SECTION 05 51 00- METAL STAIRS PART 1 – GENERAL 1.1 SCOPE OF WORK Fabricate and install metal stair assemblies in accordance with the requirements set forth in this section. Note: This specificati on applies to e quipment access type s tairs. 1.2 ADDITIONAL WORK I NCLUDED IN THIS SECTION Some items of work are usually specified in sections other than section 05 51 00, If they are to be part of the metal stair contractor’s work they must be specified here. ** NOTE: Delete any sections below not relevant to this project; add other s as required. ** A. F ield measurements of stair installation sites, and verification of vertical drop between floors. B. Installation of protective pans under stairs. C. .  1.3 WORK SPECIFI CALL Y EXCLUDED IN THIS SECTION The items in this section are not to be included in the metal stair contractor’s work: A. Temporary shoring or bracing. B. Demoli tio n and re mov al of ex ist ing wo rk. C. Clean up o f sit e pri or to i nst all ati on. D. Cuttin g, gro uting and pa tchin g of t read f iller s. E. Tempor ary wo od fil ler f or ste el tr ead pans. F. Concrete sup por ts for steel. G. Cuttin g; prepar ation of pock ets; setti ng of plates, inse rts, adapt ers, or other har dware of built in items. H. Placement of wire mesh an d re- bar f or con cret e fill I. Concrete or other fill for pans or platforms. J. Tempor ary lig hts or electrici ty. K. Tempor ar y safety r ai ls. L. Pr otecti on aft er erecti on. M. Wood t rim or moldi ngs, f or tr eads or strin gers. N. Rubber tre ads or carpets. O. Sli p resis tant concr ete tr eatment s. P. Field p ainti ng other than touch up of dam aged surfaces. Q. Final surf ace cleani ng, passiv ation, or appl icatio n of surface prot ectant aft er installation. 1.4 RELATED DOCUMENTS:  Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work of this section. 1.5 SUMMARY: A. Provid e all materi al, labor, equ ipme nt and servic es and perfor m all operati ons neces sary or required for the work of this section, in accordance with the Drawings and Specifications, and including fabrication and installation of Metal Stairs. LS-S04-OHSA-STAIR

Transcript of OHSAStair Spec R0

Page 1: OHSAStair Spec R0

8/8/2019 OHSAStair Spec R0

http://slidepdf.com/reader/full/ohsastair-spec-r0 1/8

Page 2: OHSAStair Spec R0

8/8/2019 OHSAStair Spec R0

http://slidepdf.com/reader/full/ohsastair-spec-r0 2/8

Page 3: OHSAStair Spec R0

8/8/2019 OHSAStair Spec R0

http://slidepdf.com/reader/full/ohsastair-spec-r0 3/8

Page 4: OHSAStair Spec R0

8/8/2019 OHSAStair Spec R0

http://slidepdf.com/reader/full/ohsastair-spec-r0 4/8

Page 5: OHSAStair Spec R0

8/8/2019 OHSAStair Spec R0

http://slidepdf.com/reader/full/ohsastair-spec-r0 5/8

Page 6: OHSAStair Spec R0

8/8/2019 OHSAStair Spec R0

http://slidepdf.com/reader/full/ohsastair-spec-r0 6/8

Page 7: OHSAStair Spec R0

8/8/2019 OHSAStair Spec R0

http://slidepdf.com/reader/full/ohsastair-spec-r0 7/8

Page 8: OHSAStair Spec R0

8/8/2019 OHSAStair Spec R0

http://slidepdf.com/reader/full/ohsastair-spec-r0 8/8