EAST ELEVATION - GLAZING NORTH ELEVATION - GLAZING... · south-west isometric strip section 1 - iso...

1
LEVEL PR-00-FFL +3.500 m LEVEL PR-01-FFL +7.550 m LEVEL PR-02-FFL +10.550 m LEVEL PR-03-FFL +13.550 m LEVEL PR-04-FFL +16.550 m LEVEL PR-05-FFL +19.550 m LEVEL PR-06-FFL +22.550 m LEVEL PR-07-FFL +25.550 m LEVEL PR-08-FFL +28.550 m LEVEL ROOF +32.550 m C 4000.00 3000.00 3000.00 3000.00 3000.00 3000.00 3000.00 3000.00 4050.00 250 3425 65 3740 290 8 SK002 9 SK002 SKY BAR HOTEL ACCOMMODATION HOTEL ACCOMMODATION HOTEL ACCOMMODATION HOTEL ACCOMMODATION HOTEL ACCOMMODATION HOTEL ACCOMMODATION HOTEL ACCOMMODATION HOTEL RESTAURANT 32.290 m 32.750 m C 12.50 12.50 150.00 50.00 72.50 102.50 FACING BRICKWORK CAVITY INSULATION STUD LAYER/ INSULATION 2 x PLASTERBOARD 400.00 LEVEL PR-07-FFL +25.550 m C 75.00 222.50 75.00 12.50 12.50 150.00 50.00 72.50 102.50 FACING BRICKWORK CAVITY INSULATION STUD LAYER/ INSULATION 2 x PLASTERBOARD 400.00 RECESSED BRICKWORK 25.00 77.50 25.00 LEVEL PR-00-FFL +3.500 m LEVEL PR-01-FFL +7.550 m LEVEL PR-02-FFL +10.550 m LEVEL PR-03-FFL +13.550 m LEVEL PR-04-FFL +16.550 m LEVEL PR-05-FFL +19.550 m LEVEL PR-06-FFL +22.550 m LEVEL PR-07-FFL +25.550 m LEVEL PR-08-FFL +28.550 m C 3000.00 3000.00 3000.00 3000.00 3000.00 3000.00 3000.00 4050.00 250 3425 65 3740 290 SKY BAR TERRACE HOTEL ACCOMMODATION HOTEL RESTAURANT 1175.00 2315.00 HOTEL ACCOMMODATION HOTEL ACCOMMODATION HOTEL ACCOMMODATION HOTEL ACCOMMODATION HOTEL ACCOMMODATION HOTEL ACCOMMODATION 1510.00 1970.00 2335.00 2325.00 300.00 2325.00 2325.00 2465.00 3200.00 11 SK002 12 SK002 10 SK002 32.290 m LEVEL PR-03-FFL +13.550 m C SINGLE SOLDIER COURSE FACING BRICKWORK FACING BRICKWORK RECESSED PRE-CAST CONCRETE PANEL CAVITY INSULATION STUD LAYER/ INSULATION 2 x PLASTERBOARD FINISH METAL REVEALS AROUND WINDOW FRAME 12.50 12.50 150.00 50.00 72.50 102.50 20.00 METAL REVEALS AROUND WINDOW FRAME 400.00 LEVEL PR-02-FFL +10.550 m C 150.00 CERAMIC BAKCED SPANDREL PANEL IGU METAL REVEALS AROUND WINDOW FRAME 400.00 213.00 LEVEL PR-01-FFL +7.550 m C UNINSULATED ARCHITECTURAL STEEL FRAMING IGU METAL LOUVERS INSULATION IGU 2 x PLASTERBOARD FINISH 12.50 12.50 150.00 12.00 213.00 400.00 LEVEL PR-00-FFL +3.500 m LEVEL PR-01-FFL +7.550 m LEVEL PR-02-FFL +10.550 m LEVEL PR-03-FFL +13.550 m LEVEL PR-04-FFL +16.550 m LEVEL PR-05-FFL +19.550 m LEVEL PR-06-FFL +22.550 m LEVEL PR-07-FFL +25.550 m LEVEL PR-08-FFL +28.550 m LEVEL ROOF +32.550 m C B A LEVEL PR-00-FFL +3.500 m LEVEL PR-01-FFL +7.550 m LEVEL PR-02-FFL +10.550 m LEVEL PR-03-FFL +13.550 m LEVEL PR-04-FFL +16.550 m LEVEL PR-05-FFL +19.550 m LEVEL PR-06-FFL +22.550 m LEVEL PR-07-FFL +25.550 m LEVEL PR-08-FFL +28.550 m LEVEL ROOF +32.550 m C B A 1 2 3 4 5 6 8 9 10 11 12 13 14 7 1 2 3 4 5 6 8 9 10 11 12 13 14 7 STRIP SECTION 1 STRIP SECTION 1 STRIP SECTION 2 STRIP SECTION 2 No. 55 St Paul's Street Leeds LS1 0113 887 3100 www.dla- DRAWN REVIEWED SCALE DATE TITLE PROJECT REVISIONS Note: This is a colour drawing, in order to ensure any subsequent reproduction is viewed correctly it is to be re-printed in full colour NUMBER STATUS REVISION DLA REF No. DATE DESCRIPTION As indicated @ A1 VP JO 14/03/19 TYPICAL WALL BUILD-UPS GLAZED & SOLID EXT. AREAS PRINCES QUAY, HULL HOTEL SK002 2016-223 FOR INFORMATION SOUTH-WEST ISOMETRIC STRIP SECTION 1 - ISO 1 : 50 STRIP SECTION 1 STRIP SECTION 2 - ISO SOUTH-EAST ISOMETRIC NORTH-EAST ISOMETRIC NORTH-WEST ISOMETRIC 1 : 10 CALL-OUT 8 1 : 10 CALL-OUT 9 1 : 50 STRIP SECTION 2 IGU UNINSULATED EXTERNAL CONCRETE FRAME (PRE-CAST) CERAMIC BACKED SPANDREL PANEL CAVITY WALL FACING BRICKWORK CAVITY WALL PRE-CAST CONCRETE FINISH GLASS BALLUSTRADE UNINSULATED EXTERNAL CONCRETE FRAME (PRE-CAST) CAVITY WALL FACING BRICKWORK CAVITY WALL PRE-CAST CONCRETE FINISH IGU METAL REVEALS AROUND WINDOW FRAME CERAMIC BACKED SPANDREL PANEL BRICK REVEAL BRICK REVEAL BRICK REVEAL CERAMIC BACKED SPANDREL PANEL CAVITY WALL PRE-CAST CONCRETE FINISH METAL LOUVERS IGU 1 : 10 CALL-OUT 10 1 : 10 CALL-OUT 11 1 : 10 CALL-OUT 12 1 : 200 EAST ELEVATION - GLAZING 1 : 200 WEST ELEVATION - GLAZING 1 : 200 NORTH ELEVATION - GLAZING 1 : 200 SOUTH ELEVATION - GLAZING GLAZED AREA: 113 sq.m. SOLID AREA: 350 sq.m. GLAZED AREA: 198 sq.m. SOLID AREA: 1030 sq.m. GLAZED AREA: 130 sq.m. SOLID AREA: 383 sq.m. GLAZED AREA: 353 sq.m. SOLID AREA: 876 sq.m. DESIGN INTENT DRAWING ONLY. WORK IN PROGRESS. MATERIALS AND BUILD-UPS ARE SUBJECT TO CLIENT APPROVAL. TO BE READ IN CONJUNCTION WITH DLA DRAWINGS 0010 - 0036. BRICK REVEAL BRICK REVEAL BRICK REVEAL CAVITY WALL FACING BRICKWORK CAVITY WALL FACING BRICKWORK SINGLE SOLDIER COURSE FACING BRICKWORK SINGLE SOLDIER COURSE FACING BRICKWORK SINGLE SOLDIER COURSE FACING BRICKWORK SINGLE SOLDIER COURSE FACING BRICKWORK UNINSULATED ARCHITECTURAL STEEL FRAMING

Transcript of EAST ELEVATION - GLAZING NORTH ELEVATION - GLAZING... · south-west isometric strip section 1 - iso...

Page 1: EAST ELEVATION - GLAZING NORTH ELEVATION - GLAZING... · south-west isometric strip section 1 - iso 1 : 50 strip section 1 strip section 2 - iso north-west isometric south-east isometric

LEVEL PR-00-FFL+3.500 m

LEVEL PR-01-FFL+7.550 m

LEVEL PR-02-FFL+10.550 m

LEVEL PR-03-FFL+13.550 m

LEVEL PR-04-FFL+16.550 m

LEVEL PR-05-FFL+19.550 m

LEVEL PR-06-FFL+22.550 m

LEVEL PR-07-FFL+25.550 m

LEVEL PR-08-FFL+28.550 m

LEVEL ROOF+32.550 m

C

4000

.0030

00.00

3000

.0030

00.00

3000

.0030

00.00

3000

.0030

00.00

4050

.00

250

3425

6537

40

290

8SK002

9SK002

SKY BAR

HOTEL ACCOMMODATION

HOTEL ACCOMMODATION

HOTEL ACCOMMODATION

HOTEL ACCOMMODATION

HOTEL ACCOMMODATION

HOTEL ACCOMMODATION

HOTEL ACCOMMODATION

HOTEL RESTAURANT

32.290 m

32.750 m

C

12.50 12.50 150.00 50.00 72.50 102.50

FACING BRICKWORK

CAVITY

INSULATION

STUD LAYER/ INSULATION

2 x PLASTERBOARD

400.00

LEVEL PR-07-FFL+25.550 m

C

75.00

222.5

075

.00

12.50 12.50 150.00 50.00 72.50 102.50

FACING BRICKWORK

CAVITY

INSULATION

STUD LAYER/ INSULATION

2 x PLASTERBOARD

400.00

RECESSED BRICKWORK

25.00 77.50 25.00

LEVEL PR-00-FFL+3.500 m

LEVEL PR-01-FFL+7.550 m

LEVEL PR-02-FFL+10.550 m

LEVEL PR-03-FFL+13.550 m

LEVEL PR-04-FFL+16.550 m

LEVEL PR-05-FFL+19.550 m

LEVEL PR-06-FFL+22.550 m

LEVEL PR-07-FFL+25.550 m

LEVEL PR-08-FFL+28.550 m

C

3000

.0030

00.00

3000

.0030

00.00

3000

.0030

00.00

3000

.0040

50.00

250

3425

6537

40

290

SKY BARTERRACE

HOTELACCOMMODATION

HOTEL RESTAURANT

1175

.0023

15.00

HOTELACCOMMODATION

HOTELACCOMMODATION

HOTELACCOMMODATION

HOTELACCOMMODATION

HOTELACCOMMODATION

HOTELACCOMMODATION

1510

.0019

70.00

2335

.0023

25.00

300.0

023

25.00

2325

.0024

65.00

3200

.00

11SK002

12SK002

10SK002

32.290 m

LEVEL PR-03-FFL+13.550 m

C

SINGLE SOLDIER COURSEFACING BRICKWORK

FACING BRICKWORK

RECESSED PRE-CASTCONCRETE PANEL

CAVITY

INSULATION

STUD LAYER/ INSULATION

2 x PLASTERBOARD FINISH

METAL REVEALS AROUNDWINDOW FRAME

12.50 12.50 150.00 50.00 72.50 102.50

20.00

METAL REVEALS AROUNDWINDOW FRAME

400.00

LEVEL PR-02-FFL+10.550 m

C

150.00

CERAMIC BAKCEDSPANDREL PANEL

IGU

METAL REVEALS AROUNDWINDOW FRAME

400.00

213.00

LEVEL PR-01-FFL+7.550 m

C

UNINSULATED ARCHITECTURALSTEEL FRAMING

IGU

METAL LOUVERS

INSULATION

IGU

2 x PLASTERBOARD FINISH

12.50 12.50 150.00 12.00 213.00

400.00

LEVEL PR-00-FFL+3.500 m

LEVEL PR-01-FFL+7.550 m

LEVEL PR-02-FFL+10.550 m

LEVEL PR-03-FFL+13.550 m

LEVEL PR-04-FFL+16.550 m

LEVEL PR-05-FFL+19.550 m

LEVEL PR-06-FFL+22.550 m

LEVEL PR-07-FFL+25.550 m

LEVEL PR-08-FFL+28.550 m

LEVEL ROOF+32.550 m

C B A

LEVEL PR-00-FFL+3.500 m

LEVEL PR-01-FFL+7.550 m

LEVEL PR-02-FFL+10.550 m

LEVEL PR-03-FFL+13.550 m

LEVEL PR-04-FFL+16.550 m

LEVEL PR-05-FFL+19.550 m

LEVEL PR-06-FFL+22.550 m

LEVEL PR-07-FFL+25.550 m

LEVEL PR-08-FFL+28.550 m

LEVEL ROOF+32.550 m

CBA

123456891011121314 7

1 2 3 4 5 6 8 9 10 11 12 13 147

STRIP SECTION 1

STRIP SECTION 1

STRIP SECTION 2

STRIP SECTION 2

No. 55 St Paul's Street Leeds LS10113 887 3100 www.dla-

DRAWN REVIEWED

SCALE DATE

TITLE

PROJECT

REVISIONS

Note: This is a colour drawing, in order to ensureany subsequent reproduction is viewed correctly itis to be re-printed in full colour

NUMBER

STATUS

REVISIONDLA REF

No. DATEDESCRIPTION

As indicated @ A1

VP JO

14/03/19

TYPICAL WALL BUILD-UPSGLAZED & SOLID EXT. AREAS

PRINCES QUAY, HULLHOTEL

SK0022016-223

FOR INFORMATION

SOUTH-WEST ISOMETRIC

STRIP SECTION 1 - ISO 1 : 50

STRIP SECTION 1 STRIP SECTION 2 - ISO

SOUTH-EAST ISOMETRIC NORTH-EAST ISOMETRICNORTH-WEST ISOMETRIC

1 : 10

CALL-OUT 8 1 : 10

CALL-OUT 9

1 : 50

STRIP SECTION 2

IGU UNINSULATEDEXTERNAL CONCRETEFRAME (PRE-CAST)

CERAMIC BACKEDSPANDREL PANEL

CAVITY WALLFACING BRICKWORK

CAVITY WALL PRE-CASTCONCRETE FINISH

GLASSBALLUSTRADE

UNINSULATEDEXTERNAL CONCRETEFRAME (PRE-CAST)

CAVITY WALLFACING BRICKWORK

CAVITY WALL PRE-CASTCONCRETE FINISH

IGU

METAL REVEALS AROUNDWINDOW FRAME

CERAMIC BACKEDSPANDREL PANEL

BRICK REVEAL

BRICK REVEAL

BRICK REVEAL

CERAMIC BACKEDSPANDREL PANEL

CAVITY WALL PRE-CASTCONCRETE FINISH

METAL LOUVERS

IGU

1 : 10

CALL-OUT 10 1 : 10

CALL-OUT 11 1 : 10

CALL-OUT 12

1 : 200

EAST ELEVATION - GLAZING

1 : 200

WEST ELEVATION - GLAZING

1 : 200

NORTH ELEVATION - GLAZING

1 : 200

SOUTH ELEVATION - GLAZING

GLAZED AREA: 113 sq.m.SOLID AREA: 350 sq.m.

GLAZED AREA: 198 sq.m.SOLID AREA: 1030 sq.m.

GLAZED AREA: 130 sq.m.SOLID AREA: 383 sq.m.

GLAZED AREA: 353 sq.m.SOLID AREA: 876 sq.m.

DESIGN INTENT DRAWING ONLY.WORK IN PROGRESS.MATERIALS AND BUILD-UPS ARE SUBJECT TO CLIENT APPROVAL.TO BE READ IN CONJUNCTION WITH DLA DRAWINGS 0010 - 0036.

BRICK REVEAL

BRICK REVEAL

BRICK REVEAL

CAVITY WALLFACING BRICKWORK

CAVITY WALLFACING BRICKWORK

SINGLE SOLDIERCOURSE FACING

BRICKWORK

SINGLE SOLDIERCOURSE FACING

BRICKWORK

SINGLE SOLDIERCOURSE FACING

BRICKWORK

SINGLE SOLDIERCOURSE FACING

BRICKWORK

UNINSULATEDARCHITECTURALSTEEL FRAMING