Electronic Brake Control Installation Guide NOTE: For 2, 4 ...
NOTE: ANY USE OF THE ELECTRONIC DRAWINGS OR DATA …
Transcript of NOTE: ANY USE OF THE ELECTRONIC DRAWINGS OR DATA …
1747
1749
1748
1746
1744
1745
1743
1769
1768
1801
1800
1679
1680
1681
1682
1683
1684
1685
1686
1687
1688
1689
1690
1691
1692
1693
1694
1695
1696
1697
1698
1699
1700
1701
1702
1703
1704
1705
1706
1707
1708
1709
RES
ES 443.73
ES 443.80
ES 444.54
ES 443.99
ES 444.70
ES 444.21
ES 445.03
ES 444.70
ES 445.42
ES 445.38
ES 445.98
ES 446.25
ES 446.52
ES 446.63
ES 446.92
ES 446.86
ES 447.12
ES 446.91ES 446.89
ES 447.27
ES 446.65
ES 447.42
ES 446.21
ES 445.81
ES 444.47
ES 444.78ES 444.25
ES 443.95
ES 444.10
ES 447.48
ES 44
7.41
ES 44
7.72
ES 44
8.56
ES 44
8.20
ES 444.97
ES 44
6.94
ES 447.18
ES 444.48
ES 44
7.88
ES 44
7.68
ES 447.6
2
ES 445.8
7
ES 445.30
ES 446.6
0
ES 447.4
0
ES 44
7.61
ES 446.9
4
ES 446.4
4
ES 44
5.64
ES 44
5.06
ES 44
6.47
ES 44
5.66
ES 446.62
ES 447.24
ES 44
8.79
ES 44
8.44
ES 44
7.97
ES 44
7.34
ES 44
8.06
ES 443.66
ES 443.72
ES 44
6.40
ES 44
6.35
ES 446.38
ES 44
6.98
ES 44
5.99
ES 44
5.31
ES 444.69
ES 44
6.34
ES 444.63
ES 44
6.52
ES 446.10
ES 44
5.64
ES 44
5.99
FS 443.79
FS 443.83
FS 444.54
FS 443.96
FS 444.71
FS 444.13
FS 445.03
FS 444.58
FS 445.42
FS 445.26
FS 445.98
FS 446.06
FS 446.54
FS 446.56
FS 446.92
FS 446.84
FS 447.10
FS 446.90FS 446.84
FS 447.27
FS 446.53
FS 447.42
FS 446.09
FS 445.60
FS 44
7.40
FS 444.11
FS 444.79FS 443.97
FS 443.89
FS 444.13
FS 447.60
FS 44
8.09
FS 445.14
FS 44
7.51
FS 444.48
FS 447.18
FS 44
6.50
FS 44
7.62
FS 445.27
FS 44
6.65
FS 44
8.14
FS 44
7.93
FS 44
6.94
FS 44
6.60
FS 44
6.21
FS 44
5.56
FS 44
6.63
FS 44
6.15
FS 44
7.84
FS 44
8.72
FS 44
8.11
FS 446.65
FS 447.44
FS 44
8.44
FS 44
7.74
FS 44
7.81
FS 44
7.53
FS 44
8.41
FS 443.86
FS 44
6.65
FS 446.50
FS 44
6.87
FS 44
7.29
FS 44
8.46
FS 44
6.25
FS 44
5.95
FS 445.06
FS 445.20
FS 44
7.26FS
446.7
2
FS 443.96
FS 446.50
FS 44
6.54
FS 44
6.64
ES 44
5.94
FS 44
6.46
EXISTING STAGE 'F3'
EXISTING STAGE 'F4'
FUTURE STAGE 'M2'
TBM 2
ES 445.01FS 445.16
ES 444.37FS 445.00
ES 444.32FS 444.46
KINCADE STREET
CARBERY WAY
VIEW
HAMMONDSTREET
POLK
ING
HORN
E
SHORTRIDGE DRIVE
SHORTRIDGE DRIVE
SKIPTON BALLARAT RAIL TRAIL
CARBERY WAY
CIVIL DRAWING
01 PRELIMINARY
NOTE: ANY USE OF THE ELECTRONIC DRAWINGS OR DATA PROVIDED BY CardnoTGMSHALL BE USED AT THE USER'S RISK. NO RESPONSIBILITY WILL BE TAKEN BYCardnoTGM AS TO THE ACCURACY OF THE DIGITAL DRAWING OR DATA. ANY SETOUT WORKS UNDERTAKEN USING CardnoTGM DIGITAL DRAWINGS OR DATA SHOULDBE CHECKED AGAINST EXISTING TITLE PEGS, TEMPORARY AND/OR PERMANENTSURVEY MARKS AS NOMINATED BY THE PROJECTS LICENSED SURVEYOR, THESET-OUT INFORMATION PROVIDED ON ARCHITECTURAL AND/OR OTHER PROJECTRELATED DRAWINGS AND DOCUMENTS, IN CONJUNCTION WITH THE APPROVEDHARD COPY DRAWINGS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION
PLAN VIEWSCALE 1:500
DRAWNISSUE DATE APPROVED NORTH
REV:SHEET: 0FREF. No.:
DRAWING TITLE:
C O P Y R I G H T C a r d n o T G MC
DESIGNED: DATE:
DRAWN: SCALE:
SURVEY: SHEET SIZE:
CHECKED: APPROVED:
DATE: DATE:
CLIENT: PROJECT:DRAWNISSUE ISSUED FOR DATE APPROVED ISSUED FOR
ABN 11 125 568 4611315 Sturt Street, Ballarat, VIC Australia (PO Box 563W, Ballarat West) 3350
Phone +61 3 5330 8888 Fax +61 3 5333 3815Email: [email protected] Web: www.cardno.com
C05
STAGE M1 (31 LOTS)RESIDENTIAL SUBDIVISIONLUCAS ESTATE
S.LOTAY
S.LOTAY
CARDNO TGM A1
AS SHOWN
SEP 2020
18775-206
LOT LEVELS & ABOVE 300mm FILLLAYOUT PLAN
LEGEND
PROPOSED TITLE BOUNDARY
PROPOSED ROAD KERB & CHANNEL
LOT NUMBER & DIRECTION OF NATURAL SURFACE FALLLOT 20 FALL
PROPOSED EASEMENT
21
COLOUR DEPTH RANGE0.3 to
to0.6 m
0.6 0.70.7 0.80.8 to 0.9
to 1.01.0 to 2.02.0 to3.0
5.07.0 m
7.0 to 9.0
0.4 m0.4 0.5 m0.5 to
to m to m
m0.9 m
m3.0 m
to 4.0 m4.0 to 5.0 m
to 6.0 m6.0 to
to 8.0 m8.0 m9.0 to 10.0 m10.0 to 1000 m
FILL 0.3m & MORE
m
m
mm
mmmmmmmmm
mmmm
FINISHED SURFACE LEVEL
EXISTING SURFACE LEVEL
FS ???.??
ES ???.??
EXISTING ROAD AND KERB
L.DS.L06.11.2020
LARA DE KLIJN
06.11.2020
04.12.2020 S.L --APPROVAL02
FOR CONSTRUCTION
--03 APPROVAL S.L01.02.2021
06
05.02.2021 RJFAPPROVAL04 --
17.02.2021 RJFAPPROVAL05 --
ROLAND DUNN
26.02.202126.02.2021 RJFCONSTRUCTION06 R.D.