OPERATIONAL PERFORMANCE MAY’12. Tonnage - MT. COMMODITY-WISE LOADING – FOR THE MONTH OF MAY’12. Tonnage in Lakhs. COMMODITY-WISE REVENUE – FOR THE MONTH OF MAY’12. ` - Crores. Commodity wise Net Revenue. ` - Crores. Commodity wise Gross & Net Revenue (Per Tonne). Amt - `. - PowerPoint PPT Presentation

Transcript of OPERATIONAL PERFORMANCE MAY’12

Page 1: OPERATIONAL PERFORMANCE  MAY’12

OPERATIONAL PERFORMANCE MAY’12

Month Carried Tonnage Monthly Traffic projection based

on ATP

Variation % (Over 2011 – 12)2012-13 2011-12

For May

0.35 0.21 0.35 67%

Cumulative – till May

0.74 0.49 0.74 51%

Tonnage - MT

Page 2: OPERATIONAL PERFORMANCE  MAY’12

COMMODITY-WISE LOADING – FOR THE MONTH OF MAY’12

Particulars Carried Tonnage 2012-13

Carried Tonnage 2011-12

Variation Over

Commodity May’12 Apr’12-May’12

May’11 Apr’11- May’11

Las t Yr May’11

Last Yr

Apr’11-May’12

Iron Ore/ Export

Domestic

Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.42

0.42

0.00

1.95

1.95

0%

-100%

-100%

0%

100%

-100%

Cement 0.96 1.89 0.50 0.76 93% 147%

Fertilizer 0.30 0.50 0.60 1.01 -50% -51%

Food Grains 0.11 0.40 0.10 0.29 8% 40%

LPG/POL 0.30 0.50 0.28 0.46 7% 9%

Coal 1.64 3.84 0.19 0.34 768% 1028%

Gypsum 0.16 0.27 0.04 0.08 310% 250%

Iron Sheet/Wood 0.00 0.00 0.00 0.03 0% -100%

Auto/Cont 0.00 0.00 0.00 0.00 0% 0%

Total 3.48 7.41 2.13 4.92

Tonnage in Lakhs

Page 3: OPERATIONAL PERFORMANCE  MAY’12

COMMODITY-WISE REVENUE – FOR THE MONTH OF MAY’12

Particulars Gross Revenue

2012-13

Gross Revenue

2011-12

Variation % Over

Commodity May’12 Apr’12-May’12

May’11 Apr’11- May’11

Las t Yr May’11

Last Yr

Apr’11-May’12

Iron Ore/ Export

Domestic

Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.08

1.08

0.00

5.02

5.02

0%

-100%

-100%

0%

-100%

-100%

Cement 2.73 5.34 1.10 1.65 149% 223%

Fertilizer 0.68 1.10 0.99 1.73 -31% -36%

Food Grains 0.23 0.72 0.15 0.40 51% 82%

LPG/POL 1.11 1.81 1.04 1.75 7% 4%

Coal 4.35 10.17 0.37 0.66 1085% 1436%

Gypsum 0.43 0.75 0.08 0.17 419% 351%

Iron Sheet/Wood 0.00 0.00 0.00 0.07 0% -100%

Auto/Cont 0.01 0.04 0.00 0.01 0% 279%

TOTAL 9.53 19.93 4.80 11.45

` - Crores

Page 4: OPERATIONAL PERFORMANCE  MAY’12

Commodity wise Net Revenue

Particular May 2012 May 2011 Net Rev

Commodity Gross Reve

O&M Cost `.

150.69/T

Net Reve

Gross Reve

O&M Cost `.175.26/T

Net Reve

Varation %

Iron Ore/ Export

Domestic0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.08

0.00

0.73

0.00

0.35

0%

-100%

Cement 2.73 1.45 1.28 1.10 0.88 0.22 492%

Fertilizer 0.68 0.46 0.22 0.99 1.05 -0.06 -435%

Food Grains

0.23 0.17 0.06 0.15 0.18 -0.03 -296%

LPG/POL 1.11 0.46 0.65 1.04 0.50 0.54 21%

Coal 4.35 2.47 1.88 0.37 0.33 0.04 4945%

Gypsum 0.43 0.24 0.19 0.08 0.07 0.01 1345%

Iron Sheet/ Wood

0.00 0.00 0.00 0.00 0.00 0.00 0%

Auto/Cont 0.01 0.00 0.01 0.00 0.00 0.00 0%

TOTAL 9.53 5.25 4.28 4.80 3.74 1.06

` - Crores

Page 5: OPERATIONAL PERFORMANCE  MAY’12

Commodity wise Gross & Net Revenue (Per Tonne)

Particular May 2012 May 2011 Net Rev

Commodity Gross Rev

O&M Cost /T

Net Rev

Gross Rev

O&M Cost /T

Net Rev Varation %

Iron Ore

Export

Domestic

0

0

0

0

0

0

0

259

0

175

0

84

0%

-100%

Cement 283 151 132 219 175 44 201%

Fertilizer 224 151 73 164 175 -11 -761%

Food Grains 201 151 50 143 175 -32 -257%

LPG/POL 364 151 213 365 175 190 12%

Coal 265 151 115 194 175 19 497%

Gypsum 276 151 126 218 175 43 191%

Iron Sheet /Wood

0 0 0 0 0 0 0%

Auto/Cont 680 151 529 0 0 0 0%

Amt - `

Page 6: OPERATIONAL PERFORMANCE  MAY’12

Operating Ratio for the month of May 2012May 2012 April 2012 –

May 2012

Gross Revenue 9.53 19.93

Total Income 9.53 19.93

Operating Expenses

O&M Costs (Inc of Def. OH) 6.68 14.36

Administrative Expenses 0.07 0.14

Depreciation 2.83 5.66

Total Expenses (i) 9.58 20.16

Operating Ratio (%) 100% 101%

Cost of Maintenance works (ii) 0.00 0.00

Total Expenses (I) + (II) 9.58 20.16

Operating Ratio (Cumulative) 100% 101%

Surplus/Deficit -0.05 -0.22

Surplus % -0.53% -1.13%

` - Crores

NOTE : In O&M costs, cost of fuel is calculated as per service & direction wise

Page 7: OPERATIONAL PERFORMANCE  MAY’12

COST OF FUEL (SERVICE WISE/ DIRECTION WISE) for May’12

Cost of Fuel From April ’12 – May’12 – 6.31 Cr

Particulars No of Wagons Cost of Fuel ` - Crores

Total ` - Crores

Wagon Type UP DN UP DN UP + DN

BCN Load 623 1635 0.36 0.35 0.71

BOXN Load 2700 1.24 1.24

BTPG Load 584 0.32 0.32

BTPN Load 204 0.09 0.09

BLCA/BFKN Load 45 0.01 0.01

BCNHL Ld 58 58 0.03 0.01 0.04

BOXN Empty 2180 0.14 0.14

BTPG Empty 587 0.12 0.12

BTPN Empty 761 0.12 0.12

BLCA/BFKN Empty 45 0.01 0.01

BRN Empty 90 40 0.01 0.01

Cost of Fuel of CLE + Other (UP+DN) 0.02

TOTAL 4304 5306 2.06 0.75 2.83

Cost of Lube Oil + Others 0.18

TOTAL 3.01

Page 8: OPERATIONAL PERFORMANCE  MAY’12

Line Capacity Utilization for the month of May’12 :

Direction Loaded Empties Total No of Trains

*CLE *Others Total

UP Trains 85 3 88 57

(77)

7

(18)

267

Down Trains 44 71 115

129 74 203 57 7 267

Permissible Capacity : 240

Utilized : 267

Percentage of Utilization : 111%

Percentage of Utilization Loaded : 54%

Engine Hour Cost : 52.32 Lakhs

NOTE:

* Moved between SKLR-SBHR-SKLR

Page 9: OPERATIONAL PERFORMANCE  MAY’12

WAGON DAYS – MAY 2012

No of Days

TotalUP Down

Actual 3167 2662 5829

Abnormal Detention

865 282 1147

Rate per Day in terms of 8 wheeler : ` 967.75

Wagon Hire Charges (Actual) : ` 56.41 Lakhs

Wagon Hire Charges for Abnormal : ` 11.10 Lakhs

Detention (Avoidable)

*Abnormal Detention : Time taken for completing the journey > 15 Hrs

Page 10: OPERATIONAL PERFORMANCE  MAY’12

Details of Payments Received from Mysore Division after adjusting O&M Costs

Months Due Date Actual date of Receipt

Amount Rs - Cr

Prov. Pay Final Pay (Prov Pay)

April ’12 05.05.12 31.05.12 02.06.12 4.22

May ’12 05.06.12 30.06.12

Page 11: OPERATIONAL PERFORMANCE  MAY’12

Details of Payments made by HMRDC to SWR

Particulars For the month of May’12

To the End

(Crores)

Contractual payment for maintenance works (Provisional bill from --)

----- ----