent) by typing the 

details of False numbers, Name of Examiner, Camp etc collected from the tabulation sections concerned.

3. Collection of question papers from the Office of the Controller of   Examinations   as   per   the   requirement   and   preparation   of facing sheets for each question paper.

4. Forwarding   of   these   lists   along   with   the   question   papers collected,   facing sheets etc,   to  the Personal wing for  onward transmission to the respective camps.

5. Scrutiny of marks in the script and verification of  the scripts received  after   revaluation   for  Examiner,   change  of  marks  or false numbers etc.

6. Preparation  and  despatch  of  memo(s)   to   the   candidate(s)   if change in mark(s) on scrutiny alongwith communication to the tabulation section(s) concerned.

7. Forwarding of scripts for second revaluation if the enhancement of marks is 30% above and keeping the register thereon.

8. Entry   of   marks   of   verified   scripts   into   the   System   and   its verification.

9. Forwarding of necessary communications in time to the Digital Wing for providing links to this section for entry of marks and verification   of   marks,   status   etc,   and   also   to   the   University Website for releasing of the results.

10.Taking  out   the   scripts   for   identification  by   the   candidate  as when the candidates requested.

11.Keeping   the  revalued scripts  upto   the  completion of   sending photocopies to the candidates requested for.

12.Preparation of list of register numbers of candidates applied for photocopies, preparation of address list of the candidates and taking out the scripts from the bundles for taking photocopies and its despatch.[Now a permanent staff is entrusted to take the photocopies and their despatch particularly for revalued scripts w.e.f. 20/04/2016]

13.Furnishing remarks in the files from Admn. on the requests for refund of the amount remitted.

Page 39: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

14.Preparation of D.C.B. with respect to the Heads of account Part I 05­1031­01 and Part I 05­1033­01.

15.Preparation and forwarding of monthly statement of pending revaluation.

16. Replies   for  applications  under  R.T.I  and other  works   related   to revaluation such as script change,  early publication of results of revaluation of scripts as per the direction of the Court, if any .

17. Verification, certification and forwarding of remuneration bills of the   Examiners   (revaluation)   and   submissions   of   the   claim   for Rs.10/­and Rs.3/­ per scripts  for the preparation and picking of scripts respectively.

         The section   is  also  keeping  registers   for  almost  all   the works detailed above separately. 

2. Smt. Priyanka. K.J.AssistantID No. ­ 4157

3. Smt. Shareena. M.AssistantID No. ­ 4173

EE.XI (Revaluation)

Section Officer – Sri. Naveen Joseph A.

Phone No. ­ Nil 

1. Smt. Sheena. KComputer Asst. Gr. IIID No. ­ 2905

1. Checking of applications for revaluation 

2. Typing and comparing of RV indent 

3. Forwarding the answerscripts for II RV to Personal Wing 

4. Decoding of RV marks 

5. Scrutiny of marks in the script and verification of scripts received after Revaluation for examiner, change of marks etc.

2. Sri. Saseendran. A.Senior Grade Assistant ID No. ­ 2858

1. Entry and verification of RV marks 

2. Verifying chalan details 

3. Checking 

4. Releasing of RV results 

3. Smt. Raga N. Nair AssistantID No. ­ 4317

1. Taking answerscripts for identification by the candidate

2. Entering details of offline applications in the manual register

3. Sending photocopy of answerscripts to candidates 

4. Issue memo to candidates 

5. Sending question papers along with facing sheet to CV camps

6. WP(C), RTI

Page 40: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

7. Preparation and forwarding of monthly statement 

8. Preparation of DCB statement of Revaluation 

9. Put up Tappal through DDFS

4. Sri. Hassankutty. T.P.Roneo OperatorID No. 2612

Roneo Operator and other works related to RV. 

5. Sri. Muraleedharan. M.Office AttendantID No. ­ 3053

Works related to Office Attendant for AR­IV, AR­V, AR­XXI and EE.XI

EE.XII 

Section Officer – Sri. Subramanian.  K.

Phone No. ­  Nil 

EE.XII  Section  was   constituted   for  preparation  of  Original  Degree  Certificates   in  B.Tech. 

Branch.  The  work  entrusted   to   the   section   ­   preparation  of  Original  Degree  Certificates, 

miscellaneous   certificates   and   authentication   of   genuineness   and   official   transcript,   is 

distributed branch wise, as shown below: 

1. Smt. Rekha M. AssistantID No. ­ 3106(EE.XII/1)

1. Electronics & Communication Engg.2. Automobile Engg.3. Biotechnology Engg.

2. Smt. Joshitha. M.V.AssistantID No. ­ 4087(EE.XII/2)

1. Computer Science & Engg.2. Aeronautical Engg.3. Biomedical Engg.4. B.Arch.5. Electrical & Electronics ENgg.

3. Smt. Jasmin J.AssistantID No. ­ 4499(EE.XII/3)

1. Mechanical Engg.2. Applied Electronics & Instrumentation 3. Instrumentation and Control Engg.4. Production Engg.5. Chemical Engg.6. Printing Technology 

Page 41: (Pareeksha Bhavan – B.Tech. Branch)14.139.185.6/website/RTI/72. BTech.pdf5. Works related to the CV camp closing (collecting CV camp details from the CV camps and forward UO notes

4. Sri. Praveen KaivelipurathAssistantID No. ­ 4086(EE.XII/4)

1. Civil Engg.2. Information Technology 3. Electrical and Electronics Engg. 

JOINT CONTROLLER OF EXAMINATIONS – VIB.Tech. Branch