New AMT SURV OPERATIONAL RPT ERMATINGER CASCADEN & … · 2017. 1. 17. · In this coordinate...

17
Wallbridge Mining Company Ltd. Armstrong-Ministic AMT Survey "RECEIVED JUN 20 2001 GEOSCIENCE ASSESSMENT OFFICE GEOSYSTEM AMT SURVEY, ARMSTRONG - MINISTIC LAKE, ERMATINGER, CASCADEN and TRILL TOWNSHIPS, ONTARIO. OPERATIONAL REPORT Volume 1/1 2.21934 prepared for WALLBRIDGE MINING COMPANY LIMITED by GEOSYSTEM CANADA INC. Ottawa, Ontario. June 2001 41I12SE2005 2.21634 CASCADEN 010

Transcript of New AMT SURV OPERATIONAL RPT ERMATINGER CASCADEN & … · 2017. 1. 17. · In this coordinate...

  • Wallbridge Mining Company Ltd. Armstrong-Ministic AMT Survey

    "RECEIVEDJUN 20 2001

    GEOSCIENCE ASSESSMENT OFFICE

    GEOSYSTEM

    AMT SURVEY,ARMSTRONG - MINISTIC LAKE,

    ERMATINGER, CASCADEN and TRILLTOWNSHIPS, ONTARIO.

    OPERATIONAL REPORT

    Volume 1/1

    2.21934prepared for

    WALLBRIDGE MINING COMPANY LIMITED

    byGEOSYSTEM CANADA INC.

    Ottawa, Ontario.

    June 2001

    41I12SE2005 2.21634 CASCADEN 010

  • Wallbridge Mining Company Ltd. Armstrong-Ministic AMT Survey

    CONTENTS1. INTRODUCTION...........................................................................................................l

    1.1 SURVEY DESIGN..................................................................................................................l1.2 DATA ACQUISITION............................................................................................................21.3 REMOTE REFERENCE...........................................................................................................3

    2. DATA PROCESSING AND EDITING...........................................................................32.1 PROCESSING OVERVIEW......................................................................................................32.2 ROBUST PROCESSING..........................................................................................................3

    3. DATA PRESENTATION ................................................................................................43.1 DATA DESCRIPTION AND DIMENSIONALITY...........................................................................43.2 PHASE MAPS.......................................................................................................................4

    4. BIBLIOGRAPHY ...........................................................................................................4

    Figures

    Figure la: Ministic Lake station locations. Coordinates are in meters on the UTM grid (NAD 27)......!Figure l b: Armstrong Lake station locations. Coordinates are in meters on the UTM grid (NAD 27). 2 Figure 2: Sounding 61e70n, located in the central portion of Ministic Lake........................................4

    I: Phase maps of Field Data II: Personnel and equipment

    II-1: Personnel II-2: Equipment II-3: Data Format

    HI: Station Coordinates

    Appendices

    PlatesPlate l: Station and profile locations, scale l :20,000.

    41I12SE2005 2 .21634 CASCADEN 010C

    Report prepared by:

    y. McNeice, M.Sc. Senior Geophysicist

  • Wallbridge Mining Company Ltd. Armstrong - Ministic AMT Survey

    SUMMARY

    One hundred and twelve audio-magnetotelluric (AMT) measurements were collected in Ermatinger, Cascaden and Trill Townships, Ontario at an average spacing of 200m along 12 north-south oriented lines, spaced 300m apart. AMT data in the frequency range 5.0-20,000 Hz, were acquired between January 7 and 16, 2001, using three 5-channel Metronix 24 bit ADU-06 acquisition systems. One system was a fixed reference station in a culturally quiet location, while the other two systems were used within the prospect area. Each AMT measurement consisted of a perpendicular pair of 50m dipoles, two orthogonal magnetic field sensors, and one vertical magnetic field sensor. Robust processing resulted in generally average data quality within the survey area. The AMT data were edited and rotated to a regional coordinate system determined through swift decomposition. The results are shown as a series of phase maps, the impedance phase at single frequency contoured as a function of grid position.

  • Wallbridge Mining Company Ltd. Armstrong - Ministic AMT Survey

    1. INTRODUCTIONThis report describes acquisition and processing procedures of an audio-frequency magnetotelluric (AMT) survey conducted in Ermatinger, Cascaden and Trill Townships, on behalf of Wallbridge Mining Company Ltd. A total of 112 AMT stations were occupied along 12 north-south oriented profiles. Station coordinates are listed in Appendix HI.

    LI Survey design

    455000 456000 457000

    5158000 -

    5157000 -

    5156000 -

    5155000 -

    fx sx -^ ^, a1- ^.y^

    X/ '

    y /* *X^ ,* ,*.X.X

    .........y.... ..y.

    X Xi

    5s"

    * * * ,

    V* ^ ^^ ^ ^av * * t

    * *' i 4

    A^ A^"

    ^ v^ ^ ^ * * ""VV tr V * * * *

    ^ jS?1 c#~

    X X .**

    ^ J^ o\^.*

    X X X

    x x xx x x *x -^ . x .

    tA A^.* .^

    x

    V . . . . . . . . . . . .

    ^

    -5158000

    - 5157000

    - 5156000

    - 5155000

    455000 456000 457000

    Figure la: Ministic Lake station locations. Coordinates are in meters on the UTM grid (NAD 27).

  • Wallbridge Mining Company Ltd. Armstrong - Ministic AMT Survey

    457000 456000

    5154000 -

    5153000 -

    459000i

    ^ •*

    ' -*f '* t

    . . . . . . ^ .t

    xx .

    *

    tf^

    4

    #

    X

    •\. . . . . . . . . . . . . . . . . . . . . . .

    Sf X X^ ^? ^ ft

    •^ -^ •S'* ^

    . ss

    i

    :

    ^ ^ ^ '

    * X X :

    x x i

    - 5154000

    - 5153000

    457000 458000 459000Figure Ib: Armstrong Lake station locations. Coordinates are in meters on the UTM grid (NAD27).

    The survey was carried out using three 24-bit ADU-06 systems manufactured by Metronix GmbH of Braunschweig, Germany. Magnetic sensors were the BF-6 induction coils produced by Electro-Magnetic Instruments Inc. (EMI) of El Cerrito, California. Appendix n contains a description of the personnel and equipment used for the survey, along with a description of the data formats.Layout followed the normal MT axis convention, that is, a right-handed system with z positive downwards. Dipole lengths of 50 meters and a fixed acquisition azimuth of geographic north was used throughout the survey. Access to the grid was by 4WD vehicle as far as possible, and then on snowmobile. Due to the low system weight, the operator and l or 2 helpers were able to pack all of the necessary gear without difficulty.

    L 2 Data AcquisitionThe time series data were acquired in 2 sample bands. The highest sample rate used was 40960 Hz for duration of 7 seconds. A 2048 Hz sample band was recorded for 7 minutes. The 2048 Hz sample band was decimated to a sample rate of 128 Hz to compute the low frequency data.

  • Wallbridge Mining Company Ltd. Armstrong - Ministic AMT Survey

    1.3 Remote ReferenceA remote reference site was maintained along the Fox Lake lodge road in Ermatinger Township.

    2. DATA PROCESSING AND EDITING

    2.1 Processing overviewThe basic steps required to transform field time-series to usable data are as follows:

    1. Automatic selection of coherent data segments (low noise) by comparison of the electric and magnetic fields in each band (40960, 2048, and 128 Hz);

    2. Robust processing of the 300 most coherent data segments in each sample band;3. Merging of individual bands (3) to form a complete sounding curve;4. Checking of calculated curves for geophysical plausibility.

    Data were archived on CD ROM on a daily basis after the time series was transferred from the field computers to the processing computer. Time series were viewed with the Metronix visualization program QuickLook. Automatic coherency selection and robust processing were carried out using routines developed by Jim Larsen (Larsen and others, 1996). Data analysis, interpretation, and presentation were completed with Geosystem's interpretation software, WinGLink.

    2.2 Robust processingRobust processing techniques were employed to improve data quality and reduce the effects of noise bias. The method of Larsen and others (1996) was used to estimate smooth magnetotelluric transfer functions (i.e. impedances) relating the electric and magnetic field data.Data segments were automatically selected on the basis of electric and magnetic field coherency, and used as input to the robust processing algorithm. The magnetic and electric fields are used in an iterative re-weighted method to determine the impedance tensor. During the iterations, the electric fields are corrected in both the frequency and time domains, utilizing a smooth MT transfer function to estimate the electric field data from the magnetic fields. The total time required to robust process a single sounding was approximately 15 minutes.The program outputs data at 8 equi-spaced frequencies per decade (e.g. 10, 15, 22, 32, 42, 48,62, and 82 Hz). All of the soundings were processed using the robust algorithm.

  • Wallbridge Mining Company Ltd. Armstrong - Ministic AMT Survey

    3. DATA PRESENTATION

    3.1 Data description and dimensionalityThe AMT responses are primarily two-dimensional over the acquired frequency band. Data were rotated to ~150 (average strike 0-30 degrees) decomposinging the data into responses parallel and perpendicular to regional strike (the TE and TM modes respectively). In this coordinate system the TE mode appears to be the Ryx curve, electric field approximately perpendicular to SIC structure. An example of this is shown in figure 2 (Ryx ~ TE, Rxy = TM).

    10.

    i

    0-

    10'' 10'2 10"

    Period (sec)

    Figure 2: Sounding 61e70n, located in the central portion of Ministic lake The blue apparent resistivity curve is identified as the TE mode and red as the TM mode.

    3.2 Phase mapsPhase maps of observed impedance phase at frequencies 100 and 30 Hz are plotted in Appendix I.

    4. BIBLIOGRAPHYLarsen, J., Mackie, R.L., Manzella, A,, Fordelisi, A, and Rieven, S.

    Wight, D.E.

    1996 Robust smooth magnetotelluric transfer functions: Geophys. J. Int. 124, 801-919.

    1988 SEG MT/EMAP Data Interchange Standard, Revision 1.0: SEG, Oklahoma City. 91pp.

  • Wallbridge Mining Company Ltd. Armstrong - Ministic AMT Survey

    APPENDIX I: PHASE MAPS OF FIELD DATA

  • ONTARIO MINISTRY OF NORTHERN DEVELOPMENT AND MINESTransaction No:

    Recording Date:

    Approval Date:

    Client(s):

    392385

    Survey Type(s):

    W0170.30334

    2001-JUN-20

    2001-AUG-13

    Work Report Summary

    Status: APPROVEDWork Done from: 2001 -JAN-07

    to: 2001-JUN-19

    WALLBRIDGE MINING COMPANY LIMITED

    EM

    Work Report Details:

    Claim*

    SSSS

    SSS

    S

    SS

    1229362

    1229363

    1229501

    1229502

    1229503

    1230737

    1244716

    1244717

    1244718

    1244719

    Perform36,475

    37,771

    SO

    54,316

    SO

    S863

    53,454

    S7.771

    510,361

    57,339

    548,350

    External Credits:

    Perform Approve

    56,475

    57,771

    SO

    54,316

    SO

    5863

    S3.454

    S7.771

    510,361

    57,339

    548,350

    SO

    Applied

    soso

    S2.000

    54,400

    S4.000

    SO

    SO

    SO

    SO

    50

    510,400

    Applied Approve

    soso

    52,000

    54,400

    S4.000

    SO

    sosososo

    S10.400

    Assignso

    52,000

    5050sososo

    54,000

    584

    SO

    56,084

    Assign Approve

    02,000

    0

    0

    0

    0

    0

    4,000

    84

    0

    56,084

    Reserve56,475

    55,771

    SO

    SO

    SO

    5863

    53,454

    S3.771

    510,277

    S7.339

    537,950

    Reserve Approve

    56,475

    S5.771

    SO

    50

    SO

    S863

    53,454

    53,771

    510,277

    S7.339

    537,950

    Due Date

    2001-OCT-29

    2001-OCT-29

    2002-JUN-23

    2002-JUN-23

    2002-JUN-23

    2002-FEB-21

    2002-MAY-10

    2002-MAY-10

    2002-MAY-10

    2002-MAY-10

    Reserve:537,

    537,

    950 Reserve of Work Report*: W0170.30334

    950 Total Remaining

    Status of claim is based on information currently on record.

    41I12SE2005 2 .21634 CASCADEN 900

    2001-Aug-16 11:22 Armstrong-d Page 1 of 1

  • Ministry ofNorthern Developmentand Mines

    Date: 2001-AUG-14

    Ministers du Developpement du Nord et des Mines Ontario

    GEOSCIENCE ASSESSMENT OFFICE 933 RAMSEY LAKE ROAD, 6th FLOOR SUDBURY, ONTARIO P3E 6B5

    WALLBRIDGE MINING COMPANY LIMITED 129 FIELDING ROAD LIVELY, ONTARIO P3Y1L7 CANADA

    Tel: (888) 415-9845 Fax:(877)670-1555

    Dear Sir or Madam

    Submission Number: 2 .21634 Transaction Number(s): W0170.30334

    Subject: Approval of Assessment Work

    We have approved your Assessment Work Submission with the above noted Transaction Number(s). The attached Work Report Summary indicates the results of the approval.

    At the discretion of the Ministry, the assessment work performed on the mining lands noted in this work report may be subject to inspection and/or investigation at any time.

    The geophysical portion of this submission has been reviewed by staff of the Ontario Geological Survey.

    If you have any question regarding this correspondence, please contact LUCILLE JEROME by email at [email protected] or by phone at (705) 670-5858.

    Yours Sincerely,

    Ron GashinskiSupervisor, Geoscience Assessment Office

    Cc: Resident Geologist

    Mark Hall (Agent)Wallbridge Mining Company Limited (Assessment Office)

    Assessment File Library

    Wallbridge Mining Company Limited (Claim Holder)

    Visit our website at http://www.gov.on.ca/MNDM/LANDS/mlsrnnpge.htrn Page: 1 Correspondence 10:16234

  • o o

    m wM

    M

    O IN

    H4

    S 1-gjQfJWI

    1 • •- ; - • •-'•' m. Q- l "t;-in^'; ; m-

    iT^f ircTittW S*^t:^a

    C Empl*"i*iiw and iccuwy a l* notpJ

    l he mti*nii-ii*rir. iiinwri if ri*mdfrnm Aiglbil rt ir J! 1*4*1*11; in ihe Pr.iv ntt*

    intmqttemvtfldalrti^ hhnHlkiiMMgmiqltirmMfrn a a OttMMui im rurrHVHWtonal. iWlY^y, or iwiiKm*iiRk*inlniillDnpui|imii* ^ft^lrrLwuntKon pnawi ur 1)11*11141 H conRHMl nomvaitaui HHIUH. Md Men rt Info i m ut kin may dta b* gllvhrt though iKi uc^LVri* T DK* I I RHIvUv Oflic*. Ur Ab MHltiy tl N Mini tWHuitti,

    General Information and L imitations IhlD mw m* It 9t Hiowupir*fllittfMl InHmwB vid i Ml m 11 tl laid IlKAHlnn twin uriMrt*. imev, wwwnwnti, r(*M M myti.toutiinu HfMi, l KIM** vi MMi fuiimi DI dripatroon olUWt w B lnw*n Tram lit* CriH*i, AIM a^rtiM lv ri twiuif *nd land [i*cu utm ra if w flr iiMNbiflw entv to si Aa minna ciaiffl* nw ne* he Hhntie

    PROVINCIAL HWIHa

    MINING LAND TENURE

    MAP

    Date (Time of Issue Jun212001

    TOWNSHIP l AREA

    CASCADEN

    10:53h Eastern

    PLAN

    G4022

    ADMINISTRATIVE DISTRICTS l DIVISIONSMining Division SudburyL*nd Tittei/Reglstry Division SUDBURY

    Ministry of Natural Resources District SUDBURY

    TOPOGRAPHIC

    o ,.. mQ c-..

    LAND TENURE

    E)

    i u-'HM ft if M^ O^iy

    i.' 1 '.. 1 .T 1, i L miimiw.. m

    LAND TENURE WITHDRAWALS

    Hh*t Iu'lk44 Hr4 MlnlFN ' fil-ti ^nl^rtw Wl MJMWI mtiiti tmn Wnrorrwi

    o mi* r In Cauml Withdrawal lypoi

    IMPORTANT NOTICES

    LAND TENURE WITHDRAWAL DESCRIPTIONS

    Wnm Jini?IH-* WMI Jflh 1 iH01

    HfllH WMI

    Wil C?TUB1 WHI

    Wfi -J4IDI1 *H*n

    wa.ztnn WMIW-S,14flO Wim

    VU.240D

    Jfh 1 ?W1 j*n i ran Jan 1 20111 OttJWII)

    L*HD* IHUniNO OH Mhpv l ft K t yUBJLCl fO FL00UWU

    To CDMTIHW FIFVBTIOH ftfif rillf. 4A?M

    *LL.HtMBlHW(i CRUWI LiHDS (IR WhOV LflUt

    HfiSFflVtn MOCTnHEH.1ftl7FltF HrHODS

    HE b Of VMWDVUht.AMprSLAHDS iHtktW 1M1HDRAWM hRtJ

    BY CUD c ft M council DATED ,UIY ?stH,wl?HLe MOJDHE D OF WWDV LAKt *HU ELAHK IHtHLH ARE.VMl HQfUlW

    r RON STAKING BY ORO F R H rOUflCH I) A. f D ?5 JUI V 1917

    HKO, P LAN H Jtia

    C LIB L t HCCESH AUC,1M3B.aD.

    IHKfJOSItrOH StC.JBtH)ttB..IWt

    HMno nhjHm grBir-iw,^^d bnd vi^nr tin H Jn** nfrMtndyL**ir*VuimP'uWih-biiit(aiani|4iit in-NdUtWJd.H REfifflVE 1?**)fi

    hLUUDHC t LEV* l UN im?.?M t.S^ 1r*1uU FLt: a3IB

    FI.OODH*FltV*TION 95 F T flL^: 4BHC

    Src. 35 W-LL^ IBWyDO OH l OCI.MW H*V

    SFC14 WU CZMflfi n^TMAYIlUltHA^

    EM. J&Wfi WW i-aijrjiIJt.ZE w^ tuiUI

    WH* HW 9

    IMPORTANT NOTICES, IIDI adorn di Cnndldodn s

  • oiH CN

    ino o

    ^^^•'l\^^^^^ti^^^&m

    ^^^^m^^^^f^; ; ••..•,;i!;:.!:: .-ii'-- i':::: iT&r. J-jMi : . r J Wi^/t /: i-iW:. l -̂ Ti,' : !:iii .f:-!'i: ^T^!j^' : :i: i ^;;;: : 'l'3J!'

    t.',,,' J..'v.r I w j. 4 !. :: - -^^;;:!i i :.!iii^ : ;: -ilM;i-iiti' , . . ON, : ; ; -. ,i|;f!r!-*P^-Mi:^ l; ::' ! : ; : : : :: : : ;:!i:::! x; ^W:-i;-:iv:j-- 1 ••-i'twM'-^i;;::^i'ii!x^'ik•-^|:i!i^;^,;^|.- : ' :

    •iv^^iiii^i:;^^;iili^^S^il^ip^;^^,:i-:':'' '*;-:? : :l : i*; i: ; W:3F 'ww : ;' :i : : i: i -i :. : ::ic^f!yi M" ! '^--" : :Sf :^ii'!:ii : ::;iiiHiJiJW i ; ; !i;i;i:. i ;f'-iTlr:: -;~. - :' :.''i ' : il*!-:. 1 ;\ V '-:-;;' -'

    ivWV. i.;-..:.'^•WKW?WX \;Mt^^^M^m•m\).:-^-^.'. ; rr!i-i;^i-,i!:*TiS . !fe:^U. , i i : :(^|::!i;i^-i!::ii': ; i:| : /--,':^!.LiA*iAiiitot?ri;!;:!i:-::: : ' .

    ^, V ;i 1C' i. : : L-;: Ti'fpBHJfiT^^ii,';' ! :: : : : -^^7r^?!;^^^ik^^j'jjia., i, i : i| ,- V-^% ^|:'i^!^^^^^'Wfe^ ;'Vi^ifi^Miiia^

    ^

    -.,;...i ^ ,

    i-^i^iij:^!/^;.:;!i : r*-i!d*fiii|j.;; i. Ni^ini^ilil^iliii^tillll.:'

    - . t;^:^;-:^,!;;:^^:^/:!:^-!^;;^.:.^^' ^ r\ "^ ;As - ; v.i:':!.;' i':';'.;.':; ,':- C ;\n '•tiKwwtifM'-,'''; 1' i Iff !!;:Wfe!i•''^• :M^mis^iii^i0ita

    tt luhi inimna ti*m* aftouia ciiMiuiiiHin tin wpvific^ Mining RwoidM i nitdMv rwiuon. rmmHH nitirf *iWFtdiarorjiJvHiji*Jhal, nuivay, DI limri iHls rv **i* dtuur^w i" nattfHMWtWfl. AddlUunBl liraimAlalt M# Wo P* Idtam ihiuughTtie hrd L**6 m**

    ent and Hmii l*i irtclltanil in aw en Uilt jnvl* ccmplly* I

    il notite* OITIGI o r ma Mlntauy ol Krt

    at Information and Limitations hii man m* noi Miawunrmhta od ivdinuFv w-1 irHifiili m Itod kn^Mdint) cv riLntt, luwet, HiHKBunU, right uf My*, rhfJUie itgMt. IKimil, 41 O^wtfgimy i d B|]ii*niun of rlgtit Rna imsn*t ir a m in t ir*wn, Alta cirtJH twd lanur* and hd ijipi ma resin d br lifOMlF W*B mTiV m P*r munnfl ciritnk mv MX bi nua

    PROVING AL M

    MINING LAND TENURE

    MAP

    Date l T ime of Issue Jun202001

    TOWNSHIP ; AREA

    ERMATINGER

    14:04h Eastern

    PLAN

    G-1045

    ADMINISTRATIVE DISTRICTS / DIVISIONSMining Division SudburyLund Titles/Registry Division SUDBURY

    Ministry of Natural Resources District SUDBURY

    TOPOGRAPHIC LAND TENURE

    tohnlil Ptfnnr

    D c,,.p,.dfl.

    0

    LAND TENURE WITHDRAWALS

    t ̂ ' ' ;

    IMPORTANT NOTICES

    LAND TENURE WITHDRAWAL DESCRIPTIONS

    nmr Jnniani LiCFNrt oFrKnifnrFQHNO. isi?i*;siifn FRRSTOHACHPUHPOSea OH MINIS Ut *^ AKMHTRfJHC LJHt-f

    JaniiUUI H

    M rv 1- 1MB 3f

    WJ.B2 W* JJl U 1i"*J

    IMPORTANT NOTICES

    Mklng trri muititl iltvinpmB-ni flL-lwrtir*.

    JrJWUFltVfllPOfl llbtL/IM (rbi.tDIHJIUrltiaiSS

    IS W4l-C?H)f!W OUT MnT^jiWit^^-Hriir.KilinivllFiikwMlHPiih!

    beifi requl*Ml n n C o rt* m v Aon Htwrue, t uniulii^ Mining Hic*rrt*,'t

    ifhrthfl i*a*atfflil MUKitay H tt tt* Of bflysHiTflH.'rtlihdrswNDrdiiT

    W WIONI MAY l M WiltHS HloF l

    * f r firn diuHflMMn avnt.^ln in ihs Prrwirurm^ M*ii|i{i H

  • o01 M

    M

    M

    O CM

    H H

    s^^f^r^i-sail*:

    , ;..:v*. : l ; l ' l : ' . sa'', '\ i:- W- .: I;:. i,.,nv': : ^iiiiwJT ̂ : ; : ; :

    la t take mini HE d* m* * lw Hi w (oniUl *lh ihi Fir&vtr uLxm Mmjun. iMVHup *fi"i bilU'Kiiid lur rm/Hja^tan viildccurKydiVnDlgiivintnri. Aridlttond itfuim

    ihinwn is [|enu*4 Ir i] m diutnl tfrta watten* m id i- PF

    MihlflN H.W*idWl omc nvuy, *r iwdMHC duliTi m W Jiff b* vbtikiuri Iht

    u! t hw Wim^fr Hor(n*fi QfviiattmHit AIM Mini* rai id4ktonal Utormjrwpi c nth* n iitfULii pM|hu*iw H th* mrummwn in i MI an ihi* m* IvwntpftMl from Viiicm Kiunj unah *ii tot rt L*n*l IRM DI Ra*rty Oflifl*,.ti| *e MBKW B|H*turiMtetwfCD*.

    irmi; RFC i rmn i* i Him

    GeneraMnforrnatJan a nd Limitations

    fH Mjnlno llcHrd EVI ' Off* c l PI f re

    n W 1*1" tPt*WMH C W t*

    TOPOGRAPHIC

    O 3

    PROVINCIAL UM.WO

    MINING LAND TENURE

    MAP

    Date y Time ci Issue May 30 2001

    TOWNSHIP ; AREA

    TRILL

    OB:03h Eastern

    PLAN

    G-4115

    ADMINISTRATIVE DISTRICTS \ D IVISIONSMining Division Sudbury

    Land Titles/Registry Division SUDBURY

    Ministry of Natural Resources District SUDBURY

    LAND TENURE

    EI

    Q .,,,,, D .Jf ,..n*

    Q

    LAND TENURE WITHDRAWALS

    l 1JI j' l l,. I ,IWM."*.1nm,niw uil.il 1 — •"*"'"**' UlrtwAdttMMIDMI *n

    fJ.rti-.lnCoudrlftfcM

    We .L" M.h.(M*tJn. r

    IMPORTANT NOTICES

    LAND TENURE WITHDRAWAL DESCRIPTIONS

    MQ!t Wnn J4i

    HWJ Wium Jar

    Wnii Jn

    SSWS^Jt'PD 7mn.HS'28 M+S T*

    Ji W-S-5iW tLU.

    Sil W.SJ+-W

    HlH; B) l ^ L-0. #1ja

    *H[I # i OJJILI rsA

    2DU1 li

    zoni i nui h7W1 A

    oMW.S.Z4.HI

    J iJi'^u SK. 35 W6?4H[J 28*^16 V^frtjb wiL sawi™ on r oi(SttlS WJl J12?^ !) (l H r HAV

    i TOI.U iai/ rti RL STRICT THFHVDROI'OWtHIISl. Fit; ZlU/l.

    IMPORTANT NOTICESrflU tmrrii t r a HI d ding.

    m Eri iMvdn|irnrtit ortivitiux.

  • 41I12SE2005 2.21634 CASCADEN 230

    'J - ? *

    455000 456000 457000 458000

    5158000 -

    5157000 -

    5156000 -

    5155000 H

    5154000 -

    5153000 -

    ^

    - 5 156000

    f ^*w ChV

    - 5158000

    N

    - 5157000

    5155000

    5154000

    degrees

    5153000

    5553514947

    45434139373533312S27252321191715

    455000 456000 458000

    Scale 1 20000 500 1000 Armstrong-Ministic

    Arm-Mm

    Phase XY at 0.0333 sec

  • 41I12SE2005 2.21634 CASCADEN

    455000 456000

    240

    457000 458000

    5158000

    5157000 -

    5156000 -

    5155000 -

    5154000 -

    5153000 -

    455000 456000 457000

    ——i——

    458000

    - 5156000

    - 5158000

    - 5157000

    5154000

    degrees

    5153000

    Scale 1 20000

    Armstrong-MinisticArm-Win

    Phase YX at 0.033 s ec

  • 41I12SE2005 2 .21634 CASCADEN 250

    455000 456000 457000 458000

    5158000

    5157000

    5156000

    5155000 -

    5154000 H

    5153000 -

    - 5 158000

    N

    - 5157000

    - 5156000

    - 5155000

    - 5154000

    5153000

    degrees

    55 53 51 49 47 45 43 41 39 37 35 33 31 29

    - 27 25

    (23 21

    5

    455000 456000 457000 458000

    Scale 1 20000 500 1000 1500 Armstrong-Ministic

    Arm-Min

    Phase XY at 0.01 sec

  • 41I12SE2005 2 .21634 CASCADEN 260

    455000 456000 457000 458000

    5158000

    5157000

    5156000

    5155000 -

    5154000 -

    5153000 -

    - 5156000

    - 5 158000 N

    - 5157000

    - 5155000

    5154000

    degrees

    5153000

    55535149474543413937353331

    2927252321191715

    455000 456000 457000 458000

    Scale 1 20000 500 1000 1500 Armstrong-Ministic

    Arm-Min

    Phase YX at 0.01 s ec