NASEB Energy Day

17
1 NASEB Energy Day Chris Advena Transmission Team Lead March 21 and 22, 2005

description

NASEB Energy Day. Chris Advena Transmission Team Lead March 21 and 22, 2005. NEASB Energy Day. PJM Data Sources PJM OASIS http://oasis.pjm.com/indexmain.html PJM eData https://esuite.pjm.com PJM home page http://www.pjm.com. OASIS. Operational Data. OASIS Main. OASIS Data. - PowerPoint PPT Presentation

Transcript of NASEB Energy Day

Page 1: NASEB Energy Day

1

NASEB Energy Day

Chris Advena

Transmission Team Lead

March 21 and 22, 2005

Page 2: NASEB Energy Day

2

NEASB Energy Day

• PJM Data Sources– PJM OASIS

http://oasis.pjm.com/indexmain.html

– PJM eDatahttps://esuite.pjm.com

– PJM home pagehttp://www.pjm.com

Page 3: NASEB Energy Day

3

OASIS

Operational Data

Page 4: NASEB Energy Day

4

OASIS Main

Page 5: NASEB Energy Day

5

OASIS Data

• System Information • Transmission Facilities Descriptions• Dispatch Rates • LMP Prices• Pricing Point Calculator• Emergency Procedures• RTOR Information • Additional RTOR Information as of 02/16/2005• Quad Cities West Information • PJM Coordinated Flowgates as of 01/10/2005• Process of Sharing or Transferring Unused Allocations• Allocation Results as of 03/01/2005

Page 6: NASEB Energy Day

6

OASIS Data

• System Information • Transmission Facilities Descriptions• Dispatch Rates • LMP Prices• Pricing Point Calculator• Emergency Procedures• RTOR Information • Additional RTOR Information as of 02/16/2005• Quad Cities West Information • PJM Coordinated Flowgates as of 01/10/2005• Process of Sharing or Transferring Unused Allocations• Allocation Results as of 03/01/2005

•System Conditions Impacting PJM ATC•PJM Transmission Facilities Complete Descriptions•PJM Transmission Facilities Outage List•PJM Transmission Facilities Outage List new•PJM Dispatch Rates (new 15 second interval) •PJM Real-Time Operational Data LMP, Transfer Limits, Instantaneous Load, and Transmission Constraints•Seven Day PJM Load Projections and Constraint Forecast Information

• Fixed Transmission Rights (FTRs)

Page 7: NASEB Energy Day

7

PJM Dispatch Rates

Page 8: NASEB Energy Day

8

PJM LMP Prices and Operational Data

Page 9: NASEB Energy Day

9

OASIS Main

Page 10: NASEB Energy Day

10

PJM Manuals / Reference

• PJM Tariff• CBM Practices - Man. 2: Transmission Service Request• Regional Practices / Business Rules• OASIS User Guide• NERC Tagging - Priority Codes Job Aid• OASIS Timing Requirements Job Aid• PJM Company Transmission Provider Information• Confirmed Reservations as of 03/09/2005

Page 11: NASEB Energy Day

11

OASIS

Transmission Service

Page 12: NASEB Energy Day

12

OASIS Application Login

•Display ATC•Discounts•Transaction Information•Energy Scheduled•Security

• PJM Info• Post/Read Messages• Company Information• User Information

Page 13: NASEB Energy Day

13

OASIS Transaction Information

Page 14: NASEB Energy Day

14

eData

Real-time Data

Page 15: NASEB Energy Day

15

eData

Page 16: NASEB Energy Day

16

eData

Page 17: NASEB Energy Day

17

eData

• Preferred Layout

• My eData• Energy Contracts• eSuite• IRC Report• Constraints• Activity Log• Announcements• Emergency Messages