OverDepth Dredging and Characterization
Transcript of OverDepth Dredging and Characterization
Motivation• In the past, USEPA has raised questions
concerning dredging of material from outside channel dimensions regarding adequate characterization.
• Recognized a need for the USACE to have better communication with other agencies and public about channel terminology as well as the inherent imprecision of the dredging process.
Paid Allowable Overdepth
Should reflect a process to balance consideration of:
- Cost,- Minimizing environmental impacts,- Dredge capability considering physical conditions, equipment, and material.
Operations Technologies Overdepth Dredging
Research Task Objectives:
- Provide a better understanding of overdepth dredging by different types of dredges in different types of site-specific conditions. - Provide operations managers with tools to monitor overdepth dredging on their respective projects to facilitate regulatory compliance.
http://el.erdc.usace.army.mil/elpubs/pdf/eedp04-37.pdf
Sediment Characterization- Identification and evaluation of sediment
characteristics to be dredged for predicting environmental impacts due to dredging and/or disposal activities.
- Can be physical, chemical, or biological sampling and/or testing, or any combination.
- Extent of sediment characterization necessary to ensure compliance with applicable environmental laws and regulations is site specific.
- Should be developed by the USACE after considering all site-specific variables.
Excavation Accuracy
Relates to closeness of the dredge’s completed work to the design (project and/or overdepth) grade as determined by an after-dredge hydrographic survey.
- Physical characteristics of dredged material,- Physical environment,- Level of crew skill and effort, - Quantities/physical layout.
Major Factors that Influence Selection of Dredging Plant and it’s Inherent
Excavation Accuracy
Mechanical Dredges
Courtesy of Great Lakes Dredge and Dock
Hopper Dredge
Outline
Cutterhead Dredge
Courtesy of Great Lakes Dredge and Dock
Additional Error ComponentsHydrographic surveying accuracy is a critical component.
-
In sheltered waters typical hydrographic survey accuracies of +/-
0.5 ft are achievable
-
As waves increase, so can the motion of the survey vessel-
Water surface’s relationship to the dredge datum
must be measured (tide gage or RTK)
The dredge often relies on the same methodology for determining the depth of the excavation head.
Outline
What is overdepth?
NOS1Definition: New work dredging of soft dredged materials with mechanical equipment inexposed open-water conditions.Considerations: Mechanical equipment is not normally used because of significant downtime due to rough seas. Soft sediments also tend to move around and shoals shift in someopen-water situations.Expectations: Expect a high degree of inaccuracy in dredging depth, and a very unevenbottom when done. The dredge operator will dredge at least 2 ft below maximum pay depth(with an allowable overdepth of 2 ft) to ensure achieving required grade. If less than 2 ft ofallowable overdepth is specified, the dredge operator will dredge at least 4 ft below requireddepth to achieve grade. However, if the environment is conducive to shifting shoals, expectsome infilling to occur in areas already dredged.Recommendations: Dredged material should be characterized to a depth of not less than 6 ftbelow required depth. Depending on the severity of conditions found in open water, anadditional 1 to 3 ft (or perhaps more in extreme situations) should be added to therecommended characterization depth. See the earlier description of the impacts of severeconditions found in open water on surveying inaccuracies and on the dredge and operator.
Characterization Depth Recommendations
- There is a scarcity of quantitative data to answer questions on dredge excavation accuracies and how to determine adequate characterization depth.- Recommendations based on current available data, and USACE and Contractor experiences.- Provided with the understanding that on any given dredging project that the depths characterized may vary by a margin of error of less than a foot or more than several feet.
Overdepth Dredging Analysis Tool Data Input
Technology Transfer
- Quantify different types of dredges vertical construction accuracies.
- Tools and guidance documentation to calculate overdepth dredging.
- Peer-reviewed journal article.