NFd lE i CtlNew Federal Erosion Control and Stormwater...
Transcript of NFd lE i CtlNew Federal Erosion Control and Stormwater...
![Page 1: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/1.jpg)
N F d l E i C t lNew Federal Erosion Control and Stormwater Regulationsand Stormwater Regulations
and Better Site Planning
Robert Pitt, Ph.D., P.E., BCEE, D. WREDepartment of Civil, Construction, and
Environmental EngineeringTh U i it f Al b T l AL 35487The University of Alabama, Tuscaloosa, AL 35487
![Page 2: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/2.jpg)
Early Regulations
• The Refuse Act of 1899 (33 USC 407) was used in 1970 to establish a discharge permit system (Public Law 92-500). This act prohibited the ) pdischarge of any material, except sewage and runoff, into navigable g , gwaterways without a permit from the Dept. of the Army. p y
![Page 3: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/3.jpg)
Amendments to the Water Pollution Control Act (92-500)
1956 (making the legislation permanent and to fund construction grants for POTWs), 1961 (increased funding for water quality research ( g q yand construction grants), 1965 (increased construction grants and started research concerning combined sewer overflows),g ) 1966 (removed the dollar limit on construction grants), 1972 (the most important advances to this date; act ( p ;renamed “Clean Water Act”), 1977 (to extend some of the deadlines established in the 1972 amendments), and), 1988 (require discharge permits for stormwater).
![Page 4: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/4.jpg)
TMDL Regulations• Another important regulation affecting drainage
and stormwater quality is the TMDL program. • The TMDL program is aimed specifically at
assuring attainment of water quality standards by requiring the establishment of pollutantby requiring the establishment of pollutant loading targets and allocations for waters identified as not now in attainment with those standards.
• Section 303(d)(1) of the Clean Water Act provides that states with EPA review andprovides that states, with EPA review and approval, must identify waters not meeting standards, and must establish total maximum daily loads (TMDLs) for them to restore water quality.
![Page 5: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/5.jpg)
• In general, a TMDL is a quantitative assessment of water quality problems, ycontributing sources, and pollution reductions needed to attain water quality standards.
• The TMDL specifies the amount of pollution or other stressor that need to be reduced to meet ater q alit standards allocatesmeet water quality standards, allocates pollution control, or management responsibilities among sources in aresponsibilities among sources in a watershed, and provides a scientific and policy basis for taking actions needed to p y grestore a waterbody.
![Page 6: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/6.jpg)
Rivers and Lakes, Reservoirs, Bays andE t i
Example Alabama 2006 TMDL Status
Streams (Miles), ,
and Ponds (Acres) Estuaries(Square Miles)
Good Waters 6,984 91,229 79, ,Impaired Waters 2,547 81,838 427TMDL completed 702 28,887TMDL alternative 53Non-pollutant impairment 23TMDL needed 1,770 52,951 427New TMDLs completed 0 0 0R i i TMDL d d 1 770 52 951 427Remaining TMDLs needed 1,770 52,951 427
Total Assessed Waters 9,531 173,067 505Total Waters 77 242 490 472 610Total Waters 77,242 490,472 610Percent of Waters Assessed 12.3 35.3 82.9
http://iaspub.epa.gov/waters10/attains_index.control?p_area=AL
Only about ¼ of the required TMDLs have been completed and only 12% of the y q p yrivers/streams and 35% of the lakes have been assessed. None of the coastal waters have TMDLs completed, but more that 80% have been assessed.
![Page 7: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/7.jpg)
• Beginning in 1986, and escalating since 1996, environmental public interest , porganizations have filed numerous lawsuits under the Clean Water Act’s citizen suit provision (section 505) alleging that the EPA had failed to carry g g yout its mandatory duty to disapprove inadequate state section 303(d)(1) lists q ( )( )and/or TMDLs, or to carry out state program responsibilities where states p g phave failed to do so.
![Page 8: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/8.jpg)
“Energy Independence and Security Act of 2007” signed into Law on Dec 19 20072007 signed into Law on Dec. 19, 2007
• Title IV (“Energy Savings in Building and Industry”), Subtitle C (“High Performance Federal Buildings”) Sec. 438 (“Storm C ( g e o a ce ede a u d gs ) Sec 38 ( StoWater Runoff Requirements For Federal Development Projects”):
• “The sponsor of any development or redevelopment project involving a Federal facility with a footprint that exceeds 5,000 square feet shall use site planning, design, construction, andq p g, g , ,maintenance strategies for the property to maintain or restore, to the maximum extent technically feasible, the predevelopment hydrology of the property with regard to the temperature, rate, volume, and duration of flow.”
• This new provision requires much more attention to p qcontrolling runoff volume, in addition to other hydrologic features.
![Page 9: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/9.jpg)
Extremes in Flows cause Infrastructure Damage and Habitat Destruction
Urbanization causes extremes in flows; extended dry periods and short periods of higher flows in many areas
g
periods of higher flows in many areas. In the arid west, urbanization increases dry weather flows in intermittent streams due to excessiveintermittent streams due to excessive irrigation.
Photos of Coyote Creek, San Jose, CA
![Page 10: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/10.jpg)
Failing InfrastructureFailing Infrastructure
Bank instability and WI DNR photos
habitat destruction due to increased flows
![Page 11: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/11.jpg)
It is possible to simplify much ofsimplify much of the receiving water biologicalwater biological data to relate degradation to levels of development.
Urban Steam Classification
Sensitive0 – 10%
Imperviousness
Impacted11– 25%
Imperviousness
Damaged26–100%
Imperviousnesspe ous ess pe ous ess pe ous essChannel Stability Stable Unstable Highly Unstable
Aquatic LifeAquatic Life Biodiversity Good/Excellent Fair/Good Poor
Figure and Table from Center for Watershed Protection
![Page 12: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/12.jpg)
Final Effluent Guidelines to Control Discharge Pollutants from Construction SitesPollutants from Construction Sites
• Published in the Federal Register on Dec. 1, 2009.• Regulation is effective as of Feb. 1, 2010. After this date, g , ,
all permits issued by the EPA or states must incorporate the final rule requirements.Beginning on Aug 1 2011 all sites that disturb 20 or• Beginning on Aug. 1, 2011, all sites that disturb 20 or acres at one time will be affected.
• Beginning on Feb. 2, 2014, the limitation applies to all g g , , ppconstruction sites disturbing 10 or more acres at one time.
• These sites must sample stormwater discharges and l ith i li it ti f t bidit f 280 NTUcomply with a numeric limitation for turbidity of 280 NTU.
• Disturbed areas on construction sites not under active construction activities, can only remain exposed for a co st uct o act t es, ca o y e a e posed o amaximum of 14 days.
• http://edocket.access.gpo.gov/2009/E9-28446.htm
![Page 13: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/13.jpg)
Sediment SourcesNot All Runoff is Sediment LadenNot All Runoff is Sediment-Laden
![Page 14: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/14.jpg)
Birmingham Construction Site Erosion Runoff Characteristics (Nelson 1996)Runoff Characteristics (Nelson 1996)
Low Moderate HighLow intensity rains (<0.25
Moderate intensity rains (about
High intensity rains (>1 (
in/hr)(
0.25 in/hr)(
in/hr)
Suspended 400 2 000 25 000Suspended solids, mg/L
400 2,000 25,000
Particle size (median),
3.5 5 8.5(median), m
![Page 15: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/15.jpg)
Rainfall Energy Index for Eastern US
![Page 16: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/16.jpg)
Controls to Meet Effluent Guidelines (from the Effluent Guidelines document):the Effluent Guidelines document):
• Minimize the amount of soil exposed during construction activityconstruction activity
• Minimize sediment discharges from the site. The design, installation and maintenance of erosion and g ,sediment controls must address factors such as the amount, frequency, intensity and duration of
i it ti th t f lti t t ffprecipitation, the nature of resulting stormwater runoff, and soil characteristics, including the range of soil particle sizes expected to be present on the siteparticle sizes expected to be present on the site
• Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal and maximize stormwater infiltration, unless infeasible
![Page 17: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/17.jpg)
Initial Topography (grubbing and clearing phase)
Pink: low hazardBlue: Moderate hazardYellow: High hazarde o g a a dOrange: High hazard
![Page 18: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/18.jpg)
Sediment SourcesB S il f L P i dBare Soil for Long Periods
![Page 19: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/19.jpg)
Controls to Meet Effluent Guidelines (cont ):Controls to Meet Effluent Guidelines (cont.):
• Minimize soil compaction and, unlessMinimize soil compaction and, unless infeasible, preserve topsoil.
• Soil Stabilization. Stabilization of disturbed areas must, at a minimum, be initiated immediately whenever any clearing, grading, excavating or other earth disturbing activities have permanently ceased on any portion of the site or temporarily ceased on any portionthe site, or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 calendar daysexceeding 14 calendar days
• Etc.
![Page 20: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/20.jpg)
Soil Compaction During Site ActivitiesActivities
Pitt, et al. 1999
![Page 21: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/21.jpg)
General Approach
• The most effective way to meet the numeric effluent guidelines will be through prevention: minimize the amount of disturbed land at any one time and to rapidly stabilize any disturbed groundground.
R ff t l t t th t bidit li it• Runoff controls to meet these turbidity limits in the southeast are likely limited to chemical treatment in conjunction with sediment pondstreatment in conjunction with sediment ponds.
![Page 22: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/22.jpg)
Erosion ControlsDiversion Channels and BermsDiversion Channels and Berms
![Page 23: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/23.jpg)
Erosion ControlsP t t Ch l (Ch k d d li )Protect Channels (Check dams and liners)
![Page 24: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/24.jpg)
Erosion ControlsSlope Protection with Hydroseeding and BlanketsSlope Protection with Hydroseeding and Blankets
![Page 25: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/25.jpg)
Erosion ControlsControl Site Discharges
• Filter fencing for small sites (but only for slope lengths less than about 100 ft). p g )Expect about 10 to 50% control of suspended solids.p
• Sediment ponds for areas larger than• Sediment ponds for areas larger than 10 acres. Expect up to 80% control of suspended solidssuspended solids.
![Page 26: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/26.jpg)
Measured Silt Fence Performance during Alabama Tests (about 54% reductions)
Total Suspended Solids
( )
7000.0
8000.041
d. E
rror
5000.0
6000.0
Mea
n +
Std
3000.0
4000.0 23
0 0
1000.0
2000.0
34
Control Fence Nothing0.0
Lalor, et al. 2003
![Page 27: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/27.jpg)
Construction site sediment ponds can capture significant amounts of sediment, but effluent turbidity is still high.
![Page 28: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/28.jpg)
Chemical Treatment of Exposed SoilsThese newly developed materials act by chemically combining small soil particles into larger discrete particles that are more effective in settling in ponds and in channelsthat are more effective in settling in ponds and in channels. Polyacrylamide (PAM) is the most common chemical being sold now. Polyacrylamide used for erosion control should have a negative (anionic) molecular charge.
![Page 29: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/29.jpg)
Passive chemical addition methods used in New Zealand to enhance sediment and turbidity control of construction site wet detention pondsdetention ponds.
![Page 30: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/30.jpg)
Use of Chemical-Assisted Sedimentation
Auckland Regional Council, New Zealand
![Page 31: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/31.jpg)
Example Performance Data for PAC-assisted Settling
Pond Inflow Outflow SS ReductionFl SS Fl SS
Example Performance Data for PAC-assisted Settling
Flow (L/sec)
SS (mg/L)
Flow (L/sec)
SS (mg/L) (%)
Mason’s Rd 3 26,300 3 144 99.4 M ’ Rd 2 5 100 2 40 99 2Mason’s Rd 2 5,100 2 40 99.2 OVR E 15 1,639 8 51 96 OVR E 2 749 2 56 92 23800E 8 14,800 6 966 93 23800E 1 18,700 2 67 99 B1 Gully 0.3 4,300 0.4 3 99.9B1 Gully 0.3 4,300 0.4 3 99.9 B1 Gully 0.5 16,900 3.0 59 99.6
![Page 32: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/32.jpg)
Many examples of the applicable controls are included in:• Construction Site Erosion and Sediment Controls;
Planning, Design and Performance. R. Pitt, S. Clark, and D. Lake. DESTech Publications, Lancaster, PA, 17601. 381 pages ISBN 1 932078 38 X 2007381 pages. ISBN 1-932078-38-X. 2007. http://unix.eng.ua.edu/~rpitt/Class/Computerapplications/Table.htm
• Alabama Handbook for Erosion Control, Sediment Control and Stormwater Management on Construction Sites and Urban Areas. Volume 1. Alabama Soil and Water Conservation Committee Montgomery AL 2003Water Conservation Committee, Montgomery, AL. 2003. http://unix.eng.ua.edu/~rpitt/Class/Erosioncontrol/Module2/ASWCC June 2003 Alabama Handbook Constructio_ _ _ _ _n_E&S_Control.pdf
![Page 33: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/33.jpg)
Runoff Volume Guidelines
• In addition to requiring pre- and post-d l t k ff t t t hdevelopment peak runoff rates to match, many areas are now requiring runoff volumes after development to match pre-developmentdevelopment to match pre-development conditions.
• This is extremely difficult especially when pre-This is extremely difficult, especially when predevelopment conditions are wooded areas.
• The following examples are based on matchingThe following examples are based on matching the runoff associated with a rain occurring with a two year frequency, having a duration of 24 hrs.
![Page 34: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/34.jpg)
Runoff Curve Numbers for Urban Areas(Average runoff conditions, Ia = 0.2S)
Cover Description CNs for Hydrologic Soil Group
Cover Type Average Percent A B C DCover Type Average Percent Impervious Area
A B C D
Urban districts
Commercial and business 85 89 92 94 95Commercial and business 85 89 92 94 95
Industrial 72 81 88 91 93
Residential district by average lot size⅛ acre or less (town houses) 65 77 85 90 92
¼ acre 38 61 75 83 87
⅓ acre 30 57 72 81 86½ acre 25 54 70 80 851 acre 20 51 68 79 842 acres 12 46 65 77 82
Commercial development with B soils CN = 92
![Page 35: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/35.jpg)
Typical CN Values for Pastures, Grasslands, and Woods
W d i d ditiWoods in good condition with B soils; CN = 55
![Page 36: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/36.jpg)
4.2 inches for central AL4.2 inches for central AL
TR-55, NRDC, June 198
![Page 37: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/37.jpg)
Solution of the SCS Runoff Equation(from TR-55, Urban Hydrology for Small Watersheds, Soil Conservation
Service U S Department of Agriculture):Service, U.S. Department of Agriculture):
![Page 38: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/38.jpg)
Runoff Volume Reduction Goals:Runoff Volume Reduction Goals:
• 0.6 inches pre-development runoff (CN0.6 inches pre development runoff (CN = 55 and P = 4.2 inches)
• 3 3 inches post-development runoff (CN• 3.3 inches post-development runoff (CN = 92 and P = 4.2 inches)Therefore need about 82% runoff• Therefore need about 82% runoff reduction compared to conventional developmentdevelopment.
![Page 39: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/39.jpg)
Porous Pavement• Assume no additional runoff flowing
onto porous pavement (no runon)onto porous pavement (no runon)• Use for walkways and overflow parking
d i d ( ll ) tareas, and service roads (alleys); not used in areas of material storage or for
t i ki t ffi t i i iextensive parking or traffic to minimize groundwater contamination potential.
![Page 40: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/40.jpg)
Madison, WIAustin, TX
Malmo, Sweden
![Page 41: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/41.jpg)
SingaporeEssen, Germany
![Page 42: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/42.jpg)
Potential Problem Pollutants Id tifi d B d W kwere Identified Based on a Weak-
Link Model Having the Following g gElements:
• Their abundance in stormwater,• Their mobility through the unsaturated• Their mobility through the unsaturated
zone above the groundwater, and• Their treatability before discharge.
![Page 43: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/43.jpg)
Links Depend on Infiltration Method(contamination potential is the lowest rating of(contamination potential is the lowest rating of
the influencing factors)• Surface infiltration with minimal pretreatment• Surface infiltration with minimal pretreatment
(grass swales or roof disconnections)– Mobility and abundance most criticalMobility and abundance most critical
• Surface infiltration with sedimentation pretreatment (treatment train: sedimentationpretreatment (treatment train: sedimentation then media filtration)– Mobility, abundance, and treatability all
important• Subsurface injection with minimal pretreatment
( t i ki l t d ll)(porous pavement in parking lot or dry well)– Abundance most critical
![Page 44: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/44.jpg)
Moderate to High Contamination PotentialSurface Infiltration Surface Infiltration Injection after Minimal Su ace t at owith no Pretreatment (rain gardens or swales)
Su ace t at oafter Sedimentation (media filtration and sedimentation)
ject o a te aPretreatment (such as porous pavements)
Lindane, chlordane Lindane, chlordane
Benzo (a) anthracene, bi (2 th lh l
Fluoranthene, pyrene 1,3-dichlorobenzene, b ( ) thbis (2-ethylhexl
phthalate), fluoranthene, pentachlorophenol
benzo (a) anthracene, bis (2-ethylhexl phthalate), fluoranthenepentachlorophenol,
phenanthrene, pyrenefluoranthene, pentachlorophenol, phenanthrene, pyrene
E t i E t i E t iEnteroviruses Enteroviruses Enteroviruses, some bacteria and protozoaNickel, chromium, lead, zinc
Chloride Chloride Chloride
![Page 45: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/45.jpg)
Recommendations to Reduce Groundwater Contamination PotentialGroundwater Contamination Potential when using Infiltration in Urban Areas
• Infiltration devices should not be used in most industrial areas without adequate pretreatment.
• Runoff from critical source areas (mostly in commercial areas) need to receive adequate
t t t i t i filt tipretreatment prior to infiltration.• Runoff from residential areas (the largest
t f b ff i t iti ) icomponent of urban runoff in most cities) is generally the least polluted and should be considered for infiltrationconsidered for infiltration.
![Page 46: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/46.jpg)
Continuous Simulations of Porous Pavement Installations using the 1976 Birmingham rain record (a typical rain period)
About 100 rains, 55 inches total, maximum rain depths of about 4 inches.
Input screen of the pSource Loading and Management Model (WinSLAMM) for porous pavement
![Page 47: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/47.jpg)
Modeling Findings for Porous Pavements in Central Alabama AreaPavements in Central Alabama Area
• Soils having at least 0.1 in/hr infiltration rates can totally remove the runoff from porous pavement areas assumingremove the runoff from porous pavement areas, assuming about 1 ft coarse rock storage layer. Porous pavement areas can effectively contribute zero runoff, if well maintained.
• However, slow infiltrating soils can result in slow drainage times of several days. Soils having infiltration rates of at least 0 5 in/hr can drain the pavement structure and storage area0.5 in/hr can drain the pavement structure and storage area within a day, a generally accepted goal.
• These porous pavements can totally reduce the runoff during the intense 2-year rains.
• Good design and construction practice is necessary to prolong the life of the porous pavements including restrictingprolong the life of the porous pavements, including restricting runon, prohibiting dirt and debris tracking, and suitable intensive cleaning.
![Page 48: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/48.jpg)
Green Roofs• Green roofs can contribute to energy savings
i ti f b ildi l th lifin operation of a building, can prolong the life of the roof structure, and can reduce the amount of roof runoffamount of roof runoff.
• They can be costly. However, they may be one of the few options for stormwater volumeone of the few options for stormwater volume control in ultra urban areas where ground–level options are not available.p
• Irrigation of the plants is likely necessary to prevent wilting and death during dry periods.
![Page 49: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/49.jpg)
Swarthmore College Green R f S th PARoof, Swarthmore, PA
Montgomery Park Green Roof Baltimore, MD.
Photo Courtesy Penn State Center for Green Roof Research
![Page 50: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/50.jpg)
Continuous simulations Co t uous s u at o swere also conducted for green roofs and Birmingham conditions, using WinSLAMM
The main roof runoff removal mechanism for green roofs is evapotranspiration These areevapotranspiration. These are central Alabama monthly ET values and the plant and substrate characteristics used in thesecharacteristics used in these analyses.
![Page 51: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/51.jpg)
Annual Roof Runoff Reductions for Local Green Roofs
70
80
of
Green Roofs
50
60
70
nual
Roo
%)
30
40
50
n in
Ann
unof
f (%
20
30
educ
tion
Ru
0
10
0 20 40 60 80 100
Re
0 20 40 60 80 100
Green Roof as a Percentage of Total Roof Area
![Page 52: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/52.jpg)
Critical Four Inch Rain Roof Runoff Reductions for Local Green Roofs
90
100
ctio
n Reductions for Local Green Roofs
60
70
80
me
Red
ucin
s (%
)
40
50
60
ff V
olum
inch
Rai
20
30
f Run
offo
r 4
i
0
10
0 20 40 60 80 100 120
Roo
0 20 40 60 80 100 120
Green Roof as a Percentage of Total Roof Area
![Page 53: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/53.jpg)
Results from Modeling Local Green Roofs
• Vegetated green roofs can reduce up to about 70% of the annual roof runoff during typical70% of the annual roof runoff during typical conditions, if the complete roof is planted.
• The plants would likely wilt and die as the ET• The plants would likely wilt and die as the ET drives the substrate to the plants’ wilting point during the late summer, early fall period, g , y p ,requiring substantial irrigation.
• Green roofs are capable of controlling all of the p grunoff from the critical four inch rain, if enough storage is provided on the roof, and if at least h lf f h f i l dhalf of the roof is planted.
![Page 54: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/54.jpg)
Rain Gardens for Roof and Paved Area Runoff
• Simple rain gardens with extensive excavations or underdrains can be used near buildings for the control ofunderdrains can be used near buildings for the control of roof runoff, or can be placed in or around the edges of parking areas for the control of runoff from parking areas.
• Rain gardens provide greater groundwater contamination protection compared to porous pavements as the engineered soil fill material should contain significant g gorganic material that hinders migration of many stormwater pollutants. This material also provides much better control of fine sediment found in the stormwaterbetter control of fine sediment found in the stormwater.
• Rain gardens can be sized to control large fractions of the runoff, but maintenance to prevent clogging and to remove contaminated soils is also necessary.
![Page 55: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/55.jpg)
Different types of rain ypgardens for a residential roof, a commercial parking lot and a curb-cut biofilterlot, and a curb-cut biofilter.
![Page 56: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/56.jpg)
WinSLAMM was also used to model rain gardens for local conditionsg
![Page 57: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/57.jpg)
Annual Runoff Reductions from Paved Areas or Roofs for Different Sized Rain Gardens
100
viou
s l I
mpe
rvf(
%)
10
Ann
ual
Run
off
ctio
n in
A
rea
clay (0.02 in/hr)
silt loam (0.3 in/hr)
sandy loam (1 in/hr)
1
Red
u sandy loam (1 in/hr)
0.1 1 10 100
Rain Garden Size (% of drainage area)
![Page 58: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/58.jpg)
Reductions of Runoff from Four Inch Rain from Paved Areas or Roofs for Different Sized
100
a )Rain Gardens
us A
rea
ains
(%
10
mpe
rvio
4 in
ch R
aio
n in
Imdu
ring
4
clay (0.02 in/hr)
silt loam (0.3 in/hr)
d l ( i /h )
10 1 1 10 100R
educ
tiR
unof
f d sandy loam (1 in/hr)
0.1 1 10 100R R
Rain Gardens Size (% of drainage area)
![Page 59: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/59.jpg)
Clogging Potential for Different Sized Rain Gardens Receiving Roof Runoff
10000
g
1000
ggin
g
100
rs to
Clo
years to 10 kg/m2
10Year years to 25 kg/m2
10.1 1 10 100
Rain Garden Si e (% of roof area)Rain Garden Size (% of roof area)
![Page 60: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/60.jpg)
Clogging Potential for Different Sized Rain Gardens Receiving Paved Parking Area Runoff
1000
100
oggi
ng
10ars t
o C
l
10
Yea
years to 10 kg/m2
years to 25 kg/m21
0.1 1 10 100
Rain Garden Size (% of paved parking area)Rain Garden Size (% of paved parking area)
![Page 61: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/61.jpg)
Results from Modeling Local Rain GardensGardens
• Local rain gardens should be located in areas having soil infiltration rates of at least 0 3 in/hr Lower rates result ininfiltration rates of at least 0.3 in/hr. Lower rates result in very large and much less effective rain gardens, and the likely clay content of the soil likely will result in premature l iclogging.
• Rain gardens should be from 5 to 10 percent of the drainage area to provide significant runoff reductions g p g(75+%).
• Rain gardens of this size will result in about 40 to 60% d ti i ff l f th l 4 i h ireductions in runoff volume from the large 4 inch rain.
Rain gardens would need to be about 20% of the drainage area in order to approach complete control of these large rains.
![Page 62: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/62.jpg)
Rain Garden Results (cont.)
• Clogging of the rain garden may occur from particulates entering the device, or from clay in the engineered soil mixengineered soil mix.
• Roof runoff contains relatively little particulate matter and rain gardens at least 1% of the roof area are not glikely to clog (estimated 20 to 50 years).
• Paved area runoff contains a much greater amount of particulate matter and would need to be at least 10%particulate matter and would need to be at least 10% of the paved area to have an extended life (>10 years).
![Page 63: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/63.jpg)
Example Sizing of Stormwater Controls f S ifi P f Obj tifor Specific Performance Objectives
• Estimate source area contributions for large gevents using CN values and areas for each component (roofs, walkways, streets, service
)roads, landscaping, parking)• Apply suitable control practices at each site and
l l t lti ffcalculate resulting runoff• Compare resulting runoff with required runoff goal• Adjust as needed• Layout control on site using landscaping options
![Page 64: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/64.jpg)
Source area curve number values for source areas for large events:source areas for large events:
TR-55, NRCS, 1986
Impervious areas (roofs, walks, streets, parking areas) have CN = 98p ( , , , p g )Pervious areas (landscaped areas in good condition and B soils) have CN = 61
![Page 65: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/65.jpg)
Solution of the SCS Runoff Equation(from TR-55, Urban Hydrology for Small Watersheds, Soil Conservation
Service U S Department of Agriculture):Service, U.S. Department of Agriculture):
![Page 66: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/66.jpg)
23 acre Commercial Site with B Soils
% of site ft2
CN for large
events
Q for 4.2 in
rain (in)total
runoff (ft3)
% of runoff
from area% of site ft events rain (in) runoff (ft ) from area
roofs 21.6 216,506 98 4 72,169 23
access roads 1.8 18,134 98 4 6,045 2
parking lots 61.0 611,347 98 4 203,782 65
streets 6.4 64,020 98 4 21,340 7
walkways 0.5 5,410 98 4 1,803 1landscaping
(good condition) 8.6 86,462 61 0.9 6,485 2
total: 100 1,001,880 311,624 100
Actual CN for site conditions is 96 (3 73 in runoff and 4 2 in rain; Rv = 0 89)Actual CN for site conditions is 96 (3.73 in. runoff and 4.2 in. rain; Rv = 0.89)91% impervious cover; 2.1% of runoff from pervious area, 97.9% of runoff from impervious areas. 6.2X runoff increase with development and 84% reduction needed
![Page 67: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/67.jpg)
First Trial for Stormwater Controls
stormwater control % reductionresulting
runoff (ft3)roofs 10% rain gardens 60 28 900roofs 10% rain gardens 60 28,900
access roads porous pavement 100 0parking lots 10% rain gardens 60 81,500p g g ,
streets 10% rain gardens 60 8,500
walkways porous pavement 100 0landscaping (good
condition) prevent compaction 0 6,500
total: 125,4001.50 inches
60 %
Controls not sufficient
![Page 68: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/68.jpg)
Runoff goal: 50,094 ft3Calculations to determine reduction goals
Runoff goal: 50,094 ftLandscape area runoff: 6,485 ft3
Goal for impervious areas: 43,609 ft3U t ll d i iUncontrolled impervious area
runoff: 305,139 ft3% runoff reduction for
impervious areas needed 85.7 %Therefore need 15% rain
gardens in B soilsgardens in B soils
![Page 69: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/69.jpg)
stormwater control % reduction
resulting runoff (ft3)
area needed (ft2)
15% rainroofs
15% rain gardens 86 10,100 32,500
access roadsporous
pavement 100 0 0access roads pavement 100 0 0
parking lots15% rain gardens 86 28,500 91,70015% rain
streets15% rain gardens 86 3,000 9,600
walkwaysporous
pavement 100 0 0walkways pavement 100 0 0landscaping
(good condition)prevent
compaction 0 6,500 0total: 48,100 ft3 133,800 ft2, ,
0.58 inches 3.1 acres
84.5 % reduction
13.4 % of whole sitereduction whole site
Controls are sufficient; most can fit on landscaped areas with some parking lot islands, and curb-cut biofilters
![Page 70: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/70.jpg)
23 acre Commercial Site with D Soils
% of site ft2
CN for large
events
Q for 4.2 in
rain (in)total
runoff (ft3)
% of runoff
from area% of site ft events rain (in) runoff (ft ) from area
roofs 21.6 216,506 98 4 72,169 23
access roads 1.8 18,134 98 4 6,045 2
parking lots 61.0 611,347 98 4 203,782 64
streets 6.4 64,020 98 4 21,340 7
walkways 0.5 5,410 98 4 1,803 1landscaping
(good condition) 8.6 86,462 80 2.2 156,851 5
total: 100 1,001,880 320,991 100
Actual CN for site conditions is 97 (3 84 in runoff and 4 2 in rain; Rv = 0 92)Actual CN for site conditions is 97 (3.84 in. runoff and 4.2 in. rain; Rv = 0.92)91% impervious cover; 4.9% of runoff from pervious area, 95.1% of runoff from impervious areas. 1.8X runoff increase with development and 45% reduction needed
![Page 71: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/71.jpg)
resulting
First Trial for Stormwater Controls (D soils)
stormwater control % reductionresulting
runoff (ft3)roofs 10% rain gardens 21 57,000
access roads porous pavement 100 0parking lots 10% rain gardens 21 161,000
streets 10% rain gardens 21 16 900streets 10% rain gardens 21 16,900
walkways porous pavement 100 0landscaping (good
condition) prevent compaction 0 18,850
total: 250,7003.00 inches
22%
Controls not sufficient (and rain gardens and porous pavementControls not sufficient (and rain gardens and porous pavement only used in these soils with extreme caution and special design consideration)
![Page 72: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/72.jpg)
Runoff goal: 175,329 ft3Calculations to determine reduction goals
Runoff goal: 175,329 ftLandscape area runoff: 15,851 ft3
Goal for impervious areas: 159,478 ft3U t ll d i iUncontrolled impervious area
runoff: 305,139 ft3% runoff reduction for
impervious areas needed 47.7 %Therefore need 20% rain gardens for D soils (withgardens for D soils (with
caution!)
![Page 73: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/73.jpg)
stormwater control % reduction
resulting runoff (ft3)
area needed (ft2)
20% rainroofs
20% rain gardens 48 37,500 43,300
access roadsporous
pavement 100 0 0access roads pavement 100 0 0
parking lots20% rain gardens 48 106,000 122,00020% rain
streets20% rain gardens 48 11,100 12,800
walkwaysporous
pavement 100 0 0walkways pavement 100 0 0landscaping
(good condition)prevent
compaction 0 15,900 0total: 170,400 ft3 178,400 ft2, ,
2.04 inches 4.1 acres
46.9 % reduction
17.8 % of whole sitereduction whole site
Controls are sufficient; most can fit on landscaped areas with some parking lot islands, and curb-cut biofilters
![Page 74: NFd lE i CtlNew Federal Erosion Control and Stormwater …alabamaplanning.org/wp-content/uploads/articles_research... · 2012. 8. 24. · Erosion Controls Control Site Discharges](https://reader036.fdocuments.net/reader036/viewer/2022081410/60a1561283e292391132d03c/html5/thumbnails/74.jpg)
ConclusionsN l bli h d f d l i i d• Newly published federal construction site and stormwater regulations will require much more careful site planningcareful site planning.
• Runoff volume controls during large events will require extensive use of infiltration practicesrequire extensive use of infiltration practices.
• Sizes of practices for the same land use is not very sensitive to soil conditions (less runoffvery sensitive to soil conditions (less runoff increases compared to pre-development conditions with poorer soils and therefore lower volume reduction goals).
• However, use of infiltration controls in poor soils is not a very robust/sustainable practice, and needs to be done with caution and over-sizing.