National Solidarity Program Oversight Consultant Team PCDB (Market price) 1 ENG/STU ر مب ن حات ی ر ش ت د اش ور ب ر ض ر گ ا صات خ ش م دار مق واحدDescription of Material Specification Quantity Unit 1 Charat or ghori 1.00 kg 10 12 11.00 2 crushed stone 1.00 m 3 - 3 1.00 m 3 - 5 1.00 m 3 - 6 1.00 pcs - 7 long with (17 to 20 cm Dai) 1.00 pcs - 8 4 mm (diam.) 1.00 kg - 9 6 mm (diam.) 1.00 kg - 10 8 mm (diam.) 1.00 kg - 11 10 mm (diam.) 1.00 kg - 12 12 mm (diam.) 1.00 kg - 13 14 mm (diam.) 1.00 kg - 14 16 mm (diam.) 1.00 kg - 15 20 mm (diam.) 1.00 kg - 16 25 mm (diam.) 1.00 kg - 17 1 mm (diam.) 1.00 kg - 18 20.00 pcs - 19 first calss 1.00 pcs - 20 Local ,Pakistan or Iraineen 1.00 kg - Province Market Prices ( ی$ ل$ م ی$ گ ت$ $ رام گ رو/ $ پ) ( ) ی ت $ یا$ ار ول ر$ ا $ ب ت م $ ی $ ق$ ه $ ور ر/ $ پ ت م $ ی $ ق ت ق$ ا دربProvince ( ت$ یا$ ول) : District if necessary: ( د ش$ ا $ ور ب$ ر ضر$ گ یا ل ا$ و$ س$ ل و) Date ( $ خ یر$ ا $ ب) : Note: The price includes transportation to the site The prices are based on quarterly reviews Price per Unit (Afs) ی واحد $ ف ت م $ ی $ قNo. Minimum ری $ غ ص اMaximum ی$ م$ ط ع اAverage $ ط اوسConstruction material ی ن ا$ م $ ی خ ا$ اد ش$ و$ مCement ت ن م$ سStone گ ت$ سSandy, gravel ل $ غ ج گو ریWooden timber راش پر$ ا/ $ ح ت$ و/ $ چWooden plate for door 1 x 2 m $ ه $ دروار$ هe $ ت خ $ یWooden pole ول$ گ ت$ و/ $ چSteel bars ول$ گ $ خ ی$ سSteel bar ول$ گ $ خ ی$ سSteel bar ول$ گ $ خ ی$ سSteel bar ول$ گ $ خ ی$ سSteel bar ول$ گ $ خ ی$ سSteel bar ول$ گ $ خ ی$ سSteel bar ول$ گ $ خ ی$ سSteel bar ول$ گ $ خ ی$ سSteel bar ول$ گ $ خ ی$ سSteel bar ول$ گ $ خ ی$ سWire ی$ ل$ م ک $ می ی$ سBuilding material ی ن را $ مب$ ع $ ت اد$ و$ مIron sheet (1 x 2 m) در$ ا/ $ حo ن هr اgage 24 o $ خs ی$ گBurnt brick $ هe $ ت خ/ $ ی ت $ س خGypsum u $ خ$ گ

Transcript of New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

Page 1: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Market price) 1 ENG/STU

نمبر تشریحات باشد ضرور اگر مشخصات مقدار واحد مالحظات

Description of Material Specification Quantity Unit Remarks

1 Charat or ghori 1.00 kg 10 12 11.00

2 crushed stone 1.00 m 3 -

3 1.00 m 3 -

5 1.00 m 3 -

6 1.00 pcs -

7 5 to 5 m long with (17 to 20 cm Dai) 1.00 pcs -

8 4 mm (diam.) 1.00 kg -

9 6 mm (diam.) 1.00 kg -

10 8 mm (diam.) 1.00 kg -

11 10 mm (diam.) 1.00 kg - final average

12 12 mm (diam.) 1.00 kg - -

13 14 mm (diam.) 1.00 kg -

14 16 mm (diam.) 1.00 kg -

15 20 mm (diam.) 1.00 kg -

16 25 mm (diam.) 1.00 kg -

17 1 mm (diam.) 1.00 kg -

18 20.00 pcs -

19 first calss 1.00 pcs -

20 Local ,Pakistan or Iraineen 1.00 kg -

NSP - Project Cost Data Base (PCDB) - Province Market Prices ( والیتی ( ) ( بازار قیمت پروژه قیمت دریافت ملی همبستگی پروگرام

Province (والیت ) : District if necessary: ( باشد اگرضرور ( ولسوالیDate ( تاریخ) : Note: The price includes transportation to the site است ساحه تا ترانسپورت قیمت بشمول ها قیمت

The prices are based on quarterly reviews میشود تجدید وار ربع ها قیمت

Price per Unit (Afs) واحد فی قیمت

No.

.

Minimum اصغری Maximum اعطمیAverage اوسط

Construction material ساختمانی مواد

Cement سمنت

Stone سنگ

Sandy, gravel جغل و ریگ

Wooden timber چارتراش چوب

Wooden plate for door 1 x 2 m دروازه تخته

Wooden pole گول چوب

Steel bars گول سیخ

Steel bar گول سیخ

Steel bar گول سیخ

Steel bar گول سیخ

Steel bar گول سیخ

Steel bar گول سیخ

Steel bar گول سیخ

Steel bar گول سیخ

Steel bar گول سیخ

Steel bar گول سیخ

Wire ملی یک سیم

Building material تعمیراتی مواد

Iron sheet (1 x 2 m) چادر آهن gage 24 گیج

Burnt brick پخته خشت

Gypsum گچ

Page 2: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Market price) 2 ENG/STU

21 1.00 kg -

22 1.00 kg -

23 1.00 kg -

24 1.00 m2 -

25 1.00 kg -

26 1.00 kg -

27 High quality 1.00 pcs -

28 medium quality 1.00 pcs -

29 low quality 1.00 pcs -

30 1.00 pair -

31 1.00 pair -

32 High quality 1.00 pcs -

33 medium quality 1.00 pcs -

34 low quality 1.00 pcs -

35 wooden door High quality 1.00 m2 -

36 wooden door High quality 1.00 m2 -

37 metal door High quality 1.00 m2 -

38 metal window High quality 1.00 m2 -

39 1.00 m2 -

40 1.00 liter -

41 1.00 m -

42 1.00 m -

43 1.00 m -

44 1.00 pcs -

45 1.00 pcs -

46 1.00 pcs -

47 1.00 pcs -

48 1.00 pcs -

49 1.00 pcs -

50 1.00 pcs -

51 ايراني يا پاكستاني 1.00 kg -

52 1.00 kg -

Lime چونه

Marble powder مرمر کلوخه

Nail میخ

Plastic sheet پالستیک

Straw کاه

Glue for wood کاهی سرش

Lock for door دروازه قفل

Lock for door دروازه قفل

Lock for door دروازه قفل

Hinge 3 inches چپراست

Hinge 2 inches چپراست

Hardware for windows ناخنک

Hardware for windows ناخنک

Hardware for windows ناخنک

Glasses تعمیراتی شیشه

Water آب

Building electrical parts برق سامان

Wire 2 x 1.5 mm سیم

Wire 2 x 2.5 mm سیم

Cable 3 x 6 کیبل

Junction box بکس جین

Double rod neon light راده دو نیون

Single rod neon light راده یک نیون

Switch سویچ

Socket ساکت

Automatic switch اوتومات سویچ

Fuse box بکس فیوز

Painting رنگمالی

Plastic paint پالستیک رنگ

Marble powder مرمر کلوخه

Page 3: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Market price) 3 ENG/STU

53 ايراني يا پاكستاني 1.00 kg -

54 1.00 kg -

55 1.00 kg -

56 ايراني يا پاكستاني 1.00 pcs -

57 1.00 m3 -

58 diluter ايراني يا پاكستاني 1.00 liter -

59 based on the design 1.00 pcs -

60 wooden with best quality 1.00 pcs -

61 wooden with best quality 1.00 pcs -

62 wooden with best quality 1.00 pcs -

63 wooden with best quality 1.00 pcs -

64 wooden with best quality 1.00 pcs -

65 Rotating 1.00 pcs -

66 steel 1.00 pcs -

67 1.00 kg -

68 (120X250)cm 1.00 pcs -

69 high quality 1.00 m -

70 high quality 1.00 m -

71 -

72 -

73 high quality 1.00 m -

74 high quality 1.00 m -

75 under Ground cable 4 X 25mm2 m -

76 under Ground cable 4 X 16mm2 m -

77 under Ground cable 4 x 10mm2 m -

78 high quality 1.00 m -

79 high quality 1.00 m -

80 high quality 1.00 m -

Oil paint روغنی رنگ

Powder paint پودری رنگ

Salt نمک

Sand paper ریگمال

Soil خاک

School furniture مکتب چوکی و میز

Student desk joined with chair میزپیوسته شاگرد چوکی و

Chair for teacher معلم چوکی

Table for teacher معلم میز

Office table دفتر میز

Office chair دفتر چوکی

Principle desk مدیریت میز

Chair for principle مدیریت چوکی

Book shelf کتاب الماری

Blackboard paint تخته رنگ

Blackboard سیاه تخته

MHP electrical parts آبی برق دستگاه برق سامان

Over head wier A= 125mm2 هوایی کیبل مترمربع

Over head cable A = 95 mm2 هوایی کیبل مترمربع

Over head cable A = 75 mm2 هوایی کیبلهوایی Over head cable A = 35 mm2 مترمربع کیبل مترمربع

Over head cable A = 25mm2 هوایی کیبل قطر

Over head cable A= 16mm2 هوایی کیبل مترمربع

Over head cable d= 10mm قطر هوایی کیبل

Over head cable d=6mm قطر هوایی کیبل

Over head cable d= 2.5mm قطر هوایی کیبل

Page 4: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Market price) 4 ENG/STU

81 high quality 1.00 m -

82 high quality 1.00 m -

83 high quality 1.00 pcs -

84 high quality 1.00 pcs -

85 high quality 1.00 pcs -

86 high quality 1.00 pcs -

87 high quality 1.00 pcs -

88 high quality 1.00 pcs -

89 high quality 1.00 box -

90 high quality 1.00 box -

91 high quality 1.00 box -

92 Fues for houses high quality 1.00 box -

93 Electric load control (ELC) high quality 1.00 box -

94 1.00 set -

95 m, dia 1.00 m -

96 1.00 set -

97 1.00 set -

98 1.00 m2 -

99 Master Pulley 1.00 pcs -

100 slave Pulley 1.00 pcs -

101 Electric heater 1.00 pcs -

102 Based on design 1.00 pcs -

103 Turbin Stand 1.00 set -

104 1.00 pcs -

105 1.00 pcs -

-

106 1.00 pcs -

107 1.00 pcs -

108 1.00 pcs -

109 1.00 pcs -

110 1.00 pcs -

111 1.00 pcs -

wire 1mm2 ملی یک سیم

wooden Pole L=4 m or 5m طول به گول چوب

Insulator for 400v انسولیتر

switches سوچ

sockets ساکت

Bulbs neon 20watts نیون گروپ

Junction box بکس جین

rubber tape رابرتیپ

clip small size خورد کلیپ

nail one inches long انچ یک میخ

fuse box بکس فیوز

MHP mechanical parts آبی برق دستگاه میخانیکی سامان

Generator جنراتور

Penstock پایپ

Turbine ها پولی همرای توربین

water boiler آب بایلر

Trash rack جالی

Mechnical Gate دروازه

Belts کمربند

Other fittings باب فتینگ

Hand tools کار افزار

Shovel بیل

Pickaxe کلند

hand barrow زنبیل

Wheel barrow دستی کراچی

Spud bar 1 m long متره یک جبل

Hammer for stone شکن سنگ چکش

Page 5: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Market price) 5 ENG/STU

112 1.00 kg -

113 1.00 kg -

114 1.00 pcs -

115 1.00 m3 -

116 1.00 pcs -

117 1.00 pcs -

118 1.00 pcs -

119 1.00 pcs -

120 1.00 pcs -

121 1.00 pcs -

122 1.00 pcs -

123 1.00 pcs -

124 1.00 md -

125 1.00 md 10 12 11.00

-

-

126 m3 1.00 hour -

127 mm diam. 1.00 hour -

128 Tone 1.00 hour -

129 m3 1.00 hour -

130 tone 1.00 hour -

131 m3 1.00 hour -

132 tone 1.00 hour -

133 1.00 hour -

134 liter 1.00 trip -

I

135 6" 1.00 m -

136 8" 1.00 m -

137 10" 1.00 m -

138 12" 1.00 m -

139 14" 1.00 m -

140 16" 1.00 m -

141 18" 1.00 m -

String رجه

nail میخ

Empty barrel خالی بیرل

Excavator rent for 1 m3 of excavation قیمتشاول توسط کاری کندن مکعب متر یک

Small hammer مارتول

Plier پالس

Saw اره

Trawel پنا دست

Filing trawel مجوله

Water level آبترازو

Masson level شاقول

Chip-axe تیشه

Manpower (Just skilled and unskilled peopl not supervisor, admin peple, etc نیست شامل مامورین است ماهر غیر و ماهر کارگر تنها بشری قوای

Skilled labor ماهر کارگر

Unskilled labor ماهر غیر کارگر

Machinery درایور مزد و روغنیات تیل بشمول آالت ماشین کرایه

Mixer rent مصاله مخلوط ماشین کرایه

Vibrator rent تپک ماشین کرایه

Roller rent رولر کرایه

Excavator rent شاول کرایه

Bulldozer rent بلدوزر کرایه

Loader rent لودر کرایه

Crane rent کرن کرایه

Grader rent گریدر کرایه

Water bowser آب تانکر

Water Supply آبصحی

Borring کار برمه

Borring کار برمه

Borring کار برمه

Borring کار برمه

Borring کار برمه

Borring کار برمه

Borring کار برمه

Page 6: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Market price) 6 ENG/STU

III -

142 PVC pipe 0.5" 1.00 m -

143 PVC pipe 1" 1.00 m -

144 PVC pipe 1.5" 1.00 m -

145 PVC pipe 2" 1.00 m -

146 PVC pipe 3" 1.00 m -

147 PVC pipe 4" 1.00 m -

148 PVC pipe 6" 1.00 m -

149 PVC pipe 8" 1.00 m -

150 PVC pipe 10" 1.00 m -

151 PVC pipe 12" 1.00 m -

152 GI Pipe 3/4" 1.00 m -

153 GI Pipe 0.5" 1.00 m -

154 GI Pipe 1" 1.00 m -

155 GI Pipe 1.5" 1.00 m -

156 GI Pipe 2" 1.00 m -

157 GI Pipe 2.5" 1.00 m -

158 GI Pipe 3" 1.00 m -

159 Valve 1.5" 1.00 PCS -

160 Valve 2" 1.00 PCS -

161 Valve 2.5" 1.00 PCS -

162 Valve 3" 1.00 PCS -

163 Valve 4" 1.00 PCS -

164 Air-Valve 3" 1.00 PCS -

165 Air-Valve 4" 1.00 PCS -

166 water meter 3/4'' 1.00 PCS -

167 water meter 1'' 1.00 PCS -

168 1" 1.00 PCS -

169 1.5" 1.00 PCS -

170 2" 1.00 PCS -

171 2.5" 1.00 PCS -

172 3" 1.00 PCS -

173 1.5" 1.00 PCS -

174 2" 1.00 PCS -

175 2.5" 1.00 PCS -

176 3" 1.00 PCS -

Water Supply آبصحی

Union پیوند

Union پیوند

Union پیوند

Union پیوند

Union پیوند

Union پیوند

Union پیوند

Union پیوند

Union پیوند

Page 7: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Market price) 7 ENG/STU

177 4" 1.00 PCS -

178 0.5" 1.00 PCS -

179 3/4" 1.00 PCS -

180 1" 1.00 PCS -

181 1.5" 1.00 PCS -

182 2" 1.00 PCS -

183 2.5" 1.00 PCS -

184 3" 1.00 PCS -

185 1.5" 1.00 PCS -

186 2" 1.00 PCS -

187 2.5" 1.00 PCS -

188 3" 1.00 PCS -

189 4" 1.00 PCS -

190 0.5" 1.00 PCS -

191 1" 1.00 PCS -

192 1.5" 1.00 PCS -

193 2" 1.00 PCS -

194 2.5" 1.00 PCS -

195 3" 1.00 PCS -

196 4" 1.00 PCS -

197 1x0.5" 1.00 PCS -

198 1x1.5" 1.00 PCS -

199 2x1.5" 1.00 PCS -

200 3x2" 1.00 PCS -

201 4x3" 2.00 PCS -

202 3/4" 1.00 PCS -

203 0.5" 1.00 PCS -

204 1" 1.00 PCS -

205 1.5" 1.00 PCS -

206 2" 1.00 PCS -

207 2.5" 1.00 PCS -

208 3" 1.00 PCS -

209 4" 1.00 PCS -

210 GI-stariner 0.5" 1.00 PCS -

211 GI-stariner 1" 1.00 PCS -

212 GI-stariner 1.5" 1.00 PCS -

Union پیوند

Niple اشتت

Niple اشتت

Niple اشتت

Niple اشتت

Niple اشتت

Niple اشتت

Niple اشتت

Niple اشتت

Niple اشتت

Niple اشتت

Niple اشتت

Niple اشتت

Tee دهن سه

Tee دهن سه

Tee دهن سه

Tee دهن سه

Tee دهن سه

Tee دهن سه

Tee دهن سه

Peducer بوطلی

Peducer بوطلی

Peducer بوطلی

Peducer بوطلی

Peducer بوطلی

Soket سامی

Soket سامی

Soket سامی

Soket سامی

Soket سامی

Soket سامی

Soket سامی

Soket سامی

Page 8: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Market price) 8 ENG/STU

213 GI-stariner 2" 1.00 PCS -

214 GI-stariner 2.5" 1.00 PCS -

215 GI-stariner 3" 1.00 PCS -

216 GI-stariner 4" 1.00 PCS -

217 1" 1.00 PCS -

218 1.5" 1.00 PCS -

219 2" 1.00 PCS -

220 3" 1.00 PCS -

221 4" 1.00 PCS -

222 2'' 1.00 PCS -

III PE pipes and Fittings

223 PE Pipe 20mm 1.00 m -

224 PE Pipe 25mm 1.00 m -

225 PE Pipe 32mm 1.00 m -

226 PE Pipe 40mm 1.00 m -

227 PE Pipe 50mm 1.00 m -

228 PE Pipe 63mm 1.00 m -

229 PE Pipe 90mm 1.00 m -

230 PE Pipe 100mm 1.00 m -

231 PE coupling 20mm 1.00 PCS -

232 PE coupling 25mm 1.00 PCS -

233 PE coupling 32mm 1.00 PCS -

234 PE coupling 40mm 1.00 PCS -

235 PE coupling 50mm 1.00 PCS -

236 PE coupling 63mm 1.00 PCS -

237 PE coupling 90mm 1.00 PCS -

238 PE coupling 100mm 1.00 PCS -

239 PE reducing coupling 25mmx20mm 1.00 PCS -

240 PE reducing coupling 32mmx25mm 1.00 PCS -

241 PE reducing coupling 40mmx32mm 1.00 PCS -

242 PE reducing coupling 50mmx40mm 1.00 PCS -

243 PE reducing coupling 63mmx50mm 1.00 PCS -

244 PE reducing coupling 75mmx63mm 1.00 PCS -

245 PE reducing coupling 90mmx75mm 1.00 PCS -

246 PE reducing coupling 110mmx90mm 1.00 PCS -

247 PE Threaded Male of take 20mm 1.00 PCS -

Summerceble پمپ واتر

Summerceble پمپ واتر

Summerceble پمپ واتر

Summerceble پمپ واتر

Summerceble پمپ واتر

Hand pump دستی پمپ

Page 9: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Market price) 9 ENG/STU

248 PE Threaded Male of take 25mm 1.00 PCS -

249 PE Threaded Male of take 32mm 1.00 PCS -

250 PE Threaded Male of take 40mm 1.00 PCS -

251 PE Threaded Male of take 50mm 1.00 PCS -

252 PE Threaded Male of take 63mm 1.00 PCS -

253 PE Threaded Male of take 75mm 1.00 PCS -

254 PE Threaded Male of take 90mm 1.00 PCS -

255 PE Threaded Male of take 110mm 1.00 PCS -

256 PE equal tee 20mm 1.00 PCS -

257 PE equal tee 25mm 1.00 PCS -

258 PE equal tee 32mm 1.00 PCS -

259 PE equal tee 40mm 1.00 PCS -

260 PE equal tee 50mm 1.00 PCS -

261 PE equal tee 63mm 1.00 PCS -

262 PE equal tee 75mm 1.00 PCS -

263 PE equal tee 90mm 1.00 PCS -

264 PE equal tee 110mm 1.00 PCS -

265 PE reducing tee (25x20x25)mm 1.00 PCS -

266 PE reducing tee (32x25x32)mm 1.00 PCS -

267 PE reducing tee (40x32x40)mm 1.00 PCS -

268 PE reducing tee (50x40x50)mm 1.00 PCS -

269 PE reducing tee (63x50x63)mm 1.00 PCS -

270 PE reducing tee (75x63x75)mm 1.00 PCS -

271 PE reducing tee (90x75x90)mm 1.00 PCS -

272 PE reducing tee (110x90x110)mm 1.00 PCS -

273 PE Clamp Saddles 20mm 1.00 PCS -

274 PE Clamp Saddles 25mm 1.00 PCS -

275 PE Clamp Saddles 32mm 1.00 PCS -

276 PE Clamp Saddles 40mm 1.00 PCS -

277 PE Clamp Saddles 50mm 1.00 PCS -

278 PE Clamp Saddles 63mm 1.00 PCS -

279 PE Clamp Saddles 75mm 1.00 PCS -

280 PE Clamp Saddles 90mm 1.00 PCS -

281 PE Clamp Saddles 110mm 1.00 PCS -

282 PE Male adapter 20mm 1.00 PCS -

283 PE Male adapter 25mm 1.00 PCS -

Page 10: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Market price) 10 ENG/STU

284 PE Male adapter 32mm 1.00 PCS -

285 PE Male adapter 40mm 1.00 PCS -

286 PE Male adapter 50mm 1.00 PCS -

287 PE Male adapter 63mm 1.00 PCS -

288 PE Male adapter 75mm 1.00 PCS -

289 PE Male adapter 90mm 1.00 PCS -

290 PE Male adapter 110mm 1.00 PCS -

291 PE Fmale adapter 20mm 1.00 PCS -

292 PE Fmale adapter 25mm 1.00 PCS -

293 PE Fmale adapter 32mm 1.00 PCS -

294 PE Fmale adapter 40mm 1.00 PCS -

295 PE Fmale adapter 50mm 1.00 PCS -

296 PE Fmale adapter 63mm 1.00 PCS -

297 PE Fmale adapter 75mm 1.00 PCS -

298 PE Fmale adapter 90mm 1.00 PCS -

299 Insulation foam 1.00 m2 -

300 Rad Just give us the price for one meter 1.00 m -

301 Pamp instalation cost st the wage of labours or mechanic 1.00 PCS -

302 Special 1.00 kg -

303 Solar panel 75 w 1.00 pcs -

304 Solar panel 55 w 1.00 pcs -

305 Solar panel 45 w 1.00 pcs -

306 Solar panel 25 w 1.00 pcs -

307 Solar panel stand 1.00 Set -

308 Charging cable 6mm2 1.00 m -

309 Charging cable 10mm2 1.00 m -

310 House wiring wire 2.5mm2 1.00 m -

311 Charge contorller 12v 5Amp 1.00 pcs -

312 Bettery 12v 42Amp(Dry solar Bettery) 1.00 pcs -

313 Battery 12v 50 Amp(Dry solar Bettery) 1.00 pcs -

314 Battrey 12v 75 Amp(Dry solar Bettery) 1.00 pcs -

315 Cable connectors for battery 1.00 m -

316 Florescint Lamp 12v 9w 1.00 set -

317 Florescint Lamp 12v 7w 1.00 Set -

Stack سریش

Solar Power آقتابي انرژي

Page 11: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Market price) 11 ENG/STU

318 Florescint Lamp 12v 11w 1.00 Set -

319 Switch for houses on/ off 1.00 pcs -

320 DC sockets 1.00 pcs -

321 Florescint Lamp 220v 10w 1.00 Set -

322 Input reverse polarity with fuse 1.00 Set -

323 Cable clamp 1.00 pcs -

324 Rober type 1.00 Set -

325 Joint box 1.00 pcs -

326 Nile 1 kg -

327 Solar submersable Water pump complete 5000 litr/day 1 set -

328 Solar Water pump complete 10000 litr/day 1 set -

329 Solar submersable Water pump complete 12000 litr/day 1 set -

330 Solar submersable Water pump complete 24000 litr/day 1 set -

Transportation 231 1 tons -

332 1 m -

Transportation/TONS تن واحد في ترانسبورتTransportation/ Distance واحدفاصله في ترانسبورت

Page 12: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Market price) 12 ENG/STU

Page 13: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (BoQ) 13 ENG/STU

NSP - Project Cost Data Base (PCDB) - Bill of Quantity (BoQ)

Title No. Item Quantity Unit Unit cost Afs

عنوان نمبر تفصیالت مقدار واحد واحد فی قیمت

A1 1.00 1.00 m2 0.44

1.01 0.04 Site preparation, clearing site ect. 0.04 md 11.00

A2.1 2.00 1.00 m3 5.50

2.01 0.50 Unskilled labor 0.50 md 11.00

A2.2 1.00 m3 -

A.2.3 2.30 1.00 m2 0.44

A.2.3.1 0.04 Unskilled labor 0.04 md 11.00

A.2.4 2.40 1.00 m3 4.40

2.4.1 1.20 Sandy, gravel 1.20 m3 -

2.4.2 0.40 Unskilled labor 0.40 md 11.00

A3 3.00 2.00 50.00 m3 343.05

3.01 1.1 Stone including Labour for transport 55.00 m3 -

3.02 0.3885 Sand ,gravel 19.43 m3 -

3.05 77.7 Cement (M: 200, 1:5) 1,509.32 kg 11.00

3.06 80.5 water 1,563.71 liter -

3.07 0.5 Skilled labor on site 25.00 md -

3.08 1 Unskilled labor on site 50.00 md 11.00

( ) ( احجام ( برآورد پروژه قیمت دریافت ملی همبستگی پروگرام

District ولسوالی :

Village قریه :

Subproject output پروژه : تاریخ Date :محصول

Project ID # پروژه توسط Prepared by : نمبر : تهیه

Norm/ unit فی نورم

واحد

Site preparation/clearing ساحه کاری پاک

Preparation of site for the project, preparation of hand tools and equipment for the project start کار ابزار تهیه و ساحه نمودن .آماده

Excavation/cutting by labor کارگر توسط کاری کندن

The land is ordinary soil است عادی خاک نوع

Excavation/cutting by excavator شاول توسط کاری کندن

The land is ordinary soil است عادی خاک نوع

Sub grade preparation (spreading/raking) گرید سب کار

Base course & graveling preparation بیسکورس کار

Stone work with mortar کاری سنگ

Stone work is up to 1 m height, it is with cement mortar متر یک ارتفاع الی سمنت مصاله با کاری سنگ

Page 14: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (BoQ) 14 ENG/STU

A4 4.00 1.00 m3 793.10

4.01 416 Brick including transportation 416.00 pcs -

4.02 0.308 Sand 0.31 m3 -

4.05 70 Cement (M: 120, 1:6) 70.00 kg 11.00

4.06 34.44 water 34.44 liter -

4.07 0.65 Skilled labor on site 0.65 md -

4.08 2.1 Unskilled labor on site 2.10 md 11.00

A5 5.00 1.00 m3 3,889.60

5.01 1.10 Sandy gravel 1.10 m3 -

5.04 350 Cement (M: 200, 1:5) 350.00 kg 11.00

5.05 150 water 150.00 liter -

5.06 0.7 Skilled labor on site 0.70 md -

5.07 3.6 Unskilled labor on site 3.60 md 11.00

A6 6.00 1.00 kg 0.08

6.01 1.00 Steel bar 1.00 Kg -

6.02 0.007 Wire 1 mm 0.01 Kg -

6.03 0.012 Skilled labor on site 0.01 md -

6.04 0.007 Unskilled labor on site 0.01 md 11.00

A7 7.00 1.00 m2 2.20

7.01 0.02 Wooden timber 0.02 m3 -

7.02 2.00 Wooden pole x m long 2.00 pcs -

7.03 0.05 Nail 0.05 kg -

7.04 0.20 Skilled labor on site 0.20 md -

7.05 0.20 Unskilled labor on site 0.20 md 11.00

A8 8.00 1.00 m3 2,785.75

8.01 1.055 Sandy gravel 1.06 m3 -

8.04 250 Cement (M:120, 1:6) 250.00 kg 11.00

8.05 200 water 200.00 liter -

8.06 0.65 Skilled labor on site 0.65 md -

8.07 3.25 Unskilled labor on site 3.25 md 11.00

A9 9.00 1.00 m2 0.66

9.01 0.02 wooden beam 10x6 x5 cm (timber) 0.02 m3 -

9.02 0.03 wooden plank 2.5 cm thick (timber) 0.03 m3 -

10.02 0.20 Nail 0.20 Kg -

9.03 0.20 Skilled labor on site 0.20 md -

9.04 0.06 Unskilled labor on site 0.06 md 11.00

A10 10.00 1.00 m2 0.55

10.01 1.15 ]ron sheet 1.15 m2 -

Brick work with mortar کاری خشت

The brick is burnt brick size 22 x 11 x 7 cm and with cement mortar 22 x 11 x 7 cm خشت و مصاله با کاری خشت

RCC دار سیخ کانکریت

Steel working is not included here نیست شامل بندی سیخ

Reinforcement بندی سیخ

deformed steel will be used for over 8 mm diameter از تر باال های است 8سیخ دار رخ سیخ ملی

Shuttering بندی قالب

Shuttering is considered with wooden plate and wooden pole تخته و گول چوب با بندی قالب

PCC سیخ بدون کانکریت

Roof truss بام پوش قیچی

It is wooden truss with plank on top فرش تخته با چوبی پوش قیچی

Iron sheet covering of roof بام پوش آهن

Page 15: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (BoQ) 15 ENG/STU

10.02 0.18 Skilled labor on site 0.18 md -

10.03 0.05 Unskilled labor on site 0.05 md 11.00

A11 11.00 1.00 m2 2.20

11.01 0.06 Soil 0.06 m3 -

11.02 2.00 Straw 2.00 kg -

11.03 200.00 water 200.00 liter -

11.04 0.08 Skilled labor on site 0.08 md -

11.05 0.20 Unskilled labor on site 0.20 md 11.00

A12 12.00 1.00 m2 5.50

12.01 0.07 Wooden timber 0.07 m3 -

12.02 0.20 Nail 0.20 kg -

12.03 0.07 Skilled labor on site 0.07 md -

12.04 0.50 Unskilled labor on site 0.50 md 11.00

12.10 1.00 kg -

12.20 1.00 pcs -

12.30 1.00 pcs -

12.40 1.00 pcs -

12.50 1.00 pcs -

The timber is the best quality available locally or near market, the hardware is China or Garman made

A13 13.00 Diff. diff.

13.01 1.00 m -

13.02 1.00 m -

13.03 1.00 m -

12.04 1.00 pcs -

12.05 1.00 pcs -

12.06 1.00 pcs -

12.07 1.00 pcs -

12.08 1.00 pcs -

12.09 1.00 pcs -

12.10 1.00 pcs -

0.01 Skilled labor 1.00 md -

A14 14.00 1.00 m2 24.20

14.01 0.022 Sand 0.02 m3 -

14.04 2 Cement (M: 120, 1:6) 2.00 kg 11.00

14.05 2 water 2.00 liter -

14.06 0.1 Skilled labor on site 0.10 md -

14.07 0.2 Unskilled labor on site 0.20 md 11.00

Iron sheet is gauge 22 and well galvanized گیج چادر میشود 22آهن پیچ ودبل کاری لیم که

Straw mud of roofing بام گل کاه

The thickness of the straw mud layer is 4 cm از گل نباشد 4کاه کمتر متر سانتی

Wooden doors, windows چوبی دروازه و کلکین

Glue for wood سفید سرش

Lock for door دروازه قفل

Hinge 3 inches چپراست

Hinge 2 inches چپراست

Hardware for windows ناخنک

Electrical work for buildings تعمیرات برق

Wire 2x 1.5 سیم

Wire 2x 2.5 سیم

Cable کیبل

Junction box بکس جین

Double rod neon راده دو نیون

Single rod neon راده یک نیون

Switch سوچ

Socket ساکت

Automatic switch اوتومات سوچ

Fuse box بکس فیوز

All the electrical material will be Iranian or Garman made. است جرمنی یا و ایرانی برق های سامان

Plastering پلسترکاری

the thickness of the plastering should not be less than 1.5 cm, at least 10 days curing از پلستر نباشد 1.5ضخامت کم متر سانتی

Page 16: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (BoQ) 16 ENG/STU

A15 15.00 1.00 m2 22.55

15.01 0.01 Sand 0.01 m3 -

15.04 2 Cement (M:300, 1:3) 2.00 kg 11.00

15.05 2 water 2.00 liter -

15.06 0.17 Skilled labor on site 0.17 md -

15.07 0.05 Unskilled labor on site 0.05 md 11.00

the proportion of cement - sand is a must, cement is not older than 3 months, sand and water is clean

A16 16.00 1.00 m3 3.63

16.01 1.00 Soil 1.00 m3 -

16.02 0.33 Unskilled labor on site 0.33 m3 11.00

A17 17.00 1.00 m3 6.60

17.01 1.20 Stone 1.20 m3 -

17.02 0.10 Skilled labour on site 0.10 md -

17.03 0.60 Unskilled labor on site 0.60 md 11.00

A18 18.00 1.00 m2 -

18.01 1.00 Glasses 1.00 m2 -

18.02 0.12 Skilled labor on site 0.12 md -

0.04 Unskilled labor on site 0.04 md 11.00

A19 19.00 1.00 m2 -

19.01 1.00 Plastic sheet cover (.2 mm thick) 1.00 m2 -

19.02 0.01 Skilled labor on site 0.01 md -

A20 20.00 1.00 m2 0.44

20.01 0.04 Unskilled labor on site 0.04 md 11.00

A21.1 21.00 1.00 m2 0.44

21.01 0.04 Skilled labor on site 0.04 md -

21.02 0.02 Unskilled labor 0.02 md 11.00

21.03 0.20 Plastic Paint 50% 0.20 kg -

21.04 0.30 Sand paper 0.30 pcs -

A21.2 1.00 m2 0.11

21.01 0.0275 Skilled labor on site 0.03 md -

21.02 0.01 Unskilled labor 0.01 md 11.00

21.03 0.30 Marble powder 0.30 kg -

21.04 0.02 Powder paint 0.02 kg -

21.05 0.02 Salt 0.02 kg -

A21.3 1.00 m2 -

Pointing of stone work کاری هنگاف

Filling with soil خاک با پرکاری

Soil filling should be well compacted میگردد تپک خوب خاک

Filling with stone سنگ با کاری پر

Stone or gravel can be used for filling جغل یا و کوهی پارچه سنگ

Glass fitting for windows کلکین شیشه نصب

Glass thickness is 5 mm است 5شیشه ملی

Floor and roof insulation(plastic sheet) عایقپالستیک با سازی

The thicker plastic available in the local market will be used میگردد استفاده مارکیت پالستیک ترین دبل

Site clearance ساحه کاری پاک

Painting (plastic 1:1) پالستیکی رنگمالی

plane painting آبی رنگمالی

Oil painting روغنی رنگمالی

Page 17: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (BoQ) 17 ENG/STU

21.01 0.04 Skilled labor on site 0.04 md -

21.03 0.17 Oil paint 0.17 kg -

21.04 0.50 Sand paper 0.50 pcs -

A22 22.00

22.01 1.00 pcs -

22.02 1.00 pcs -

22.03 1.00 pcs -

22.04 1.00 pcs -

22.05 1.00 pcs -

22.06 1.00 pcs -

22.07 1.00 pcs -

22.08 1.00 pcs -

22.09 1.00 kg -

22.10 1.00 pcs -

Student joined desk and chair is for two student, office tables and chairs are ordinary ones, principle desk and chair is good design

A23 23.00

23.01 1.00 pcs -

23.02 1.00 pcs -

23.03 1.00 pcs -

23.04 1.00 pcs -

23.05 1.00 pcs -

23.06 1.00 pcs -

23.07 1.00 kg -

23.08 1.00 kg -

23.09 1.00 pcs -

23.10 1.00 pcs -

23.11 1.00 pcs -

23.12 1.00 pcs -

23.13 1.00 pcs -

23.14 1.00 pcs -

23.15 1.00 pcs -

23.16 1.00 pcs -

23.17 1.00 pcs -

A24 24.00

24.01 1.00 m - 24.02 1.00 m - 24.03 1.00 m - 24.04 1.00 m - 24.05 1.00 m - 24.06 1.00 pcs - 24.07 1.00 pcs - 24.08 1.00 pcs - 24.09 1.00 pcs - 24.10 1.00 pcs -

School furniture مکتب چوکی و میز

Student desk with chair شاگرد چوکی و میز

Chair for teacher معلم چوکی

Table for teacher معلم میز

Office table دفتر میز

Office chair دفتر چوکی

Principle desk مدیریت میز

Chair for principle مدیریت چوکی

Book shelf کتاب الماری

Blackboard paint تخته رنگ

Blackboard سیاه تخته

Hand tools کار افزار

Shovel بیل

Pickaxe کلند

hand barrow زنبیل

Wheel barrow دستی کراچی

Spud bar 1 m long متره یک جبل

Hammer for stone شکن سنگ چکش

String رجه

nail میخ

Empty barrel خالی بیرل

Small hammer مارتول

Pliers پالس

Saw اره

Trowel پنا دست

Filing trowel مجوله

Water level آبترازو

Masson level شاقول

Chip-axe تیشه

MHP electrical parts آبی برق دستگاه برق سامان

Over head cable d= 10mm قطر هوایی کیبل

Over head cable d=6mm قطر هوایی کیبل

Over head cable d= 2.5mm قطر هوایی کیبل

wire 1mm ملی یک سیم

wooden beam l=4 m طول به گول چوب

Insulator انسولیتر

switches سوچ

sockets ساکت

Bulbs neon 20watts نیون گروپ

Junction box بکس جین

Page 18: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (BoQ) 18 ENG/STU

24.11 1.00 pcs - 24.12 1.00 box - 24.13 1.00 box - 24.14 1.00 box -

A25 25.00

25.01 1.00 set -

25.02 1.00 m -

25.03 1.00 set -

25.04 1.00 set -

25.05 1.00 m2 -

25.06 1.00 pcs -

25.07 1.00 pcs -

25.08 1.00 pcs -

25.09 1.00 pcs -

A27 27.00 hour

27.01 1.00 hour -

27.02 1.00 hour -

27.03 1.00 hour -

27.04 1.00 hour -

27.05 1.00 hour -

27.06 1.00 hour -

27.07 1.00 hour -

27.08 1.00 hour -

27.090 1.00 trip -

A28 28.00

28.01 1.00 m -

28.02 1.00 m -

28.03 1.00 m -

28.04 1.00 m -

28.05 1.00 m -

28.06 1.00 m -

28.07 1.00 m -

28.08 PVC pipe 1.00 m -

28.09 PVC pipe 1.00 m -

28.10 PVC pipe 1.00 m -

28.11 PVC pipe 1.00 m -

28.12 PVC pipe 1.00 m -

28.13 PVC pipe 1.00 m -

28.14 PVC pipe 1.00 m -

28.15 PVC pipe 1.00 m -

28.16 PVC pipe 1.00 m -

28.17 PVC pipe 1.00 m -

rubber tape رابرتیپ

clip small size خورد کلیپ

nail one inches long انچ یک میخ

fuse box بکس فیوز

MHP mechanical parts سامانآبی برق دستگاه میخانیکی

Generator (single phase) فاز یک جنراتور

Penstock پایپ

Turbine with pulley ها پولی همرای توربین

water boiler آب بایلر

Trash rack جالی

Gate دروازه

fitting باب فتینگ

Belts کمربند

Other fittings باب فتینگ

Machinery rent including fuel, driver کرایهدرایور مزد و روغنیات تیل بشمول آالت ماشین

Mixer rent مصاله مخلوط ماشین کرایه

Vibrator rent تپک ماشین کرایه

Roller rent رولر کرایه

Excavator rent شاول کرایه

Bulldozer rent بلدوزر کرایه

Loader rent لودر کرایه

Crane rent کرن کرایه

Grader rent گریدر کرایه

Water tanker آب تانکر

Water Supply آبصحی

Borring کار برمه

Borring کار برمه

Borring کار برمه

Borring کار برمه

Borring کار برمه

Borring کار برمه

Borring کار برمه

Page 19: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (BoQ) 19 ENG/STU

28.18 GS Pipe 1.00 m -

28.19 GS Pipe 1.00 m -

28.20 GS Pipe 1.00 m -

28.21 GS Pipe 1.00 m -

28.22 GS Pipe 1.00 m -

28.23 GS Pipe 1.00 m -

28.24 GS Pipe 1.00 m -

28.25 Wall 1.00 PCS -

28.26 Wall 1.00 PCS -

28.27 Wall 1.00 PCS -

28.28 Wall 1.00 PCS -

28.29 1.00 PCS -

28.30 1.00 PCS -

28.31 1.00 PCS -

28.32 1.00 PCS -

28.33 1.00 PCS -

28.34 1.00 PCS -

28.35 1.00 PCS -

28.36 1.00 PCS -

28.37 1.00 PCS -

28.38 1.00 PCS -

28.39 1.00 PCS -

28.40 1.00 PCS -

28.41 1.00 PCS -

28.42 1.00 PCS -

28.43 1.00 PCS -

28.44 1.00 PCS -

28.45 1.00 PCS -

28.46 1.00 kg -

28.47 Rad 1.00 m -

28.48 Pamp instalation cost 1.00 PCS -

A29 29.00

29.01 Solar panel 75 w

1.00 pcs -

29.02 Solar panel 55 w

1.00 pcs -

29.03 Solar panel 45 w

1.00 pcs -

Union پیوند

Tee دهن سه

Tee دهن سه

Tee دهن سه

Tee دهن سه

Niple اشتت

Peducer بوطلی

Peducer بوطلی

Peducer بوطلی

Peducer بوطلی

Soket سامی

Soket سامی

Summerceble پمپ واتر

Summerceble پمپ واتر

Summerceble پمپ واتر

Summerceble پمپ واتر

Hand pump دستی پمپ

Stack سریش

Solar Power آقتابي انرژي

Page 20: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (BoQ) 20 ENG/STU

29.04 Solar panel stand

1.00 Set -

29.05 Charging cable 6mm2

1.00 m -

29.06 Charging cable 10mm2

1.00 m -

29.07 House wiring wire 2.5mm2

1.00 m -

29.08 Charge contorller 12v 5Amp

1.00 pcs -

29.09 Bettery 12v 42Amp

1.00 pcs -

29.10 Battery 12v 50 Amp

1.00 pcs -

29.11 Battrey 12v 75 Amp

1.00 pcs -

29.12 Cable connectors for battery

1.00 m -

29.13 Florescint Lump 12v 9w

1.00 set -

29.14 Florescint Lump 12v 7w

1.00 Set -

29.15 Florescint Lump 12v 11w

1.00 Set -

29.16 Inverter (converter ) 300w

1.00 pcs -

29.17 Switch for houses on/ off

1.00 pcs #REF!

29.18 DC sockets

1.00 pcs -

29.19 Florescint Lump 220v 10w

1.00 Set -

29.20 Input reverse polarity with fuse

1.00 Set -

29.21 Cable clamp

1.00 pcs -

29.22 Rober type

1.00 Set -

29.23 Joint box

1.00 pcs -

29.24 Nile

1.00 kg -

A30 30.00 1.00 tons

A31 31.00 1.00 m

Note: The used norm is the average norm if it is not fitting to the site condition please ignore it and replace it by an actual norm.

Transportation/TONS تن واحد في ترانسبورت

Transportation/ Distance واحدفاصله في ترانسبورت

Page 21: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (BoQ) 21 ENG/STU

NSP - Project Cost Data Base (PCDB) - Bill of Quantity (BoQ)

Remark

مجموعی قیمت مالحظات

0.44

0.44

5.50

5.50

-

0.44

0.44

4.40

-

4.40

17,152.55

-

-

16,602.55

-

-

550.00

( ) ( احجام ( برآورد پروژه قیمت دریافت ملی همبستگی پروگرام

: تاریخ

Prepared by توسط : تهیه

Total cost َW Afs

Page 22: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (BoQ) 22 ENG/STU

793.10

-

-

770.00

-

-

23.10

3,889.60

-

3,850.00

-

-

39.60

0.08

-

-

-

0.08

2.20

-

-

-

-

2.20

2,785.75

-

2,750.00

-

-

35.75

0.66

-

-

-

-

0.66

0.55

-

Page 23: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (BoQ) 23 ENG/STU

-

0.55

2.20

-

-

-

-

2.20

5.50

-

-

-

5.50

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

24.20

-

22.00

-

-

2.20

Page 24: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (BoQ) 24 ENG/STU

22.55

-

22.00

-

-

0.55

3.63

-

3.63

6.60

-

-

6.60

-

-

-

0.44

-

-

-

0.44

0.44

0.44

-

0.22

-

-

0.11

-

0.11

-

-

-

-

Page 25: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (BoQ) 25 ENG/STU

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Page 26: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (BoQ) 26 ENG/STU

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Page 27: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (BoQ) 27 ENG/STU

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Page 28: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (BoQ) 28 ENG/STU

-

-

-

-

-

-

-

-

-

-

-

-

-

#REF!

-

-

-

-

-

-

-

-

-

Note: The used norm is the average norm if it is not fitting to the site condition please ignore it and replace it by an actual norm.

Page 29: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Unit price) STU/ENG

NSP - Project Cost Data Base (PCDB) - Summary

Title Item Unit Total cost (AFS)

عنوان تفصیالت واحد مجموعی قیمت

A1 m2 0.44

A2.1 m3 5.50

A2.2 m3 -

A.2.3 m3 0.44

Specification:

A.2.4 m3 4.40

Specification:

A3 m3 17,152.55

Specification:

A4 m3 793.10

A5 m3 3,889.60

Specification:

A6 kg 0.08

Specification:

A7 m2 2.20

Specification:

A8 m3 2,785.75

Specification:

A9 m2 0.66

Specification:

A10 m2 0.55

A11 m2 2.20

A12 m2 5.50

Specification: The timber is the best quality available locally or near market, the hardware is China or Garman made

( ) ( خالصه ( پروژه قیمت دریافت ملی همبستگی پروگرام

District ولسوالی :

Village قریه :

Subproject output پروژه : تاریخ Date : محصول

Project ID # پروژه توسط Prepared by : نمبر : تهیه

Site preparation/clearing ساحه کاری پاک

Specification: Preparation of site for the project, preparation of hand tools and equipment for the project start کار ابزار تهیه و ساحه نمودن .آماده

Excavation/cutting by labor کارگر توسط کاری کندن

Specification: The land is ordinary soil است عادی خاک نوع

Excavation/cutting by excavator توسطشاول کاری کندن

Specification: The land is ordinary soil است عادی خاک نوع

Subgrade preparation (spreading/raking) گرید سب کار

Base course & graveling preparation بیسکورس کار

Stone work with mortar کاری سنگ

Brick work with mortar کاری خشت

Spicification: The brick is burnt brick size 22 x 11 x 7 cm and with cement mortar 22 x 11 x 7 cm خشت و مصاله با کاری خشت

RCC دار سیخ کانکریت

Reinforcement بندی سیخ

Shuttering بندی قالب

PCC سیخ بدون کانکریت

Roof truss بام پوش قیچی

Iron sheet covering of roof بام پوش آهن

Specification: Iron sheet is gauge 22 and well galvanized گیج چادر 22آهن

Straw mud of roofing بام گل کاه

Specification: The thickness of the straw mud layer is 4 cm از گل نباشد 4کاه کمتر متر سانتی

Wooden doors windows چوبی دروازه و کلکین

Page 30: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Unit price) STU/ENG

A13 -

A14 m2 24.20

A15 m2 22.55

Specification:

A16 m3 3.63

Specification:

A17 m3 6.60

Specification:

A18 m2 -

A19 m2 -

A20 m2 0.44

Specification:

A21.1 m2 0.44

A21.2 m2 0.11

A21.3 m2 -

A22 pcs -

Specification:

A23 pcs - Specification:

A24 diff. - Specification:

A25 diff. - Specification:

A27 -

Specification: the rent includes fuel, oil and the driver expenses.

A28 PCs -

A29 Set -

A30 tons -

Electrical work for buildings تعمیرات برق

Specification: All the electrical material will be Iranian or Garman made. است جرمنی یا و ایرانی برق های سامان

Plastering پلسترکاری

Specification: The thickness of the plastering should not be less than 1.5 cm, at least 10 days curing از پلستر نباشد 1.5ضخامت کم متر سانتی

Pointing of stone work کاری هنگاف

Filling with soil خاک با پرکاری

Filling with stone سنگ با کاری پر

Glass fitting for windows کلکین شیشه نصب

Specification: Glass thickness is 5 mm است 5شیشه ملی

Floor and roof insulation(plastic sheet) پالستیک با سازی عایق

Specification: The thicker plastic available in the local market will be used میگردد استفاده مارکیت پالستیک ترین دبل

Site clearance ساحه کاری پاک

Painting (plastic 1:1) پالستیکی رنگمالی

Specification: Two layer plastic painting پالستیک رنگ قلم دو

plane painting آبی رنگمالی

Specification: Two layer plane painting آبی رنگ قلم دو

Oil painting روغنی رنگمالی

Specification: Three layer oil painting روغنی رنگ قلم سه

School furniture مکتب چوکی و میز

Hand tools کار افزار

MHP electrical parts آبی برق دستگاه برق سامان

MHP mechanical parts آبی برق دستگاه میخانیکی سامان

Machinery درایور مزد و روغنیات تیل بشمول آالت ماشین کرایه

Water Supply آبصحی

Solar Power آقتابي انرژي

Transportation/TONS تن واحد في ترانسبورت

Page 31: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Unit price) STU/ENG

A31 m -

24,700.93

Transportation/ Distance واحدفاصله في ترانسبورت

Total Cost of Subproject پروژه مجموعی قیمت

Page 32: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Unit price) STU/ENG

Remark

مالحظات

Specification: The timber is the best quality available locally or near market, the hardware is China or Garman made

: تاریخ

Prepared by توسط : تهیه

Specification: Preparation of site for the project, preparation of hand tools and equipment for the project start کار ابزار تهیه و ساحه نمودن .آماده

خشت و مصاله با کاری خشت

Page 33: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Unit price) STU/ENG

از پلستر نباشد 1.5ضخامت کم متر سانتی

Page 34: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Unit price) STU/ENG

Page 35: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Unit price) STU/ENG

Page 36: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Unit price) STU/ENG

Page 37: New Project Cost Data Base (PCDB)-14-11-07 دریافت قیمت پروژه

National Solidarity ProgramOversight Consultant Team

PCDB (Unit price) STU/ENG