Natural Stone Paving Slabs - Vehicle Over-run Area ... · waterstones books gordons chemist kitchen...
Transcript of Natural Stone Paving Slabs - Vehicle Over-run Area ... · waterstones books gordons chemist kitchen...
D
IS
A
B
LE
D
D
IS
A
B
LE
D
S
O
L
O
M
/C
S
O
N
L
Y
T
A
X
IS
T
A
X
IS
T
A
X
I
S
T
A
X
I
S
T
A
X
IS
TA
X
IS
LB
B
B
LB
LB
LB
LB
LB
FP
FP
S
P
E
C
S
A
V
E
R
S
O
P
TIC
IA
N
S
C
LE
A
R
IN
G
S
H
O
P
D
O
LC
E
V
IT
A
C
U
A
N
M
O
R
B
A
R
P
IT
LO
C
H
R
Y
K
N
IT
W
E
A
R
N
A
TIO
N
W
ID
E
B
U
ILD
IN
G
S
O
C
IE
TY
W
H
S
M
IT
H
TW
E
E
D
H
O
U
S
E
E
D
IN
B
U
R
G
H
W
O
O
LE
N
M
ILL
TH
E
O
B
A
N
B
A
Y
FIS
H
&
C
H
IP
S
H
O
P
B
O
O
TS
N
E
W
LO
O
K
S
U
P
E
R
D
R
U
G
R
B
S
B
A
N
K
M
A
C
P
H
E
E
&
P
A
R
TN
E
R
S
W
A
TE
R
S
TO
N
E
S
B
O
O
K
S
G
O
R
D
O
N
S
C
H
E
M
IS
T
K
IT
C
H
E
N
G
A
R
D
E
N
P
A
LA
C
E
H
O
TE
L /
P
U
R
D
IE
S
S
K
IP
IN
N
IS
H
C
E
ILID
H
H
O
U
S
E
W
E
S
T C
O
A
S
T
M
O
TO
R
S
G
E
O
R
G
E
S
T F
IS
H
&
C
H
IP
S
H
O
P
H
E
A
V
E
N
S
C
E
N
T
T
H
E
IO
N
A
S
H
O
P
B
O
W
M
A
N
S
T
O
U
R
S
C
A
F
E
C
A
L
E
D
O
N
IA
N
C
A
R
P
A
R
K
B
A
N
K
O
F
S
C
O
T
L
A
N
D
D
M
M
A
C
K
IN
N
O
N
C
O
L
U
M
B
A
H
O
T
E
L
P
A
IT
IN
G
S
P
IE
R
C
A
F
E
TH
E
H
A
R
B
O
U
R
IN
N
T
H
E
H
A
R
B
O
U
R
IN
N
CA
LE
DO
NIA
N H
OT
EL
R
A
I
L
W
A
Y
S
T
A
T
I
O
N
B
B
L
B
L
B
L
B
LB
R
T
B 1
T2
- -
K1
P1
B -
P4
B -
B 1
T2
B 1
T2
P3
B -
P4
B -
P4
B -
P4
B -
P4
B -
P4
B -
P4
B -
P4
B -
P4
B -
P3
B -
P3
B -
P3
B -
P3
B -
P3
B -
P3
B -
P1
B -
P1
B -
P1
B -
P1
B -
P1
B -
P1
B -
P1
B -
P1
B -
P1
B -
P1
B -
P1
B -
P1
B -
P1
B -
P4
B -
P4
B -
P5 P5
P6
B -
P6
B -
P6
B -
K3
- -
K3
- -
K3
- -
K3
- -
-
W2
-
W2
--
W3
--
W3
--
W3
--
W3
--
W3
--
F1
--
F1
--
F1
--
F1
- -
S1
- -
S1
- -
S1
- -
S1
- -
S1
- -
S1
- -
S2
- -
S2
- -
S1
- -
S1
- -
S4
- -
S1
B 1
T2
B 1
T2
B 1
T2
B 1
T2
B 1
T2
B 1
T2
B 1
T2
B 1
T2
B 1
T2
B 1
T2
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
B -
T1
B -
T1
B -
T1
B -
T1
B -
T1
B -
T1
B -
T1
B -
T1
B -
T1
B -
T1
B -
T1
B -
T1
B -
T1
B -
T1
K2
- -
K2
- -
B -
T1
B -
T1
B -
T1
B -
T1
P1
B -
B -
T1
P10
B -
P10
B -
P10
B -
K2
- -
P10
B -
P10
B -
P3
B -
P3
B -
- -
K1
- -
K1
K2
- -
K2
- -
P10
B -
P10
B -
P3
B -
P3
B -
B -
T1
B -
T1
B -
T1
B -
T1
P10
B -
P10
B -
--
W3
P10
B -
P10
B -
P1
B -
P1
B -
P1
B -
P1
B -
P5
B 2
P5
B 2
P5
B 2
P5
B 2
K4
- -
K4
- -
K4
- -
K4
- -
K4
- -
K4
- -
K4
- -
B -
T1
- -
K1
K2
- -
K4
- -
K4
- -
- -
K1
- -
K1
K2
- -
K2
- -
K4
- -
K4
- -
K4
- -
K2
- -
- -
K1
K2
- -
- -
K1
- -
K1
P10
B -K2
- -
K2
- -
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
K2
- -
K2
- -
P10
B -
K2
- -
K2
- -
K2
- -
K2
- -
K2
- -
K2
- -
K2
- -
K2
- -
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
K2
- -
K2
- -
K2
- -
K2
- -
L
B
5
.
7
5
4
.5
0
6
.
0
0
4
.2
5
6
.
0
0
4
.
5
0
4
.
7
5
5
.
0
0
5
.
5
0
5
.
2
5
5
.
5
0
6
.
2
5
5
.
7
5
6
.0
0
5
.5
0
5.25
5
.
0
0
4
.
5
0
4
.
7
5
5.75
4
.
2
5
A
B
L
4
0
1
L
1
0
1
C
L
1
0
1
D
L
1
0
2
E
L
1
0
2
F
L
1
0
2
G
L
1
0
3
H
L
1
0
3
J
L
1
0
3
1
L
1
0
2
2
L
1
0
2
X
T
<
~
1
:2
1
+
4
.3
0
5
T
e
rra
c
e
+
5
.7
5
T
e
rra
c
e
+
5
.5
0
+
5
.
0
0
+
4
.
6
6
+
5
.0
0
L
E
V
E
L
T
e
rra
c
e
+
6
.0
0
+
6
.2
5
+
5
.
0
0
+
5
.5
0
+
5
.2
5
+4.50
S
3
/
2
B
e
n
c
h
+
5
.
4
5
+
6.25
+
4
.9
2
G
u
lly
+
5
.9
0
G
u
lly
+
4
.
5
0
+
4
.
8
3
+5.00
4.50+
+5.00
+4.95
<
~
1
:2
1
<
~
1
:1
8
.5
<
~
1
:1
8
.5
<
~
1
:1
2
+5.50
+5.8
5
+5.9
0
+6.2
0
+
6
.2
5
+
6
.1
5
+6.1
5
+6.1
0
+4.185 (e)
4.10+
4
.
2
2
+
+
4
.3
8
5
4
.2
6
0
+
+
5
.3
4
4.16++4.285
4
.1
8
0
+
4.25+
4.13+
+
4
.
3
4
5
4.28+
5
.
3
4
+
Top of granite level
5.34 (110mm bench top)
+
4
.2
6
6
4
.2
6
0
+
+
4
.2
8
6
4
.2
8
0
+
+
4
.4
1
5
4
.2
9
0
+
+
4
.4
8
5
4
.3
6
0
+
+
4
.3
6
5
4
.2
4
0
+
3
L
1
0
2
LB
TH
E O
BA
N
IN
N
KR
O
N
KS
R
O
O
M
15
LIT
TLE
BA
Y C
AF
E
TH
E P
O
KE
Y
H
AT
TH
E W
EE
G
ALLE
R
Y
W
EB
ST
ER
C
AM
ER
AS
D
r
o
p
C
r
o
s
s
in
g
4
.4
0
+
+
4
.9
5
L
E
V
E
L
+
4
.9
5
B
E
N
C
H
L
E
V
E
L
4.28+
+4.45
4
.3
5
+
+4.475
4
.
5
0
B
B
B
B
LB
FP
LB
G
u
lly 4
.4
4
+
--
F1
--
F1
P3
B -
P3
B -
--
W3
--
W3
--
W3
- -
S1
- -
S1
B 1
T2
Bespoke seat Type 1
2500x500x500mm, WPC seating panels incorporating armrests
and back rest. See drawing L103 for details.
- -
S1
Light grey Granite HB2 road kerb flame finished. Refer to
engineers drawings 05 for layout and 06 for construction details.
Cube Trim
75mm thick light grey granite, 100 x 100mm. Diamond sawn,
flamed finish.
2No bands with staggered joints.
B -
T1
Resin Bound Gravel Surfacing
Colour natural (P5B2)and silver grey (P5B1), see drawing L101
for details
Porphyry Natural Stone Paving Panels
80mm thick Porphyry, Violet mix,150 x random length (Range
150 - 600). Diamond sawn, flamed finish, staggered bond- 50mm
min stagger
Granite Blister Paving - Vehicle Over-run Area
65mm thick light grey granite, 400 x 400mm. Diamond sawn,
flamed finish, stack bond.
P10
B -
Paving Material/Colour/Finish
Thickness - A = Pedestrian Area
B = Vehicle Overun Area
Px
A -
LB
Bespoke Litter Bin
Dark grey Granite clad, 671 x 671 x 1200mm,
120Litre capacity. Refer to Drawing L105
Ornamental Shrub Planting
Refer to Drawing L110 for detailed planting plan
and planting schedule
Feature lighting column position. To include for additional
performance metered connections and WIFI repeater station.
Refer to lighting engineers drawings for details.
Wall mounted LED street lighting luminaire
Refer to lighting engineers drawings for details.
Lighting column position.
Refer to lighting engineers drawings for details.
required. Availability of performance connections to be provided
Proposed feeder pillar locations. Metered/un-metered as
at feature lighting points.
Refer to lighting engineers drawings for details.
FP
Finger post sign location
See drawing L108 for details
B
FP
Channel Trim - Vehicle Over-run Area
65mm thick light grey granite, 300mm random length.
Diamond sawn, flamed finish.
B 1
T2
Natural Stone Paving Slabs - Vehicle Over-run Area
65mm thick pink granite, 300 x random length (Range 300-600)
Diamond sawn, flamed finish, staggered bond- 50mm min
stagger
P1
B -
P3
B -
P4
B -
Natural Stone Setts - Vehicle Over-run Area
80mm thick pink granite,150 x random length (Range 150 - 300)
Diamond sawn, hammered finish, staggered bond- 50mm min
stagger
P5
B 1
Bituminous Surfacing
See engineers drawings for details.
P6
B -
Existing Concrete Sea Wall/ Coping.
To be retained and cleaned, see spec on L001 for details
--
W3
Slate Stone Faced Planter Wall
with Granite Coping (Ref C3).
Coping light grey granite, diamond sawn, flamed finish.
Refer to Drawing L102
--
W2
Existing Ballustrade.
To be painted RAL 7015 (slate grey)
--
F1
Bespoke seat Type 2
3000x500x500mm, WPC seating panels incorporating armrests
and back rest. See drawing L103 for details.
- -
S2
Bespoke seat Type 4
Slate dry stone wall base with WPC seating panels. See
drawings L103 & L102 for details.
- -
S4
Existing wall mounted 3m column to remain (nominal height to
lantern 5m) to support catenary cables for festoon lighting. To be
structurally tested and completed with post top mounted LED
lantern, see electrical engineers drawings for details.
Heavy duty wall mounted 3m column (nominal height to lantern
5m) to support catenary cables for festoon lighting. To be
completed with embellishment kit and post top mounted LED
lantern, see electrical engineers drawings for details.
Proposed tree planting within tree grille, inlaid with light grey
granite setts, see drawing L106 for details.
300mm diameter x 750mm high granite bollard.
Dark grey granite, flame finish.
See drawing L104 for details
Real time information LED display unit incorporated into bus
shelters, to be installed by others
RT
K3
- -
Stainless Steel flexible edging strip
See drawing L101 for details
Light grey Granite drop kerb, flame finished. Refer to engineers
drawings 05 for layout and 06 for construction details.
P5
B 2
K2
- -
- -
K1
Light grey Granite flush channel road kerb (CS1), flame finished.
Refer to engineers drawings 05 for layout and 06 for construction
details.
K4
- -
T
A
X
IS
T
A
X
I
S
T
A
X
I
S
T
A
X
IS
TA
X
IS
B
C
A
R
P
A
R
K
B
A
N
K
O
F
S
C
O
T
L
A
N
D
D
M
M
A
C
K
IN
N
O
N
P
O
U
N
D
C
R
A
Z
Y
J
A
N
E
'
S
T
H
E
C
O
F
F
E
E
C
O
R
N
E
R
J
U
L
IA
N
G
R
A
V
E
S
S
E
M
I-C
H
E
M
M
&
C
O
R
A
I
L
W
A
Y
S
T
A
T
I
O
N
L
B
L
B
L
B
LB
R
T
R
T
P4
B -
P4
B -
P4
B -
P1
B -
P1
B -
P4
B -
P4
B -
P5
B 1
P5
B 1
P6
B -
K3
- -
K3
- -
K3
- -
K3
- -
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
- -
K1
B -
T1
B -
T1
B -
T1
B -
T1
B -
T1
B -
T1
B -
T1
K2
- -
K2
- -
K2
- -
K3
- -
B -
T1
- -
K1
P5
B 2
P5
B 2
P5
B 2
P5
B 2
P5
B 2
K4
- -
B -
T1
Drawing
Project
Client
Scale @ A0
Drawn
Approved
Project No.
Date
Checked
project
revision
origin
zone rolelevel
file type
number
Drawing Identifier
(BS1192:2007/Avanti Compliant )
Property and infrastructure
CS068322-04
ARGYLL AND BUTE COUNCIL
PROPOSED SITE LAYOUT
1:250 RC
17.04.15
OBAN_LA_PH2_L001
CastleWay House, 17 Preston New Road, Blackburn, BB2 1AU
Tel: 01254 273296 www.capita.co.uk/property
Capita Property and Infrastructure Ltd.
Q
U
E
E
N
S
P
A
R
K
P
L
A
C
E
G
E
O
R
G
E
S
TR
E
E
T
STATION SQUARE
SEE ABOVE
Purpose of Issue
Status
TENDER
JGJG
Uncontrolled crossing
Lighting renewed on building facades
Station square to become kerb free. Taxi
rank and access to station, car park and
harbour-side retained.
Taxi waiting bays indicated with yellow
dashed line, see engineers drawing
PH2/07-1 for details.
New pedestrian refuge
New pedestrian refuge
Existing road widths, parking provision
and turning movements remain as
existing
ISSUED
OBAN BAY
REGENERATION PROJECT:
GEORGE STREET & STATION
SQUARE PUBLIC REALM
STATION SQUARE
George Street & Station Square Public Realm
Planning Application Boundary
Pedestrian controlled
crossing retained.
Tree retained
Clock Tower retained
and cleaned.
S
T
A
F
F
O
R
D
S
T
R
E
E
T
WHITE BUILDING
Date
Rev/Description
CheckedBy Approved
T06
Double bus shelter: Toughened glass
with real time information display.
Details to be provided by supplier.
12/03/15JGPR JG
T01 Updated for tender
Existing slipway
NOTE:
Paving, lanterns and festoon lighting to be
included in phase 2 works, for entire sea
wall. See lighting engineers drawings for
details.
NOTE:
Works within the hatched area are
outside of this contract, including street
lighting, shown for reference only.
See drawing PH2_L002 for details
See drawing PH2_L003 for details
See drawing PH2_L003 for details
See drawing PH2_L004 for details
See drawing PH2_L005 for details
See drawing PH2_L004 for details
See drawing PH2_L005 for details
See drawing PH2_L006 for details
See drawing PH2_L006 for details
See drawing PH2_L007 for details
NOTE:
6no existing benches to the waterfront side of George
Street are dedicated memorial benches. To be carefully
removed to Council store. Allow for fixing of plaques to
6No proposed benches. Benches to receive plaques to be
confirmed on site by landscape architect. See drawing
L103 for details.
NOTE:
See engineers drawings for kerb layouts and road marking
layouts.
NOTE:
SPECIFICATION FOR CLEANING HARBOUR WALL
AND STATION SQUARE CLOCK-TOWER.-
Acid cleaning: concentrations and dwell times to be
determined by a suitably qualified contractor through initial
testing of small areas of masonry, to ensure the surface is
not damaged and sufficient cleaning is achieved. Wash-off
with super heated steam.
Extent of works:
Harbour wall- limited to parapet above road/ pavement
level, coping and seaward side to same level. Note this is
a listed building (Grade C Historic Scotland).
Clock Tower- concrete block tower, all external sides.
Double bus shelter: Toughened glass
with real time information display.
Details to be provided by supplier.
08/04/15JGPR JG
T02 Additional paving to North Pier
included
17/04/15JGRC JG
T03 Revision to note on memorial
benches and new plaques.
24/04/15JGPR JGT04 Spec for cleaning harbour wall and
clock-tower included.
NOTE:
Fingerpost to be included in
phase 2 works
24/04/15JGPR JG
T05 Additional fingerpost sign included
in phase 2 works
15/05/15JGPR JG
T06 Taxi rank markings to station
square inlcuded.