Description CSI Team is the brigade that support the national team in the constant internal process improvement at local level meanwhile offer the best experiences to each customer.

Ambition CSI team during 14-15 term aspire to be the most innovative and relevant support team at national level. CSI team will be recognized as the team that give the committees all what they need to give a better experiences for each customer experiences ( TMP, TLP ,EXCHANGEs)

Page 4: New csi

Structure

Page 5: New csi

Process Tracking

NPS Track

CASES Track

Improvement Track

CO-Delivery indicators

Tools - Follow up

Planning

Promoters y detractors strategies.

Process Improvement.

Risk Management.

Quality Cooperation.

Implementing

Effective Communication.

Support during improvement.

Operating

Firefighting Support.

Process and structure audit.

Global Quality Feeling.

Page 6: New csi

CUSTOMER:

• For each experience the team will work hard every day.

AIESEC VALUE PROMISE:

• Unify the concept

TALENT DEVELOP AND CULTURE:

• Achieve a real change.

STRUCTURE AND PROCESS IMPOVEMENT:

• Simple and effectives.

TOOLS AND TECNOLOGIES:

• Optimize

MEASURING AND STRATEGIES CREATION:

• Convert data into action

Mainstay

Page 7: New csi

C.S.I. Feeling

Page 8: New csi

Firefighting Overview Firefighting is our clear assistance to our customers’ network. It’s giving the possibility of a 24/7 service in order to ensure the security, wellness and proper experience to each one of our members and to our interns in Colombia and abroad. Its caring about any single dissatisfaction and doing something to fix it as fast as possible within our boundaries and internal policies.

Firefighting System. In order to support better the experiences we would use CASE system. That consist in be fast and human sense firefighting flow.

Customer’s

Awesome

Support

Experience

Page 9: New csi

About c.a.s.e. CASE system is not only fix situations, is bring a fast solving understanding the real support that each experience need. Before understand CASE flow we need to understand what is a case. Cases are not only “quality cases” in CASE system we have tree kinds of cases: Crisis Management, Support Claim and quality cases.

Quality Cases:

• Issues according break of minimums and politics.

•Ex. XPPs break,

Crisis

Management

Cases:

•Managing risk situations.

•Ex: Illness or sinister.

Support Cases:

•Support in procedures.

•Ex: Legal problems..

Page 10: New csi

c.a.s.e. Flow for Exchanges

Page 11: New csi

Step 1: Internal level Situation: • The EP or TN taker try to solve issues privately

Responsible: • The EP is responsible but TN manager or EP

Manager must support this process.

Timeframe: • 48-72 Hrs after the issues is acknowledge.

Incomes: • Claim supports.

Outcomes: • AIESEC responsible must ensure that the

solution be stated in a document and signed by the three parts ( AIESEC, EP and TN Taker)

The case will be from step 1 to step 2 when: a) After 48-72 hours after the issue(s) was acknowledge

and no solutions can be provided. b) The issue claimed is directly with an AIESEC Local

Committee.

Page 12: New csi

Step 2: Local level Situation:

• AIESEC in Colombia entity, the intern or the TN manager should inform the Home & Hosting Local Entity in order to get the issue solved.

• The solution could be provided LC-EP or LC-LC

Responsible: • Hosting & Home commits’ VPs, EP manager and TN manager must support this process.

• CSI Team help as advisor to AIESEC in Colombia’s LCs

Timeframe: • One week after the case had been opened.

Incomes:

• At this level a case must be opened in the CSI follow up tool: http://bit.ly/EmergencyCase.

• Attach in the tool: ANs, visas, legal documents, documents signed by the EP and claim’s support documents.

Outcomes: • AIESEC responsible must ensure that the solution be stated in a document and signed by the three parts ( AIESEC, EP and TN Taker)

The case will be from step 2 to step 3 when: a) 1 week after the cases had been opened in CSI Follow up

tool. b) When foreign MC or NCB,/NQB request the solutions.

Page 13: New csi

Step 3: National level

Situation:

• At this stage CSI team make an official statement with suggestions and possible next step according XPPs and other documents.

• MC and CSI together will try to concert a solution, coordinated with LCEBs of HE and SE.

Responsible: • CSI Team and MCVP responsible. CSI Team make the

official statement and MCVP allows CSI director to deal with HE or SE

Timeframe: • Two week after the case been opened.

Incomes: • Attach Official statement.

• Attach new communications or proof provided.

Outcomes: • CSI Team must ensure that the case solution be stated in

a document and signed by the implicates in liabilities.

The case will be from step 2 to step 3 when: a) 2 week after the cases had been opened. b) When foreign MC or NCB,/NQB make an official case

application to ICB according the politics.

Page 14: New csi

Step 4: ICB level Situation:

• The situation been sent to the Internal Control Board to arbitrate the solution and get a final solution from AIESEC.

Responsible: • MCVP OS and CSI Team need to support and answer

ICB requests.

Timeframe: • About Two week after the case application.

Incomes:

• Attach Official Case Application form.

• Attach Official Solution document

• Attach liabilities support. (payments, documents etc…)

Outcomes: • MCVP OS and CSI Team must ensure that the solution

been succeed.

• Make an appeal.

Page 15: New csi

KEEPING QUALITY

¡Gracias!