Project reason: Reliability - To meet connection point reliability requirements and achieve market benefits
Project category: Prescribed - Connection
Approvals
Author Jay Esson Network Planning Engineer
Endorsed Jahan Peiris Main Grid Planning Manager
Andrew Kingsmill Manager/Network Planning
Approved Andrew Kingsmill Manager/Network Planning
Date submitted for approval 1 December 2017
Change history
Revision Date Amendment
0 November 2017 Initial issue
1 December 2017 Project triggers updated
NEED/OPPORTUNITY STATEMENT & OPTION
SCREENING ASSESSMENT (NOSA)
Renewables in North Western NSW
NOSA- 000000001904 revision 2.0
2 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
1. Background
Support North Western NSW for Renewables
On 14 July 2017, COAG adopted the majority of recommendations of the Independent Review into the Future
Security of the National Electricity Market. The adopted recommendations include the development of an integrated
grid plan and identification of priority projects to facilitate the efficient development and connection of renewable
energy zones.
It is probable that the integrated grid plan will identify renewable energy zones and priority projects in New South
Wales. However, the location and scope of the renewable energy zones is not sufficiently certain to be included in
the ex-ante capital expenditure forecast in the revenue proposal.
TransGrid has interest from renewable energy proponents seeking to connect to its network in North Western New
South Wales. Therefore, it is probable that North Western New South Wales may be identified as a renewable
energy zone in the integrated grid plan.
2. Need/opportunity
The network in North Western NSW is a parallel network of 132 kV lines connecting to the 330 kV substations at
Tamworth and Armidale (see Figure 1).
S
SVC
To Liddell
Tamworth 330
Armidale
Dumaresq
Tamworth 132
Gunnedah
Narrabri
Inverell
Glen Innes
To Tenterfield
Bulli Creek
9U4
To Muswellbrook
To Koolkhan
To Coffs Harbour
To Kempsey
96T
96N
9U2
8C8E
8L8M
96R
968
969
97A
97B
86
85
84
88
966
96C
965
87
13.6 kV
SVC
Design voltage 330 kV
Operating voltage 132
kV
330 kV
132 kV
66 kV and below
Interstate Exchange Point
Transformer
SVC
Reactor
Capacitor
Double Circuit Line
96M
Moree
9UH
9U3
Boggabri North
Boggabri East9UJ
White Rock
Wind Farm
9UG
S
Figure 1 – North Western NSW area network
3 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
TransGrid has received applications for a number of generator connections to the North Western NSW
transmission system. Some of these projects are proposed to connect to the 132 kV and 66 kV network and will
result in the flow of power from the local 132 kV network to 330 kV network. Other projects are proposed to connect
to the 330 kV network, and the capacity for additional generation on the 330 kV in this part of the network is
approaching full capacity. If no network augmentations are undertaken with these additional renewable generation
developments, it’s possible that these new generators would need to be curtailed to manage system security.
Curtailment of cheap renewable generation would result in higher prices in National Electricity Market.
Tables 1 and 2 summarise these proposed projects (refer Figure 2 for a geographical representation of these new
renewable connections).
Table 1 – Generation connection interests – 132 kV or below
Project Capacity Connection Point Project Stage
This equates to 132 kV or 66 kV connections of:
170 MW of partially commission generation;
280 MW of advanced generation;
540 MW that require significant augmentation to increase capacity to sufficient levels to cater for these
connections,
Plus 875 MW of multiple parties competing for capacity at the same location,
.
4 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
Table 2 – Generation connection interests – 330 kV
Project Capacity Connection Point Project Stage
This equates to 330 kV connections of:
270 MW of committed generation;
220 MW of advanced generation;
Currently an additional 500 MW of enquiries;
Plus 2 sites with multiple parties competing for capacity:
5 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
Figure 2 – North Western NSW area network with potential generator connections
It is anticipated that new generator connections in North Western NSW may deliver market benefits with additional
augmentations to allow these new connections to generate without constraints placed upon them. The market
benefits would be from the following key sources:
Lower costs associated with meeting the supply reliability standard in New South Wales, through
facilitating access to the output from these additional generation connections; and
Lower market dispatch costs (and hence lower prices for consumers) resulting from the additional output
from these additional generator connections.
Subject to commitment of over 800 MW of generation in North Western NSW, there may be an opportunity to
expand the transmission network to realise the market and economic benefits of increased transmission capacity
from the new generator connections in North Western NSW to the rest of the NEM.
6 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
3. Related needs/opportunities
Connections of new generation in North Western New South Wales will continue to be monitored.
4. Options Summary
Table 1 — Options
Option Short description OFS required
Technically feasible
A Wollar – Gunnedah – Tamworth 330 kV single circuit transmission line (+ 330 kV substations)
Yes Yes
B Wollar – Narrabri - Armidale 330 kV double circuit transmission line (+ 330 kV substations)
Yes Yes
C Liddell – Tamworth – Gunnedah – Wollar and Tamworth - Tenterfield – Armidale 330 kV single circuit transmission line (+ 330 kV substations)
Yes Yes
D Wollar – Gunnedah – Narrabri – Moree – Sapphire 330 kV double circuit transmission lines (+ 330 kV substations + 969 upgrade to 330 kV)
Yes Yes
E Wollar – Gunnedah, Gunnedah – Tamworth, Gunnedah – Armidale East, Tamworth – Armidale East, Armidale East – Sapphire 330 kV single circuit transmission lines (+ 330 kV substations)
Yes Yes
NP&O/Project Development shall undertake Options Feasibility Studies for the options as indicated in Table 1
above. The assessments shall include consideration of the cost, timing of activities, risk analysis and practicality of
being able to carry out the works.
The Option Feasibility Study for Option E is required by 31 October 2017. The studies for the other options are
required 30 April 2018, and high level costings to be provided by February 2018.
7 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
5. Options
5.1 Option A: Wollar – Gunnedah – Tamworth 330 kV single circuit transmission line (+ Gunnedah 330 kV substation)
S
SVC
To Liddell
Tamworth 330
Armidale
Dumaresq
Tamworth 132
Gunnedah
Narrabri
Inverell
Glen Innes
To Tenterfield
Bulli Creek
9U4
To Muswellbrook
To Koolkhan
To Coffs Harbour
To Kempsey
96T
96N
9U2
8C8E
8L8M
96R
968
969 97A
97B
86
85
84
88
966
96C
965
87
13.6 kV
SVC
Design voltage 330 kV
Operating voltage 132 kV
330 kV
132 kV
66 kV and below
Interstate Exchange Point
Transformer
SVC
Reactor
Capacitor
Double Circuit Line
96M
Moree
9UH
9U3
Boggabri North
Boggabri East
9UJ
White Rock
Wind Farm
9UG
S
To Wollar
(~200km)
~65km
Tentative ultimate possible with this option:
a) Gunnedah – Narrabri – Moree – Mid-South Queensland 330 kV transmission lines (+ Moree – Sapphire
330 kV transmission line) OR
b) Armidale – Glen Innes – Tenterfield – South-East Queensland 330 kV transmission lines
c) Future: duplicate Wollar - Gunnedah, turn 5A3 into Wollar
Transmission line works:
All transmission lines are to be single circuit, 330 kV, strung with twin olive conductor:
~200km Wollar – Gunnedah
8 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
~65km Gunnedah – Tamworth
Substation works:
Gunnedah 330/132/66 kV Substation
66 kV Bus
9U
3 B
og
ga
bri
Ea
st
96
9 T
am
wo
rth
33
0
Ta
mw
ort
h 3
30
132 kV Bus
No.2 Capacitor No.1 Capacitor
87
7 K
ee
pit
Bo
gg
ab
ri M
ine
Byp
ass
88
L G
un
ed
ah
66
88
K G
un
ed
ah
66
87
5 T
am
wo
rth
13
2
(Re
tire
d)
330 kV Bus
Wo
lla
r
New work
9 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
New connection at Wollar 330
Gu
nn
ed
ah
330 kV Bus
We
lling
ton
New work
To 500 kV Bus
New connection at Tamworth 330
86
Arm
ida
le
84
Lid
de
ll
85
Arm
ida
le
88
Mu
sw
ellb
roo
k
No.1
Ca
pa
cito
r
330 kV Bus
No
.2 R
ea
cto
r
No.1
Re
acto
r
Gu
nn
ed
ah
33
0
New work
10 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
5.2 Option B: Wollar – Narrabri - Armidale 330 kV double circuit transmission line (+ 330 kV substations)
S
SVC
To Liddell
Tamworth 330
Armidale
Dumaresq
Tamworth 132
Gunnedah
Narrabri
Inverell
Glen Innes
To Tenterfield
Bulli Creek
9U4
To Muswellbrook
To Koolkhan
To Coffs Harbour
To Kempsey
96T
96N
9U2
8C8E
8L8M
96R
968
969
97A
97B
86
85
84
88
966
96C
965
87
13.6 kV
SVC
Design voltage 330 kV
Operating voltage 132 kV
330 kV
132 kV
66 kV and below
Interstate Exchange Point
Transformer
SVC
Reactor
Capacitor
Double Circuit Line
96M
Moree
9UH
9U3
Boggabri North
Boggabri East
9UJ
White Rock
Wind Farm
9UG
S
To Wollar
(~300km)
~230km
Tentative ultimate possible with this option:
a) Narrabri – Moree – Mid-South Queensland 330 kV transmission lines OR
b) Armidale – Glen Innes – Tenterfield – South-East Queensland 330 kV transmission lines
c) Future: duplicate Wollar - Narrabri, turn 5A3 into Wollar
Transmission line works:
All transmission lines are to be constructed as double circuit with twin olive conductor.
~200km Wollar – Narrabri
~230km Narrabri – Tamworth
11 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
Substation works:
New Narrabri 330/132/66 kV station
96
8
Ta
mw
ort
h
96
M
Mo
ree
9U
3
Gu
nn
ed
ah
13
2
No.1
132/66kV
60MVA
To 66 kV
Bus
No.3
132/66kV
60MVA
To 66 kV
Bus
Wo
llar
Arm
ida
le
132 kV
Bus
330 kV
Bus
New work
Wo
llar
Arm
ida
le
New connection at Armidale 330
Co
ffs H
arb
ou
r
Du
ma
resq
SV
C
Ta
mw
ort
h
330 kV Bus
No.1
Re
acto
r
Ta
mw
ort
h
New work
Du
ma
resq
Na
rra
bri
Na
rra
bri
12 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
New connection at Wollar 330
Na
rrab
ri
330 kV Bus
We
lling
ton
New work
To 500 kV Bus
Na
rrab
ri
5.3 Option C: Liddell – Tamworth – Gunnedah – Wollar and Tamworth - Tenterfield – Armidale 330 kV single circuit transmission line (+ 330 kV substations)
S
SVC
To Liddell
Tamworth 330
Armidale
Dumaresq
Tamworth 132
Gunnedah
Narrabri
Inverell
Glen Innes
To Tenterfield
Bulli Creek
9U4
To Muswellbrook
To Koolkhan
To Coffs Harbour
To Kempsey
96T
96N
9U2
8C8E
8L8M
96R
968
969 97A
97B
86
85
84
88
966
96C
965
87
13.6 kV
SVC
Design voltage 330 kV
Operating voltage 132 kV
330 kV
132 kV
66 kV and below
Interstate Exchange Point
Transformer
SVC
Reactor
Capacitor
Double Circuit Line
96M
Moree
9UH
9U3
Boggabri North
Boggabri East
9UJ
White Rock
Wind Farm
9UG
S
New line to
Liddell
(~140km)
~65km
~300km
New line to
Wollar
(~200km)
~190km
Tentative ultimate possible with this option:
a) Tenterfield – South-East Queensland 330 kV transmission line
13 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
Transmission line works:
All transmission lines are to be single circuit, 330 kV, strung with twin olive conductor:
~200km Wollar – Gunnedah
~65km Gunnedah – Tamworth
~300km Tamworth – Tenterfield
~190km Armidale – Tenterfield
Substation works:
Gunnedah 330/132/66 kV Substation
66 kV Bus
9U
3 B
og
ga
bri
Ea
st
96
9 T
am
wo
rth
33
0
Ta
mw
ort
h 3
30
132 kV Bus
No.2 Capacitor No.1 Capacitor
87
7 K
ee
pit
Bo
gg
ab
ri M
ine
Byp
ass
88
L G
un
ed
ah
66
88
K G
un
ed
ah
66
87
5 T
am
wo
rth
13
2
(Re
tire
d)
330 kV Bus
New work
Wo
lla
r
14 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
New connection at Liddell 330
To
ST
N T
x
New work
330 kV Gen Bus
Ba
ysw
ate
r
Ba
ysw
ate
r330 kV Main Bus
Ne
wca
stle
To
ma
go
To
Ge
n T
xM
usw
ellb
roo
k
Ta
mw
ort
h
To
Ge
n T
x
To
Ge
n T
x
To
Ge
n T
x
To
ST
N T
x
Ta
mw
ort
h
Tenterfield 330/132/66 kV Substation
Lis
mo
re te
e
Ca
sin
o
Gle
n In
ne
s
To 22 kV
Bus
To 22 kV
Bus
Ta
mw
ort
h
132 kV
Bus
330 kV Bus
New work
Arm
ida
le
15 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
New connections at Tamworth 330
86
Arm
ida
le
84
Lid
de
ll
85
Arm
ida
le
88
Mu
sw
ellb
roo
k
No.1
Ca
pa
cito
r
330 kV Bus
No
.2 R
ea
cto
r
No.1
Re
acto
r
Gu
nn
ed
ah
33
0
New work
Lid
de
ll
Te
nte
rfie
ld
New connection at Wollar 330
Gu
nn
ed
ah
330 kV BusW
ellin
gto
n
New work
To 500 kV Bus
16 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
New connection at Armidale 330
Co
ffs H
arb
ou
r
Du
ma
resq
SV
C
Ta
mw
ort
h
330 kV Bus
No.1
Re
acto
r
Ta
mw
ort
h
New work
Du
ma
resq
Te
nte
rfie
ld
17 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
5.4 Option D: Wollar – Gunnedah – Narrabri – Moree – Sapphire 330 kV double circuit transmission lines (+ 330 kV substations + 969 upgrade to double circuit 330 kV)
S
SVC
To Liddell
Tamworth 330
Armidale
Dumaresq
Tamworth 132
Gunnedah
Narrabri
Inverell
Glen Innes
To Tenterfield
Bulli Creek
9U4
To Muswellbrook
To Koolkhan
To Coffs Harbour
To Kempsey
96T
96N
9U2
8CFuture 8J
8L8M
96R
968
969 (upgrade to
330kV)
97A
97B
86
85
84
88
966
96C
965
87
13.6 kV
SVC
Design voltage 330 kV
Operating voltage 132 kV
330 kV
132 kV
66 kV and below
Interstate Exchange Point
Transformer
SVC
Reactor
Capacitor
Double Circuit Line
96M
Moree
9UH
9U3
Boggabri North
Boggabri East
9UJ
White Rock
Wind Farm
9UG
S
To Wollar
(~200km)
Future Sapphire
~95km
~100km
~185km
8E
Tentative ultimate possible with this option:
a) Moree – Mid-South Queensland 330 kV transmission lines
b) Future: turn 5A3 into Wollar
Transmission line works:
All transmission lines are to be double circuit, 330 kV, strung with twin olive conductor:
~200km Wollar – Gunnedah
~65km Gunnedah – Tamworth (969 uprate and double circuit)
~95km Gunnedah – Narrabri
~100km Narrabri – Moree
~185km Moree – Sapphire
18 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
Substation works:
New Gunnedah 330/132/66 kV station
66 kV Bus
9U
3 B
og
ga
bri
Ea
st
Sp
are
Ta
mw
ort
h 3
30
132 kV Bus
No.2 Capacitor No.1 Capacitor
87
7 K
ee
pit
Bo
gg
ab
ri M
ine
Byp
ass
88
L G
un
ed
ah
66
88
K G
un
ed
ah
66
87
5 T
am
wo
rth
13
2
(Re
tire
d)
330 kV Bus
Wo
lla
r
New work
Ta
mw
ort
h 3
30
Wo
lla
r
Na
rra
bri
Na
rra
bri
19 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
New Narrabri 330/132/66 kV station 9
68
Ta
mw
ort
h
96
M
Mo
ree
9U
3
Gu
nn
ed
ah
13
2
To 66 kV
Bus
To 66 kV
Bus
Mo
ree
Gu
nn
ed
ah
132 kV
Bus
New work
Mo
ree
Gu
nn
ed
ah
330 kV Bus
Sapphire 330 kV switching station
Armidale
330 kV Transformer Bus
New work
330 kV A Bus
Dumaresq
To wind farm transformers
Moree
Moree
330 kV B Bus
20 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
New Moree 330/132/66 kV station
Inve
rell N
arr
ab
ri
To 66 kV
Bus
To 66 kV
Bus
Na
rra
bri
Sa
pp
hire
132 kV
Bus
330 kV
Bus
New work
Sa
pp
hire
Na
rra
bri
New connection at Wollar 330 G
un
ne
da
h
330 kV Bus
We
lling
ton
New work
To 500 kV BusG
un
ne
da
h
21 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
New connection at Tamworth 330
86
Arm
ida
le
84
Lid
de
ll
85
Arm
ida
le
88
Mu
sw
ellb
roo
k
No.1
Ca
pa
cito
r
330 kV Bus
No
.2 R
ea
cto
r
No.1
Re
acto
r
Gu
nn
ed
ah
33
0
(up
rate
96
9)
New work
Gu
nn
ed
ah
22 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
5.5 Option E: Wollar – Gunnedah, Gunnedah – Tamworth, Gunnedah – Armidale East, Tamworth – Armidale East, Armidale East – Sapphire 330 kV single circuit transmission lines (+ 330 kV substations)
S
SVC
To Liddell
Tamworth 330
Armidale
Dumaresq
Tamworth 132Gunnedah
Narrabri
Inverell
To Tenterfield
Bulli Creek
9U4
To Muswellbrook
To Koolkhan
To Coffs Harbour
To Kempsey
96T
96N
9U2
8CFuture 8J
8L8M
96R
968
969
97A
97B
86
85
84
88
966
96C
965
87
SVC
330 kV
132 kV
66 kV and below
Interstate Exchange Point
Transformer
SVC
Reactor
Capacitor
Double Circuit Line
96M
Moree
9UH
9U3
Boggabri North
Boggabri East
9UJ
White Rock
Wind Farm
9UG
S
To Wollar
(~200km)
Future Sapphire
~185km
8E
Armidale East
~120km
~120km
~65km
~185km
Tentative ultimate possible with this option:
a) Glen Innes –South-East Queensland 330 kV transmission lines
b) Future: turn 5A3 into Wollar
Transmission line works:
All transmission lines are to be single circuit, 330 kV, strung with twin olive conductor:
~200km Wollar – Gunnedah
~65km Gunnedah – Tamworth
~185km Gunnedah to Armidale East
~120km Tamworth – Armidale East
~120km Armidale East – Sapphire
23 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
Substation works:
New Gunnedah 330/132/66 kV station
66 kV Bus
9U
3 B
og
ga
bri
Ea
st
Sp
are
Ta
mw
ort
h 3
30
132 kV Bus
No.2 Capacitor No.1 Capacitor
87
7 K
ee
pit
Bo
gg
ab
ri M
ine
Byp
ass
88
L G
un
ed
ah
66
88
K G
un
ed
ah
66
87
5 T
am
wo
rth
13
2
(Re
tire
d)
330 kV Bus
Ea
st
Arm
ida
le
New work
Wo
lla
r
Sapphire 330 kV switching station
Armidale
330 kV Transformer Bus
New work
330 kV A Bus
Dumaresq
To wind farm transformers
ArmidaleDumaresq
330 kV B Bus
Armidale East
24 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
New Armidale East 330 kV switching station
Armidale East 330 kV switching station is to be established somewhere along 87 transmission line, close to
existing Armidale substation. It could be adjacent to the existing substation or further away if a short section of
330 kV transmission line is not preferred.
Sapphire
Coffs Harbour
330 kV B
Bus
New work
330 kV A
Bus
Armidale
Tamworth
Gunnedah
New connection at Wollar 330
Gu
nn
ed
ah
330 kV Bus
We
lling
ton
New work
To 500 kV Bus
25 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
New connections at Tamworth 330
86
Arm
ida
le
84
Lid
de
ll
85
Arm
ida
le
88
Mu
sw
ellb
roo
k
No
.1 C
ap
acito
r
330 kV Bus
No.2
Re
acto
r
No
.1 R
ea
cto
r
Gu
nn
ed
ah
New work
Arm
ida
le E
ast
Bay rename at Armidale 330
Arm
ida
le E
ast
Du
ma
resq
SV
C
Ta
mw
ort
h
330 kV Bus
No.1
Re
acto
r
Ta
mw
ort
h
New work
Du
ma
resq
The same bay rename will also be required at Coffs Harbour substation.
26 / Renewables in North Western NSW NOS- 000000001904 revision 2.0
6. Recommendation
It is recommended that options be considered to address the identified need/opportunity and further progressed to
undertake Option Feasibility Studies.
It is also recommended that TransGrid propose a contingent project for the transmission network developments in
New South Wales north western area in the revised revenue proposal for 2018-2023. The contingent project would
have the following triggers:
(a) New generation more than 800 MW is committed in North Western NSW (north of Bayswater and Liddell)
(b) Two or more of the following:
(i) Inclusion of renewable energy zones in North Western NSW in AEMO’s Integrated Grid Plan or similar
plan as recommended by the Independent Review in to the Future Security of the National Electricity
Market by Professor Alan Finkel and accepted by the COAG Energy Council
(ii) Notification to TransGrid by the Federal Government, COAG Energy Council, NSW Government or the
Energy Security Board that it considers that augmentation of the transmission network to deliver increased
capacity from North Western NSW is required in order to meet or manage the expected demand for
prescribed transmission services or comply with an applicable regulatory obligation or requirement
associated with the provision of prescribed transmission services
(iii) Successful completion of a RIT-T or alternate framework introduced in response to the recommendation of
the Independent Review in to the Future Security of the National Electricity Market by Professor Alan
Finkel and accepted by the COAG Energy Council (including comprehensive assessment of credible
options) demonstrating that increasing capacity of the network in North Western NSW at 330/132kV or
other voltages used in future is the option that maximises the positive net economic benefits
(iv) Determination by the AER that the proposed investment satisfies the RIT-T or abovementioned alternate
framework
(c) TransGrid Board commitment to proceed with the project subject to the AER amending the revenue
determination pursuant to the Rules.
The trigger is specific and capable of objective verification, relates to a specific location or locations, and is
probable but too uncertain to include the proposed contingent project in the forecast capital expenditure in this