Neil Mark 172 Report

30
PILING The Contractor shall furnish the piles in accordance with an itemized list, which will be provided by the Engineer, showing the number and lengths of all piles. When cast-in-place concrete piles are specified on the Plans, the Engineer will not furnish the Contractor an itemized list showing the number and length of piles. When test piles and load tests are required in conformance with Subsection 400.1.2 and 400.1.3, respectively, the data obtained from driving test piles and making test loads will be used in conjunction with other available sub-soil information to determine the number and lengths of piles to be furnished. The Engineer will not prepare the itemized list of piles for any portion of the foundation area until all specified loading tests in the Contract representative of the portion have been completed. In determining lengths of piles for ordering and to be included for payment, the lengths given in the order list will be based on the lengths which

description

Pile driving

Transcript of Neil Mark 172 Report

Page 1: Neil Mark 172 Report

PILINGThe Contractor shall furnish the piles in accordance with an

itemized list, which will be provided by the Engineer, showing the number and lengths of all piles. When cast-in-place concrete piles are specified on the Plans, the Engineer will not furnish the Contractor an itemized list showing the number and length of piles. When test piles and load tests are required in conformance with Subsection 400.1.2 and 400.1.3, respectively, the data obtained from driving test piles and making test loads will be used in conjunction with other available sub-soil information to determine the number and lengths of piles to be furnished. The Engineer will not prepare the itemized list of piles for any portion of the foundation area until all specified loading tests in the Contract representative of the portion have been completed. In determining lengths of piles for ordering and to be included for payment, the lengths given in the order list will be based on the lengths which are assumed to remain in the completed structure. The Contractor, shall, without added compensation, increase the lengths to provide for the fresh heading and for such additional length as maybe necessary to suit the Contractor’s method of operation.

Page 2: Neil Mark 172 Report

Concrete and Steel Pile Bearing Values

The bearing values for concrete and steel pile will be determined by the Engineer using the following formulas:

a. Modified Hiley’s Formula or any formula from brochures of the equipment used, shall be used when the ratio of weight of ram or hammer to weight of pile is greater than one fourth (1/4).

Page 3: Neil Mark 172 Report

b. Hiley’s Formula shall be used when the ratio of the weight of ram or hammer to weight of pile is less than one fourth (1/4).

Page 4: Neil Mark 172 Report
Page 5: Neil Mark 172 Report
Page 6: Neil Mark 172 Report

Safe LoadsWhen the safe bearing power of any pile

is found by test or computation to be less than the design load, longer piles or additional piles shall be driven as ordered in writing by the Engineer.

Page 7: Neil Mark 172 Report

Steel H-PilesSteel H-Piles shall be rolled steel sections of

the weight and shape called for on the Plans. They shall be structural steel meeting the requirements of AASHTO M 183 provided that, where the Special Provisions called for copper-bearing structural steel, the steel shall not contain less than one-fifth percent nor more than zero point thirty five percent (0.35%) of copper, except that steel manufactured by the acid-bessemer process shall not be used.

Page 8: Neil Mark 172 Report

CONSTRUCTION REQUIREMENTS

-LOCATION AND SITE PREPARATION:Piles shall be driven where indicated on the Plans or as

directed by the Engineer. All excavations for the foundation on which the piles are to be driven shall be completed before the pile driving, unless otherwise specified or approved by the Engineer. After driving is completed, all loose and displaced materials shall be removed from around the piles by hand excavation, leaving clean solid surface to receive the concrete of the foundation. Any requirement for granular fill and lean concrete shall be indicated on the Plans or as directed by the Engineer.

Page 9: Neil Mark 172 Report

Determination of Pile LengthPile length and bearing capacity shall be determined by the Engineer fromthe results of the test piling and load tests.The criterion for pile length may be one of the following:1. Piles in sand and gravel shall be driven to a bearing power determined by the use of the pile driving formula or as decided by the Engineer.2. Piles in clay shall be driven to the depth ordered by the Engineer. However, the bearing power shall be controlled by the pile driving formula if called for by the Engineer. 3. Piles shall be driven to refusal on rock or hard layer when so ordered by the Engineer.

The Contractor shall be responsible for obtaining the correct pile length and bearing capacity according to the criteria given by the Engineer.

Page 10: Neil Mark 172 Report

PILE DRIVINGAll piles shall be driven as shown on the Plans or as ordered in

writing by the Engineer. They shall be driven within an allowed variation of 20mm per metre of pile length from the vertical or batter as shown on the Plans. The maximum allowable variation at the butt end of the pile shall be 75mm in any direction from the location shown on the Plans or as directed by the Engineer. Each pile shall, after driving, be within 150mm from the theoretical location underneath the pile 146 cap or underneath the superstructure in case of pile bents. All piles pushed up by the driving of adjacent piles or any other cause shall be redriven.

Piles shall be used only in places where the minimum penetration of 3m in firm materials, or 5m in soft materials can be obtained. Whereas soft upper stratum overlies a hard stratum, the piles shall penetrate the hard materials at sufficient depths to fix the ends rigidly.

Page 11: Neil Mark 172 Report

All pile driving equipment is subject to the Engineer’s approval. The Contractor is responsible for sufficient weight and efficiency of the hammers to drive the piles down to the required depth and bearing capacity. Hammers shall be gravity hammers, single and double acting steam or pneumatic hammers or diesel hammers. Gravity hammers shall not weigh less than 60 percent of the combined weight of the pile and driving head but not less than 2,000 kg. The fall shall be regulated so as to avoid injury to the pile and shall in no case exceed 4.50m for timber and steel piles and 2.50m for concrete piles unless otherwisespecified or approved by the Engineer.

Page 12: Neil Mark 172 Report

Piles shall be supported in line and position with leads while being driven. Pile driving leads shall be constructed in such a manner as to afford freedom of movement of the hammer, and shall be held in position by guys or steel braces to insure rigid lateral support to the pile during driving. The leads shall be of sufficient length to make the use of a follower unnecessary and shall be so designed as to permit proper placing of batter piles. The driving of the piles with followers shall be avoided if practicable and shall be done only under written permission from the Engineer.

The method used in driving piles shall not subject them to excessive and undue abuse producing deformation of the steel. Manipulation of piles to force them into proper position if considered by the Engineer too excessive will not be permitted.

The pile tops shall be protected by driving heads, caps or cushions in accordance with the recommendation of the manufacturer of the pile hammer and to the satisfaction of the Engineer. The driving head shall be provided to maintain the axis of the pile with the axis of the hammer and provide a driving surface normal to the pile.

Page 13: Neil Mark 172 Report

PILE RECORDS

The Contractor shall keep records of all piles driven or installed. A copy of the record shall be given to the Engineer within two (2) days after each pile is driven. The record form to be used shall be approved by the Engineer. The pile records shall give full information on the following:

Page 14: Neil Mark 172 Report
Page 15: Neil Mark 172 Report

AGGREGATE SUB-BASE COURSEAggregate shall consist of hard, durable particles or fragments of crushed stone, crushed

slag or crushed or natural gravel. Materials that break up when alternately wetted and dried shall not be used.

Coarse aggregate is the material retained on the 2.00 mm (No. 10) sieve and shall have a percentage of wear of not more than 50 for sub-base and not more than 45 for Base and Surface Courses as determine by AASHTO Method T 96.

Fine aggregate is the material passing the 2.00 mm (No. 10) sieve and shall consist of natural or crushed sand and fine mineral particles. The fraction passing the 0.075 mm (No. 200) sieve shall not be greater than 0.66 (two-thirds) of the fraction passing the 0.425 mm (No. 40) sieve. For base courses, the fraction passing the 0.425 mm (No. 40) sieve shall have a liquid limit not greater than 25 and a plasticity index not greater than 6, while for sub-base course, the liquid limit shallnot be greater than 35 plasticity index not greater than 12.

For surface courses, the fraction passing the 0.425 mm (No. 40) sieve shall have a liquid limit not greater than 35 and a plasticity index not less than 4 or greater than 9.

All materials shall be free from vegetable matter and lumps or balls of clay. When crushed aggregate is specified, not less than 50 mass percent of the particles

retained on the 4.75 mm (No. 4) sieve shall have at least one fractured face. Gradation of each designated size of aggregate shall be obtained by crushing, screening and blending processes as may be necessary.

Page 16: Neil Mark 172 Report

STRUCTURAL CONCRETE CLASS “A”

All superstructures and heavily reinforced substructures. The important parts of the structure included are slabs, beams, girders, columns, arch ribs, box culverts, reinforced abutments, retaining walls, and reinforced footings.

Page 17: Neil Mark 172 Report

MATERIALS REQUIREMENT:- PORTLAND CEMENT

Cement shall conform to the requirements of the following cited Specifications for the type specified or permitted.

The Contractor shall provide suitable means of storing and protecting the cement against dampness. Cement which, for any reason, has become partially set or which contains lumps of caked cement will be rejected. Cement salvaged from discarded or used bags shall not be used.

Page 18: Neil Mark 172 Report

-FINE AGGREGATESIt shall consist of natural sand, stone screenings or

other inert materials with similar characteristics, or combinations thereof, having hard, strong and durable particles. Fine aggregate from different sources of supply shall not be mixed or stored in the same pile nor used alternately in the same class of concrete without the approval of the Engineer. It shall not contain more than three (3) mass percent of material passing the 0.075 mm (No. 200 sieve) by washing nor more than one (1) mass percent each of clay lumps or shale. The use of beach sand will not be allowed without the approval of the Engineer. The fine aggregate shall be well-graded from coarse to fine and shall conform to Table 311.1

Page 19: Neil Mark 172 Report
Page 20: Neil Mark 172 Report

- COARSE AGGREGATE• It shall consist of crushed stone, gravel,

blast furnace slag, or other approved inert materials of similar characteristics, or combinations thereof, having hard, strong, durable pieces and free from any adherent coatings. It shall contain not more than one (1) mass percent of material passing the 0.075 mm (No. 200) sieve, not more than 0.25 mass percent of clay lumps, nor more than 3.5 mass percent of soft fragments. And gradation shall conform to table 405.1.

Page 21: Neil Mark 172 Report

• WaterWater used in mixing, curing or other

designated application shall be reasonably clean and free of oil, salt, acid, alkali, grass or other substances injurious to the finished product. Water which is drinkable may be used without test. Where the source of water is shallow, the intake shall be so enclosed as to exclude silt, mud, grass or other foreign materials.

Page 22: Neil Mark 172 Report
Page 23: Neil Mark 172 Report
Page 24: Neil Mark 172 Report

Stone Masonry

• It is used in in headwalls for culverts, in retaining walls at the toes of slopes, and at other places called for on the Plans, constructed on the prepared foundation bed, in accordance with this Specification and in conformity with the lines, grades, sections, and dimensions shown on the Plans or as ordered in writing by the Engineer.

Page 25: Neil Mark 172 Report

MATERIALS- STONE

The stone shall be clean, hard, and durable and shall be subject to the Engineer’s approval. Adobe stone shall not be used unless otherwise specified.

Sizes and Shapes – Unless other sizes are shown on the Plans, stones have a thickness of not less than 150 mm, and widths of not less than one and one-half times their respective thickness, and lengths of not less than one and one half times their respective widths. Each stone shall be of good shape and be free of depressions and projections that might weaken or prevent it from being properly bedded.

Dressing – The stone shall be dressed to remove any thin or weak portions. Face stones shall be dressed to provide bed and joint lines that do not vary more than 20 mm from the true lines and to ensure the meeting of bed and joint lines without the rounding of corners of the stones in excess of 30 mm in radius. Bed surfaces of the face stones shall be approximately normal to the face of the stones for about 80 mm and from this point may depart from a normal plane not to exceed 50 mm in 300 mm.

Finish for Exposed Faces – Face stones shall be pitched to the line along the beds and joints. The maximum projection of rock faces beyond the pitch lines shall not be more than 50 mm.

Page 26: Neil Mark 172 Report

- MORTARCement, fine aggregate, and water shall conform to the respective

requirements for those materials as specified under Item 405, Structural Concrete, except as to the grading of fine aggregate which shall all pass the 2.36 mm (No. 8) sieve, not less than 15 nor more than 40 percent shall pass the 0.3 mm (No. 50 ) sieve, and not more than 10 percent shall pass the 0.15 mm (No.100) sieve.

The mortar for the masonry shall be composed of one part of Portland Cement and two parts of fine aggregate by volume and sufficient water to make the mortar of such consistency that it can be handled easily and spread with a trowel. Mortar shall be mixed only in those quantities required for immediate use. Unless an approved mortar mixing machine is used, the fine aggregate and cement shall be mixed dry in a tight box until the mixture assumes a uniform color, after which, water shall be added as the mixing continues until the mortar attains the proper consistency. Mortar that is not used within 90 minutes after the water has been added shall be discarded. Retempering of mortar will not be permitted.

Page 27: Neil Mark 172 Report

• Selection and placing:- Care shall be taken to prevent the bunching of small stone or stones of the same size. Large stones shall be used in the corners.- All stones shall be cleaned thoroughly and wetted immediately before being set, and the bed which is to receive them shall be cleaned and moistened before the mortar is spread. They shall be laid with their longest faces horizontal in full beds of mortar, and the joints shall be flushed with mortar.

Construction

Page 28: Neil Mark 172 Report

• Beds and joints - Beds for face stones may vary from 20 mm to 50 mm in thickness. They shall not extend an unbroken line through more than 5 stones. Joints may vary from 20 mm to 50 mm in thickness. They shall not extend in an unbroken line through more than two stones.

• Headers - Headers shall be distributed uniformly throughout the walls of the structures so as to form at least one-fifth of the exposed faces.

Page 29: Neil Mark 172 Report

BackingBacking shall be built mostly of large stones as shown in

the approved plans or as directed by the Engineer. The individual stones composing the backing and hearting shall be well bonded with the stones in the face wall and with each other. All openings and interstices in the backing shall be filled completely with mortar or with spalls surrounded completely by mortar.

PointingBoth bed and vertical joints shall be finished as

shown on the Plans or as directed by the Engineer. The mortar in joints on top of surface of masonry shall be crowned slightly at the center of the masonry to provide drainage.

Page 30: Neil Mark 172 Report

Cleaning Exposed FacesImmediately after being laid, and while the mortar is

fresh, all face stones shall be thoroughly cleaned of mortar stains an shall be kept clean until the work is completed.

Curing In hot or dry weather, the masonry shall be

satisfactory protected from the sun and shall be kept wet for a period of at least three days after completion.