North Elevation South Elevation - Government of Jersey · North Elevation South Elevation East...
Transcript of North Elevation South Elevation - Government of Jersey · North Elevation South Elevation East...
Photo A Showing location of proposed new shelter
;··>'1 1N•ne:o1i!ghbouring Property
Existing bus stop markings burnt off.
Plan
Section of footpath planter broken out. New macadam hardstandlng formed.
Roadside guardrailing maintained and altered -central section to be removed
Bus stop markings relocated
D
IDIDI
La Route des Quennevais
Roadside guardrailing modified
Clear footpath width maintained
1300
Clear footpath iil width maintained ~
0 1 2 3
I I I I I I I I I I
UNEAR SCALE 1 :50
4 5n
New prefabricated bus shelter in accordance with manufacturers
All dimensions are to be checked on site before the commencement of any works including the order of materials. Any discrepancies are to be reported to the Architect. Do not scale from this drawing. Unless the title 'Contract' or 'Working' has been added to these drawings then these drawings are not for site use and we will accept no responsibility for errors or omissions, the drawing will also not be adjusted to include for SER requirements. This drawing is design copyright© Andrew Harvey Architects Ltd. Digimap Licence Number J48. Portions of this drawing may include intellectual property of the States of Jersey and are herein used by permission.
Date: Revision Note:
3 Bay Fully Enclosed Bus Shelter Specification:
Description: Dome Roof/3 Bay/Full End Panels/2 Front Openings
Dimensions: 1300mm Wide x 3000mm Long x 2500mm High
Seating: Length of Shelter/ 700mm from Ground Level
Glazing: Roof - Bronze Tinted Polycarbonate Sides - 6mm TSG
Colour: Dark green framing
/"/--7"'- details ~~7 1300 (!~
Bus stop markings relocated
Clear footpath width maintained
a
La Route des Quennevais
North Elevation South Elevation
East Elevation New prefabricated bus shelter in accordance with manufacturers dela"ls
New prefabricated bus shelter in accordance with manufacturers details
Section of footpath planter broken out. New macadam hardstanding formed.
Bus stop marldngs relocated
===-- --=== === === === ===' === ===
3000 ~· 7100 (Section of Railings Removed)
West Elevation
dient
States of Jersey Transport & Technical Services
project title
New Bus Shelter at Stop No. 2542 (Don Farm) La Route des Quennevais
St. Brelade
drawing tltle
Layout Plan, Elevations, Site Plan &
scale(s):
1:50/1:100
Photo
Consultation
date: drawn:
April 2016 R.M checked:
Andrew Harvey Architects DDDDDDDDDDDDDDDDDDDDDDDDDDDDDD
1st Floor, Beresford House, Bellozanne Road,
St. Helier, Jersey, JE2 3JW
telephone: 01534 869291 facsimile: 01534 869293
drawing number:
11s1 I 01 I 02
mobile: 07797 740530 [email protected]