Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves...

22
Our Journey About Us Our Team Board of Directors Senior Management Group Structure What We Believe In Corporate Philosophy What We Do Metal Power Generation Power Transmission & Distribution Property and F&B Our Locations Contact Us Business Locations

Transcript of Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves...

Page 1: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

Our JourneyAbout Us

Our TeamBoard of Directors

Senior Management

Group Structure

What We Believe InCorporate Philosophy

What We DoMetal

Power Generation

Power Transmission & Distribution

Property and F&B

Our LocationsContact Us

Business Locations

Page 2: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

Our journey

Our story began in 1976 with the establishment of Leader

Cable by Dato' Seri Hng Bok San. Through the years, the

Group has grown by leaps and bounds, from an annual

turnover of RM3 Million to over RM3 Billion today having

diversified from Cable into various industries including

Metal, Power, Property and F&B.

Page 3: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

HNG Capital is the investment holding and management

company of HNG Capital Group ("The Group"). The Group is a

progressive and well-established local conglomerate with

diversified business interests in investments, power generation,

power transmission and distribution, metal, cable and property

investment.

HNG Capital was founded by Tan Sri Dato’ Seri H'ng Bok San.

The Group's history can be traced to its origin in Leader Group

that previously owned and controlled the cable business under

Leader Cable, which was established in 1976. The Leader Group

has grown from strength to strength, from an annual turnover

of RM3 million to over RM3 billion. The tremendous growth over

the past years has position the Leader Group as the largest

cable and wire producer in Malaysia and South East Asia. The

drive to consistently excel has earned Leader Group the

recognition as the most reputable and reliable manufacturer in

the cable and wire industry. Building on the strength of its core

business, Leader Group has diversified its business to include

metal, power, property and F&B. The privatisation of its listed

entity (Leader Universal Holdings Berhad) in July 2012 saw the

emergence of HNG Capital Group.

The Group has evolved in recent years that saw the disposal of

its main cable business in late 2014 to re-align The Group's

resources to facilitate a major change in its business focus.

Going forward, The Group's strategic focus will be on growing

its power and metal business locally and regionally.

ABOUT US

HNG CAPITAL CORPORATE PROFILE

Our Journey • Leader’s Sucess Story

Page 4: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

Our team

Page 5: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

H’NG CAPITAL SDN BHD

HNG CAPITAL CORPORATE PROFILE

Our Team • Board of Directors

Spearheaded by Tan Sri Dato’ Seri

H’ng Bok San, Dato’ Sean H’ng

Chun Hsiang and Datin Jessica

H’ng Hsieh Ling, H’ng Capital Sdn.

Bhd. is backed by a versatile

management team. Drawing

strength from their extensive

experience in various fields, the

Group offers customers the added

advantage of superior knowledge

and expertise.

Datin Jessica H’ng Hsieh Ling Group Chief Financial Officer

Dato’ Sean H’ng Chun Hsiang Group Chief Executive Officer

Tan Sri Dato’ Seri H’ng Bok San, JPPSM, DPPN, DGPN, DSPN, PKT, PJKGroup Executive Chairman

BOARD OF DIRECTORS

Page 6: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

HNG CAPITAL CORPORATE PROFILE

Our Team • Senior Management

LEADER GROUP OF COMPANIES

SENIOR MANAGEMENT

Metal Division

Kon Ted LiukSenior Managing Director

Property and F&B Division

H’ng Chun ChingExecutive Director

Power Generation Division

Wong Hui KeatManaging Director

Power Transmission & Distribution, and Business Development Division

Gan Boon HeanCheif Investment Officer

Page 7: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

Our Structure

Page 8: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

HNG CAPITAL CORPORATE PROFILE

Our Team • Group Structure

GROUP STRUCTURE

HNG CAPITAL SDN BHD

METAL DIVISIONLEADER UNIVERSAL ALUMINIUM SDN BHD

ALPHA INDUSTRIES SDN BHD

POWER DIVISIONCAMBODIAN ENERGY LIMITED (CAMBODIA)

LEADER ENERGY LIMITED

CAMBODIAN TRANSMISSION LIMITED (CAMBODIA)

LEADER ELECTRICAL ENGINEERING LIMITED (CAMBODIA)

INVESTMENT HOLDINGLEADER UNIVERSAL (HONG KONG) COMPANY LIMITED

LEADER (CAMBODIA) LIMITED (CAMBODIA)

LEADER INFRASTRUCTURE LIMITED

LEADER INVESTMENTS LIMITED

CABLE DIVISIONLITE KABEL SDN BHD

PROPERTY AND F&B DIVISIONLEADER UNIVERSAL PROPERTIES SDN BHD

MILLION CREST (M) SDN BHD

LEADER GARDEN SDN BHD

DOLPHIN SQUARE SDN BHD

LEADER HOLDINGS SDN BHD

LEADER PROPERTIES SDN BHD

EXOGOLD SDN BHD

HNG INTERNATIONAL LIMITED

H DINING CONCEPTS SDN BHD

BAGAN EIGHTEEN SDN BHD

CALDWELL DINING PTE LTD

Page 9: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

What we believe inOur total commitment to quality and customer satisfaction stems from our LEADER

Philosophy where we demand excellence in every aspect of our operations. It is a

philosophy that has served our customers well and is one of the main catalysts that

drives us to excel in our every endeavour.

Page 10: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

HNG CAPITAL CORPORATE PROFILE

What We Believe In • Corporate Philosophy

L e a d e r s h i pin giving the best at all times to enhance our position as a leading corporate entity.

E q u a l i t yof opportunities for all our people to participate in the growth of the Company.

A d v a n c e m e n tfor the realization of both the Company’s and individual’s goals.

D i v e r s i f i c a t i o nof strength through new ventures and technological breakthrough.

E x c e l l e n c e in providing quality products and services to meet our customers’ needs.

R e w a r d s for the commitment of working towards the Company’s goal of creating value for our customers.

CORPORATE PHILOSOPHY

Page 11: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

Our Business

Page 12: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

METAL

Leader Universal Aluminium Sdn. Bhd. (LUA) is a

wholly-owned subsidiary of HNG Capital Sdn. Bhd.

A leading manufacturer of quality Aluminium Electrical

Conductors and Aluminium Alloy Rods in Malaysia, LUA

has a production capacity of 100,000 MT per annum,

which is currently supported by its production facilities

in Tampoi, Johor and Nilai, Negeri Sembilan. LUA’s

Aluminium and Aluminium Alloy Rods, which are

manufactured mainly for the wire and cable industry, are

renowned internationally for its world class quality

standards.

Alpha Industries Berhad (Alpha), a partially-owned

subsidiary of the Group, is one of the leading

manufacturers of electrical conductor grade copper rods

and wires in Malaysia. Incorporated on 20 February 1970,

Alpha has since consolidated its business operations in

two locations. Its headquarters is located in Johor while

its factory branch in situated in Prai.

HNG CAPITAL CORPORATE PROFILE

What We Do • Metal

Division Structure

Metal Division

Leader Universal Aluminium Sdn. Bhd.100% Subsidiary

Alpha Industries Sdn. Bhd.51% Subsidiary

Page 13: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

HNG CAPITAL CORPORATE PROFILE

What We Do • Metal

Our International Clientele• Pakistan

• India

• Sri Lanka

• Thailand

• Indonesia

• China

• Myanmar

• Vietnam

• Cambodia

• Singapore

• Philippines

• Korea

• Japan

• Australia

• New Zealand

• Fiji

• Canada

• USA

• Honduras

• Brazil

• Chile

• United Kingdom

• Belgium

• Algeria

• Syria

• Jordan

• Sudan

• Saudi Arabia

• United Arab Emirates

• Oman

• South Africa

• Zambia

In line with the Group’s ongoing efforts to innovate according to market trends and diversify the product range,

we carry out continuous Research and Development to cater to the ever-changing industry demands.

Our Products

Our products are:

• Alloy 6151 & 6110 for Bicycle Industry (R&D)

• Thermal Alloy 60 for Overhead Conductors (R&D)

• EC Rods (EC 1350, H 12, H 14, EC 1370)

• Alloy Rods (Alloy 6101, Alloy 6201, Alloy 1120)

• Aluminium Solidal Conductor

• SCR (Tough Pitch Copper) - Bare Copper Rod 8.00mm, Bare Copper Wire 1.30mm - 4.50mm,

Welding Wire 0.80mm - 1.50mm

• Outokumpu (Oxygen Free Copper) - Bare Copper Rod 8.00mm - 25.00mm,

Bare Copper Wire 1.30mm - 5.00mm

Page 14: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

Metal Plants

HNG CAPITAL CORPORATE PROFILE

What We Do • Cable

Johor

Kedah

KelantanTerengganu

Malacca

Negeri Sembilan

Pahang

Perak

Perlis

Penang

Selangor

LUATampoi, Johor

LUANilai, Negeri Sembilan

AlphaJB, Johor

AlphaPrai, Butterworth

Page 15: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

POWER GENERATION

Concession Projects

The Group’s involvement in the power generation

business started in 1994 when it secured the first

Independent Power Producer (IPP) project in Cambodia

for an 18 years’ concession tenure to build-operate-transfer

a 35 MW diesel engine power plant in Phnom Penh. The

concession has expired in May 2015.

Riding on our successful operating track record, the

Group managed in 2009 to secure a second IPP project

in Cambodia for a 30 years’ concession tenure to

build-own-operate a 100MW coal-fired power plant in

Sihanoukville. This power plant was successfully put

into commercial operation in December 2013.

Forward Plan

In realising our vision to develop a portfolio of power

generation assets of diverse fuels in the region, where

the concession income serves to provide stable returns

to its investors, the Group is aggressively pursuing new

power generation projects in Southeast Asia in

Cambodia, Laos, Myanmar, Vietnam and Indonesia.

Apart from developing power plants, the Group, armed

with more than 16 years of operation experience, is also

exploring niche markets for the operation and

maintenance of power plants.

HNG CAPITAL CORPORATE PROFILE

What We Do • Power Generation

Division Structure

Power Generation Division

Cambodian Energy Limited (CEL)

Leader Energy Limited (LEL)

Page 16: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

POWER TRANSMISSION& DISTRIBUTION

Concession Projects

The Group secured a 25 years’ concession to

Build-Operate-Transfer (“BOT”) a power transmission

line project in Cambodia in 2009. The BOT project

involves the construction of the North Phnom Penh

230/115kV substation and the Kampong Cham 115/22kV

substation and approximately 110km of double circuit

230kV overhead transmission lines linking these 2

substations. This project has commenced commercial

operation in August 2013.

The Group’s expertise and experience in designing,

manufacturing, supplying, laying, trunking and erecting

of power and telecommunication cables is evident from

the list of turnkey projects that have been successfully

commissioned over the years.

Turnkey Installation Projects

Some of the projects the Group was awarded include:

• Kulim Hi-Tech Industrial Park Power Utility Project -

Turnkey supply, installation & commissioning of 11kV,

33kV and 132kV underground power cables.

• Cyberjaya, Selangor - 132kV underground cable

network development.

• Pencawangan Masuk Utama Kilat, Seremban -

Turnkey supply of underground power cables.

• Kuala Lumpur, Wilayah Persekutuan & Klang Valley

development project - Supply, installation and

commissioning of underground power cable network.

• Kawasan Tanjung Tokong to Farlim, Penang - 132kV

underground cable project.

• Batu Berendam GIS Substation, Malacca - 132kV

underground cable project.

• Wilayah Persekutuan, Selangor, Penang & Kedah -

33kV underground cable network.

HNG CAPITAL CORPORATE PROFILE

What We Do • Power Transmission & Distribution

Page 17: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

HNG CAPITAL CORPORATE PROFILE

What We Do • Power Transmission & Distribution

Division Structure

Power Transmission Division

Cambodian Transmission Limited (CTL)

Leader Electrical Engineering Limited(LEEL)

• Kawasan Johor Bahru & Kilat Substation - 132kV

underground cable network.

• Putrajaya, Selangor - 33kV underground cable

network.

• Gelugor Power Station Upgrade project - Turnkey

supply, laying and commissioning of power cables

and oil-filled power cables’ underground cable

network.

• Malaysia’s Light Rail Transit - Turnkey cable supplier

for rail’s signalling system.

• Bayan Baru Substation to Bayan Lepas Substation -

132kV underground cable project.

• Bukit Raja Substation to M. S. Steel Works - 132kV

underground cable project.

• Permas Jaya, Kota Putri, Sentul Raya and Batu

Caves Substation - 132kV XLPE underground cable

project.

• Kawasan Seremban - 132kV underground cable

network.

• Wilayah Persekutuan, Selangor, Penang & Kedah -

33kV underground cable network.

Power Transmission System: Complete System Design, Procurement, Supply, Installation and Commissioning of Overhead Lines and Substations

Underground Power Cable EHV 275kV Transmission System: System Design, Installation and Termination

Page 18: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

PROPERTY

HNG CAPITAL CORPORATE PROFILE

What We Do • Property

Division Structure

The Group’s involvement in property development began

in the late 80’s. It has to date developed several major

projects located mainly in Penang. These projects consist

of residential, commercial or mixed development ranging

from shop lots, retail units, terrace houses, bungalows,

condominiums and super condominiums. Driven by a

commitment towards excellence in design, workmanship

and delivery, the Group has earned itself a solid

reputation for developing top-notch quality and

well-designed properties with excellent value for money.

Due to a shift in focus onto its other core businesses,

especially in the Power segment, the Group has scaled

down its property development activities over the last few

years. Nevertheless, the Group is poised to reposition

itself as a developer as well as investor in strategic

property assets.

LEADER GroupProperty Development Division

Leader Universal Properties Sdn. Bhd.100% Subsidiary

Holding company for property investment and development

Page 19: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

HNG CAPITAL CORPORATE PROFILE

What We Do • Property

Dolphin Square Sdn. Bhd.

Dolphin Square Sdn. Bhd. was involved in the Mayfair

project, one of the most prestigious residential

developments on Penang island. This luxurious

29-storey, 49-unit super condominium with 5 basement

car parks is located along Jalan Sultan Ahmah Shah,

which is also known as Penang’s “Millionaire’s Row”.

Leader Garden Sdn. Bhd.

Leader Garden Sdn. Bhd. spearheaded a major

residential project known as Leader Garden on a

44.7-acre plot of land in Tanjung Bungah, Penang since

1995. The project was divided into 3 phases of

development, detailed as follows:

PHASE I

428 units of Condominium

PHASE II

45 units of 2-storey terrace house

PHASE III

54 units of 3-storey terrace house

10 units of 2-storey house

2 units of 3-storey semi-detached house

1 unit of 3-storey semi-detached house

Wisma Leader

Leader Garden Project - 1st & 2nd phase

Kompleks Pulau Mutiara project

Mayfair project

Leader Garden Project - 3rd phase - 3 storey and 2 storey terrace house

Page 20: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

Head Office

Suite 7A & 8A, Menara Northam,55 Jalan Sultan Ahmad Shah,10050 Penang, Malaysia.

T +604 2199 888F +604 2292 333

Cambodia Head Office

Power Plant #2, National Road #2,Sangkat Chak Angre Leu,Khan Meanchey,Phnom Penh, Kingdom of Cambodia.

T +855 2342 5991F +855 2342 5990

POWER DIVISIONLaos Representative Office

Leader Energy LimitedNong Pa Nai Village,Sikhottabong District,Vientiane Capital, Lao PDR

T +856 20 5550 6591

Malaysia Office

Leader Energy LimitedSuite 7-04A, Level 7, The PinnaclePersiaran Lagoon, Bandar Sunway,46150 Petaling Jaya, Selangor, Malaysia.

T +603 7610 0800 F +603 7610 0880

Singapore Office

Leader Energy Limited12, Marina View,#28-02, Asia Square Tower 2,Singapore 018961.

CONTACT US

Page 21: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

Leader Universal Aluminium Sdn Bhd2, Jalan Tahana, Kawasan Perindustrian Tampoi81200 Johor Bahru, JohorT +607-2381888 F +607-2386333www.luasb.com

C26 Kawasan Perindustrian Nilai 2, 71800 Nilai, Negeri SembilanT +606-7993061

Main Activity :Manufacture and sale of aluminium and aluminium alloy rods

Alpha Industries Sdn BhdNo, 37, Jalan Kangkar Tebrau, 81100, Johor Bahru, JohorT +607-3543996F +607-3542537, 3551521

2901 Solok Perusahaan Satu, Lot 2782 Mukim 1, Kawasan Perindustrian Prai, 13600 Sebarang Prai, PenangT +604-3985688F +604-3985388

Main Activity : Manufacture and sale of copper rods & wires

METAL

BUSINESS LOCATION

Cambodian Transmission LimitedLeader Electrical Engineering LimitedPower Plant #2, National Road #2, Sangkat Chak Angre Leu Khan Meanchey, Phnom Penh Kingdom of CambodiaT 855-23-425991 F 855-23-425990

Main Activity :Power Distribution & Transmission

Cambodian Energy Limited Preah Sihanouk Province Office Village 2, Kampenh Commune,Steung Hav District Preah Sihanouk Province Kingdom of CambodiaT 855-34-900611 F 855-23-425050

Main Activity : Power Generation

Leader Energy LimitedPower Plant #2, National Road #2, Sangkat Chak Angre Leu Khan Meanchey, Phnom Penh Kingdom of CambodiaT 855-23-425991 F 855-23-425990

Main Activity : Power Generation

POWER GENERATIONPOWER TRANSMISSION & DISTRIBUTION

Page 22: Our Journey Our Team What We Believe In What We Do Capital... · What We Believe In ... Caves Substation - 132kV XLPE underground cable project. • Kawasan Seremban - 132kV underground

Lite Kabel Sdn Bhd3 Medan Bayan Lepas, Phase 4, NFTZ, Bayan Lepas Technoplex, 11900 Penang T +604-6423626F +604-6423625www.litekabel.com

Main Activity :Manufacture and sale of optical fibre cables

CABLE

Leader Universal Properties Sdn BhdLeader Garden Sdn BhdMillion Crest (M) Sdn BhdDolphin Square Sdn BhdExogold Sdn BhdLeader Holdings Sdn BhdLeader Properties Sdn BhdHNG International LimitedH Dining Concepts Sdn BhdBagan Eighteen Sdn BhdCaldwell Dining Pte Ltd

Suite 7A, Menara Northam55 Jalan Sultan Ahmad Shah, 10050 Penang T +604-2199888 F +604-2292333

Main Activity : Property development and F&B

PROPERTY AND F&B