Network Elements above Threshold - PUN
Network
Element
Target
utilization
Total
Elements
No of elements
exceeding target
utilization
Reason Action Plan
BSC - TRX 80 12 33 BSC crossed 80 utilization
(MOH01 , MOH02 & JAL01)
As per TTSL, BSC TRX Utilizationcan reach 90.
BSC- Gb
link70 12 0 NA NA
BSC- NSEI
(PCU) *90 498 438
PCU requirement alreadyrequested to TTSL
POI 70 144
1 .Aircel Outroamer
2. Datacom
External POI
Traffic increasing for TTSL
Outroamer in Aircel and also
with Datacom external PoI
1. Augmentation requirementdiscussed with TTSL
2. Augmentation requirement
discussed with TTSL
MSS 70 2 0 NA NA
MGW 70 4 0 NA NA
2
-
8/13/2019 Orm With Ttsl Jan 14
3/24
Punjab 2G Without Exclusion
KPIMeasu
r.
We
ighTHR LCL
Targe
tUCL Jul-13
Aug-
13
Sep-
13
Oct-
13
Nov-
13Remark Action Plan
Network
Availability
Overall Network Availability Radio (Top
Towns)24 hr 7.5 100 99.90 99.98 100 99.82 99.91 99.74 99.89 99.94 Due to
infra
issues
Exclusion being
takenOverall Network Availability Radio (Rest of
Circle)24 hr 5 100 99.90 99.92 100 99.80 99.88 99.78 99.86 99.92
Network Availability Core 24 hr 2.5 100 100 99.98 100 100 100 100 100 100
Customer
Complaints
No. of Complaints per 1000 Subscribers 24 hr 5 3 2 1.5 1 1.70 1.31 1.73 1.32 1.21
% of Complaints resolved within SLA 24 hr 2.5 98 99 99.5 99.8 100 100 100 100 100
Repeated Complaints 24 hr 2.5 NA 3 2 1 0.28 0.36 0.27 0.26 0.19
Switch
PSR (Overall) NBH NBH 5 90 92 94.5 97 95.40 95.21 95.48 95.86 96.03
Terminating SMS success Rate NBH 2.5 NA 96 97.5 99 97.86 97.85 97.77 97.94 97.92
TSR NBH 5 96 97 98 99 98.26 98.38 98.06 98.33 98.71
Voice
% cells with DCR 98 BBH 2.5 NA 80 85 90 93.44 92.86 93.22 93.90 94.91
% of Connections with Good Voice Quality
(0-5) DL(Top 100)NBH 5 93 95 96 97 97.62 97.40 97.34 97.55 97.93
% of Connections with samples of UL FER
95%DBBH 5 NA 93 96 99 97.46 97.37 97.36 97.74 98.02
TBF drop DNBH 5 NA 1.2 0.8 0.4 5.06 5.69 5.96 5.29 5.25 EUTM
enabled
To be taken up with
TTL for new targets%age of Cells having TBF drop
-
8/13/2019 Orm With Ttsl Jan 14
4/24
KPI Daily KPI Sign Off May 13Meas
ur.
Weig
hTHR LCL
Targe
tUCL Jul'13
Aug'1
3
Sep'1
3
Oct'1
3
Nov'
13Remark Action Plan
Network
Availability
Overall Network Availability Radio (Top
Towns)24 hr 7.5 100 99.9 99.98 100 100 100 100 100 100
Overall Network Availability Radio (Rest of
Circle)24 hr 5 100 99.9 99.92 100 100 100 100 100 100
Network Availability Core 24 hr 2.5 100 100 99.98 100 100 100 100 100 100
Customer
Complaints
No. of Complaints per 1000 Subscribers 24 hr 5 3 2 1.5 1 0.79 0.74 0.74 0.59 0.48
% of Complaints resolved within SLA 24 hr 2.5 98 99 99.5 99.8 100 100 100 100 100
Repeated Complaints 24 hr 2.5 NA 3 2 1 0.28 0.36 0.27 0.26 0.19
Switch
PSR (Overall) NBH NBH 5 90 92 94.5 97 95.40 95.21 95.48 95.86 96.03
Terminating SMS success Rate NBH 2.5 NA 96 97.5 99 97.86 97.85 97.77 97.94 97.92
TSR NBH 5 96 97 98 99 99.68 99.79 99.37 99.47 99.62
Voice
% cells with DCR 98 BBH 2.5 NA 80 85 90 96.01 95.66 95.91 96.37 97.12
% of Connections with Good Voice Quality
(0-5) DL(Top 100)NBH 5 93 95 96 97 97.62 97.40 97.34 97.55 97.93
% of Connections with samples of UL FER
95% DBBH 5 NA 93 96 99 97.46 97.37 97.36 97.74 98.02
TBF drop DNBH 5 NA 1.2 0.8 0.4 0.80 0.80 0.80 0.80 0.80
%age of Cells having TBF drop
-
8/13/2019 Orm With Ttsl Jan 14
5/24
Punjab 3G Without Exclusion
Measure / KPI Wt %Thresh
old %
Lower
Limit %
Target
Value %
Upper
Limit %Jul-13 Aug-13
Sep-
13
Oct-
13Nov-13 Reason Action Plan
Network
AvailabilityCore Network Availabiliity 5 99.9 99.99% 100% 100% 100 100 100 100 100
Radio Network Availability -
Top Towns
2.5 99.85 99.90% 99.92% 99.96% 99.79 99.89 99.67 99.85 99.94 Infra related Issues
Heavy storm in punjabon 16/17-Sep.
Follow-up with
IPRadio Network Availability 2.5 99.75 99.88% 99.90% 99.92% 99.76 99.86 99.85 99.50 99.91
Preventive
Maintenance
Core Network 2 NA 95% 97% 100% 100 100 100 100 100
Radio Network 2 NA 95% 97% 100% 99 99.00 99.00 99.00 99.0
Customer
Complaints
No. of Network Complaints
Per 1000 VLR / Per Month5 5 4 3 2 0.38 0.28 0.31 0.33 0.28
% of Complaints resolved
within SLA5 80% 85% 90% 95% 100 100 100 100 100
Connection
Establishmen
t (Overall)
Voice - CSSR 2.5 93.62% 98.71% 99.73% 100% 99.66 99.72 99.70 99.73 99.77
instantaneous UE
Fails/RTWP observed in
NW/And Target is too
stringent
Case is already
taken up with
TTSL for
resolution
Voice - CSSR (Rest of the
Circle )2.5 92.54% 98.70% 99.73% 100% 99.66 99.70 99.67 99.69 99.71
Rel' 99 Svs - CSSR 2.5 NA 98.50% 99.51% 100% 97.85 97.93 97.72 98.21 97.97
Rel' 99 Svs - CSSR (Rest of
the Circle )2.5 NA 98.61% 99.63% 100% 96.61 96.87 96.10 97.28 96.52
HSDPA - CSSR 2.5 92.57% 96.68% 97.710% 98.74% 97.08 95.68 97.23 97.96 96.78
HSDPA - CSSR (Rest of the
Circle)2.5 92.33% 97.57% 98.098% 98.62% 96.75 95.89 96.21 94.94 95.12
HSUPA - CSSR 2.5 NA 96.36% 97.378% 98.41% 96.27 96.42 97.08 97.31 95.94
HSUPA - CSSR (Rest of the
Circle)2.5 NA 96.65% 97.673% 98.70% 95.51 96.24 95.35 93.16 93.48
5
-
8/13/2019 Orm With Ttsl Jan 14
6/24
-
8/13/2019 Orm With Ttsl Jan 14
7/24
Punjab 3G With Exclusion
Measure / KPIWt
%THR
Lower
Limit %
Targe
t
Value
%
Upper
Limit %Jul-13
Aug-
13
Sep-
13
Oct-
13
Nov-
13Reason Action Plan
Network
Availability
Core Network Availabiliity 5 99.9 99.99 100 100% 100 100 100 100 100
Radio Network Availability -
Top Towns
2.5 99.85 99.90 99.92 99.96 100 100 100 100 100
Radio Network Availability 2.5 99.75 99.88 99.90 99.92 100 100 100 100 100
Preventive
Maintenance
Core Network 2 NA 95% 97% 100% 100 100 100 100 100
Radio Network 2 NA 95% 97% 100% 99.00 99.00 99.00 99.00 99.00
Customer
Complaints
No. of Network Complaints
Per 1000 VLR / Per Month5 5 4 3 2 0.38 0.28 0.31 0.33 0.28
% of Complaints resolved
within SLA5 80% 85% 90% 95% 100 100 100 100 100
Connection
Establishmen
t (Overall)
Voice - CSSR 2.5 93.62 98.71% 99.73 100% 99.66 99.72 99.70 99.73 99.77
External Interference
causing high RL Fails.
RTWP observed in NW
Case is already taken
up with TTSL for
resolution
Voice - CSSR (Rest of the
Circle ) 2.5 92.54 98.70% 99.73 100 99.66 99.70 99.67 99.69 99.71
Rel' 99 Svs - CSSR 2.5 NA 98.50% 99.51 100% 97.85 97.93 97.72 98.21 97.97
Rel' 99 Svs - CSSR (Rest of
the Circle )2.5 NA 98.61% 99.63 100% 96.61 96.87 96.10 97.28 96.52
HSDPA - CSSR 2.5 92.57 96.68% 97.71 98.74% 97.08 95.68 97.23 97.96 96.78
HSDPA - CSSR (Rest of the
Circle)2.5 92.33 97.57% 98.09 98.62% 96.75 95.89 96.21 94.94 95.12
-instantaneous UE
Fails/RTWP observed in
NW Random degradation
observed in all cells.
Case is already taken
up with TTSL for
resolution/Care Case is
raised for the same
HSUPA - CSSR 2.5 NA 96.36% 97.37 98.41% 96.27 96.42 97.08 97.31 95.94
instantaneous UE
Fails/RTWP observed in
NW
Case is already taken
up with TTSL for
resolution
HSUPA - CSSR (Rest of the
Circle)2.5 NA 96.65% 97.67 98.70% 95.51 96.24 95.35 93.16 93.48
instantaneous UE
Fails/RTWP observed in
NW
Case is already taken
up with TTSL for
resolution
7
-
8/13/2019 Orm With Ttsl Jan 14
8/24
Punjab 3G With Exclusion
Measure / KPI Wt %
Thres
hold
%
Lower
Limit
%
Target
Value
%
Upper
Limit
%
Jul-13Aug-
13
Sep-
13
Oct-
13
Nov-
13Reason Action Plan
Connection
etainability
(Overall)
Voice - BLER (0 to 2 for % of Samples) 0.5 NA 96% 98% 99% 100 100 100 100 100
Voice - BLER (0 to 2 for % of Samples)
(Rest of the Circle )0.5 NA 96% 98% 99% 100 100 100 100 100
Voice - DCR 2.5 0.67% 0.34% 0.28% 0.26% 0.40 0.34 0.37 0.24 0.22
Voice - DCR (Rest of the Circle ) 2.5 0.53% 0.26% 0.21% 0.19% 0.46 0.42 0.49 0.29 0.34
Low Call volume cells
Targets too
Stringent.
To be taken up
with TTL
Rel' 99 Svs - DCR 2.5 NA 0.83% 0.70% 0.63% 1.04 0.83 0.84 0.79 0.79Instantaneous RL
Fails/RTWP in NW.
Rel' 99 Svs - DCR (Rest of the Circle ) 2.5 NA 0.81% 0.74% 0.66% 0.88 0.56 0.80 0.60 0.86
HSDPA - DCR 2.5 NA 0.94% 0.786% 0.71% 2.09 1.96 2.12 1.76 1.65 External Interference
causing high RL Fails.
RTWP observed inNW
Case is already
taken up with
TTSL forresolution
HSDPA - DCR (Rest of the Circle ) 2.5 NA 0.81% 0.734% 0.66% 2.33 2.36 2.65 1.92 1.94
HSUPA - DCR 2.5 NA 0.85% 0.712% 0.64% 1.98 2.08 2.23 1.84 1.79HSUPA - DCR (Rest of the Circle ) 2.5 NA 0.83% 0.757% 0.68% 2.23 2.38 2.68 1.95 1.95
2G-3G HOSR 0.5 NA 96% 98% 99% 99.91 99.94 99.85 99.94 99.96
2G-3G HOSR (Rest of the Circle ) 0.5 NA 96% 98% 99% 99.89 99.95 99.82 99.87 99.94
3G-2G HOSR 0.5 NA 96% 98% 99% 99.87 99.89 99.87 99.70 99.87
3G-2G HOSR (Rest of the Circle ) 0.5 NA 96% 98% 99% 99.88 99.89 99.86 99.97 99.85
Voice - SHOSR 0.5 NA 95% 97% 98% 99.92 99.94 99.94 99.93 99.94
Voice - SHOSR (Rest of the Circle ) 0.5 NA 95% 97% 98% 99.92 99.95 99.94 99.94 99.93
Voice - SHO Factor 0.5 NA 35% 35% 35% 31.28 31.43 31.61 31.32 31.61
Voice - SHO Factor (Rest of the Circle ) 0.5 NA 35% 35% 35% 29.02 29.23 29.18 29.48 29.01
Switch
Call Setup Success Rate (CS CORE) 5 94% 97% 98% 99% 99.12 99.17 99.13 99.12 98.90
RAB Establishment Success Rate 5 92% 97% 98% 99% 98.36 98.97 98.49 99.14 98.99
PSR 5 87% 90% 92% 94% 95.72 95.87 95.51 95.95 96.11
Answer to Seizure Ratio (Excluding
ILD)1 NA 35% 40% 45% 44.48 45.29 45.66 46.45 48.42
Nb Traffic throughput utilization 1 NA 75% 70% 65% 35.55 36.25 38.51 37.94 39.37
Nb Traffic, Packet success ratio 1 NA 97% 98% 99% 100 100 100 100100.0
0
Processor Load RNC, MGW, MSS 1 NA 75% 70% 65% 12.81 13.68 14.76 13.71 13.47Signalling Utilization 1 NA 35% 40% 45% 17.62 18.57 17.70 16.68 18.13
8
-
8/13/2019 Orm With Ttsl Jan 14
9/24
Aug, Sep, Oct & Nov 13 Worst Cells
Worst Cells analysis - PUN
9
Stable trend
KPI
Worst Cells With Optimization
PossibleImproved Under Optimization
Aug-13 Sep-13 Oct-13 Nov-13 Aug-13 Sep-13 Oct-13 Nov-13 Aug-13 Sep-13 Oct-13 Nov-13
DCR 253 124 98 73 201 105 76 60 52 19 22 13
TCH BLOCK 38 44 22 15 27 35 19 9 11 9 3 6
SD BLOCK 4 10 4 2 4 10 4 2 0 0 0 0
CSSR 61 47 27 25 48 40 24 22 13 7 3 3
DL VOICE
Quality169 99 67 84 85 62 39 52 84 37 28 32
UL Voice
Quality60 43 26 23 29 32 18 15 31 11 8 8
9
-
8/13/2019 Orm With Ttsl Jan 14
10/24
Customer Complaints Analysis - PUN
10
Sep'13:
Total SR's: 645VLR: 870500SR/1000: 0.74
Nov'13:
Total SR's:485VLR:873105SR/1000:0.55
Aug'13:
Total SR's: 626VLR: 847365SR/1000: 0.73
Sep'13:
Total SR's: 18VLR: 57626SR/1000: 0.31
Nov13:
Total SR's: 17VLR: 66701SR/1000: 0.25
Aug'13:Total SR's: 31VLR:54369SR/1000: 0.27
Oct'13:
Total SR's:521VLR:877041SR/1000:0.59
Oct'13:
Total SR's: 19VLR: 58331SR/1000: 0.32
0
0.5
1
1.5
2
Aug/13 Sep/13 Oct/13 Nov/13
SR/1000
2G SR/1000 Trend
SR's /1000
Target
0.00
0.50
1.00
1.502.00
2.50
3.00
3.50
Aug/13 Sep/13 Oct/13 Nov/13
SR/10
00
3G SR/1000 Trend
SR's /1000
Target
CSMM Categorization Action PlanNetwork Coverage 2G-29 Sites & 3G- 52sites under Catapult Project are planned .Network Coverage - On
Highway Not PlannedNetwork Capacity 24- 2G Sites & 22 -3G sites declared as RFS under Catapult Project .Continuous Speech of
Voice Calls Maintaining network quality, Enhancement plan for Call drops in the network for continuous speech ofvoice calls.Network - Call Quality Optimizer planned for Half Yearly
10
-
8/13/2019 Orm With Ttsl Jan 14
11/24
Initiatives - PUN
11
Cost Optimization Initiatives & status
Downtime penalty has been imposed on Infra vendors for 34 lacks rupees in last 3
months.
Network Quality & customer satisfaction improvement initiatives:
SPC & ESB/LBS completed for all the nodes.
RU30 upgraded in all the RNCs & WN7.0 implemented in all the node-Bs.
IOS upgrade done in Jalandhar/ Shimla Routers.
Project catapult 24 nos.2G sites & 22 nos.3G sites made RFS + 7 nos. -4
th
sectoradditions done.
77 ID/OD conversions completed.
7 nos. PCU cards added in the network. TSR optimization/improvement.
Reliance ICR connectivity for Reliance ICR In-roamers in progress. Initial UAT testing completed.
TX topology changes & M/w ring closures to reduce dependency on troubled sites and avoid link
site outages 31 galaxy sites hops short closures.
11
-
8/13/2019 Orm With Ttsl Jan 14
12/24
Concerns/Critical Issues - PUN
12
Support Required from TTL :
Replenishment of RNP/damage units.
High Infra outages on VIOM Hub sites & BSC/RNC due to Infra issue non
clearance.
Critical Spares required for Core/BSC/RNC/Tellabs/NodeB.
12
-
8/13/2019 Orm With Ttsl Jan 14
13/24
Haryana
k l b h h ld
-
8/13/2019 Orm With Ttsl Jan 14
14/24
Network Elements above Threshold - HAR
14
Network Element
Target
utilizatio
n
Total
Elemen
ts
No of
elements
exceeding
targetutilization
Reason Action Plan
BSC - TRX 80 12 2BPNT1 & BRTK1 is Greater than
80 % utilized
As per TTSL, BSC TRX Utilization
can reach 90.
BSC- Gb link 70 12 0 NA NA
BSC- NSEI (PCU) * 90 441 414 High utilized NSEIs/PCUs PCU Requirement
POI 70 110 2-AIRTEL LOCAL Non availability of media
Requested Augmentation
already, not feasible due to
unavailability of media as per
customer.
MSS 70 2 0 NA NA
MGW 70 4 0 NA NA
14
-
8/13/2019 Orm With Ttsl Jan 14
15/24
KPI KPIMeas
.
Weig
hTHR LCL
Targe
tUCL Jul-13
Aug-
13
Sep-
13
Oct-
13
Nov-
13Remark Action Plan
Network
Availability
Overall Network Availability Radio (Top Towns) 24 hr 7.5 100 99.9 99.98 100 99.83 99.92 99.90 99.90 99.93 High outages on
TVI, Reliance Sites.
High outage on
TTSL media
Overall Network Availability Radio (Rest of
Circle)24 hr 5 100 99.9 99.92 100 99.82 99.88 99.84 99.85 99.86
Network Availability Core 24 hr 2.5 100 100 99.98 100 100% 100% 100% 100%100%
Customer
Complaints
No. of Complaints per 1000 Subscribers 24 hr 5 3 2 1.5 1 0.35 0.35 0.34 0.33 0.33
% of Complaints resolved within SLA 24 hr 2.5 98 99 99.5 99.8 100 100 100 100 100.0
Repeated Complaints 24 hr 2.5 NA 3 2 1 0.23 0.23 0.22 0.23 0.23
Switch
PSR (Overall) NBH NBH 5 90 92 94.5 97 96.50 96.12 96.41 96.36 96.36
Terminating SMS success Rate NBH 2.5 NA 96 97.5 99 97.82 97.78 97.94 97.92 98.08
TSR NBH 5 96 97 98 99 98.11 98.12 98.10 98.34 98.29
Voice
% cells with DCR 98 BBH 2.5 NA 80 85 90 92.80 92.00 92.88 93.17 94.50% of Connections with Good Voice Quality (0-5)
DL(Top 100)NBH 5 93 95 96 97 97.66 97.58 97.51 97.60 97.75
% of Connections with samples of UL FER 95% DBBH 5 NA 93 96 99 98.06 97.85 97.49 97.64 97.92
TBF drop DNBH 5 NA 1.2 0.8 0.4 5.52 5.94 6.07 5.82 5.55EUTM enabled
to be taken
up with TTL%age of Cells having TBF drop
-
8/13/2019 Orm With Ttsl Jan 14
16/24
Haryana2G With Exclusion
KPI KPIMeas
ur.
Weig
hTHR LCL
Targe
tUCL Jul-13
Aug-
13
Sep-
13
Oct-
13
Nov-
13Remark
Action
Plan
Network
Availability
Overall Network Availability Radio (Top Towns) 24 hr 7.5 100 99.9 99.98 100 100 100 99.99 100 100
Overall Network Availability Radio (Rest of Circle) 24 hr 5 100 99.9 99.92 100 100 100 99.99 100 100
Network Availability Core 24 hr 2.5 100 100 99.98 100 100 100 100 100 100
Customer
Complaints
No. of Complaints per 1000 Subscribers 24 hr 5 3 2 1.5 1 0.35 0.35 0.34 0.33 0.33
% of Complaints resolved within SLA 24 hr 2.5 98 99 99.5 99.8 100 100 100 100 100Repeated Complaints 24 hr 2.5 NA 3 2 1 0.23 0.23 0.22 0.23 0.23
Switch
PSR (Overall) NBH NBH 5 90 92 94.5 97 96.50 96.12 96.41 96.36 96.36
Terminating SMS success Rate NBH 2.5 NA 96 97.5 99 97.82 97.78 97.94 97.92 98.08
TSR NBH 5 96 97 98 99 99.79 99.79 99.74 99.69 99.50
Voice
% cells with DCR 98 BBH 2.5 NA 80 85 90 94.75 94.14 93.99 94.53 96.03
% of Connections with Good Voice Quality (0-5)
DL(Top 100)NBH 5 93 95 96 97 97.66
97.58 97.51 97.61 97.75
% of Connections with samples of UL FER 95% DBBH 5 NA 93 96 9998.06
0 97.85 97.49 97.64 97.92
TBF drop DNBH 5 NA 1.2 0.8 0.4 0.80 0.80 0.80 0.80 0.80
%age of Cells having TBF drop
-
8/13/2019 Orm With Ttsl Jan 14
17/24
KPI KPIWeig
hTHR LCL
Targe
tUCL
July'1
3
Aug'1
3
Sep'1
3
Oct'1
3
Nov'1
3Reason Action Plan
Network
Availability
Core Network Availability Top Towns 2.5 99.999.99
%100% 100% 100 100 100 100 100
Core Network Availability (Rest Of the
Circle)2.5 99.9
99.99
%100% 100% 100 100 100 100 100
Radio Network Availability - Top Towns 2.5 99.75 99.88%
99.90%
99.92%
99.77%
99.91%
100% 100% 99.95
Radio Network Availability (Rest Of the
Circle)2.5 99.75
99.88
%
99.90
%
99.92
%
99.91
%
99.67
%100% 100% 99.92
Preventive
Maintenance
Core Network 2 NA 95% 97% 100% 100 100 100 100 100
Radio Network 2 NA 95% 97% 100% 98 98 98 98 98
Customer
Complaints
No. of Network Complaints Per 1000
VLR / Per Month5 5 4 3 2 0.22 0.23 0.23 0.19 0.16
% of Complaints resolved within SLA 5 80% 85% 90% 95% 100 100 100 100 100
Connection
Establishmen
t
Voice - CSSR (Top Towns) 2.593.62
%
98.71
%
99.73
%100% 99.52 99.74 99.73 99.69 99.55
Service Impacting alarms
on specific daysTemporary
Issue
Voice - CSSR (Rest of the Circle ) 2.592.54
%
98.70
%
99.73
%100% 99.73 99.66 99.67 99.62 99.61
Service Impacting alarms
on specific days
Temporary
Issue
Rel' 99 Svs - CSSR (Top Towns) 2.5 NA98.50
%
99.51
%100% 99.29 99.42 99.34 99.49 99.47
Service Impacting alarms
on specific daysTemporary
Issue
Rel' 99 Svs - CSSR (Rest of the Circle ) 2.5 NA98.61
%
99.63
% 100% 99.21 99.39 99.28 99.39 99.50Service Impacting alarms
on specific days TemporaryIssue
HSDPA - CSSR (Top Towns) 2.592.57
%
96.68
%
97.71
%
98.74
%97.80 95.77 97.42 98.36 98.36
HSDPA - CSSR (Rest of the Circle) 2.592.33
%
97.57
%
98.10
%
98.62
%98.39 94.43 96.28 98.31 98.92
HSUPA - CSSR (Top Towns) 2.5 NA96.36
%
97.38
%
98.41
%96.24 96.24 96.64 97.02 98.14
HSUPA - CSSR (Rest of the Circle) 2.5 NA
96.65
%
97.67
%
98.70
% 97.79 96.35 96.81 97.88 98.78
Haryana3G Without Exclusion
17
H 3G Wi h E l i
-
8/13/2019 Orm With Ttsl Jan 14
18/24
KPI KPIWei
ghTHR LCL Target UCL
July'1
3
Aug'1
3
Sep'1
3
Oct'1
3
Nov1
3Reason Action Plan
Connection
Retainability
(Overall)
Voice - BLER (0 to 2 for % of
Samples) UL (Top Towns)0.5 NA
96.00
%
98.00
%
99.00
%100 100 100 100 100
Voice - BLER (0 to 2 for % of
Samples) UL (Rest of the Circle)0.5 NA
96.00
%
98.00
%
99.00
%100 100 100 100 100
Voice - DCR(Top Towns) 2.5 0.67 0.34% 0.28% 0.25% 0.25 0.29 0.23 0.2 0.20
Voice - DCR (Rest of the Circle ) 2.5 0.53 0.26% 0.21% 0.19% 0.26 0.29 0.23 0.19 0.17
Rel' 99 Svs - DCR(Top Towns) 2.5 NA 0.83% 0.695 0.63% 0.72 0.47 1.51 1.27 1.10Dip Due to HRNAMB01 Increase
in IU FailsCare Case
raised
Rel' 99 Svs - DCR (Rest of the Circle
)2.5 NA 0.81% 0.74% 0.66% 0.75 0.51 1.66 1.38 1.28
HSDPA - DCR(Top Towns) 2.5 NA 0.94% 0.79% 0.71% 1.34 1.28 1.37 1.12 1.05Revised Target of these KPIs are
very stringent to achieve.HSDPA - DCR (Rest of the Circle ) 2.5 NA 0.81% 0.73% 0.66% 1.36 1.49 1.50 1.11 1.07
HSUPA - DCR(Top Towns) 2.5 NA 0.85% 0.71% 0.64% 1.51 1.49 1.60 1.36 1.34
HSUPA - DCR (Rest of the Circle ) 2.5 NA 0.83% 0.76% 0.68% 1.44 1.67 1.70 1.30 1.31
2G-3G HOSR(Top Towns) 0.5 NA 96% 98% 99% 99.99 99.98 99.96 99.99 99.98
2G-3G HOSR (Rest of the Circle ) 0.5 NA 96% 98% 99% 100 99.96 99.96 99.94 99.94
3G-2G HOSR RT+NRT (Top Towns) 0.25 NA 96% 98% 99% 99.80 99.81 99.69 99.78 99.82
3G-2G HOSR RT+NRT (Rest of the
Circle )0.25 NA 96% 98% 99% 99.85 99.87 99.73 99.78 99.97
Voice - SHOSR(Top Towns) 0.5 NA 95% 97% 98% 99.90 99.91 99.89 99.91 99.84
Voice - SHOSR (Rest of the Circle ) 0.5 NA 95% 97% 98% 99.91 99.91 99.90 99.87 99.80
Voice - SHO Factor RT + NRT (Top
Towns)0.5 NA 35% 35% 35% 31.49 30.38 32.17 32.85 33.21
Voice - SHO Factor RT + NRT (Rest
of the Circle ) 0.5 NA 35% 35% 35% 29.54 28.46 29.82 29.89 29.96
Switch
Call Setup Success Rate (CS CORE) 5 94% 97% 98% 99% 98.97 99.17 99.13 99.11 98.56
RAB Establishment Success Rate 5 92% 97% 98% 99% 99.48 99.62 99.54 99.61 99.56
PSR 5 87% 90% 92% 94% 96.79 96.48 96.37 96.60 96.59
Answer to Seizure Ratio (Excluding
ILD)1 NA 35% 40% 45% 46.32 45.74 45.59 47.30 47.64
Nb Traffic throughput utilization 1 NA 75% 70% 65% 41.63 42.42 45.19 46.31 45.24
Nb Traffic, Packet success ratio 1 NA 97% 98% 99% 100 100 100 100 99.99
Processor Load RNC, MGW, MSS 1 NA 75% 70% 65% 15.63 17.79 18.08 18.79 18.10
Signalling Utilization 1 NA 35% 40% 45% 23.63 21.59 23.10 24.05 20.65
Haryana3G Without Exclusion
18
H 3G With E l i
-
8/13/2019 Orm With Ttsl Jan 14
19/24
KPI KPIWeig
hTHR LCL
Targe
tUCL
July'1
3
Aug'1
3
Sep'1
3
Oct'1
3
Nov'1
3Reason Action Plan
Network
Availability
Core Network Availability Top Towns 2.5 99.999.99
%100% 100% 100 100 100 100 100
Core Network Availability (Rest Of the
Circle)2.5 99.9
99.99
%100% 100% 100 100 100 100 100
Radio Network Availability - Top Towns 2.5 99.7599.88
%
99.90
%
99.92
% 100% 100% 100% 100% 100
Radio Network Availability (Rest Of the
Circle)2.5 99.75
99.88
%
99.90
%
99.92
%100% 100% 100% 100% 100
Preventive
Maintenance
Core Network 2 NA 95% 97% 100% 100 100 100 100 100
Radio Network 2 NA 95% 97% 100% 98 98 98 98 98
Customer
Complaints
No. of Network Complaints Per 1000
VLR / Per Month5 5 4 3 2 0.22 0.23 0.23 0.19 0.16
% of Complaints resolved within SLA 5 80% 85% 90% 95% 100 100 100 100 100
Connection
Establishment
Voice - CSSR (Top Towns) 2.593.62
%
98.71
%
99.73
%100% 99.52 99.74 99.73 99.69 99.55
Service Impacting Alarms on
specific days
One time
issue
Voice - CSSR (Rest of the Circle ) 2.592.54
%
98.70
%
99.73
%100% 99.73 99.66 99.67 99.62 99.61
Service Impacting Alarms on
specific days
One time
issue
Rel' 99 Svs - CSSR (Top Towns) 2.5 NA98.50
%
99.51
%100% 99.29 99.42 99.34 99.49 99.47
Service Impacting Alarms on
specific days
One time
issue
Rel' 99 Svs - CSSR (Rest of the Circle ) 2.5 NA98.61
%
99.63
%100% 99.21 99.39 99.28 99.39 99.50
Service Impacting Alarms on
specific days
One time
issue
HSDPA - CSSR (Top Towns) 2.592.57
%
96.68
%
97.71
%
98.74
%97.80 95.77 97.42 98.36 98.36
HSDPA - CSSR (Rest of the Circle) 2.592.33
%
97.57
%
98.10
%
98.62
%98.39 94.43 96.28 98.31 98.92
HSUPA - CSSR (Top Towns) 2.5 NA96.36
%
97.38
%
98.41
%96.24 96.24 96.64 97.02 98.14
HSUPA - CSSR (Rest of the Circle) 2.5 NA96.65
%
97.67
%
98.70
%97.79 96.35 96.81 97.88 98.78
Haryana3G With Exclusion
19
H 3G With E l i
-
8/13/2019 Orm With Ttsl Jan 14
20/24
KPI KPIWei
ghTHR LCL Target UCL
July'1
3
Aug'1
3Sep'13 Oct'13
Nov1
3Reason Action Plan
Connection
Retainabilit
y (Overall)
Voice - BLER (0 to 2 for % of Samples) UL
(Top Towns)0.5 NA
96.00
%
98.00
%
99.00
%100 100 100 100 100
Voice - BLER (0 to 2 for % of Samples) UL
(Rest of the Circle)0.5 NA
96.00
%
98.00
%
99.00
%100 100 100 100 100
Voice - DCR(Top Towns) 2.5 0.67 0.34% 0.28% 0.25% 0.26 0.29 0.23 0.2 0.20
Voice - DCR (Rest of the Circle ) 2.5 0.53 0.26% 0.21% 0.19% 0.26 0.29 0.23 0.19 0.17
Rel' 99 Svs - DCR(Top Towns) 2.5 NA 0.83% 0.695 0.63% 0.72 0.47 1.50 1.27 0.83 Increase in IU Fail in
HRNAMB01.Rel' 99 Svs - DCR (Rest of the Circle ) 2.5 NA 0.81% 0.74% 0.66% 0.75 0.51 1.65 1.38 0.96
HSDPA - DCR(Top Towns) 2.5 NA 0.94% 0.79% 0.71% 1.34 1.28 1.37 1.12 1.05 Revised Target of these
KPIs are very stringent to
achieve.
HSDPA - DCR (Rest of the Circle ) 2.5 NA 0.81% 0.73% 0.66% 1.36 1.49 1.50 1.11 1.07
HSUPA - DCR(Top Towns) 2.5 NA 0.85% 0.71% 0.64% 1.51 1.49 1.60 1.36 1.34
HSUPA - DCR (Rest of the Circle ) 2.5 NA 0.83% 0.76% 0.68% 1.44 1.67 1.70 1.30 1.31
2G-3G HOSR(Top Towns) 0.5 NA 96% 98% 99% 99.99 99.98 99.96 99.99 99.982G-3G HOSR (Rest of the Circle ) 0.5 NA 96% 98% 99% 100 99.96 99.96 99.94 99.94
3G-2G HOSR RT+NRT (Top Towns) 0.25 NA 96% 98% 99% 99.80 99.81 99.69 99.78 99.82
3G-2G HOSR RT+NRT (Rest of the Circle ) 0.25 NA 96% 98% 99% 99.85 99.87 99.73 99.78 99.97
Voice - SHOSR(Top Towns) 0.5 NA 95% 97% 98% 99.90 99.91 99.89 99.91 99.84
Voice - SHOSR (Rest of the Circle ) 0.5 NA 95% 97% 98% 99.91 99.91 99.90 99.87 99.80
Voice - SHO Factor RT + NRT (Top Towns) 0.5 NA 35% 35% 35% 31.49 30.38 32.17 32.85 33.21
Voice - SHO Factor RT + NRT (Rest of the
Circle )
0.5 NA 35% 35% 35% 29.54 28.46 29.82 29.89 29.96
Switch
Call Setup Success Rate (CS CORE) 5 94% 97% 98% 99% 98.97 99.17 99.13 99.11 98.56
RAB Establishment Success Rate 5 92% 97% 98% 99% 99.48 99.62 99.54 99.61 99.56
PSR 5 87% 90% 92% 94% 96.79 96.48 96.37 96.60 96.59
Answer to Seizure Ratio (Excluding ILD) 1 NA 35% 40% 45% 46.32 45.74 45.59 47.30 47.64
Nb Traffic throughput utilization 1 NA 75% 70% 65% 41.63 42.42 45.19 46.31 45.24
Nb Traffic, Packet success ratio 1 NA 97% 98% 99% 100 100 100 100 99.99
Processor Load RNC, MGW, MSS 1 NA 75% 70% 65% 15.63 17.79 18.08 18.79 18.10
Signalling Utilization 1 NA 35% 40% 45% 23.63 21.59 23.10 24.05 20.65
Haryana3G With Exclusion
20
W C ll l i HAR
-
8/13/2019 Orm With Ttsl Jan 14
21/24
Worst Cells analysis - HAR
21
KPI
Worst cells with Optimization
PossibleImproved Under Optimization
Aug-13 Sep-13 Oct-13 Nov-13 Aug-13 Sep-13 Oct-13 Nov-13 Aug-13 Sep-13 Oct-13 Nov-13
DCR 54 99 105 43 39 78 89 32 15 21 16 11
TCH Blking 40 59 86 49 33 47 72 41 7 12 14 8
SD Blking 10 11 14 11 10 8 13 8 0 3 1 3
CSSR 53 77 110 58 47 60 86 44 6 17 24 14
Voice
Qual_DL118 143 138 88 63 101 107 62 55 42 31 26
Voice
Qual_UL 34 30 39 20 28 24 39 18 6 6 0 2
21
C t C l i t A l i HAR
-
8/13/2019 Orm With Ttsl Jan 14
22/24
Customer Complaints Analysis - HAR
22
Aug13:Total SR's: 448
VLR: 1288488SR/1000: 0.35
OCT'13:Total SR's:441
VLR:1328729SR/1000:0.33
Sep13:Total SR's: 446
VLR: 1327006SR/1000: 0.34
Aug'13:Total SR's: 12
VLR: 60095SR/1000: 0.22
Oct13:Total SR's: 11
VLR: 56427SR/1000: 0.19
Sep13:Total SR's: 13
VLR:57140SR/1000: 0.23
Nov13:Total SR's: 430
VLR: 1318343SR/1000: 0.32
Nov13:Total SR's: 10
VLR: 67975SR/1000: 0.16
0
0.5
1
1.5
2
Aug'13 Sep'13 Oct'13 Nov'13
2G SR/1000 Trend
2G SR/1000
Target
0
0.5
1
1.52
2.5
3
3.5
Aug'13 Sep'13 Oct'13 Nov'13
3G SR/1000 Trend
3G SR/1000
Target
CSMM Categorization Action PlanNetwork Coverage 2G-66 Sites & 3G-49 sites under Catapult Project are planned .
Network Coverage - On
Highway Not PlannedNetwork Capacity 43- 2G Sites & 22 -3G sites declared as RFS under Catapult Project .Continuous Speech of
Voice Calls Maintaining network quality, Enhancement plan for Call drops in the network for continuous speech ofvoice calls.Network - Call Quality
Optimizer planned for Half Yearly
22
I iti ti HAR
-
8/13/2019 Orm With Ttsl Jan 14
23/24
Initiatives - HAR
23
Cost Optimization Initiatives & status
An approximate Cost of Rs. 89,39,607- saved in last 03 months , found as variance duringvalidation of IP invoices where IP have wrongly claimed the same .
Uptime penalty and Theft and damage penalty has been imposed on Infra vendors for INR
69,66,247 in last three months till Nov13.
Network Quality & customer satisfaction improvement initiatives
RCOM ICR implemented and launched successfully.SPC & ESB/LBS completed for all the nodes.
RU30 upgraded in all the RNCs & WN7.0 implemented in all the node-Bs.
Project catapult 43 nos.2G sites & 22 nos.3G sites made RFS + 13nos. -4thsector
additions done.
82 ID/OD conversions completed.
10 nos. PCU cards added in the network.
RAM upgraded in BAMB1 as S16.1 preparation
S16.1 will be implement in BAMB1
EP 5.2 will be implement in all BTS of BAMB1
23
C /C i i l I HAR
-
8/13/2019 Orm With Ttsl Jan 14
24/24
Concerns/CriticalIssues - HAR
24
Support Requested:
Non availability of critical Spares.
Replenishment of RNP/damage units.
Requirement of sufficient quantity of consumables.( Jumpers ,weather proofing kits
,cable ties,PVC tapes)
Concerns/critical issues:
From new year perspective, augmentation is required with Airtel POI, as per
customer media is not available there.
24