Increasing Efficiency with OMS – Ice Storm vs. Hurricane Ike What a difference a day (and the right system) makes Phil Caskey

description

Hope you enjoy this power outage management systems focused presentation from Milsoft's 2009 User Conference. It was originally presented there by Phil Caskey. The Milsoft Electric Utility Solutions Users Conference is the premier event for both our users and vendors offering interoperable utility management services that enhance Milsoft Smart Grid Solutions. If you’d like to be on our mailing list, just email: [email protected].

Transcript of Outage Management Software: Increasing Efficiency With OMS

Page 1: Outage Management Software: Increasing Efficiency With OMS

Increasing Efficiency with OMS –Ice Storm vs. Hurricane Ike

What a difference a day (and the right system) makes

Phil Caskey

Page 2: Outage Management Software: Increasing Efficiency With OMS

Overview• Quick recap of Consolidated

– Provides needed context• Brief review of major outages• Comparison of two biggest events• Discuss impact of effective OMS• Open dialogue

– Answer questions– Debate processes– ???

Page 3: Outage Management Software: Increasing Efficiency With OMS

Consolidated Electric Cooperative, Mount Gilead, Ohio

• 16,000 meters• 1,800 miles of line• 7 counties

– mostly the two counties immediately north of Columbus, Ohio

• $30 million annual revenue• 43 employees in 2 district offices

Page 4: Outage Management Software: Increasing Efficiency With OMS

Consolidated Electric Cooperative, Mount Gilead, Ohio

• Ohio Co-ops own substations/meter points.– 138kV, 69kV, 34.5kV, 12.5kV

• Transmission contracted with IOUs.– A few co-ops have some transmission.– CEC has one 4.7 mile 69kV tap.

• CEC has 16 substations.– 138kV(5), 69kV(10), 34.5kV(1)

• Embarking on AMI adventure

Page 5: Outage Management Software: Increasing Efficiency With OMS

System Model

• Line Numbers– All protective devices– 01~1A1A1A …

• Chapel Mapping– SQL Server database

for connectivity– Creates .STD file

• WindMil EA model• DisSPatch Model

Page 6: Outage Management Software: Increasing Efficiency With OMS

E&O Outage Staffing

VP, E&OCoordinate &

Assist Dispatchers

Director Ops Director EngBird Dog

E&O AsstLead Dispatcher

North Crews (7) South Crews (6) Staking (2)Bird Dogs

Safety & ContractsBird Dog

Ops ClerkDispatcherOps Clerk

Subsidiaries,Other Departments

Bird Dogs

Page 7: Outage Management Software: Increasing Efficiency With OMS

Major Outage History• 1992 Ice Storm

– Sheriff called to protect office after members’ threats.

– Good Ol’ Boy OMS• 2005 Ice Storm

– 5 days– CRC call data

• 2006 Thunderstorms– 2 days– Brand X OMS

• 2008 Ice Storm– 3 days– DisSPatch

• 2008 Wind Storm (Hurricane Ike)– 5 days– DisSPatch

• 2009 Wind Storm– 2 days– DisSPatch

Page 8: Outage Management Software: Increasing Efficiency With OMS

Ike Storm vs. Ice Storm

• Ike 2008– Fully restored 5 days– 11,936 Meters

• 14,884 with repeats– 258 Outages– 279,185 Cust-Hrs

• 17.1 Hrs per meter served• 18.8 Hrs per meter

affected– 3 Outside Crews Assisting

• 2005 Ice Storm– Fully restored 5 days– 4,524 Meters

• 9,878 with repeats– 124 Outages– 190,397 Cust-Hrs

• 12.4 Hrs per meter served• 19.3 Hrs per meter

affected– 4 Outside Crews Assisting

Page 9: Outage Management Software: Increasing Efficiency With OMS

2005 Ice Storm – Lines Damaged

Page 10: Outage Management Software: Increasing Efficiency With OMS

Ike 2008

Page 11: Outage Management Software: Increasing Efficiency With OMS

DisSPatch Performance• Advantages

– Three main reasons for substantial investment• “Verified Closed”• Graphic and Web displays

– AVL!!!• Partial Restores

• Wish List– Additional Statuses for Bird Dogs– Trouble Tickets (Non-Outage)– Outage Display Filter– Crew Display Filter