JWC STAFF ORDER
JWC COS 19/-
DATE: 25 APRIL 2019
TO: SEE DISTRIBUTION
SUBJECT: ACT-LED STUDY ON COMMUNICATIONS AND INFORMATION SYSTEMS (CIS) AND INFORMATION MANAGEMENT (IM) EXERCISE PLANNING/SUPPORT FINAL SYNCHRONIZATION WORKSHOP
REFERENCES: A IMSM-0301-2018, BI-SCS TASKING TO IMPLEMENT RECOMMENDATIONS ON COORDINATION OF COMMUNICATIONS AND INFORMATION SYSTEMS SUPPORT TO EXERCISES, DATED 14 SEP 18.
1. SITUATION
B. 7000/TSC TXX 0700/TT-0413/SER: NR 0068, COORDINATION OF COMMUNICATIONS AND INFORMATION SYSTEMS SUPPORT TO EXERCISES, DATED 4 OCT 18. C. 5000/TSC TXX 0070/TT-0933/SER: NU0024, COMMUNICATIONS AND INFORMATION SYSTEMS (CIS) AND INFORMATION MANAGEMENT (IM) EXERCISE SUPPORT COORDINATION WORKSHOP CALLING LETTER, DATED 12 MAR 19.
In response to the analysis of shortcomings within the coord ination of Communications and Information Systems (CIS) and Information Management (IM) support to exercises, the Bi-SCs were tasked (at Reference A), to provide coordinated feedback to the IMS by September 2019. The first workshop was conducted at SACT SEE on 22 - 23 JAN 19.
2. MISSION
It is intended to hold a follow on workshop at JWC in Stavanger, Norway from 12 - 14 JUN 19. Chaired by HQ SACT JFD PM (Mr Stuart Furness), attendance of both CIS and IM staff is requested from: NATO HQ C3 Staff, SHAPE, JWC, JFTC, JFCBS, JFCNP, AIRCOM, LANDCOM, MARCOM, NCIA and NCISG. NATO School Oberammergau and NATO CIS School are also welcome given that some action points relate to existing I new training and course content.
-1-NATO UNCLASSIFIED
INT-1208
NATO UNCLASSIFIED
3. EXECUTION
3.1 Intent
JWC will provide a conference hosting facility suitable for conducting this workshop. JWC will support and facilitate all Real Life Support requirements for lodging, transportation and security via WAFER registration. The C-Biock rooms have been reserved for this workshop. JWC is expected to participate with members from IM/C4, CIS Branch and IKM, in addition members from the local NCIA CSU will be invited to attend. Other members from JWC that wish to attend or observe this workshop should contact IM/C4 Branch in advance.
3.2 End State
The aim of this second Final Synchronization Workshop is to coordinate the Bi-SC response to the IMS, based on actions taken since the first workshop. The objectives of this workshop are as follows:
3.2.1 Finalizing suggestions on improving CIS and IM exercise planning/support processes, timelines/milestones, roles/responsibilities, methods, tools, portals/websites, definitions, etc.
3.2.2 Finalizing CIS/1M exercise planning/support related input to the main CIS/1M principle reference documents like Bi-SC 075-003, AD 80-95 and MC 593/1.
3.2.3 Review and update the Information Management processes for CIS/1M exercise planning/support with focus on marking and labelling.
3.2.4 Discuss and improve the Joint CIS and IM Control Centre (JCCC) concept.
3.2.5 Finalizing suggestions on improving the existing NATO CIS/1M courses with more detailed CIS/1M contend and eventually on creating a new CIS/1M exercise planning/support course at NCISS (or similar).
3.3 Concept of Operations
3.3.1 Primary travel days for workshop attendees will be Tuesday 11 JUN 19 and Friday 14 JUN 19.
3.3.2 Wednesday 12 JUN 19 and Thursday 13 JUN19: conduct workshop in CBiock.
3.3.3 Draft agenda iaw with Annex A to this Staff Order.
3.4 Tasks
3.4.1 SPT DIR
3.4.1.1 Real Life Support (RLS) to support this workshop with event registration through WAFER.
-2-NATO UNCLASSIFIED
NATO UNCLASSIFIED
3.4.1.2 RLS to request and coordinate transportation for attendees according to preferences given in WAFER, including daily transportation between down town Stavanger and JWC during 12 and 13 June.
3.4.1.3 Base Support to ensure cleaning of C-Biock prior to the workshop start and daily cleaning of nearby toilet facilities.
3.4.1.4 Security to coordinate and execute the provision of access badges for attendees iaw with WAFER registration. Bunker access must be granted to all workshop attendees.
3.4.2 ET&I DIR
3.4.2.1 IM/C4 Branch Head, LTC (DEU -F) HEUMUELLER, Dieter is the main POC for the workshop, LTC (DEU -A) KARNATZ, Jens is OPR.
3.4.2.2 IM/C4 will coordinate the necessary CIS in C-block in preparation of this workshop.
4. ADMINISTRATION AND LOGISTIC
4.1 Working Hours
4.1.1 Working hours will be 08:30 - 16:00 hrs, Wednesday 12 JUN 19 and Thursday, 13 JUN 19.
4.1.2 In-processing will take place between 07 45 and 0900 hrs on Wednesday 12 JUN 19 at JWC F-Biock main entrance.
4.2 Security
4.2.1 Attendees will be provisioned with access badges during in-processing on 12 JUN 19. Attendees should bring the following to identify themselves:
4.2.1 .1 Military ID for military personnel or civilian passport for civilian personnel.
4.2.1.2 Security certification (minimum NATO SECRET) is required by all attendees.
4.2.2 Attendees will require access to F-Biock and C-Biock
4.3 Transportation
4.3.1 Daily transportation schedule (12 and 13 JUN 19):
Stavanger down town - JWC: JWC - Stavanger down town:
-3-
07:30 hrs. 16:30 hrs.
NATO UNCLASSIFIED
NATO UNCLASSIFIED
4.4 Meals
4.4.1 On 12 and 13 JUN 19, lunch will be served in the JWC level 5 canteen (pay as you go).
4.5 Attendees
4.5.1 The expected number of attendees is between 40 and 50 PAX.
4.5.2 No flag level officers or other dignitaries are expected.
5. COMMAND AND SIGNALS
5.1 ACT Point of Contact- Mr FURNESS, Stuart (GBR CIV), SACT JFD PM, phone: +1 757 747 3941 , e-mail : [email protected]
5.2 JWC POCI IM/C4 Branch Head - LTC (OF-4) HEUMUELLER, Dieter (DEU AF), phone: +47 5287 9621 , mobile: +47 94167615, e-mail: dieter. heumueller@jwc. nato. int
5.3 JWC OPR I Lead Planner- LTC (OF-4) KARNATZ, Jens (DEU A), phone: +47 5287 9650, e-mail : [email protected]
, OINT WARFARE CENTRE
TOM ROBERTSEN Captain (N), NOR - N Director of Management and Chief of Staff (acting)
ANNEX: A. DRAFT AGENDA/WORKSHOP PLAN
DISTRIBUTION:
External-NATO HQ C3 Staff COS SHAPE (for J6 I DOM) NCISG NCIA (for OPSIEX Service Line and NATO CIS School) NSHQ HQ SACT JFT
-4-NATO UNCLASSIFIED
HQ SACT SEE SHAPE CYBER J6 JFC NAPLES J6 JFC BRUNSSUM J6 HQ AC RAMSTEIN HQ LC IZMIR HQ MC NORTHWOOD JFTC NATO School OBERAMMERGAU
Internal-
COM cos SPECAD DOM ET&I DCOS ET&I PROG DIR ET&I EX PLAN DIV ET&I EX PROD DIV ET&I TTD DIV SPT DCOS BUDFIN LEGAD SEC AD PAO GENAD RLS BUDFIN
NATO UNCLASSIFIED
-5-NATO UNCLASSIFIED
NATO UNCLASSIFIED
ANNEXA TO JWC COS 19/DATED 25 APR 19
ACT-LED STUDY ON COMMUNICATIONS AND INFORMATION SYSTEMS (CIS) AND INFORMATION MANAGEMENT (IM) EXERCISE PLANNING/SUPPORT
FINAL SYNCHRONIZATION WORKSHOP
DRAFT AGENDA/WORKSHOP PLAN
Stavanger, Norway, JWC (C-Biock, rooms (tbd)).
Wednesday, 12 JUN 19
TIME ITEM SUBJECT ACTION/OPR
0745-0900 1. In Processing JWC
0900-0915 2. Introductions & Opening Comments ACT JFD PM
0915-0930 3. Scene Setter: Summary of 151 Workshop ACT JFD PM
1000- 1030 Coffee Break
1030-1130 4. Summary of actions taken regarding the Study JWC IM/C4
11 30-1245 Lunch
1245 - 1330 5. Topic 1: Requirements Management and Development
SHAPE J6/IM (Action 1.1 + 1.2)
1330-1400 6. Topic 1: Requirements Management and Development JFCBS +
(Action 1.3 + 1.4) JFCNP J6/IM
1400- 1430 Coffee Break
1430 - 1500 7. Topic 1: Requirements Management and Development
SHAPE J6/IM (Action 1.5)
1500-1530 8. Topic 2: Exercise Preparation and Pre-Testing
SHAPE J6/IM (Action 2)
1530-1600 9. Day 1 Concluding Remarks ACT JFD PM
-A 1-NATO UNCLASSIFIED
INT-1208
NATO UNCLASSIFIED
Thursday, 13 JUN 19
TIME ITEM SUBJECT ACTIONIOPR
0830-0900 1. Day 2 Opening Comments ACT JFD PM
Topic 3: Roles, Responsibilities and Authorities (RRA) I 0900-1000 2. Terminology SHAPE J611M
(Action 3)
1000-1030 Coffee Break
1030- 1130 4. Topic 4: Handover J6 I IM Planners to NCISGINCIA SHAPE J611M
(Action 4.1 + 4.2) + NCIA
1130 - 1245 Lunch
1245-1330 6. Topic 4: Handover J6 I IM Planners to NCISGINCIA All to provide
(Action 4.3) PE Fill Rates
1330-1400 7. Topic 5: Review CIS I IM Training
ACT JFD PM (Action 5)
1400 - 1430 Coffee Break
1430-1500 8. Open Discussion I Result Finalization Al l
1500-1 545 10. Way Ahead I Preparing Result Presentation to MCIIMS HQ SACT PM
1545- 1600 11 . Concluding Remarks All I ACT JFD PM
-A2-NATO UNCLASSIFIED