OM4 OM3 OM2 Proposed Site formation - EPD
1
LANDSCAPE BLOW-UP PLAN AND SECTIONS DK 10 / 15 EL DL NTS A FIRST ISSUE 07/13 Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery – Design and Construction 11.6.3 B REVISED ISSUE 11/14 C REVISED ISSUE 10/15 C Site formation platform to be handover to relevant department Proposed internal road within Sandy Ridge OM3 OM2 OM4 B B BLOW-UP PLAN B N.T.S. Section B-B N.T.S. OM4 OM2 OM3 BLOW-UP PLAN A N.T.S. Section A-A N.T.S. OM4 OM2 A A Shuttle Bus drop-off area OM4 OM3
Transcript of OM4 OM3 OM2 Proposed Site formation - EPD
LANDSCAPE BLOW-UP PLAN AND SECTIONS
DK 10 / 15 EL DL
NTS
A FIRST ISSUE 07/13
Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery – Design and Construction
11.6.3
B REVISED ISSUE 11/14C REVISED ISSUE 10/15
C
Site formation platform to be handover to relevant department
Proposed internal road within Sandy Ridge
OM3
OM2
OM4
B
B
BLOW-UP PLAN BN.T.S.
Section B-BN.T.S.
OM4
OM2
OM3
BLOW-UP PLAN AN.T.S.
Section A-AN.T.S.
OM4OM2
A
A
Shuttle Bus drop-off area
OM4
OM3