NATIONAL INITIATIVES FOR
SUSTAINABLE DEVELOPMENT -
ZANZIBAR
Zanzibar Planning Commission
21st OCTOBER, 2013
ZANZIBAR 2
Unguja Island Pemba Island
Outline 3
Country Profile
Planning & Development Framework in Zanzibar 2000 – 2020, The Vision
Implementation of Vision 2020
2012 at a glance, Zanzibar in figures
ZSGRP I (MKUZA I)
ZSGRP II (MKUZA II)
MKUZA II Implementation Plan
Government Objectives (True North for Zanzibar)
Challenges
Conclusion
Country Profile
4
Zanzibar consists of two main islands, Unguja and Pemba
Located in the Western Indian Ocean, about 30 km off the East Coast of Africa between latitudes 5 and 7 degrees south of Equator
Zanzibar has a total area of 2,654 sq km , out of this, Unguja has an area of 1,666 sq km and Pemba has an area of 988 sq km.
Population of Zanzibar reach 1,303,568 according to 2012 Population and housing Census from 981,754 2002
Country Profile 5
Constitutionally, Zanzibar is one of the two countries that united in 1964 to form the United Republic of Tanzania
Zanzibar has its own government; the Executive, Judicial System and Legislative Assembly
Zanzibar has its own autonomy in its domestics affairs include Economic planning and Management
Administratively the islands are divided into five regions (three in Unguja and two in Pemba) with ten districts (two each).
Planning & Development Framework
in Zanzibar 2000 - 2020
6
The Overall Development Objective for Vision 2020
Transform Zanzibar into a middle income country and enable it to eradicate absolute poverty in the society through:
Building a strong and competitive economy;
Achieving high quality livelihoods for citizens
Improve good governance and the rule of law without compromising Zanzibar’s rich culture.
By 2020 Zanzibar should have gone through an unprecedented economic transformation and development to achieve middle income status characterized by:
High levels of industrialization,
Competitiveness,
Quality livelihoods,
7
Vision 2020: Economic Targets 8
Middle-income status.
Annual economic growth of 9-10% by 2020.
60% of GDP derived from tourism, trade,
manufacturing and construction.
50% of employment concentrated in tourism
sector and free zones and 20% from
agricultural sector.
VISION 2020 – SOCIAL TARGETS 9
Access to safe water.
Access to basic, high-quality healthcare.
Infant mortality rate of 20 per thousand.
Life expectancy of 65 years.
100% enrolment in primary education (by 2005).
Implementation of the Vision 10
THROUGH MEDIUM-TERM STRATEGIES AND
PLANS
Zanzibar Poverty Reduction Plan (ZPRP) 2002-2005
The ZPRP involved a strategic selection of priority
sectors deemed to have a more direct impact on
poverty reduction. Hence these priority sectors
(education, water, health, HIV/AIDS, good
governance, infrastructure) were allocated more
resources relative to other sectors
Implementation of the Vision, cont… 11
Zanzibar Strategy for Growth and Reduction of
Poverty (ZSGRP I) 2007-2010
The ZSGRP I, which is more popularly known in its
Kiswahili acronym, MKUZA I, was adopted to retain
and scale up achievements as well as addressing the
challenges and weaknesses of the ZPRP.
It was outcome-based and thus it clustered the
strategies and interventions around linked goals and
outcomes.
Implementation of the Vision, cont… 12
Cluster I
Growth and Reduction of Income Poverty
Primarily addresses Zanzibar’ s Growth Challenges
Cluster II
Social Services and Well Being
Aims at improving wellbeing and social services
Cluster III
Good Governance and National Unity
Aims at putting in place an improved governance systems
ZSGRP II (MKUZA II) 13
Zanzibar Strategy for Growth and Reduction of
Poverty (ZSGRP II) 2010-2015
The ZSGRP II or MKUZA II was adopted to maintain
and scale up achievements as well as addressing the
challenges and weaknesses of the ZSGRP I.
Like ZSGRP, It is outcome-based and thus it clustered the
strategies and interventions around linked goals and
outcomes to MDG goals.
Both ZSGRPs mainstreamed all crosscutting issues
including HIV/AIDS, gender and environment.
The FOCUS includes 14
implementation of Growth Strategy by coordinating
and linking with other sectors and scale up growth-
related interventions
To harness and scale up the Public Private
Partnership
Implementation of Core Reforms
MKUZA II 5 years Implementation
Plan 15
Developed an actionable program/project plan which sequences interventions in a logical manner arising from MKUZA II outcomes, the flagship projects.
Developed and costed the Investment Plan based on priority areas as stipulated in MKUZA II and the Growth Strategy
Ensure actionable program/projects plan strengthen the credibility and consistency of MTEFs in accordance with MKUZA II outcomes
Priority areas…….. 16
Cluster I: Growth and Reduction of Income Poverty
focus on:-
Tourism, Trade, Agriculture, Services (particularly
ICT), and manufacturing/value addition,
Energy, harbours, Roads network, land
development (including land use planning) and
Water for irrigation
Priority Areas ………. 17
Cluster II: Social Welfare and Well-being
Focus on:-
Provision of quality health, education and water
Skills development relevant to the planned activities of clusters I, II and III.
Cluster III: Good Governance, the Rule of Law and National Unity
focus on:-
Filling the gaps in governance and leadership, particularly reform the way leaders and public servants act at all levels, such that they operate using result-based management approach.
Priority areas………. 18
Implementing major reforms like Zanzibar Public Service Reform, Zanzibar Local Government Reform, Zanzibar Legal Sector Reform, etc
Enhancing the tracking of governance indicator .
Building effective governance institutions.
Undertaking institutional reforms in the public services by reforming the way bureaucracy operates and making it more responsive and efficient through nurturing, selection, training and retaining able and dedicated civil servants.
Structure of Prioritization of projects
and programs 19
a. On going Programs/projects
b. New Programs/projects (Flagship)
flagship projects consist three Categories
characterized by:-
Their potential for achieving Vision 2020 aspirations;
those that are strategic and/or important pre-requisites for the implementation of other programmes/projects;
readiness of their implementation; and
financial availability and cost implications.
Structure of Prioritization of projects
and programs.......... 20
Category I consists of programs and projects with the following attributes:
feasibility Study is Completed,
require less pre requisite from other programs/projects;
it is critical for economic growth and employment generation and;
have higher chances/potential for being financed.
Category II is of those programs and projects with the following main attributes:
they are dependent on the completion of programs/Projects from other Sectors
feasibility Study is under Pre preparation.
Category III are those programs and projects, which are on concept note stage.
Sequencing of Programmes and
Projects 21
Rank I
Infrastructure projects energy,
water, roads, ports are ranked highest for implementation
Rank II
Special Economic Zones (SEZs), which is crucial not only for increasing production for both domestic markets and for exports, but also to establish synergies among sectors such as agriculture and value addition, tourism and trade.
Improvement in ICT and health infrastructure
Sequencing of Programs and Projects
22
Rank III
Institutional reform,
capacity building,
environmental management; etc.
Rank IV
Remaining programs and projects are found under
all three clusters
REQUIRED FINANCING FOR
THE INVESTMENT PLAN- CLUSTER I,II &III 23
SUMMARY MKUZAII INVESTMENT BY
CLUSTER AND YEAR (US$ 000 )
MKUZAII Cluster 2012 2013 2014 2015 2016 Total
Cluster I 264,041.62 501,213.10 365,951.27 306,752.77 215,153.07 1,653,111.83
Cluster II 226,634.68 206,799.46 101,773.95 49,633.75 48,144.50 632,986.34
Cluster III 79,444.40 99,030.05 74,047.17 39,220.75 13,420.32 305,162.69
Total MKUZAII 570,120.70 807,042.61 541,772.39 395,607.27 276,717.89 2,591,260.86
Source of financing
A. Conventional/Traditional Sources
Tax collection
Non tax collection
Foreign Grants and Concessional Loans
Climate Change Financing Mechanism
Bolstering Skills Development Financing
Source of Financing cont….
B. Non-Conventional Approach
Sovereign Borrowing
Utilization of Diaspora
Regional Arrangement
Private Sectors and PPP
2012 at a glance Zanzibar in Figures as of 2011 and 2012
26
Population 1,303,569
GDP constant price growth rate 6.7% (2011)and 7.0% (2012)
Per capita GDP USD 617 2011, USD 638 2012
Inflation 14.7 % 2011, 9.4% 2012
Tourist Arrivals 175,000 2011, 169,223 2012
Household size 5.5
Net enrolment in primary school 81.4
Literacy rate 82.3
Youth unemployment rate % 17.1
Basic needs poverty % 44.4
Food poverty % 13.04
Life expectancy at birth 60
MDG Goal Indicator Baseline
(1990)
Current
status
2015
Target
Progress at a
Glance
1. Eradicate
extreme
poverty and
hunger
1.1 Proportion of population
below($1, PPP) (based on
national income poverty
line)
61% 44.41%
(2010) 30.5%
Not
achievable
1.1 Proportion of population
below($1, PPP) (based on
national food poverty line) 25% 13.04%
(2010) 12.5%
Achievable
1.8 Under-5 Underweight (%)
Children underweight
(weight-for-age below -2SD) 39.9% 8.1%
(2009) 19.9%
Achievable
1.8 Under-5 Stunted (%)
47.9% 23.1%
(2005) 23.8%
Achievable
2. Achieve
universal
primary
education
2.1 Net enrolment ratio in
primary education (%) 50.9% 81.5%
(2010) 100%
Achievable
probable
2.2 Gross enrolment ratio in
primary education (%) 112.1% 100% Achievable
27
MDG Goal Indicator Baseline
(1990)
Current
status
2015
Target
Progress at a
Glance
3. Promote
gender
equality and
empower
women
3.1 Ratio of girls to boys in
primary school (%) 0.98 1.01 (2007) 1 Achievable
3.2 Ratio of girls to boys in
secondary school (%) 1.05 (2007) 1 Achievable
3.3 Ratio of females to males
in tertiary education (%) 0.68 (2007) 1 Achievable
probable
3.4 Proportion of women
among members of
Parliament (%) 24% (2010) 50%
Achievable
probable
4. Reduce
child
mortality
4.1 Under-five mortality rate
(per 1,000 live births) 202 79 (2009) 67 Achievable
4.2 Infant mortality rate (per
1,000 live births) 120 54 (2009) 40 Achievable
4.3 Proportion of children
vaccinated against
measles
95.8 (2009) 100 Achievable
28
-
MDG Goal Indicator Baseline
(1990)
Current
status
2015
Target
Progress at a
Glance
5. Improve
maternal
health
5.1 Maternal Mortality Ratio (per
100,000 live births) 377 (1998) 279 (2010) 170 Not
achievable 5.2 Proportion of births attended
by skilled health personnel
(%) - 43 (2009) 90
Not
achievable
6. Combat
HIV/AIDS,
malaria and
other
diseases
6.1 HIV prevalence, 15-24 years
6.2 Malaria
%
2.5% (2008)
<1%
< 6%
Achievable
7. Ensure
environment
al
sustainability
7.8 Proportion of population
using an improved drinking
water source (:% of rural
population)
35% 60% (2010) 67.5%
Achievable
7.8 Proportion of population
using an improved drinking
water source (% of urban
population)
70% 80% (2010) 85%
Achievable
7.9 Proportion of people with
access to improved
sanitation (Rural/Urban) 26/52
51/75
(2006)
Defining the True North for Zanzibar 30
Transforming Zanzibar
......through an unprecedented socio-economic transformation and development to achieve middle income status; characterized by increasing levels of industrialization, competitiveness, quality livelihoods and good governance and rule of law; and having in place an educated and pro-learning society with distinct culture and values (ZDV 2020)
Zanzibar true north is to attain high GDP growth rate anticipated to be 7.5%
GOVERNMENT OBJECTIVES
Economic Transformation Programme
Enablers
Human Capital Development
Government Transformation Programme
Crosscutting issues
31
Economic Transformation Programme 32
Tourism
S/N Key Issues Key Initiatives Actors
1 Security of tourists: about......
cases of robery were reported in
2012 an increase from ...cases in
previous year
Improve security by increasing patrol
and awereness to the community
Implement Tourism for All Strategy
Commission of
Tourism, Regional
and Districts
offices, Police and
Community
2 Standard and classification: No
categorization of hotels in place
causing difficulty in tax collection
and tourist information
Conduct comprehensive categorization
survey
Commission of
Tourism, OCGS, TRA
and ZRB
3 Stiff competition of tourism
industry
Improve promotion services including
attending international fairs and
preparation of brochures and
magazines ;
Improve domestic tourism;
Renovate historical sites
MDAs, Commission
of Tourism, NGOs,
Tour Operators,
Tour guides
4 Poor linkage supply chain Conduct market study on what to
produce for tourism industry
Commission of
Tourism
Trade 33
S/N Key Issues Key Initiatives Actors
1 Knowledge and
penetration of
international markets,
branding and packaging
Support
implementation of
Zanzibar Export
Development
Strategy
MTIM, ZNCCIA,
Zanzibar
Exporters
Association
(ZEXA)
Light industries 34
S/N Key Issues Key Initiatives Actors
1 Weak
manufacturing/industri
al base and
entrepreneurship
culture
Support Special
economic zones (SEZ)
and entrepreneurship
training
MTIM, ZNCCIA,
2 Barriers to entry Encourage industry
start-up through
reduction in barriers
to entry (licencing,
start up costs)
ZIPA, MTIM,
Agriculture 35
S/N Key Issues Key Initiatives Actors
1 Low domestic production of food Increase
productivity
through irrigation
and use of organic
fertilizer
MANR, farmers,
extension officers
2 Higher level of post- harvest
losses
Support food
preservation and
value addition
MANR, ZNCCIA,
MTIM
3 Crops and livestocks theft Law enforcement MANR, Police,
Community and
MLF
ENABLERS…. Infrastructure 36
S/N Key Issues Key Initiatives Actors
1 Congestion Rehabilitation and Construction
of Town Entry Roads
MoIC, Road
Fund
2 Low handling
capacity at
Zanzibar port
Conduct feasibility study of
Mpigaduri hub port
MoIC,
Zanzibar Port
Corporation
(ZPC)
3 Low handling
capacity at
Zanzibar airports
Conduct feasibility study and
implement the
recommendations of Karume
Airport- Pemba;
Completion of Terminal 2
building in Unguja
MoIC,
Zanzibar
Aviation
Authority
(ZAA)
Energy 37
S/N Key Issue Key Initiative Actors
1 Unreliable power supply
from Mainland
Cunduct feasibility study of
Renewable Energy (Solar,
Wind, and biomass)
MLHWE
2 Price and quality of
utilities
Support establishment and
operationalization of ZURA
MLHWE
Water 38
S/N Key Issue Key Initiative Actors
1 Insufficient and
unreliable supply of
water
Rehabilitate network and
distribution systems;
Conduct study of water
availability and distribution
and implement the
recommendations
ZAWA
Skills development 39
S/N Key Issue Key Initiative Actors
1 Shortage of
instructors, experts
and facilities in
vocational training
centres
Train and recruit experts
and instructors;
Provision of appropriate
facilities
Vocational
Authority,
MoEVT,
2 Weak skills in
economic and social
sectors
Conduct need
assessment on skills
gaps in Tourism, light
industry and agriculture
sectors and implement
the recommendations
Higher learning
Institutions,
MANR, MoICTS,
MTIM
Entrepreneurship 40
S/N Key Issue Key Initiative Actors
1 Weak
entrepreneurshi
p culture
Support
entrepreneurship
training;
Provide facilities
(credit &
equipment) for
entrepreneurs
MTIM,
ZNCCIA and
Higher
learning
Institutions,
Private sector 41
S/N Key Issue Key Initiative Actors
1 Underdevelopment
of private sector
Improve public
private partnership
through policy
formulation and
framework ;
Implement the PPP
policy and
framework
POFEDP,
ZNCCIA,
MTIM
Quality and standards 42
S/N Key Issue Key Initiative Actors
1 Poor quality
of goods and
services
Support Zanzibar
Bureau of
Standards;
Facilitate set up of
quality standards
in MDAs
ZBS, MTIM,
HUMAN CAPITAL……Health 43
S/N Key Issue Key Initiative Actors
1 High child and
maternal mortality,
home delivery and
childhood malnutrition
Improving health services in
particular child and maternal
mortality; Training midwives;
Awareness compaign on
nutrition
MoH
2 Increase of non-
communicable disease
Awareness compaign on non-
communicable disease
MoH
3 Inadequate qualify
doctors and facilities
Train doctors in various
professions;
Provision of health facilities
MoH
4 Sustaining Malaria and
HIV/AIDS
Regular anti malaria spray;
Increase awareness of HIV/AIDS
MoH,
ZAC
Education 44
S/N Key Issue Key Initiative Actors
1 Poor quality
education
Recruit qualify
teachers;
Improve laboratory
facilities
MoEVT
2 Inadequate
schools
infrastructure and
facilities in some
regions
Construction of schools
based on population
demand e.g Urban
West Region
MoEVT
GOVERNMENT TRANSFORMATION
PROGRAMME.. Government Performance and
Delivery
45
S/N Key Issues Key Initiatives Actors
1 Weak
mainstreaming
of national
objectives
Mainstreaming of
national objectives in
MDAs and trickle down
to lower level
MDAs,
POFEDP,
LGAs
2 Absence of key
performance
indicators (KPIs)
Support establishment
of KPIs in all
institutions
MDAs,
POFEDP
Anticorruption 46
S/N Key Issues Key Initiatives Actors
1 Corruption in
public sector
(Procurement,
revenue, judiciary,
employment,
hospital)
Support anti-
corruption bureau;
Implement anti-
corruption policy
and strategy;
Awareness
compaign on
corruption
POPSGG,
Police,
MOJCA, DPP,
POFEDP
Capacity building 47
S/N Key Issue Key Initiative Actors
1 Weak
capacity of
staff
Conduct assessment
of the institutional
infrastructure;
Conduct relevant
training to increase
performance
MDAs
CROSS CUTTING ISSUES...Climate change,
environment and Disaster
48
S/N Key Issue Key Initiative Actors
1 Environmental
degradation
Facilitate Environmental
conservation
FVPO
2 Climate change
vulnerability
Adaptation and mitigation to
climate change
FVPO
3 Poor waste
management
Improve waste management –
sanitation and solid waste
disposal
Zanzibar
Municipa
l Council
4 Disaster prone Facilitate disaster preparedness
and management
SVPO
Gender 49
S/N Key Issue Key Initiative Actors
1 Weak linkages of
gender issues
and planning
Mainstreaming
gender issues in
development
planning
MSWYWCD
Vulnerable groups 50
S/N Key Issue Key Initiative Actors
1 Weak services
to
disadvantaged
and vulnerable
groups
Facilitate measures to
take care of the
vulnerable groups
VPO1,
MDAs
Challenges 51
• Balancing economic growth and protecting socio-cultural values of the people of Zanzibar
• Building a strong domestic Private sector capable of transforming the productive sectors of Zanzibar
• Establishing a prosperous society with an economy that is fully competitive, dynamic, robust and resilient
• Ensuring an economically just society, in which there is a fair and equitable distribution of the wealth of the nation
• Shortage of skills in priority areas like manufacturing and value addition in general
Challenges, cont… 52
• Weak capacity in planning, policy analysis and
monitoring and evaluation
• Absence of planning practices and framework
at local level.
• Inadequate mobilization both domestic and external
resources
• Weak capacity in the development of district plans
and integration district plans into national plan
Conclusion 53
Second half of Vision 2020 is underway, effective implementation of MKUZA II is crucial
Economic Transformation is key to achieve sustainable growth
Capacity and Resources are main challenges, special efforts needed.
Integration of District Plans into National plan
We bank on all stakeholders and friends of Zanzibar in achieving the desired results
We can attain middle income status by 2020 if everybody stay on course.
Ahsanteni 54