How to Implement Miradore to 10,000 devices in 2 Weeks
Otto Metsähukala
Senior Technical Engineer, Miradore Ltd
How to Implement Miradore to 10,000 devices in 2 Weeks
Implementation in general
Case example
Summary
Miradore Management Suite
Implementation in general
Management Suite infrastructure example
Miradore server Miradore client
HTTPS (TCP 443)
Wakeup (TCP 32227)
MS SQL serverMiradore masterinstallation point
Domain controller
Miradore clientdeployer
AD connector
Workstation
Miradore clientMiradore
installation point
RPC (TCP 135)NetBIOS (TCP 139)SMB (TCP 445)
RPC (TCP 135)NetBIOS (TCP 139)SMB (TCP 445)
HTTPS (TCP 443)
Wakeup (TCP 32227)
Internet
+ Patch managerHTTP (TCP 80)HTTPS (TCP 443)
Remote controlserver
Endpointbackup server
Miradore remotecontrol client
Miradore remotecontrol ADMIN client
HTTPS (TCP 443)
TCP 10001TCP 10001
Miradore Endpointbackup client
HTTPS (TCP 443)HTTPS (TCP 443)
Asset management
SW & OS deployment
Patch management
Remote control
Endpoint backup
Management Suite implementation process
1Initiation
2Preparations
3Installations
4Implementation
5Closing
Management Suite implementation process
• Scoping decisions
• Platforms
• Features
• Coverage
• Integrations & data import
• Service architecture decisions
• Delivery model
• Rollout decisions
• Definition of done
• Roles
• Schedule
1Initiation
2Preparations
3Installations
4Implementation
5Closing
Management Suite implementation process
• Basic information
• Number of:
• Locations
• Devices
• Users
• Operative decisions
• Client deployment method
• Installation points (how many & where?)
• Connectors
• Delivery capacity
• Miradore server
• Database server
• Connectivity
• Connectors
1Initiation
2Preparations
3Installations
4Implementation
5Closing
Management Suite implementation process
• Infrastructure verifications
• Server capacity
• Connectivity
• Installations
• Instance setup
• Permissions
• Basic settings
• Connectors
• Client deployment
• Testing
• Connectors
• Client deployment
1Initiation
2Preparations
3Installations
4Implementation
5Closing
Management Suite implementation process
• Asset management
• Client deployment
• Configuring settings
• OS & SW deployment
• Installation point setup
• Configuration
• Software asset management
• Identifying software
• Creating license pools
• Endpoint backup
• Endpoint backup server setup
• Defining backup jobs
• Patch management
• Setting up Patch manager
• Creating asset groups
• Creating automatic approval rules
• Remote control
• Install server & clients
• Configuration
1Initiation
2Preparations
3Installations
4Implementation
5Closing
Management Suite implementation process
• Handover to production
• Server hosting
• Support
• Aftercare activities
• Tasks to be done after the project
• Sign-off
• Customer representative closes theproject if ”Definition of done” is met
1Initiation
2Preparations
3Installations
4Implementation
5Closing
Engineering company in Asia
Case example
Fast facts: Engineering company in Asia
Employees19,000
Revenue1,3 B€ (2016 fiscal)
Locations10 business units, 20 factories, 50 sales offices, 10 centres of competence and 10 R&D centres
Background
• 30+ days delivery of computer after request
• Hard to address costs to proper business units due to unreliable inventory
• Lost devices due to lack of asset tracking
• Inefficient use of resources, over/underpowered machines
• Hardware components changed by end users
• Inability to know where devices are
• Manual wall to wall asset discovery
Management Suite solution
• Scoping decisions
• Platforms: Windows only
• Features: HW asset mgmt
• Coverage: Single country
• Integrations & data import: AD, HR data sheet, OEM warranty
• Service architecture decisions
• Servers hosted on end customer’svirtual host
• Rollout decisions
• Definition of done: HW asset mgmtreports in place
• Roles: 1 technical resource fromService provider + 1 Miradore engineer
• Schedule: 10 days for Installations & Implementation
1Initiation
2Preparations
3Installations
4Implementation
5Closing
Management Suite solution
• Basic information
• Number of:
• Locations: ~100
• Devices: 10,000
• Users: 19,000
• Operative decisions
• Client deployment method: 3rd party sw deployment tool
• Connectors: AD (x 5)
• Delivery capacity
• 2 virtual machines and networkconnectivity ordered
1Initiation
2Preparations
3Installations
4Implementation
5Closing
Management Suite solution
Active directory
Manufacturerwarranty
HR Datasheet
Client deployment
Users and computersCustom attributes
SubnetsHW inventories
Change log
Assets
Locations
Reporting
1Initiation
2Preparations
3Installations
4Implementation
5Closing
10 days
Management Suite implementation process
• Handover to production
• Aftercare activities
• Training the Asset manager
• Sign-off
1Initiation
2Preparations
3Installations
4Implementation
5Closing
Challenges during the implementation
• Server software issues (preconfigured IIS)
• Virtual machine issues
• AD, subnet and location information wasnot prepared beforehand and getting theinformation was slow
• Using end customer’s own software deployment tools for Miradore clientdeployment
• Internet connectivity issues
Summary
10 days
Implementation process& template
Smart infrastructure
2 technical engineers Hardware assetmanagement
10,000 clientsdeployed
Implementation in general
Case example