Narragansett Bay Commission Narragansett Bay Commission Combined Sewer Overflow Combined Sewer Overflow Control Facilities Program Control Facilities Program The Biggest Project You The Biggest Project You will Never See will Never See Paul Pinault, P.E. Former Executive Director NBC Paul Pinault, P.E. Former Executive Director NBC Client Service Leader CDM Smith Client Service Leader CDM Smith

Transcript of Nbc cso apwa expo july 8 t12

Page 1: Nbc cso apwa expo july 8 t12

Narragansett Bay CommissionNarragansett Bay CommissionCombined Sewer OverflowCombined Sewer OverflowControl Facilities ProgramControl Facilities Program

The Biggest Project You will Never The Biggest Project You will Never SeeSee

Narragansett Bay CommissionNarragansett Bay CommissionCombined Sewer OverflowCombined Sewer OverflowControl Facilities ProgramControl Facilities Program

The Biggest Project You will Never The Biggest Project You will Never SeeSee

Paul Pinault, P.E. Former Executive Director NBCPaul Pinault, P.E. Former Executive Director NBC

Client Service Leader CDM SmithClient Service Leader CDM Smith

Paul Pinault, P.E. Former Executive Director NBCPaul Pinault, P.E. Former Executive Director NBC

Client Service Leader CDM SmithClient Service Leader CDM Smith

Page 2: Nbc cso apwa expo july 8 t12
Page 3: Nbc cso apwa expo july 8 t12
Page 4: Nbc cso apwa expo july 8 t12

NBC CSO NBC CSO ProgramProgram

NBC CSO NBC CSO ProgramProgram

Combined Sewer OverflowCombined Sewer OverflowControl Facilities ProgramControl Facilities ProgramCombined Sewer OverflowCombined Sewer OverflowControl Facilities ProgramControl Facilities Program

Page 5: Nbc cso apwa expo july 8 t12

Phase I Facilities...Phase I Facilities...Phase I Facilities...Phase I Facilities...

CSO Diversion and CSO Diversion and CollectionCollection

CSO Storage - Main CSO Storage - Main Spine TunnelSpine Tunnel

Tunnel Capacity: Tunnel Capacity: – 61.8 MG Design61.8 MG Design– 66.5 MG Actual66.5 MG Actual

Tunnel Pump Tunnel Pump StationStation

CSO Diversion and CSO Diversion and CollectionCollection

CSO Storage - Main CSO Storage - Main Spine TunnelSpine Tunnel

Tunnel Capacity: Tunnel Capacity: – 61.8 MG Design61.8 MG Design– 66.5 MG Actual66.5 MG Actual

Tunnel Pump Tunnel Pump StationStation

Page 6: Nbc cso apwa expo july 8 t12

SITE S1 AND OUTFALL 067

Page 7: Nbc cso apwa expo july 8 t12

CSO Diversion and CollectionCSO Diversion and CollectionCSO Diversion and CollectionCSO Diversion and Collection

COMBINED SEWAGEOVERFLOW - DIVERSION AND STORAGE

TUNNEL1.PRS

DIVERSION STRUCTURE(APPROX. 22'L X 12'W)

INTERCEPTS EXISTING CSO OVERFLOW

GATE & SCREENING STRUCTURE(APPROX 35'L x 20'W)CONTROLS FLOW INTO TUNNEL

APPROACH CHANNELORGANIZES FLOW TO CREATE VORTEX

DE-AERATION CHAMBERREMOVES ENTRAINED AIR FROM FLOWS

RECIRCULATION PIPEDE-AERATED AIR IS DRAWN BACK INTO DROP SHAFT

CONNECTING ADIT(APPROX 72" DIA; LENGTH VARIES)

EXISTING SEWER SYSTEMCURRENTLY OVERFLOWS

INTO RIVERS AND BAY DURING WET WEATHER NEAR SURFACE

FACILITIES WITHIN 25' OF GROUND SURFACE

SOIL / ROCK INTERFACE- DEPTH VARIES BETWEEN 40' AND 160'

MAIN SPINE TUNNEL(APPROX 26'DIA; 16,000' LONG & 62 MG STORAGE)CONVEYS FLOW TO PUMPING FACILITIES

DROP SHAFT(5' - 9' DIA; DEPTH 250')TRANSFERS FLOW FROM SURFACE TO TUNNEL DEPTH

VENTILATION SHAFT (2'-3.5' DIA.)

ENABLES DE-AERATED AIR TO LEAVE CHAMBER

Page 8: Nbc cso apwa expo july 8 t12

SUCTION LINE - TRANSFERSWATER FROM TUNNEL TO

PUMPS

SCREENS

GRITS AND SCREENING REMOVAL BY GANTRY

CRANE

FORCE MAIN TO FIELDS POINT

SITE S1

CONFIGURATION OFPUMP STATION OPERATING

FACILITIES

200' ±

TPS1.PRS

UPPER LEVEL - PUMP FLOOR

LOWER LEVELPUMP FLOOR

TPS OPERATION & CONTROL BUILDING

110'±

68'±

SoilDepth155'±

Rock150'±

TOTAL DEPTH TO INVERT 305'±

SUMP

SAFEROOM

32-FEET DIAMETERACCESS SHAFT

MAIN SPINE TUNNEL62 MG

11-FEET DIAMETEREQUIPMENT

HOISTING SHAFT

SAFEROOM

SITE S1CONFIGURATION OF PUMP STATION OPERATING FACILITIES

Page 9: Nbc cso apwa expo july 8 t12

CSO StorageCSO StorageMain Spine TunnelMain Spine Tunnel

CSO StorageCSO StorageMain Spine TunnelMain Spine Tunnel

Tunnel capacity: Tunnel capacity: – 61.88 MG (Design)61.88 MG (Design)– 66.5 MG (Actual)66.5 MG (Actual)

Tunnel capacity: Tunnel capacity: – 61.88 MG (Design)61.88 MG (Design)– 66.5 MG (Actual)66.5 MG (Actual)

Seven dropshaftsSeven dropshafts

divert flow to the tunneldivert flow to the tunnel

Seven dropshaftsSeven dropshafts

divert flow to the tunneldivert flow to the tunnel

Page 10: Nbc cso apwa expo july 8 t12

B R I N E P U M P

M O B I L E R E F R I G E R A T I O N P L A N T

E X P A N S I O N V A L V E

L I Q U I D R E F R I G E R A N T

F R E E Z E T U B E S

C O O L I N G W A T E R

L O W P R E S S U R E R E F R I G E R A N T G A S

H I G H P R E S S U R E R E F R I G E R A N T G A S

C O M P R E S S O RC H I L L E RC O N D E N S E R

D E V E L O P I N GF R E E Z E W A L L

B R I N E F R E E Z I N G S Y S T E M

Page 11: Nbc cso apwa expo july 8 t12

Developmental Phases

Page 12: Nbc cso apwa expo july 8 t12
Page 13: Nbc cso apwa expo july 8 t12
Page 14: Nbc cso apwa expo july 8 t12
Page 15: Nbc cso apwa expo july 8 t12
Page 16: Nbc cso apwa expo july 8 t12
Page 17: Nbc cso apwa expo july 8 t12
Page 18: Nbc cso apwa expo july 8 t12
Page 19: Nbc cso apwa expo july 8 t12
Page 20: Nbc cso apwa expo july 8 t12
Page 21: Nbc cso apwa expo july 8 t12
Page 22: Nbc cso apwa expo july 8 t12
Page 23: Nbc cso apwa expo july 8 t12
Page 24: Nbc cso apwa expo july 8 t12
Page 25: Nbc cso apwa expo july 8 t12
Page 26: Nbc cso apwa expo july 8 t12
Page 27: Nbc cso apwa expo july 8 t12
Page 28: Nbc cso apwa expo july 8 t12
Page 29: Nbc cso apwa expo july 8 t12
Page 30: Nbc cso apwa expo july 8 t12
Page 31: Nbc cso apwa expo july 8 t12
Page 32: Nbc cso apwa expo july 8 t12
Page 33: Nbc cso apwa expo july 8 t12
Page 34: Nbc cso apwa expo july 8 t12
Page 35: Nbc cso apwa expo july 8 t12
Page 36: Nbc cso apwa expo july 8 t12
Page 37: Nbc cso apwa expo july 8 t12
Page 38: Nbc cso apwa expo july 8 t12
Page 39: Nbc cso apwa expo july 8 t12
Page 40: Nbc cso apwa expo july 8 t12
Page 41: Nbc cso apwa expo july 8 t12
Page 42: Nbc cso apwa expo july 8 t12
Page 43: Nbc cso apwa expo july 8 t12
Page 44: Nbc cso apwa expo july 8 t12
Page 45: Nbc cso apwa expo july 8 t12
Page 46: Nbc cso apwa expo july 8 t12
Page 47: Nbc cso apwa expo july 8 t12
Page 48: Nbc cso apwa expo july 8 t12
Page 49: Nbc cso apwa expo july 8 t12
Page 50: Nbc cso apwa expo july 8 t12
Page 51: Nbc cso apwa expo july 8 t12

1

2

3

45

6

9

78

1011

2

3

4,5

6,7,8

9,10,11

Page 52: Nbc cso apwa expo july 8 t12
Page 53: Nbc cso apwa expo july 8 t12
Page 54: Nbc cso apwa expo july 8 t12
Page 55: Nbc cso apwa expo july 8 t12
Page 56: Nbc cso apwa expo july 8 t12
Page 57: Nbc cso apwa expo july 8 t12
Page 58: Nbc cso apwa expo july 8 t12
Page 59: Nbc cso apwa expo july 8 t12
Page 60: Nbc cso apwa expo july 8 t12

The End of the TunnelThe End of the Tunnel