Napa River O&M Dredging Project Planned Dredging ...

23
US Army Corps of Engineers BUILDING STRONG ® Napa River O&M Dredging Project Planned Dredging Activities for 2016 Rick Thomasser, Operations Manager, Napa County Flood Control and Water Conservation District Pamela Patton, Project Manager, San Francisco District, USACE July 12, 2016

Transcript of Napa River O&M Dredging Project Planned Dredging ...

Page 1: Napa River O&M Dredging Project Planned Dredging ...

US Army Corps of Engineers BUILDING STRONG®

Napa River O&M Dredging Project Planned Dredging Activities for 2016

Rick Thomasser, Operations Manager, Napa County Flood Control and Water Conservation District

Pamela Patton, Project Manager, San Francisco District, USACE

July 12, 2016

Page 2: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG®

Agenda • Background • History • Project Overview • Disposal Sites • Schedule • Dredging Areas • Question/Answers

2

Page 3: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG®

Background What will the project do? Dredging the Napa River Navigation Channel is required periodically in order to maintain safe navigation of both commercial and recreational vessels.

3

Page 4: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG®

History of the Napa River Navigation Channel

Footprint of Project

Frequency of Dredging

Placement Sites

4

Page 5: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG®

Project Map

5

Page 6: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG®

Overview

The project starts at 3rd St. Bridge in Napa and ends at the confluence with Asylum Slough, and the lower channel that ends just upstream of the HWY 37 Bridge in Vallejo.

Nine feet with an additional one

foot of over depth throughout both the lower and upper channel planned dredge areas.

6

Page 7: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG®

Disposal Sites The disposal sites that will be utilized in support of this year’s dredging effort will be the Flood District’s Imola 3rd Street site and Napa Pipe.

7

Page 8: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG®

Schedule

8

Aug 1

Nov 30

Nov 1

Oct 1

Sept 1

Pre-dredging Activities: Environmental Approvals Dredging Contract Solicitation Contract Award

Env

ironm

enta

l Wor

k W

indo

w

July 1

Dredging Contract: Start of Dredging: ~ Mid-Sept to early Oct. Duration: ~ 6-9 weeks Daily Operations:

3rd Street- Tulocay Creek: 7:00 am-11:00 pm Below Tulocay Creek: 24-hrs/day

Presenter
Presentation Notes
Noise levels will vary from that of general heavy traffic (78dBA) to hat of general construction equipment (eg. Bulldozer, Hammer, loaders, backhoes) but may peak as high as a jackhammer from large Pipeline cutterhead dredge equipment: up to 100-110 dBA , in audible ~ 500m from dredge. (Source: Clarke, D., Dickerson, C., and K. Reine 2002. “Characterization of underwater sounds produced by dredges. Dredging 2002, ASCE, Orlando, Florida, USA, p 64-81.)
Page 9: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG®

DREDGING AREAS

9

Page 10: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG®

10

Page 11: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG® 11

Page 12: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG® 12

Page 13: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG® 13

Page 14: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG® 14

Page 15: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG® 15

Page 16: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG® 16

Page 17: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG® 17

Page 18: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG® 18

Page 19: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG® 19

Page 20: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG® 20

Page 21: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG® 21

Page 22: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG® 22

Page 23: Napa River O&M Dredging Project Planned Dredging ...

BUILDING STRONG® 23

Q & A Contact Info: Pamela Patton USACE – San Francisco District 1455 Market Street San Francisco, CA 94103 (415) 329-9505 [email protected]