Opening the museum and the life thereafter
-
Upload
elaine-heumann-gurian-llc -
Category
Documents
-
view
143 -
download
0
description
Transcript of Opening the museum and the life thereafter
![Page 1: Opening the museum and the life thereafter](https://reader036.fdocuments.net/reader036/viewer/2022083001/55840422d8b42a6a148b4c2d/html5/thumbnails/1.jpg)
OPENING THE MUSEUM AND THE LIFE THEREAFTERELAINE HEUMANN GURIAN2012
![Page 2: Opening the museum and the life thereafter](https://reader036.fdocuments.net/reader036/viewer/2022083001/55840422d8b42a6a148b4c2d/html5/thumbnails/2.jpg)
BEFORE OPENING – TIME AND MONEY KEEP TRACK OF TIME AND BUDGET KEEP SLICING PROJECT US SO THAT
SOME PARTS CAN BE DELAYED START TIMELINE FOR DAY 2 SO THAT
PEOPLE SEE YOU HAVE NOT FORGOTTEN THE PROJECT YOU ARE DELAYING
ELIMINATE SOMETHINGS FOR THE FORSEEABLE FUTURE AND SAY SO.
![Page 3: Opening the museum and the life thereafter](https://reader036.fdocuments.net/reader036/viewer/2022083001/55840422d8b42a6a148b4c2d/html5/thumbnails/3.jpg)
BEFORE OPENING -- STAFF MOVE PEOPLE DOWNTOWN WHO ARE SPENDING
TOO MUCH TIME COMMUTING BETWEEN SITES RELIEVE THE PRESSURE ON FOLKS WHO ARE
TRYING TO OPERATE IN TWO SITES BY HAVING BACK UPS AT THE OLD SITE. IT ALLOWS SOME JUNIOR STAFF TO GROW.
BRING IN A SENIOR CHEERLEADER AT THE OLD SITE SO THE STAFF DO NOT FEEL ABANDONED
HAVE FLOOR STAFF ASSIGNED TO FOLKS AS ALL AROUND HELPERS AS SOON AS THE SITE IS CLOSED SO THAT EXTRA HANDS ARE AVAILABLE.
![Page 4: Opening the museum and the life thereafter](https://reader036.fdocuments.net/reader036/viewer/2022083001/55840422d8b42a6a148b4c2d/html5/thumbnails/4.jpg)
BEFORE OPENING – SPIRIT BE AS GOOFY AS POSSIBLE PIZZA PIZZA PIZZA REWARD EVERYTHING ALL THE TIME AND
EVERYWHERE REMEMBER PEOPLE ARE GIVING THEIR ALL
AND THEIR FAMILIES ARE TOO. ALLOW ANYONE WHOSE PROJECT HAS A
NATURAL ENDING TO TAKE SOME TIME OFF TO DO THE LAUNDRY AND SEE THEIR FAMILY.
![Page 5: Opening the museum and the life thereafter](https://reader036.fdocuments.net/reader036/viewer/2022083001/55840422d8b42a6a148b4c2d/html5/thumbnails/5.jpg)
BEFORE OPENING – THE DAILY MEETING KEEP DOING THE DAILY MEETING,
EXPAND, ADAPT, ETC AND DON’T THINK IT WILL GO AWAY UNTIL AFTER OPENING.
![Page 6: Opening the museum and the life thereafter](https://reader036.fdocuments.net/reader036/viewer/2022083001/55840422d8b42a6a148b4c2d/html5/thumbnails/6.jpg)
BEFORE OPENING -- SYSTEMS ADD AS MUCH INFRASTRUCTURE AS POSSIBLE
NOW SO THAT SO PRACTICE CAN HAPPEN BEFORE OPENING
MAKE SURE THERE ARE MULTIPLE WAYS FOR DELIVERING INFORMATION FAST AND ACCURATELY SO THAT THE UNDERGROUND DOES NOT FORM AND SO THE LEADERSHIP CAN CONTINUE TO BE TRUSTED. USE AS MANY AVENUES FOR THE SAME INFORMATION AS NEEDED.L
CREATE AN INSTITUTION WIDE REPAIR NOTIFICATION SYSTEM NOW AND BEGIN TO USE IT.