OPERATIONAL PERFORMANCE JULY’13

11
OPERATIONAL PERFORMANCE JULY’13 Month Carried Tonnage Monthly Traffic projection based on ATP Variation % (Over 2012 – 13) 2013-14 2012- 13 For July 0.47 0.26 0.28 79% Cumula tive – till July 1.95 1.34 1.42 45% Tonnage - MT

description

OPERATIONAL PERFORMANCE JULY’13. Tonnage - MT. COMMODITY-WISE LOADING – FOR THE MONTH OF JULY’13. Tonnage in Lakhs. COMMODITY-WISE REVENUE – FOR THE MONTH OF JULY’13. ` - Crores. Commodity wise Net Revenue Including OH. ` - Crores. - PowerPoint PPT Presentation

Transcript of OPERATIONAL PERFORMANCE JULY’13

Page 1: OPERATIONAL PERFORMANCE  JULY’13

OPERATIONAL PERFORMANCE JULY’13

Month Carried Tonnage Monthly Traffic projection based

on ATP

Variation % (Over 2012 – 13)2013-14 2012-13

For July 0.47 0.26 0.28 79%

Cumulative – till July

1.95 1.34 1.42 45%

Tonnage - MT

Page 2: OPERATIONAL PERFORMANCE  JULY’13

COMMODITY-WISE LOADING – FOR THE MONTH OF JULY’13

Particulars Carried Tonnage 2013-14

Carried Tonnage 2012-13

Variation Over

Commodity July’13 Apr’13 -July’13

July’12 Apr’12- July’12

Las t Yr July’12

Last Yr

Apr’12-July’12

Iron Ore/ Export

Domestic

Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0%

0%

0%

0%

0%

0%

Cement 0.95 3.66 0.73 3.40 31% 8%

Fertilizer 0.62 2.38 0.75 1.73 -18% 38%

Food Grains 0.33 2.35 0.05 0.59 555% 302%

LPG/POL 0.22 0.79 0.26 1.02 -17% -23%

Coal 2.39 9.22 0.81 6.33 197% 45%

Gypsum 0.15 0.81 0.00 0.31 0% 161%

Iron Sheet/Wood 0.00 0.00 0.00 0.00 0% 0%

Cont 0.0027 0.24 0.00 0.00488 0% 4883%

Total 4.67 19.46 2.60 13.39 80% 46%

Tonnage in Lakhs

Page 3: OPERATIONAL PERFORMANCE  JULY’13

COMMODITY-WISE REVENUE – FOR THE MONTH OF JULY’13

Particulars Gross Revenue

2013-14

Gross Revenue

2012-13

Variation % Over

Commodity July’13 Apr’13 -July’13

July’12 Apr’12- July’12

Las t Yr July’12

Last Yr

Apr’12-July’12

Iron Ore/ Export

Domestic

Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0%

0%

0%

0%

0%

0%

Cement 2.51 10.47 1.85 9.37 36% 12%

Fertilizer 1.33 5.54 1.55 3.69 -14% 50%

Food Grains 0.60 4.56 0.10 1.08 489% 321%

LPG/POL 0.75 2.95 0.86 3.59 -12% -18%

Coal 6.06 25.59 1.89 16.46 221% 55%

Gypsum 0.41 2.37 0.00 0.85 0% 177%

Iron Sheet/Wood 0.00 0.00 0.00 0.00 0% 0%

Cont 0.02 0.31 0.00 0.039 0% 693%

Total 11.68 51.80 6.25 35.10 87% 48%

` - Crores

Page 4: OPERATIONAL PERFORMANCE  JULY’13

Commodity wise Net Revenue Including OH

Particular July 2013 July 2012 Net Rev

Commodity Gross Reve

O&M Cost `. 147/T

* Net Reve

Gross Reve

O&M Cost `.173/T

Net Reve

Variation %

Iron Ore/ Export

Domestic0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0%

0%

Cement 2.51 1.40 1.11 1.85 1.26 0.59 89%

Fertilizer 1.33 0.91 0.42 1.55 1.31 0.24 75%

Food Grains

0.60 0.49 0.11 0.10 0.09 0.01 806%

LPG/POL 0.75 0.32 0.43 0.86 0.45 0.41 6%

Coal 6.06 3.52 2.54 1.89 1.40 1.49 418%

Gypsum 0.41 0.23 0.18 0.00 0.00 0.00 0%

Iron Sheet/ Wood

0.00 0.00 0.00 0.00 0.00 0.00 0%

Cont 0.0159 0.01 0.0586 0.00 0.00 0.00 0%

TOTAL 11.68 6.88 4.80 6.25 4.51 1.74 175%

` - Crores

•July’13 -Net Revenue Includes Def OH of ` 113 Lakhs ,O&M Cost Inclusive of Def OH- ` 171/T•July’12 –Net Revenue Includes Def OH of ` 73 Lakhs, O&M Cost Inclusive of Def OH- ` 201/T

Page 5: OPERATIONAL PERFORMANCE  JULY’13

Commodity wise Gross & Net Revenue Including OH (Per Tonne)

Particular July 2013 July 2012 Net Rev

Commodity Gross Rev

O&M Cost /T

Net Rev

Gross Rev

O&M Cost /T

Net Rev Variation %

Iron Ore

Export

Domestic

0

0

0

0

0

0

0

0

0

0

0

0

0%

0%

Cement 263 147 116 253 173 80 45%

Fertilizer 215 147 68 205 173 32 109%

Food Grains 181 147 34 202 173 29 20%

LPG/POL 344 147 197 326 173 153 29%

Coal 253 147 106 234 173 61 73%

Gypsum 269 147 122 0 0 0 0%

Iron Sheet /Wood

0 0 0 0 0 0 0%

Cont 587 147 440 0 0 0 0%

Amt - `

•July’13 - Net Revenue Includes Def OH of ` 24/T , O&M Cost Inclusive of Def OH - ` 171/T•July’12 – Net Revenue Includes Def OH of ` 28/T, O&M Cost Inclusive of Def OH - ` 201/T

Page 6: OPERATIONAL PERFORMANCE  JULY’13

Operating Ratio for the month of July 2013For July

2013To End of July 2013

Gross Revenue 11.68 51.80

Total Income 11.68 51.80

Operating Expenses

O&M Costs (Inc of Def. OH) 8.72 35.90

Administrative Expenses 0.08 0.30

Depreciation 2.88 11.52

Total Expenses (i) 11.68 47.72

Operating Ratio (%) 100% 92%

Cost of Maintenance works (ii) 0.22 1.31

Total Expenses (I) + (II) 11.90 49.03

Operating Ratio (Cumulative) 102% 95%

Surplus/Deficit -0.22 2.77

Surplus % -2% 5%

` - Crores

NOTE : In O&M costs, cost of fuel is calculated as per service & direction wise

Page 7: OPERATIONAL PERFORMANCE  JULY’13

COST OF FUEL (SERVICE WISE/ DIRECTION WISE) for July’13

Cost of Fuel From April ’13 – July’13 – 16.51 Cr

Particulars No of Wagons Cost of Fuel ` - Crores

Total ` - Crores

Wagon Type UP DN UP DN UP + DN

BCN Load 1275 1773 0.78 0.37 1.15

BOXN Load 3870 0 1.78 0.00 1.78

BTPG Load 477 0 0.26 0.00 0.26

BTPN Load 104 0 0.04 0.00 0.04

BLCA Load 0 45 0.00 0.01 0.01

BCNHL Ld 115 0 0.03 0.00 0.03

BOXN Empty 0 4292 0.00 0.28 0.28

BTPG Empty 0 574 0.00 0.12 0.12

BTPN Empty 0 468 0.00 0.07 0.07

BCN Empty 40 0 0.01 0.00 0.01

Cost of Fuel of CLE + Other (UP+DN) 0.01

TOTAL 5882 7152 2.90 0.85 3.76

Cost of Lube Oil + Others 0.25

TOTAL 4.01

Page 8: OPERATIONAL PERFORMANCE  JULY’13

Line Capacity Utilization for the month of July’13 :

Direction Loaded Empties Total No of Trains

*CLE *Others Total

UP Trains 116 1 117 43

(53)

8

(18) 312Down Trains 44 100 144

160 101 261 43 8 312

Permissible Capacity : 340

Utilized : 312

Percentage of Utilization : 92%

Percentage of Utilization Loaded : 47%

Engine Hour Cost : 93.53 Lakhs

NOTE:

* Moved between SKLR-SBHR-SKLR

Page 9: OPERATIONAL PERFORMANCE  JULY’13

WAGON DAYS – July 2013

No of Days

TotalUP Down

Actual 3622 3214 6836

Abnormal Detention

595 86 681

Rate per Day in terms of 8 wheeler : ` 1038.30

Wagon Hire Charges (Actual) : ` 71.01 Lakhs

Wagon Hire Charges for Abnormal : ` 7.07 Lakhs

Detention (Avoidable)

*Abnormal Detention : Time taken for completing the journey > 15 Hrs

Page 10: OPERATIONAL PERFORMANCE  JULY’13

Details of Payments Received from Mysore Division after adjusting O&M Costs

Months Due Date Actual date of Receipt

Amount Rs - Cr

Prov. Pay Final Pay (Prov Pay)

April ’13 05.05.13 31.05.13 04.06.13 5.55

May ’13 05.06.13 30.06.13 29.06.13 5.51

June’13 05.07.13 30.07.13 01.08.13 7.40

July’13 05.08.13 30.08.13

Page 11: OPERATIONAL PERFORMANCE  JULY’13

Details of Payments made by HMRDC to SWR

Particulars For the month of July’13

To the End

(Crores)

Contractual payment for maintenance works (Provisional bill from --)

0.22 1.31