11490 Interchange Circle North | Miramar, Florida 33025 | 1 (800) 321-7423 OPEN HOUSE INVITATION Turnpike-Palmetto Road Relocation Project Florida Gas Transmission Company, LLC (FGT) is the owner and operator of an existing 18-inch natural gas pipeline that runs generally alongside Florida’s Turnpike (SR91) and the Palmetto Expressway (SR826) in Broward and Miami-Dade Counties, Florida. The Florida Department of Transportation (FDOT) District 6 and Florida Turnpike Enterprise (FTE) are developing construction plans to widen sections of the Palmetto Expressway and Florida’s Turnpike in addition to improving a system-to-system connection at the Golden Glades Interchange that will cause portions of the existing FGT 18-inch mainline to be relocated. The Turnpike-Palmetto Road Relocation Project, as currently proposed, will require the abandonment of approximately 19.1 miles of FGT’s existing 18-inch mainline pipeline, and the relocation and construction of approximately 15.4 miles of anticipated 24-inch mainline pipeline along existing corridors, including Florida Power & Light’s power line corridor and private easement, in order to provide continued natural gas service to meet the demand for energy in South Florida. FGT invites all interested parties, including Federal Energy Regulatory Commission (FERC) Staff, to attend an open house regarding FGT’s proposed Turnpike-Palmetto Road Relocation Project. The open house is an informal opportunity for you to learn more about the project. Representatives from FGT will be on hand to answer questions regarding the project. Information will be available on topics such as project scope, location of pipeline facilities, environmental surveys, facility design, construction, operation, schedules, land restoration, and the safety and regulatory processes. Open House Dates, Times and Locations Monday, June 11, 2018 4:00 – 9:00 pm Everglades High School 17100 SW 48 th Court Miramar, FL 33027 Phone: (754) 323-0500 Tuesday, June 12, 2018 5:00 – 8:00 pm Dade Christian School 6601 NW 167 th Street Hialeah, FL 33015 Phone: (305) 822-7690 The Turnpike-Palmetto Road Relocation Project is currently in the FERC “Pre-Filing” process in Docket No.: PF18-5-000. FERC is the lead federal agency responsible for authorizing interstate natural gas facilities. During this process the public and other stakeholders are provided with opportunities, such as these open houses, to learn about the project and provide input prior to submission of a formal application to the FERC. In the near future, FERC will conduct its own formal public scoping meeting(s) to take comments about the project. FERC will send out a separate notice to landowners, stakeholders, and other interested parties announcing the location, date and time of its public scoping meeting(s).

Transcript of OPEN HOUSE INVITATION - Energy Transfer...

Page 1: OPEN HOUSE INVITATION - Energy Transfer Partnersfgttransfer.energytransfer.com/.../Turnpike-Palmetto-OpenHouseInvit… · OPEN HOUSE INVITATION . Turnpike-Palmetto Road Relocation

11490 Interchange Circle North | Miramar, Florida 33025 | 1 (800) 321-7423

OPEN HOUSE INVITATION Turnpike-Palmetto Road Relocation Project

Florida Gas Transmission Company, LLC (FGT) is the owner and operator of an existing 18-inch natural gas pipeline that runs generally alongside Florida’s Turnpike (SR91) and the Palmetto Expressway (SR826) in Broward and Miami-Dade Counties, Florida. The Florida Department of Transportation (FDOT) District 6 and Florida Turnpike Enterprise (FTE) are developing construction plans to widen sections of the Palmetto Expressway and Florida’s Turnpike in addition to improving a system-to-system connection at the Golden Glades Interchange that will cause portions of the existing FGT 18-inch mainline to be relocated.

The Turnpike-Palmetto Road Relocation Project, as currently proposed, will require the abandonment of approximately 19.1 miles of FGT’s existing 18-inch mainline pipeline, and the relocation and construction of approximately 15.4 miles of anticipated 24-inch mainline pipeline along existing corridors, including Florida Power & Light’s power line corridor and private easement, in order to provide continued natural gas service to meet the demand for energy in South Florida.

FGT invites all interested parties, including Federal Energy Regulatory Commission (FERC) Staff, to attend an open house regarding FGT’s proposed Turnpike-Palmetto Road Relocation Project. The open house is an informal opportunity for you to learn more about the project. Representatives from FGT will be on hand to answer questions regarding the project. Information will be available on topics such as project scope, location of pipeline facilities, environmental surveys, facility design, construction, operation, schedules, land restoration, and the safety and regulatory processes.

Open House Dates, Times and Locations

Monday, June 11, 2018 4:00 – 9:00 pm

Everglades High School 17100 SW 48th Court Miramar, FL 33027

Phone: (754) 323-0500

Tuesday, June 12, 2018 5:00 – 8:00 pm

Dade Christian School 6601 NW 167th Street

Hialeah, FL 33015 Phone: (305) 822-7690

The Turnpike-Palmetto Road Relocation Project is currently in the FERC “Pre-Filing” process in Docket No.: PF18-5-000. FERC is the lead federal agency responsible for authorizing interstate natural gas facilities. During this process the public and other stakeholders are provided with opportunities, such as these open houses, to learn about the project and provide input prior to submission of a formal application to the FERC. In the near future, FERC will conduct its own formal public scoping meeting(s) to take comments about the project. FERC will send out a separate notice to landowners, stakeholders, and other interested parties announcing the location, date and time of its public scoping meeting(s).

Page 2: OPEN HOUSE INVITATION - Energy Transfer Partnersfgttransfer.energytransfer.com/.../Turnpike-Palmetto-OpenHouseInvit… · OPEN HOUSE INVITATION . Turnpike-Palmetto Road Relocation

PROPRIETARYENERGY TRANSFER

1 in = 0.5 miles

1:31,668 .PROJECT:

ABSOLUTESCALE:

REFERENCESCALE:

MP 11.3 - PROPOSEDREPLACEMENT MAINLINE

END PROPOSEDREPLACEMENT MAINLINE

INSTALL PIG TRAPS

N.W. HIALEAH CITYGAS METER STATION

6" HIALEAH N.W.LATERAL (FLBTY)

TAKE OFFVALVE 20-72B

NUI OPA-LOCKA M&R

2-1/2" FGT OPA-LOCKALATERAL (FLBTW)

8" CROSS OVERBLOCK VALVE 20-7A

TAKE OFFVALVE 20-71B

NORTH MIAMI PEOPLESGAS METER STATION

6" FGT NORTH MIAMILATERAL (FLBTU)

3" FGT LAKE FORESTLATERAL (FLBTR)

LAKE FORESTMETER STATION

TAKE OFFVALVE 20-62B

TAKE OFFVALVE 20-62A

6" DANIALATERAL (FLBTO)

INSTALL PIG TRAPS

BEGIN PROPOSEDREPLACEMENT MAINLINE

36" FGT MAINLINE(FLMEA)

EXISTING 18" FGT MAINLINE(TO REMAIN IN SERVICE)

EXISTING 24" FGT MAINLINE(TO REMAIN IN SERVICE)

EXISTING 18" FGT MAINLINE(TO BE ABANDONED)

EXISTING 24" FGT MAINLINE(TO REMAIN IN SERVICE)

EXISTING 24" FGT MAINLINE(TO REMAIN IN SERVICE)

EXISTING 18" FGT MAINLINE(TO BE ABANDONED)

PROPOSED REPLACEMENT MAINLINE

EXISTING 18" FGT MAINLINE

EXISTING 24" FGT MAINLINE

EXISTING PIPELINES

TURNPIKE-PALMETTO ROAD RELOCATION

DOCUMENTS COMPILED UTILIZING PUBLICLY AVAILABLE GIS RESOURCES AND MINIMAL ON THE GROUND RECONNAISSANCE

1 0 1 20.5Miles