New York State Department of Transportation
description
Transcript of New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF
TRANSPORTATIONI-390 Interchange Improvements
Design-Build Project (PIN 4390.59)
City of Rochester & the Town of Brighton, Monroe County
Request for Qualifications
Informational Meeting
February 4, 2014
I-390 Interchange Improvements Design-Build Project (PIN 4390.59)Agenda
Introductions and Opening Remarks Project Overview Quality Control & Quality Assurance Procurement Questions and Answers
2
Mr. Peter RussellAttn: I-390 Interchange Improvements Project
Office of Contracts ManagementNew York State Department of Transportation
50 Wolf Road, 6th FloorAlbany, New York [email protected]
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Rules of Contact
3
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Agenda
Introductions and Opening Remarks Project Overview
General Location Goals General Scope of Work Utilities
Quality Control & Quality Assurance Procurement Questions and Answers
4
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) General Location
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) General Location – Existing Conditions
6
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Goals
Improve Traffic Patterns & access to/from I-390 & NY 15A
Reduce congestion and accommodate future growth and development
Address geometric deficiencies to improve traffic flow and facilitate traffic operations
Correct safety deficiencies using cost effective accident reduction measures
Minimize impacts on the travelling public, residents and businesses
Improve highway design features and aesthetic conditions
7
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Goals Continued…
Ensure coordination with all utility owners, third parties and any adjacent construction projects
Ensure a long-service life for all Project elements to satisfy long term preservation goals
Maximize the benefit of the public investment in the Project and provide the best value to the Department
Deliver the Project safely, on schedule & within budget
8
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) General Scope of Work – NY 15A
Elimination of the existing Ramp GC from I-390 northbound to NY 15A;
Construction of new Ramp (Ramp NFC) from I-390 northbound to NY 15A northbound;
Elimination of the existing Ramp DH from NY 15A to I-390 northbound;
Construction of new Loop Ramp (Ramp NFD) from I-390 northbound to NY 15A southbound;
9
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) General Scope of Work – NY 15A (Continued)
Construction of new Ramp NFE from I-390 NB to existing Ramp EW (which connects to NY 15)
Construction of a new Ramp DH connecting NY 15A to I-390 northbound
Construction of a grade separated crossing for the new Ramp NFE over relocated Ramp DH
10
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) General Scope of Work – NY 15A (Continued)
Replacement of the existing bridge carrying NY 15A over the Erie Canal (BIN 4443310). The new bridge will provide four travel lanes with one auxiliary lane
Rehabilitation of BIN 1070900, NY-15A over I-390, incl. deck rehab. and substructure repairs
Widening of the I-390 northbound Ramp GB to accept the dual left turn moves and to improve merge distances
11
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) General Scope of Work – NY 15A (Continued)
Asphalt overlay and localized pavement repair of Ramp SF, between NY 15 and NY 15A; and
Restriping of NY 15A and existing ramps to accommodate new lane configurations and traffic movements
12
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) General Scope of Work – BIN 1070910
Rehabilitation of BIN 1070910, Ramp EW over I-390, including deck rehabilitation and substructure repairs
13
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Scope of Work - Continued
14
BIN 1070900
ELIMINATION OF EXISTING RAMP GCCONSTRUCTION OF NEW RAMP NFC
ELIMINATION OF EXISTING RAMP DH
CONSTRUCTION OF NEW LOOP RAMP NFD
CONSTRUCTION OF NEW RAMP NFE
CONSTRUCTION OF NEW BRIDGE CARRYING RAMP NFE OVER RAMP DHRECONSTRUCTION
OF BIN 4443310
REHABILITATION OF BIN 1070900
WIDENING OF RAMP GB
CONSTRUCTION OF NEW RAMP DH
RESURFACING OF RAMP SF
REHABILITATION OF BIN 1070910
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) General Scope of Work – Other
Installation of new traffic signals Overhead sign structure removal and
overhead panel modification Installation of new roadway lighting Relocation and/or preservation of
existing utilities Potential remediation and disposal of
asbestos containing materials
15
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) General Scope of Work – Other (continued)
Reconstruction of existing drainage systems and structures as necessary to accommodate the new ramps and reconstructed roadways;
Fabrication and Installation of new guide railing and bridge railing; and
Grading and earthwork to accommodate the final bridge and ramp
16
Existing storm sewer in NY 15A north of BIN 4443310
Existing water main running along NY 15A Crosses under Erie Canal west of BIN 4443310 Crosses under I-390 east of BIN 1070900
Abandoned steam line on utility bridge east of BIN 4443310
Possible fiber optic on utility bridge with steam line; information is still being obtained
Navigation lighting and street lighting on BIN 4443310
17
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Utility Coordination – Existing Utilities
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Utility Coordination - Relocation and/or Preservation of Existing Utilities
Three Way Coordination – DB, Utility & State DB Responsibilities
DB Team responsible for holding utility coordination meetings
DB Team to provide supporting documents for utility design, including: plans, Table of Conflicts & Special Note of Utility Coordination
Table of Conflicts to include existing & proposed locations. Assume Preliminary and Final
Special Note of Utility Coordination must include work description, proposed locations and time frames
18
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Agenda
Introductions and Opening Remarks Project Overview Quality Control & Quality Assurance Procurement Questions and Answers
19
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Quality Control (QC)
QC is Design-Builder’s Responsibility Design-Builder shall be required to develop a QC Plan
covering both Design QC and Construction QC Design-Builder shall appoint a QC Manager responsible
for Project QC Design QC shall be by the Designer in accordance with
the QC Plan Construction Inspection shall be by an Independent
Engineering Firm (Hired by the Design-Builder) Materials Testing shall be by an Independent Testing
Firm or Laboratory (Hired by the Design-Builder) The Materials Testing Firm shall report to the
Construction Inspection Firm
20
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Quality Assurance (QA)
Design & Construction QA is Department’s Responsibility
The Department may perform QA on any of the Design-Builder’s Design and Construction Activities including off-site Fabrication
The Department may utilize an independent Consultant to perform QA of the Design-Builder’s Designs
Department Staff will perform Construction QA RFQ Section 1.9 covers QA/QC RFP will describe in detail the Department’s QA Role
for the Project
21
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Agenda
Introductions and Opening Remarks Project Overview Quality Control & Quality Assurance Procurement
Schedule Contract Information SOQ Evaluation and Selection Additional Information and Website
Questions and Answers
22
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Procurement Schedule
Activity Due DatePre-RFQ Informational Meeting February 4, 2014
Final RFQ Released February 14, 2014
Final Date for receipt of Proposer’s questions March 7, 2014
Issue Date for Final Addendum to the RFQ and/or answers to Proposer’s questions March 14, 2014
SOQ Due Date March 28, 2014
Shortlisted DB Teams Announced (3 to 5 Teams) April 16, 2014
Draft RFP Issued April 22, 2014
Draft RFP Informational Meeting May 7, 2014
Final RFP to Shortlisted Firms May 21, 2014
Proposals Due July 2014
Selection of Best Value Proposal August 2014
Execute Contract October 2014
Notice to Proceed October 2014
23
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Contract Information
Lump Sum Design-Build Contract Two Step Design-Build Procurement Process Project Schedule
Total Duration 26 Months +/- There will be a Payment Schedule provided in the RFP Stipend Amount will be provided in the Final RFQ Liquidated Damages may be imposed for missed
milestones and missed Project completion date ROW by NYSDOT Construction Related Permits (i.e., Staging Area) by
Design-Builder
24
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) SOQ Evaluation and Selection
Pass/Fail Evaluation Factors Legal; Financial; Backlog Capacity; Vendor Responsibility; and
Quality Evaluation Factors Organization and Key Personnel (15%) Experience of the Firms (25%) Project Understanding (25%) Past Performance (30%) Compliance with SOQ Format and Organization
(5%)
25
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Additional Information
Responses to Proposer Questions will be posted on the Project Web Site
Final date for receipt of Questions on RFQ March 7, 2014
There will be a Buy America Clause There will be a DBE Participation Goal RFQ Section 1.10 covers Insurance & Bonding
26
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Additional Information (continued)
Reference Information will be Posted on the Project Web Site: Final Design Report and Environmental Assessment
(multiple files) BIN 1070900 and BIN 1070910 Record Plans (D95739) RC 72-084 NY-15A over Erie Canal Deck Rehab Record
Plans (1972) D251189 BIN 4443310 NY-15A over Erie Canal Rehab
Record Plans (1984) RC 48-025 NY-15A over Erie Canal Original
Construction As-Built Plans (1948) BIN Inspection Reports Record Geotechnical Borings
27
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Project Website
https://www.dot.ny.gov/main/business-center/designbuildproject6
28
Peter RussellAttn: I-390 Interchange Improvements
ProjectOffice of Contracts ManagementNew York State Department of
Transportation50 Wolf Road, 6th Floor
Albany, New York [email protected]
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Project Contact
29
I-390 Interchange Improvements Design-Build Project (PIN 4390.59) Questions and Answers
Questions??
30