Neutronic calculations done within the EURISOL-RTD project
description
Transcript of Neutronic calculations done within the EURISOL-RTD project
March 10-11, 2005 1Eurisol meeting - CERN - Task 4
Neutronic calculations done within the EURISOL-Neutronic calculations done within the EURISOL-RTD projectRTD project
• Energy deposition
• Fission densities
• Outgoing particles
• energy spectra
• angular distributions
CEA-Saclay ContributionCEA-Saclay Contribution
March 10-11, 2005 2Eurisol meeting - CERN - Task 4
Neutronic calculations done within the EURISOL-Neutronic calculations done within the EURISOL-RTD projectRTD project
UCx
Hg
CEA-Saclay ContributionCEA-Saclay Contribution
• Energy deposition
March 10-11, 2005 3Eurisol meeting - CERN - Task 4
Neutronic calculations done within the EURISOL-Neutronic calculations done within the EURISOL-RTD projectRTD project
CEA-Saclay ContributionCEA-Saclay Contribution
• Fission density (/cm3)UCx
Hg
March 10-11, 2005 4Eurisol meeting - CERN - Task 4
CEA-Saclay ContributionCEA-Saclay Contribution
Neutronic calculations done within the EURISOL-Neutronic calculations done within the EURISOL-RTD projectRTD project
En(MeV)
E(MeV)
• Outgoing particles
• energy spectra
• (angular distribution)
March 10-11, 2005 5Eurisol meeting - CERN - Task 4
Validations are needed!Validations are needed!
CEA-Saclay ContributionCEA-Saclay Contribution
MCNPX:MCNPX: INCINC Bertini-Isabel- Bertini-Isabel-INCL4INCL4 DeexDeex Dresner- Dresner-ABLAABLA (and CEM2k(and CEM2k))FLUKA: …FLUKA: …
March 10-11, 2005 6Eurisol meeting - CERN - Task 4
So, for the neutronic calculations, we plan to:So, for the neutronic calculations, we plan to:
Collect Data (bank)Collect Data (bank) Validate the CodeValidate the Code Set-up real geometriesSet-up real geometries
Calculations with real Calculations with real geometries and optimizationgeometries and optimization
neutron spectra neutron spectra energy deposition energy deposition fission densitiesfission densities
CEA-Saclay ContributionCEA-Saclay Contribution
9 months
3 months
12 months
(preliminary report)
6 months
March 10-11, 2005 7Eurisol meeting - CERN - Task 4
Provisional budget: Personnel 40.5(81) k€ (post-doc Dr Negoita
from 1st of June) Consumable 3(3) k€ Travel 3(12) k€
Permanent staffPermanent staff:J.-C. David, D. Doré, D. Ridikas, A. Boudard, S. Leray, C. Volant
CEA-Saclay ContributionCEA-Saclay Contribution