Designing and ConstructingLow Impact Development Stormwater Devices
at Sacramento State
City of SacramentoSacramento State Facilities Management
![Page 2: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/2.jpg)
Overview• Stormwater Issues• Managing Stormwater: LID• Project
– Background, collaboration, funding, benefits– Design goals and challenges– Construction– Operation and maintenance– Monitoring, education, outreach
• Site Visits
![Page 3: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/3.jpg)
Stormwater – Water Quality Pollutants
http://www.nassaucountyny.gov
Nutrients
Pesticides Sediment
Heavy Metals
Oil and Grease
Pathogens
http://www.swfwmd.state.fl.ushttp://cfpub.epa.gov
http://www.americanrecycler.com
http://www.floridasprings.org
![Page 4: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/4.jpg)
Stormwater: Pollutant Sources
4
Fertilizers
Tree/leaf litter
Pesticides
Vehicles & Roads
Industrial activities
Stream erosion
Construction
Pets & wildlife
Humans
http://earthfix.opb.org
http://www.maxwellturf.com
http://www.scientificamerican.com
http://www.wm.edu
![Page 5: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/5.jpg)
Stormwater: Pollutant Impacts
5
Algae blooms Fish kills Habitat destruction Reservoir storage loss Visually Unappealing Odors Toxicity Beach closures
Study links salmon deaths to stormwater runoff from highways
Stormwater is one of the leading, remaining causes of water quality problems (EPA) http://action.surfrider.org
http://www.oregonlive.com
http://mandellplace.orghttp://www.cantonpl.org
www.examiner.com
http://www.charlottesville.org
![Page 6: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/6.jpg)
StormwaterA Common Theme: Urbanization
6
http://www.peachcounty.net/stormwaterdepartment.cfm
![Page 7: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/7.jpg)
Stormwater: Urbanization Impacts
7
Increased Flow and Volume Results in• Increased Flooding
• Increased Stream Bed and Bank erosion
• Enlarged channels
• Habitat Loss and Damage
• Increased Pollutant Transport (Increase Water Quality Impacts) Increased Aquatic Toxicity
Increased Consumer Toxicity
Increased Health Outbreaks
Increased Beach Closures
Degradation of Aesthetics
http://www.sccwrp.org/researchareas/Stormwater/Hydromodification/EffectOfIncreasesInPeakFlowsAndImperviousness.aspx
http://www.crwr.utexas.edu/gis/gishydro03/Classroom/trmproj/Lancaster/AustinErosion.htm
![Page 8: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/8.jpg)
Managing Stormwater Today:Low Impact Development (LID)
1. Mimic Natural Hydrology (Infiltrate)
2. Protect Receiving Waters
3. Reduce Flooding4. Groundwater Recharge5. Opportunities for Reuse US
EPA
![Page 9: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/9.jpg)
LOW IMPACT DEVELOPMENT (LID)Types of Devices
9
http://www.csc.temple.edu/t-vssi/BMPSurvey/delaware_countycc.htm
Bioretention Planters
Rain Gardens
Bioswales
Porous Pavement
Biostrips
Road Narrowing (reduce impervious area)
Cisterns or Rain Barrels
Tree Box Filters
Constructed Wetlands
Green Roofs
Infiltration Trenches
![Page 10: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/10.jpg)
Rain Garden Profile and Function
10
Surface depth 6”
Amended Soil depth 18”
Native Soil
![Page 11: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/11.jpg)
Rain Gardens
Harford County, MDUS EPA
![Page 12: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/12.jpg)
Bioswale - Profile
Native Soil
6” heightAmended Soil: 6” – 18”
![Page 13: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/13.jpg)
Bioswales
Lake County, ILCaltrans
![Page 14: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/14.jpg)
Bioretention Profile and Function
14
Surface depth 6”
Amended Soil depth 18”
Underdrain storage depth 12”
Elevated Underdrain Discharge
Native soil
![Page 15: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/15.jpg)
Bioretention – Parking Lots
Scott Taylor, PERBF Consulting
![Page 16: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/16.jpg)
Bioretention – Streets
Scott Taylor, PERBF Consulting
![Page 17: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/17.jpg)
Porous Pavement - Profile
Native Soil
Porous Pavement
Gravel Filter Course
4”
12”
![Page 18: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/18.jpg)
Porous Pavement
![Page 19: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/19.jpg)
LID Implementation at Sacramento State
![Page 20: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/20.jpg)
Project Background: Campus Stormwater
Drain Inlet ‐ Campus Storm Drain Discharges into American River
![Page 21: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/21.jpg)
Project Background: American River
Outfall – Guy West Bridge Upstream Sample
Discharge Sample
![Page 22: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/22.jpg)
Project Background1. Proposition 84 – Stormwater
Grant Program2. State Water Resources
Control Board3. Objectives:
a) Prevent stormwater contamination of rivers, lakes, and streams.
b) Implement requirements of stormwater permits
c) Implement Low Impact Development (LID)
d) Monitoring and Education OutreachCity of Kirkland, WA
![Page 23: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/23.jpg)
Project Collaboration
State Water Resources Control Board
City of Sacramento
Office of Water Programs @ Sacramento State/UEI
Sacramento State Facilities Management
Design and Construction Contractors
Project ManagementDesign and Construction OversightStormwater MonitoringPublic Education and Outreach
![Page 24: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/24.jpg)
Project FundingProject Total - $3.3M
A. Prop 84 - $2.6MB. Local Match - $0.7M
i. Sacramento State FM - $500Kii. City of Sacramento - $112Kiii. Office of Water Programs – $31Kiv. Dry Creek Conservancy - $30Kv. Local LID Expertise - $25Kvi. County of Sacramento - $1K
![Page 25: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/25.jpg)
Project Benefits1. Meet Stormwater
Permit Requirements2. Faculty/Student
Involvement3. High Visibility4. Protects the American
River5. Replenish Irrigation
Wells6. Demonstration and
Training Facility for Northern CA
![Page 26: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/26.jpg)
Campus Layout
![Page 27: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/27.jpg)
Design GoalsEnhance Infiltration
A. Silty sands over gravelsB. No devices linedC. 14 acre-feet per year infiltrated or treatedD. 13.2 acre-feet per year - infiltration aloneE. Total Tributary Area ~ 13 acres
Hearty VegetationA. Drought- and Inundation-TolerantB. Variety of Types and Combinations
![Page 28: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/28.jpg)
Design Goals – Large Tributary Areas
Parking Lot 7 (South): Bioretention Planters and Bioswale
1.64 Acres1.82 Acres
![Page 29: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/29.jpg)
Design Challenges1. Fitting into the existing drainage system
a. Horizontalb. Vertical
2. Negotiating the removal of parking stalls3. Fitting into existing topography4. Existing infrastructure5. Interactions with buildings6. Subsurface soil?7. Timing8. Compatibility with Campus Master Plan
![Page 30: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/30.jpg)
Design Challenges• Fitting into the existing drainage system
– Horizontal
Drain in traveled way Drain conveniently located
![Page 31: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/31.jpg)
Design Challenges• Fitting into the existing drainage system
– Vertical
Existing pipe invert to be maintained(can limit depth of bioretention media)
![Page 32: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/32.jpg)
Design Challenges• Negotiating the removal of parking stalls
8 97 10
1 2 53 4
6 11
186 stalls in watershed
![Page 33: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/33.jpg)
Design Challenge• Fitting into existing topography
– Steep slopes don’t accommodate large bioretention cells
Bioretention media
6”
1’ bench
2:1
Volume reduced by bench
3’ wall with curb
6”
Existing pavement(slope exaggerated)
Railing
3’ wall 7’ wall with curb
![Page 34: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/34.jpg)
Design Challenges• Conflicts with other infrastructure
– Sanitary sewer, gas, electric, light standards, trees
Gas (high pressure)
Water
Electrical
CommunicationsStorm
Lightstandard
![Page 35: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/35.jpg)
Design Challenges• Interactions with buildings
– Avoid saturating soils around foundations– Tapping into building drainage systems
• May require architect or mechanical engineer• Some inaccessible
Concrete bottomSeparation from wall
This one is OK but what if the pipe is inside the building?
Calaveras Hall
![Page 36: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/36.jpg)
Design Challenges
• Subsurface soil– Will it infiltrate?– How has it been affected by previous
construction?• Timing
– Summer Construction Window
![Page 37: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/37.jpg)
Design Challenges• Compatibility with campus master plan
![Page 38: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/38.jpg)
Construction Status• Lot 7, Lot 10, College Town Drive
– Construction complete– Contractor returning mid-October to replace plants
![Page 39: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/39.jpg)
Construction Status• Jed Smith Drive
– Construction complete– Planting and landscaping currently underway
![Page 40: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/40.jpg)
Construction Status• Library Green, Campus Grove, & Calaveras Hall
– Rain garden infrastructure complete– Planting and landscaping currently underway– Public access installations resuming soon
![Page 41: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/41.jpg)
Construction Challenges• Unanticipated utilities and tree roots
– Reduced footprints– Changed geometry– Broken irrigation lines flooded excavations– Parking pass dispenser shut down
• Specified plants not available• Keep heavy equipment off excavations• Unknown vehicular access points• Extremely hot weather• Improper planting techniques
![Page 42: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/42.jpg)
Monitoring• Performance Monitoring
– Flows (pressure heads)– Water Quality
• TSS, TDS, turbidity• Chlorpyrifos & Diazinon• Copper, Lead, & Zinc
• Evaluation & Reporting– Up to 90% reductions
0
2
4
6
8
10
12
14
16
18
20
3/18
/11
9:00
3/18
/11
12:0
0
3/18
/11
15:0
0
3/18
/11
18:0
0
3/18
/11
21:0
0
3/19
/11
0:00
3/19
/11
3:00
3/19
/11
6:00
3/19
/11
9:00
3/19
/11
12:0
0
3/19
/11
15:0
0
3/19
/11
18:0
0
3/19
/11
21:0
0
3/20
/11
0:00
3/20
/11
3:00
3/20
/11
6:00
3/20
/11
9:00
3/20
/11
12:0
0
3/20
/11
15:0
0
3/20
/11
18:0
0
3/20
/11
21:0
0
3/21
/11
0:00
3/21
/11
3:00
3/21
/11
6:00
3/21
/11
9:00
Date/Time
Rai
nfal
l Int
ensi
ty (m
m/h
r)0
0.1
0.2
0.3
0.4
0.5
Flow
Rat
e (L
/s)
Rainfall Intensity (mm/hr)Flow Rate (L/s)Sample Taken
Event SummarySite: Sac ORVTS (3-362)Event: 2010/11-3/18/2011
Catchment Area (ha): 0.041Assumed Fraction Runoff/Rain Volume: 0.07
Rain DataStart Date/Time: 03/18/11 11:49
Stop Date/Time: 03/20/11 18:32
Event Rain (mm): 37.08Max Intensity (mm/hr): 12.19
Runoff DataStart Date/Time: 03/18/11 11:50
Stop Date/Time: 03/21/11 07:01
Total Flow Volume (L): 1606Peak Flow (L/s): 0.18
Obs. Fraction Runoff/Rain Volume: 0.106
Sample DataStart Date/Time: 03/18/11 12:01
Stop Date/Time: 03/20/11 18:53
Estimated Percent Capture: 93%Successful Aliquots: 103
Notes: Two day event. RO/Rain <<1_RO infiltration suspected. RO/RF ratio is within the range observed during the 2009-10 monitoring season (0.016 - 0.129). Rain covers are currently in place over the collection system. Flow at end of event most likely caused by standing water remaining in the flume.
![Page 43: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/43.jpg)
Education and Outreach
1. Signage, Website, Tours (Mobile App)
2. Brochures3. Conferences and
Papers4. LID Conference5. Campus
Presentations6. Public Affairs
Kitsap Conservation District Green Side Up
![Page 44: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/44.jpg)
Operation and Maintenance
1. Weed, Litter, and Debris Removal (As needed)
2. Infiltration Inspections (Runoff Infiltrating?) (Twice a year during storms)
3. Low or no Infiltration? Remove and Replace Topsoil (~ 5 to 10 years)
4. Use integrated pest management (IPM) techniques to minimize use of fertilizers, pesticides and herbicides. (As needed)
5. Inspect (~ 2 times per year –including once at end of wet season) for erosion and sediment buildup. Correct problems as needed.
Kevin PerryUrban Rain Design
![Page 45: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/45.jpg)
Project Timeline
Spring 2015: Complete DesignSummer and Fall 2015: Construction2015/2016: Post-Construction MonitoringJanuary 2017: Final Report2016 – 2036: O&M
![Page 46: New Designing and Constructing Low Impact Development … · 2020. 2. 2. · US EPA Harford County, MD. Bioswale - Profile ... Design and Construction Contractors Project Management](https://reader034.fdocuments.net/reader034/viewer/2022051922/601037596f341e48ac56a6e2/html5/thumbnails/46.jpg)
Funding for this project has been provided in full or in part through an agreement with the State Water Resources Control Board. The contents of this document do not necessarily reflect the views and policies of the State Water Resources Control Board, nor does mention of trade names or commercial products constitute endorsement or recommendation for us.
Project Funded by SWRCB
www.owp.csus.edu