DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product Lifecycle Management & Power Analytics Solutions Brian Chambers Dassault Systemes Mark Ascolese EDSA

Transcript of Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential...

Page 1: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

Optimizing Data Center Design and Operational Performance:

Integrating Product Lifecycle Management & Power Analytics Solutions

Brian Chambers

Dassault Systemes

Mark Ascolese

EDSA

Page 2: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

Optimizing Data Center Design and Operational Performance:

Integrating Product Lifecycle Management and Power Analytics Solutions

Abstract

Product Lifecycle Management (PLM) solutions integrated with Power Analytics during the design,

build, and operation of data centers provide an ability to jointly optimize across energy efficiency,

reliability, and the total cost of ownership.

System design integrity is maintained throughout the lifecycle to improve commissioning, asset

management, modular extension and IT equipment upgrades.

With pre-validated and more standardized designs, remote monitoring of the electrical system,

integrated with PLM, provides an ability to scale operations across a fleet of data centers, and

leverages the more centralized use of highly skilled resources.

These integrated solutions simultaneously address IT availability, scalability and sustainability.

Page 3: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

DS V6 Innovation Spiral for Data Center

3

ExperienceExperience

ExperienceVisibility acrossProject and Operations

Status in 3D

Produce

Page 4: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

DS V6 Innovation Spiral for Data Center

4

ExperienceExperience

ExperienceVisibility acrossProject and Operations

Status in 3D

People

Engineer / Configure to Order

Pre-validated Designs

Produce

Page 5: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

DS V6 Innovation Spiral for Data Center

5

ExperienceExperience

ExperienceVisibility acrossProject and Operations

Status in 3D

Produce

Design

Reduced Design ErrorsOptimized Space, Power and Cooling

Page 6: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

SimulateReduced Commissioning Costs

DS V6 Innovation Spiral for Data Center

6

ExperienceExperience

ExperienceVisibility acrossProject and Operations

Status in 3D

Produce

Page 7: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

DS V6 Innovation Spiral for Data Center

7

ExperienceExperience

ExperienceVisibility acrossProject and Operations

Status in 3D

Produce

Managed Energy UsageContinual Improvement against “What If” Scenarios

Page 8: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

DS V6 Innovation Spiral for Data Center

8

ExperienceExperience

ExperienceVisibility acrossProject and Operations

Status in 3D

Ensured Optimal Technical Refresh

Produce

Page 9: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

Modeling

• Detailed power systems

design, simulation, and

analysis; get facility design

“Perfect on Paper”

• Results in a detailed

knowledge base of the

design, or “DesignBase”

Power Analytics Overview

Page 10: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

Modeling

• Detailed power systems

design, simulation, and

analysis; get facility design

“Perfect on Paper”

• Results in a detailed

knowledge base of the

design, or “DesignBase”

Integrate DataCollection

Infrastructure

• Connect DesignBase to

facility’s on-line electrical

system data, enabling expert

assessment of electrical

system health

Power Analytics Overview

Page 11: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

Modeling

• Detailed power systems

design, simulation, and

analysis; get facility design

“Perfect on Paper”

• Results in a detailed

knowledge base of the

design, or “DesignBase”

Integrate DataCollection

Infrastructure

• Connect DesignBase to

facility’s on-line electrical

system data, enabling expert

assessment of electrical

system health

ActivatePower Analytics

• Once in operation, system

develops its own deep

knowledge about electrical

system infrastructure

• “Actual” and “As-designed”

specifications are compared,

to predict potential problems

before they occur

Power Analytics Overview

Page 12: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

Program Mgt, Project Mgt

DATA CENTER – Business Processes (Tier 0)

12

Installation &Validation

Enterprise

Governance Processes

Power & Cooling

SystemsProcesses

IT & Telecom

SystemsProcesses

Site, Facility &

BuildingProcesses

Supply Chain

Management Processes

PreparePlan

End of lifeInstall

Commission

System DesignBidding

Tendering

New Project

Handover Operate MaintainUpgrade

Power Cooling Design , Analysis

Operation, Reconfigure, Maintain,

Upscale, Upgrade

Operation, Reconfigure, Maintain,

Upscale, Upgrade

Site/Building requirements, Construction Planning

Structure, MEP, Equipment layout

Construction, Installation, maintenance

Strategy & Planning,Capability Delivery

Supplier/Partner Installation & Test

Supplier/Partner Interface Management

Services/Offers, Development

IT & Telco Installation &Validation

IT & Telco Logical Design

Page 13: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

Building

DATA CENTER - System Engineering

IT

Power

Cooling

RFLP Benefit: Traceability and continuity across all

levels & data structures

Voice of the customer

R

Define what the system

does

F

Define how the system

acts

L

Define 3D behavior of system

P

Page 14: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

DATA CENTER - PLM and Power Analytics

14

Power Systems Design, Commission, Monitor

& Power Infrastructure Diagnostics

Project Requirement Engineering RegulationEquipment

Catalog

Contractor

& VendorConstruction Operation

Mo

delin

g

Collaborative PLM Platform

ENOVIA V6

As-maintainedConfiguration

Contract Resources Deliverables Work break-down

Customer’sRequirements Equipment

Requirementsas Supplied

Compliancy Requirements

F – L – PLibrary of Standard

Equipment Schedule

Design &Validation

Power Commissioning, Operation,

Reconfigure, Maintain, Upscale,

Upgrade

EngineeredConfiguration

R

Page 15: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

Predictive Maintenance Foundation

# Scenario

1 Info Worker’s Multi-Discipline Portala) Check Facility status via

Collaboration Portal b) Prepare work for Maintenance

Technician

2 Mobility for Maintenance Techniciana) Review Work Order

• 3D Live Interactive Visual Docsb) Repair Faulty / At-risk Assetsc) Sign-off Work Order

3 Maintenance & Engineering Collaboration with KPI based Engineering Issue Generationa) Raise Issue(s) with Engineering in 3Db) Generate Engineering Issue(s)c) Execute ECR / ECO / Maintenance

4 Maintenance DocumentationGenerationa) Update 3D Maintenance Doc from

ECR / ECO / Maintenance Tasksb) Release Updated Technical

Documentation

Operation, Reconfigure, Maintain,

Upscale, Upgrade

Operation, Reconfigure, Maintain,

Upscale, Upgrade

Supplier/Partner Interface Management

Evolving Configuration – Pilot Change Orders# Scenario

1 Info Worker’s Multi-Discipline Portala) Check Facility status via

Collaboration Portal b) Prepare work for Maintenance

Technician

2 Mobility for Maintenance Techniciana) Review Work Order

• 3D Live Interactive Visual Docsb) Repair Faulty / At-risk Assetsc) Sign-off Work Order

3 Maintenance & Engineering Collaboration with KPI based Engineering Issue Generationa) Raise Issue(s) with Engineering in 3Db) Generate Engineering Issue(s)c) Execute ECR / ECO / Maintenance

4 Maintenance DocumentationGenerationa) Update 3D Maintenance Doc from

ECR / ECO / Maintenance Tasksb) Release Updated Technical

Documentation

Page 16: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

POWER ANALYTICS “BOM” MANAGEMENT (1/2)

Paladin Live Power Analytics Data Management

Page 17: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

POWER ANALYTICS “BOM” MANAGEMENT (2/2)

Paladin Live Power Analytics Data Management

Page 18: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

DATA CENTER – Evolving Configuration

IT (Servers) Network

CoolingPower

Building Security,

Fire

Protection

IT, Power, Cooling, Network and Facilities Equipments

Power Cooling Installation &Validation

Power & Cooling

Design, Analysis

Construction, Installation, maintenance

IT & Telco Installation &Validation

Program Mgt, Project Mgt

Services/Offers, Development

Structure, MEP, Equipment layout

Page 19: Optimizing Data Center Design and Operational Performance ... PLM and... · EDSA. DS Confidential Secured Optimizing Data Center Design and Operational Performance: Integrating Product

DS Confidential Secured

PLM for Power Analytics

19

Energy Efficiency, reduced operating costs and

improved Availability by System Design

Space, Power and Cooling jointly Optimized by 3D

Simulation

Streamlined Maintenance with Remote 3D

Monitoring

Resources Optimization by Real-Time 3D

Monitoring combined with Analytics Tools and IP

Capture on a fleet of Data Centers

Data Center Solution Key Values