Risk Mitigation Strategies
for Compliance TestingJonathan Harben and Paul Reese
Abstract: Many strategies for risk mitigation are now practiced in calibration laboratories. This paper presents a modern look
at these strategies in terms of compliance to ANSL/NCSLI and ISO standards. It distinguishes between Bench Level and
Program Level risk analysis techniques, which each answer different questions about risk mitigation. It investigates concepts
including the test uncertainty ratio (TUR) and end of period reliability (EOPR) that are directly related to risk, as well as the math-
ematical boundary conditions of false accept risk to gain a comprehensive understanding of practical, efcient risk mitigation.
The paper presents practices and principals that can allow a calibration laboratory to meet the demand of customers and manage
risk for multifunction instrumentation, while complying with national and international standards.
1. Background
Calibration is all about condence. In some scenarios, it is important
to have condence that the certied value of a laboratory reference
standard is within its assigned uncertainty limits. In other scenarios,
condence that an instrument is performing within its published ac-
curacy specications may be desired. Condence in an instrument is
often obtained through compliance testing, which is sometimes called
conformance testing, tolerance testing, or verication testing. For
these types of tests, a variety of strategies have historically been used
to manage the risk of falsely accepting non-conforming items and er-
roneously passing them as good. This type of risk is called false
accept risk (also known as FAR, probability of false accept (PFA),
consumers risk, or Type II risk). To mitigate false accept risk, sim-
plistic techniques have often relied upon assumptions or approxima-
tions that were not well founded. However, high condence and low
risk can be achieved without relying on antiquated paradigms or un-
necessary computations. For example, there are circumstances where
a documented uncertainty is not necessary to demonstrate that false
accept risk was held below certain boundary conditions. This is a
somewhat novel approach with far-reaching implications in the eld
of calibration.
While the importance of uncertainty calculations is acknowledged
for many processes (e.g. reference standards calibrations), it might be
unnecessary during compliance tests when historical reliability data is
available for the unit under test (UUT). Many organizations requirea documented uncertainty statement in order to assert a claim of met-
rological traceability [1], but the ideas presented here offer evidence
that acceptance decisions can be made with high condence without
direct knowledge of the uncertainty.
In the simplest terms, when measurement & test equipment
(M&TE) owners send an instrument to the calibration laboratory they
want to know, Is my instrument good or bad? During a compliance
test, M&TE is evaluated using laboratory standards to determine if it
is performing as expected. This performance is compared to speci-
cations or tolerance limits that are requested by the end user or cus-
tomer. These specications are often the manufacturers published
accuracy1specications. The customer is asking for an in-tolerance
or out-of-tolerance decision to be made, which might appear to be
a straightforward request. But exactly what level of assurance does
the customer receive when statements of compliance are issued? Is
simply reporting measurement uncertainty enough? What is the risk
that a statement of compliance is wrong? While alluded to in many
international standards documents, these issues are directly addressed
inANSI/NCSL Z540.3-2006[2].
Since its publication, sub-clause 5.3b of the Z540.3 has, under-
standably, received a disproportionate amount of attention compared
with other sections in the standard [3, 4, 5]. This section represents
a signicant change when compared to its predecessor, Z540-1 [6].
Section 5.3b has come to be known by many as The 2 % Rule
and addresses calibrations involving compliance tests. It states:
Where calibrations provide for verication that measurement quan-
tities are within specied tolerances, the probability that incorrect
acceptance decisions (false accept) will result from calibration tests
shall not exceed 2% and shall be documented. Where it is not prac-
ticable to estimate this probability, the test uncertainty ratio shall be
equal to or greater than 4:1.
Much can be inferred from these two seemingly innocuous state-
ments. The material related to compliance testing in theISO 17025
[7] is sparse, as that standard is primarily focused on reporting uncer-tainties with measurement results, similar toZ540.3section 5.3a. Per-
haps the most signicant reference to compliance testing inISO 17025
is found in section 5.10.4.2 (Calibration Certicates) which states that
When statements of compliance are made, the uncertainty of mea-
surement shall be taken into account. However, practically no guid-
ance in provided regarding the methods that could be implemented to
take the measurement uncertainty into account. The American Asso-
1The term accuracy is used throughout this paper to facilitate the classicalconcept of uncertainty for a broad audience. It is acknowledged thatthe VIM [1] denes accuracy as qualitative term, not quantitative, and that
numerical values should not be associated with it.
TECHNICAL PAPERS
-
7/25/2019 (NASA P.reese J.harben) Risk Mitigation Strategies for Compliance Testing (Measure Article 2012-Mar) Final
2/1239 | NCSLI Measure www.ncsl i.org
TECHNICAL PAPERS
Figure 1. Five possible bench level calibration scenarios.
ciation of Laboratory Accreditation (A2LA)
further claries the requirements associated
with this concept inR205[8]:
When parameters are certied to be within
specied tolerance, the associated uncer-
tainty of the measurement result is properly
taken into account with respect to the toler-
ance by a documented procedure or policy
established and implemented by the labora-
tory that denes the decision rules used by
the laboratory for declaring in or out of tol-
erance conditions.2
Moreover, the VIM [1] has recently added
a new Note 7 to the denition of metrologi-
cal traceability. This note reiterates that the
International Laboratory Accreditation Coop-
eration (ILAC) requires a documented mea-
surement uncertainty for any and all claims of
metrological traceability. However, simply re-
porting the uncertainty along with a measure-
ment result may not satisfy customer require-
ments where compliance tests are desired.
Without having a quantiable control limit
such as false accept risk, this type of reporting
imparts unknown risks to the customer.
The methods presented in this paper pro-
vide assurance that PFA risks are held be-
low a specied maximum permissible value
(2 %) without direct knowledge of the un-
certainty. However, they may not satisfy the
strict language of national and international
documents, which appear to contain an im-
plicit requirement to document measurement
uncertainties for all calibrations.
Where compliance tests are involved,
the intent of the uncertainty requirements
may (arguably) be to allow an opportunity
to evaluate the risks associated with pass/
fail compliance decisions. If this is indeedthe intent, then the ideas presented here can
provide the same opportunity for evalua-
tion without direct knowledge of the uncer-
tainty. Because considerable effort is often
required to generate uncertainty statements,
it is suggested that accreditation bodies ac-
cept the methods described in this paper as
an alternative solution for compliance testing.
2. Taking the Uncertainty
Into Account
What does it mean to take the uncertainty
into account and why it is necessary? For
an intuitive interpretation, refer to Fig. 1. Dur-
ing a compliance test on the bench, what are
the decision rules if uncertainty is taken into
account? For example, during the calibration,
the UUT might legitimately be observed to be
in-tolerance. However, the observation could
be misleading or wrong as illustrated in Fig. 1.
It is understood that all measurements are
only estimates of the true value of the measur-
and; this true value cannot be exactly known
due to measurement uncertainty. In scenario
#1, a reading on a laboratory standard volt-
meter of 9.98 V can condently lead to an in-
tolerance decision (pass) for this 10 V UUT
source with negligible risk. This is true due to
sufciently small uncertainty in the measure-
ment process and the proximity of the mea-
sured value to the tolerance limit. Likewise,a non-compliance decision (fail) resulting
from scenario #5 can also be made with high
condence, as the measured value of 9.83 V
is clearly out-of-tolerance. However, in sce-
narios #2, #3, and #4, there is signicant risk
that a pass/fail decision will be incorrect.
AuthorsJonathan Harben
The Bionetics Corporation
M/S: ISC-6175
Kennedy Space Center, FL 32899
Paul Reese
Covidien, Inc.
815 Tek Drive
Crystal Lake, IL 60014
2The default decision rule is found in
ILAC-G8:1996[9], Guidelines on Assessment
and Reporting of Compliance with Specication,section 2.5. With agreement from the customer,other decision rules may be used as provided for
in this section of the requirements.
-
7/25/2019 (NASA P.reese J.harben) Risk Mitigation Strategies for Compliance Testing (Measure Article 2012-Mar) Final
3/1240 | NCSLI Measure www.ncsl i.org
TECHNICAL PAPERS
In scenarios, #2, #3, & #4, this uncer-
tainty makes it possible for the true value of
the measurand to be either in or out of toler-
ance. Consider scenario #3, where the UUT
was observed at 9.90 V, exactly at the lower
allowable tolerance limit. Under such condi-
tions, there is a 50 % probability that either an
in-tolerance or out-of-tolerance decision will
be incorrect, barring any other information.
In fact, even for standards with the lowest
possible uncertainty, the probability of being
incorrect will remain at 50 % in scenario #33.
This concept of bench level risk is addressed
in several documents [9, 10, 11, 12].
The simple analysis of the individual
measurement results presented above is not
directly consistent with the intent of The
2 % rule in Z540.3, although it still has
application. Until now, our discussion has
dealt exclusively with bench level analysis
of measurement decision risk. That is, riskwas predicated only on knowledge of the
relationship between the UUT tolerance, the
measurement uncertainty, and the observed
measurement result made on-the-bench.
However, the computation of false accept
risk, for strict compliance with the 2 % rule
inZ540.3, does not depend on any particular
measurement, nor does it depend on its prox-
imity to a given UUT tolerance limit. Instead,
the 2 % rule in Z540.3addresses the risk at
the program level, prior to obtaining a mea-
surement result. To understand both bench
level and program level false accept risk, theintent underlying the 2 % rule and its relation-
ship to TUR and EOPR4must be examined.
3. The Answer to Two Different
Questions
False accept risk describes the overall prob-
ability of false acceptance when pass/fail
decisions are made. False accept risk can be
interpreted and analyzed at either the bench
level or the program level [4]. Both risk lev-
els are described in ASME Technical Report
B89.7.4.1-2005[13]. The ASME report refers
to bench level risk mitigation as controlling
the quality of individual workpieces, while
program level risk strategies are described
as controlling the average quality of work-
pieces. Bench level risk can be thought of as
an instantaneous liability at the time of mea-
surement, whereas program level risk speaks
more to the average probability that incorrect
acceptance decisions will be made based on
historical data. These two approaches are
related, but result in two answers to two dif-
ferent questions. Meeting a desired quality
objective requires an appropriate answer to
an appropriate question, and ambiguity in the
question itself can lead to different assump-
tions regarding the meaning of false accept
risk. Many international documents discuss
only the bench level interpretation of risk,
and require an actual measurement result to
be available [9, 10, 11, 12]. These documents
describe the most basic implementation of
bench level risk, where no other pre-mea-surement state of knowledge exists. They
address the instantaneous false accept risk
associated with an acceptance decision for a
single measured value, without the additional
insight provided by historical data. This most
basic of bench level techniques is sometimes
called the condence level method. How-
ever, if a-priori data exists, a more rigor-
ous type of bench-level analysis is possible
using Bayesian methods. By employing prior
knowledge of reliability data, Bayesian anal-
ysis updates or improves the estimate of risk.
The Z540.3 standard, however, was in-tended to address risk at the program level
[14]. When this standard requires the
probability that incorrect acceptance deci-
sions (false accept) will result from calibra-
tion tests shall not exceed 2%.., it might
not be evident which view point is being ad-
dressed, the bench level or the program lev-
el. The implications of this were signicant
enough to prompt NASA to request interpre-
tive guidance from the NCSLI 174 Standards
Writing Committee [15]. It was afrmed that
the 2 % false accept requirement applies to
a population of like calibration sessions or
like measurement processes [14]. As such,
Z540.3section 5.3b does not directly address
the probability of false accept to any single,
discrete measurement result or individual
workpiece and supports the program level
view of risk prior to, and independent of, any
particular measurement result.
In statistical terms, the 2 % rule refers to
the unconditional probability of false accep-
tance. In terms of program level risk, false
accept risk describes the overall or average
probability of false acceptance decisions to
the calibration program at large. It does not
represent risk associated with any particular
instrument. The 2 % rule speaks to the fol-
lowing question: Given a historical collec-
tion of pass/fail decisions at a particular test-
point for a population of like-instruments (i.e.
where the EOPR and TUR are known), what
is the probability that an incorrect acceptance
decision will be made during an upcoming
test? Note that no measurement results are
provided, and that the question is being asked
before the scheduled measurement is ever
made and the average risk is controlled for
future measurements. Even so, the question
can be answered as long as previous EOPR
data on the UUT population is available, and
if the measurement uncertainty (and thus
TUR) is known. In certain circumstances, it
is also possible to comply with the 2 % ruleby bounding or limiting false accept risk us-
ing either:
EOPR data without knowledge of the
measurement uncertainty.
TUR without knowledge of EOPR data.
To understand how this is possible, a
closer look at the relationship between false
accept risk, EOPR, and TUR is helpful.
4. End of Period Reliability (EOPR)
EOPR is the probability of a UUT test-point
being in-tolerance at the end of its normal
calibration interval. It is sometimes known as
in-tolerance probability and is derived from
previous calibrations. In its simplest form,
EOPR can be dened as
EOPR =Number of in-tolerance results
Total number of calibrations. (1)
If prior knowledge tells us that a signicant
number of previous measurements for a pop-
ulation of UUTs were very close to their tol-
erance limits as-received, it can affect thefalse accept risk for an upcoming measure-
ment. Consider Fig. 2 where two different
model UUT voltage sources are scheduled
for calibration, model A and model B. The
ve previous calibrations on model As have
shown these units to be highly reliable; see
Group A. Most often, they are well within
their tolerance limits and easily comply with
their specications. In contrast, previous
model B calibrations have seldom met their
specications; see Group B. Of the last ve
3Bayesian analysis can result in false accept riskother than 50 % in such instances, where the a
priori in-tolerance probability (EOPR) of the UUTis known in addition to the measurement resultand uncertainty.
4The subject of measurement decision risk
includes not only the probability of false-accept(PFA), but the probability of correct accept(PCA), probability of false reject (PFR) and theprobability of correct reject (PCR). While falserejects can have signicant economic impact to
the calibration lab, the discussion in this paper is
primarily limited to false accept risk.
-
7/25/2019 (NASA P.reese J.harben) Risk Mitigation Strategies for Compliance Testing (Measure Article 2012-Mar) Final
4/1241 | NCSLI Measure www.ncsl i.org
TECHNICAL PAPERS
calibrations, two model Bs were recorded
as being out-of-tolerance and one of them
was barely-in. Therefore, making an in or
out of tolerance decision will be a precari-
ous judgment call, with a high probability of
making a false accept decision.
In Fig. 3, imagine the measurement result
is not yet shown on the chart. If it was known
ahead of time that this upcoming measure-
ment result would be near the tolerance limit,
it can be seen that a false accept would indeed
be more likely given the uncertainty of the
measurement. The critically important point
is this -- if the historical reliability data in-
dicates that in-tolerance probability (EOPR)
of the UUT is poor (up to a point5), the false
accept risk increases.
The previous scenarios assume familiar-
ity with populations of similar instruments
that are periodically recalibrated. But how
can EOPR be reconciled when viewed from
a new laboratorys perspective? Can a
5Graphs of EOPR vs. false-accept risk can reveal
a perceived decrease in false-accept risk as theEOPR drops below certain levels. This is due tothe large number of out-of-tolerance conditions
that lie far outside the UUT tolerance limits. Thisis discussed later in this paper.
Figure 2. Previous historical measurement data can inuence future false accept risk.
Figure 3. The possibility of a false accept for a measurement result.
-
7/25/2019 (NASA P.reese J.harben) Risk Mitigation Strategies for Compliance Testing (Measure Article 2012-Mar) Final
5/1242 | NCSLI Measure www.ncsl i.org
TECHNICAL PAPERS
new laboratory open its doors for business
and meet the 2 % false accept requirement
of Z540.3without EOPR data? The answer
is yes. However, the new laboratory must
employ bench level techniques, or techniques
such as boundary condition methods or
guardbanding. Such methods are described
later in this paper. This same logic would ap-
ply to an established laboratory that receives
a new, unique instrument to calibrate for the
rst time. In the absence of historical data,
other appropriate techniques and/or bench
level methods must be employed.
If EOPR data or in-tolerance probability
is important for calculating risk, several other
questions are raised. For example, how good
must the estimate of EOPR be before pro-
gram level methods can be used to address
false accept risk for a population of instru-
ments? When is the collection of measure-
ment data complete? What are the rules forupdating EOPR in light of new evidence?
Sharing or exchanging EOPR data between
different laboratories has even been proposed
with varying opinions. Acceptance of this
generally depends upon the consistency of
the calibration procedure used and the labo-
ratory standards employed. The rules used
to establish EOPR data can be subjective
(for example, how many samples are avail-
able, are rst-time calibrations counted, are
broken instruments included, are late calibra-
tions included, and so on). Instruments can
be grouped together by various classica-tions, such as model number. For example,
reliability data for the M&TE model and
manufacturer level can be used to conserva-
tively estimate the reliability of the M&TE
test point. This is addressed in compliance
Method 1 & 2 of theZ540.3Handbook [16].
5. Test Uncertainty Ratio
It has been shown that EOPR can affect the
false accept risk of calibration processes.
However, test uncertainty ratio (TUR) is like-
ly to be more familiar than EOPR as a metric
of the quality of calibration. The preced-
ing examples show that a lower uncertainty
generally reduces the likelihood of a false
accept decision. The TUR has historically
been viewed as the uncertainty or tolerance
of the UUT in the numerator divided by the
uncertainties of the laboratorys measurement
standard(s) in the denominator [17]. A TUR
greater than 4:1 was thought to indicate a ro-
bust calibration process.
The TUR originated in the Navys Produc-
tion Quality Division during the 1950s in
an attempt to minimize incorrect acceptance
decisions. The origins of the ubiquitous 4:1
TUR [18] assume a 95 % in-tolerance prob-
ability for both the measuring device and the
UUT. In those pre-computer days, these as-
sumptions were necessary to ease the compu-
tational requirements of risk analysis. Since
then, manufacturers specications have of-
ten been loosely inferred to represent 2 or
95 % condence for many implementations
of TUR, unless otherwise stated. In other
words, it is assumed that all UUTs will meet
their specications 95 % of the time (i.e.
EOPR will be 95 %). Even if the calibration
personnel did not realize it, they were relying
on these assumptions to gain any utility out of
the 4:1 TUR. However, is the EOPR for all
M&TE really 95 %? That is, are all manufac-
turers specications based on two standard
deviations of the product distribution? If theyare not, then the time-honored 4:1 TUR will
not provide the expected level of protection
for the consumer.
While the spirit ofZ540.3is to move away
from the reliance on TUR altogether, its use is
still permitted if adherence to the 2 % rule is
deemed impracticable. The use of the TUR
is discouraged due to the many assumptions it
relies on for controlling risk. However, given
that the false accept risk computation requires
the collection of EOPR data, the use of TUR
might be perceived as an easy way for labs
to circumvent the 2 % rule. Section 3.11 inZ540.3redenes TUR as:
The ratio of the span of the tolerance of a
measurement quantity subject to calibration,
to twice the 95% expanded uncertainty of the
measurement process used for calibration.
At rst, this denition appears to be simi-
lar to older denitions of TUR. The deni-
tion implies that if the numerator, associated
with the specication of the UUT, is a plus-
or-minus () tolerance, the entirespanof the
tolerance must be included. However, this is
countered by the requirement to multiply the
95 % expanded uncertainty of the measure-
ment process in the denominator by a factor
of two. The condence level associated with
the UUT tolerance is undened. This quanda-
ry is not new, as assumptions about the level
of condence associated with the UUT (nu-
merator) have been made for decades.
There is, however, a distinct difference
between the TUR as dened in Z540.3 and
previous denitions. This difference centers
on the components of the denominator. In
Z540.3, the uncertainty in the denominator is
very specically dened as the uncertainty
of the measurement process used in calibra-
tion. This denition has broader implica-
tions than historical denitions because it
includes elements of the UUT performance
(for example, resolution and process repeat-
ability) in the denominator. Many laborato-
ries have long assumed that the uncertainty
of the measurement process, as it relates to
the denominator of TUR, should encompass
all aspects of the laboratory standards, envi-
ronmental effects, measurement processes,
etc., but not the aspects of the UUT. His-
torically, the TUR denominator reected the
capability of the laboratory to make highly
accurate measurements, but this capability
was sometimes viewed in the abstract sense,
and was independent of any aspects of theUUT. The redened TUR in the Z540.3 in-
cludes everything that affects a laboratorys
ability to accurately perform a measurement
on a particular device in the expanded uncer-
tainty, including UUT contributions. This
was reiterated to NASA in another response
from the NCSLI 174 Standards Writing Com-
mittee [19].
The new denition of TUR is meant to
serve as a single simplistic metric for evaluat-
ing the plausibility of a proposed compliance
test with regard to mitigating false accept
risk. No distinction is made as to where therisk originates, it could originate with either
the UUT or the laboratory standard(s). A
low TUR does not necessarily imply that the
laboratory standards are not good enough.
It might indicate, however, that the measure-
ment cannot be made without signicant false
accept risk due to the limitations of the UUT
itself. Such might be the case if the accuracy
specication of a device is equal to its resolu-
tion or noise oor. This can prevent a reliable
pass/fail decision from being made.
When computing TUR with condence
levels other than 95 %, laboratories have
sometimes attempted to convert the UUT
specications to 2 before dividing by the
expanded uncertainty (2) of the measure-
ment process. Or, equivalently, UUT specs
were converted to 1 for division by the
standard uncertainty (1) of the measure-
ment process. Either way, this was believed
by some to provide a more useful apples-to-
apples ratio for the TUR. Efforts to develop
an equivalent or normalized TUR have been
-
7/25/2019 (NASA P.reese J.harben) Risk Mitigation Strategies for Compliance Testing (Measure Article 2012-Mar) Final
6/1243 | NCSLI Measure www.ncsl i.org
TECHNICAL PAPERS
documented by several authors [18, 20, 21,
22]. However, the integrity of a TUR depends
upon the level of effort and honesty demon-
strated by the manufacturer when assigning
accuracy specications to their equipment.
It is important to know if the specications
are conservative and reliable, or if they were
produced by a marketing department that was
motivated by other factors.
6. Understanding Program Level False
Accept Risk
Investigating the dependency of false accept
risk on EOPR and TUR is well worth the ef-
fort involved. The reader is referred to several
papers that provide an excellent treatment of
the mathematics behind the risk requirements
at the program level [3, 4, 23, 24, 25]. These
publications and many others build upon the
seminal works on measurement decision risk
by Eagle, Grubbs, Coon, & Hayes [18, 26, 27]
and should be considered required reading.
This discussion is more conceptual in
nature, but a brief overview of some funda-
mental principles is useful. As stated earlier,
M&TE tolerance limits are often set by the
manufacturers accuracy specications. The
device may be declared in-tolerance if the
UUT is observed to have a calibration result
eobsthat is within the tolerance limits L. This
can be written as L eobs L.The observed
calibration result eobsis related to the actual or
true UUT error euutand the measurement pro-
cess error estdby the equation eobs = euut + estd.Note that the quantity euutis the parameter be-
ing sought when a calibration is performed,
but eobsis what is obtained from the measure-
ment. The value of euutis always an estimate
due to the possibility of measurement process
errors estddescribed by uncertainty U95. It is
not possible to determine euutexactly.
Errors (such as euut and estd), as well as
measurement observations (such as eobs), are
quantities represented by random variables
and characterized by probability density
functions. These distributions represent the
relative likelihood of any specic error (euut
and estd) or measurement observation (eobs)
actually occurring. They are most often of
the Gaussian form or normal distribution and
are described by two parameters, a mean or
average , and a standard deviation . The
standard deviation is a measure of the vari-
ability or spread in the values from the mean.
The mean of all the possible error values
will be zero, which assumes systematic ef-
fects have been corrected. Real-world mea-
Figure 4. The probability density of possible measurement results.
Figure 5. Topographical contour map with tolerance limits (L) and regionsof incorrect compliance decisions.
-
7/25/2019 (NASA P.reese J.harben) Risk Mitigation Strategies for Compliance Testing (Measure Article 2012-Mar) Final
7/1244 | NCSLI Measure www.ncsl i.org
TECHNICAL PAPERS
surements are a function of both () charac-
terized by the UUT performance uutand the
measurement eobswith associated uncertainty
, where obs = uut+ std. The relative like-
lihood of all possible measurement results is
represented by the two dimensional surface
area created by the joint probability distribu-
tion given by(, eobs) = () (std). Fig-
ures 4 and 5 illustrate the concept of prob-
ability density of measurement and represent
the relative likelihood of possible measure-
ment outcomes given the variables TUR and
EOPR. It is assumed that measurement un-
certainty and the UUT distribution follow a
normal or Gaussian probability density func-
tion, yielding a bivariate normal distribution.
Figure 5 is a top-down perspective of Fig. 4,
when viewed from above.
The height, shape, and angle of the joint
probability distribution change as a function
of input variables TUR and EOPR. The dy-namics of this are critical, as they dene the
amount of risk for a given measurement sce-
nario. The nine regions in Fig. 5 are dened
by two-sided symmetrical tolerance limits.
Risk is the probably of a measurement oc-
curring in either the false accept regions or
the false reject regions. Computing an actual
numeric value for the probability (PFA or
PFR) involves integrating the joint probabil-
ity density function over the appropriate two
dimensional surface areas (regions) dened
by the limits stated below. Incorrect (false)
acceptance decisions are made when euut >|L| and L eobs L. In this case, the UUT
is truly out of tolerance, but is observed to
be in tolerance. Likewise incorrect (false) re-
ject decisions are made when eobs >|L| andL
euut L, or where the UUT is observed to
be out of tolerance, but is truly in tolerance.
Integration over the entire joint probability
region will yield a value of 1, as would be
expected. This encompasses 100 % of the
volume under the surface of Fig. 4. When
the limits of integration are restricted to the
two false accept regions shown in Fig. 5, a
small portion of the total volume is computed
which represents the false accept risk as a
percentage of that total volume.
In the ideal case, if the measurement un-
certainty was zero, the probability of mea-
surement errors estdoccurring would be zero.
The measurements would then perfectly re-
ect the behavior of the UUT and the distri-
bution of possible measurement results would
be limited to the distribution of actual UUT
errors. That is, (obs) would equal (uut)
and the graph in Fig. 5 would collapse to a
straight line at a 45 angle and the width in
Fig. 4 would collapse to a simple two dimen-
sional surface with zero volume. However,
since real-world measurements are always
hindered by the probability of errors, obser-
vations do not perfectly reect reality and
risk results. In this case, the angle is given by
tan() = obs
uut
,where 45 90.
7. Efficient Risk Mitigation
In order for a calibration laboratory to comply
with Z540.3 (5.3b), the program level PFA
must not exceed 2 % and must be document-
ed. However, computing an actual value for
PFA is not necessarily required when demon-
strating compliance with the 2 % rule. To un-
derstand this, consider that the boundary con-
ditions of PFA can be investigated by varying
the TUR and EOPR over a wide range of val-
ues and observing the resultant PFA. This isbest illustrated by a three dimensional surface
plot, where the x and y axis represent TUR
and EOPR, and the height of the surface on
the z-axis represents PFA (Fig. 6 and 7).
This surface plot combines both aspects
affecting false accept risk into one visual
representation that illustrates the relationship
between the variables TUR and EOPR. One
curious observation is that the program level
PFA can never be greater than 13.6 % for any
combination of TUR and EOPR. The maxi-
mum value of 13.6 % occurs when the TUR
is approximately 0.3:1 and the EOPR is 41%. Any change, higher or lower, for either
the TUR or EOPR will result in a PFA lower
than 13.6 %.
One particularly useful observation is that,
for all values of EOPR, the PFA never ex-
ceeds 2 % when the TUR is above 4.6:1. In
Figures 6 and 7, the darkest blue region of the
PFA surface is always below 2 %. Even if the
TUR axis in the above graph were extended
to innity, the darkest blue PFA region would
continue to fall below the 2 % threshold. Cal-
ibration laboratory managers will nd this to
be an efcient risk mitigation technique for
compliance withZ540.3. The burden of col-
lecting, analyzing, and managing EOPR data
can be eliminated when the TUR is greater
than 4.6:1.
This concept can be further illustrated by
rotating the perspective (viewing angle) of
the surface plot in Fig. 6, allowing the two
dimensional maximum outer-envelope or
boundary to be easily viewed. With this per-
spective, PFA can be plotted only as a func-
tion of TUR (Fig. 8). In this instance, the
worst-case EOPR is used whereby the maxi-
mum PFA is produced for each TUR.
The left-hand side of the graph in Fig.
8 might not appear intuitive at rst. Why
would the PFA suddenly decrease as the
TUR drops below 0.3:1 and approaches zero?
While a full explanation is beyond the scope
of this paper, the answer lies in the number of
items rejected (falsely or otherwise) when an
extremely low TUR exists. This causes the
angle of the joint probability distribution to
rotate counter-clockwise away from the ideal
45 line, shifting areas of high density away
from the false accept regions illustrated in
Fig. 5. For a very low TUR, there are indeed
very few false accepts and very few correct
rejects. The outcome of virtually all mea-
surement decisions is then distributed over
the correct accept and false reject regions as
approaches 90. It would be impractical for acalibration laboratory to operate under these
conditions, although false-accepts would be
exceedingly rare.
Examining the boundary conditions of
the surface plot also reveals that the PFA is
always below 2 % where the true EOPR is
greater than 95 %. This is true even with ex-
tremely low TURs (even below 1:1). Again,
if the perspective of the PFA surface plot in
Fig. 6 is properly rotated, a two dimensional
outer-envelope is produced whereby PFA can
be plotted only as a function of EOPR (Fig.
9). The worst-case TUR is used for each andevery point of the Fig. 9 curve, maximizing
the PFA, and illustrating that knowledge of
the TUR is not required.
As was the case with a low TUR, a simi-
lar phenomenon is noted on the left-hand
side of the graph in Fig. 9; the maximum PFA
decreases for true EOPR values below 41 %.
As the EOPR approaches zero on the left
side, most of the UUT values lie far outside
of the tolerance limits. When the values are
not in close proximity to the tolerance limits,
the risk of falsely accepting an item is low.
Likewise on the right-hand side of the graph,
where the EOPR is very good (near 100 %),
the false accept risk is low. Both ends of the
graph represent areas of low PFA because
most of the UUT values have historically
been found to lie far away from the tolerance
limits. The PFA is highest, in the middle of
the graph, where EOPR is only moderately
poor, and where much of the data is near the
tolerance limits.
-
7/25/2019 (NASA P.reese J.harben) Risk Mitigation Strategies for Compliance Testing (Measure Article 2012-Mar) Final
8/1245 | NCSLI Measure www.ncsl i.org
TECHNICAL PAPERS
8. True Versus Observed EOPR
Until now, this discussion has been limited to
the concept of true EOPR. The idea of a
true EOPR implies that a value for reliabil-
ity exists that has not been inuenced by any
non-ideal factors, but of course, this is not the
case. In the calibration laboratory, reliability
data is collected from real-world observa-
tions or measurements. The measurements
of UUTs are often made by comparing them
to reference standards with very low uncer-
tainty under controlled conditions. But even
the best available standards have nite uncer-
tainty, and the UUT itself often contributes
noise and other undesirable effects. Thus, the
observed EOPR is never a completely accu-
rate representation of the true EOPR.
The difference between the observed and
true EOPR becomes larger as the measure-
ment uncertainty increases and the TUR
drops. A low TUR can result in a signicant
deviation between what is observed and what
is true regarding the reliability data [23, 28,
29, 30]. The reported or observed EOPR
from a calibration history includes all inu-
ences from the measurement process. In this
case, the standard deviation of the observed
Figure 6. Surface plot of false accept risk as a function of TUR and EOPR.
Figure 7. Topographical contour map of false accept risk as a function of TUR and EOPR.
-
7/25/2019 (NASA P.reese J.harben) Risk Mitigation Strategies for Compliance Testing (Measure Article 2012-Mar) Final
9/1246 | NCSLI Measure www.ncsl i.org
TECHNICAL PAPERS
distribution is given by obs
= uut
2 +std
2
where and stdare derived from statisti-
cally independent events. The corrected or
true standard deviation can be approximat-
ed by removing the effect of measurement
uncertainty and solving for uut
= obs
2 std
2
where uutis the true distribution width rep-
resented by standard deviation.
The above equation shows that the stan-
dard deviation of the observed EOPR data is
always worse (higher) than the true EOPR
data. That is, the reliability history main-
tained by a laboratory will always cause the
UUT data to appear to be further dispersed
than what is actually true. This results in an
89 % observed EOPR boundary condition
where the PFA is less than 2 % for all pos-
sible values of TUR6(Fig. 10).
If measurement uncertainty is thought of
as noise, and the EOPR is the measurand,
then the observed data will have greater vari-
ability or scatter than the true value of the
6When correcting EOPR under certain conditions,low TUR values can result in imaginary values
for uut. This can occur where uutand stdarenot statistically independent and/or the levels ofcondence associated with stdand/or uut havebeen misrepresented.
Figure 8. Worst case false accept risk vs. TUR.
Figure 9. Worst case false accept risk vs. EOPR.
-
7/25/2019 (NASA P.reese J.harben) Risk Mitigation Strategies for Compliance Testing (Measure Article 2012-Mar) Final
10/12
-
7/25/2019 (NASA P.reese J.harben) Risk Mitigation Strategies for Compliance Testing (Measure Article 2012-Mar) Final
11/1248 | NCSLI Measure www.ncsl i.org
TECHNICAL PAPERS
that, for 4.6, the multiplierM2% is < 0. This
implies that a calibration lab could actually
increase the acceptance limits Abeyond the
UUT tolerancesLand still comply with the
2 % rule. While not a normal operating proce-
dure for most calibration laboratories, setting
guard band limits outside the UUT tolerance
limits is possible while maintaining compli-
ance with the program level risk requirement
of Z540.3. In fact, laboratory policies often
require items to be adjusted back to nominal
for observed errors greater than a specied
portion of their allowable tolerance limitL.
10. Conclusion and Summary
Organizations must determine if risk is to be
controlled for individual workpieces at the
bench level, or mitigated for the population of
items at the program level7. Computation of
PFA at the program level requires the integra-
tion of the joint probability density function.
The input variables to these formulas can bereduced to EOPR and TUR. The 2 % PFA
maximum boundary condition, formed by ei-
ther a 4.6:1 TUR or an 89 % observed EOPR,
can greatly reduce the effort required to man-
age false accept risk for a signicant portion
of the M&TE submitted for calibration. Ei-
ther or both boundary conditions can be lev-
eraged depending on the available data, pro-
viding benet to practically all laboratories.
However, there will still be instances where
the TUR is lower than 4.6: 1 and the observed
EOPR is less than 89 %. In these instances,
it is still possible for the PFA to be less than
2 %. A full PFA computation is required to
show the 2 % requirement has not been ex-
ceeded. However, other techniques can be
employed to ensure that the PFA is held below
2 % without an actual computation.
There are six methods listed in theZ540.3
Handbook for complying with the 2 % false
accept risk requirement [16]. These methods
encompass both program level and bench
level risk techniques. This paper has speci-
cally focused on some efcient approaches
for compliance with the 2 % rule, but it does
not negate the use of other methods nor imply
that the methods discussed here are necessar-
ily the best. The basic strategies outlined here
for handling risk without rigorous computa-
tion of PFA are:
Analyze EOPR data. This will most like-
ly be done at the instrument-level, as op-posed to the test-point level, depending on
data collection methods. If the observed
EOPR data meets the required level of 89
%, then the 2 % PFA rule has been satised.
If this is not the case, then further
analysis is needed and the TUR must
be determined at each test point. If the
analysis reveals that the TUR is greater
than 4.6:1, no further action is neces-
sary and the 2 % PFA rule has been met.
If neither the EOPR nor TUR threshold
is met, a Method #6 guardband can be
applied.
Compliance with the 2 % rule can be ac-
complished by either calculating PFA and/or
limiting its probability to less than 2% by the
methods presented above. If these methods
are not sufcient, alternative methods of miti-
gating PFA are available [16]. Of course, no
amount of effort on the part of the calibration
laboratory can force a UUT to comply with
unrealistic expectations of performance. In
some cases, contacting the manufacturer with
this evidence may result in the issuance of
revised specications that are more realistic.
Assumptions, approximations, estima-
tions, and uncertainty have always been part
of metrology, and no process can guarantee
that instruments will provide the desired ac-
curacy, or function within their assigned tol-
erances during any particular application oruse. However, a well-managed calibration
process can provide condence that an in-
strument will perform as expected and within
limits. This condence can be quantied via
analysis of uncertainty, EOPR, and false ac-
cept risk. Reducing the number of assump-
7Bayesian analysis can be performed to determine
the risk to an individual workpiece using both themeasured value on the bench and program-levelEOPR data to yield the most robust estimate of
false accept risk [31].
Figure 11. Guardband multiplier for acceptable risk limits as a function of TUR.
-
7/25/2019 (NASA P.reese J.harben) Risk Mitigation Strategies for Compliance Testing (Measure Article 2012-Mar) Final
12/12
TECHNICAL PAPERS
tions and improving the estimations involved during calibration can
not only increase condence, but also reduce risk and improve quality.
11. Acknowledgements
The authors thank the many people who contributed to our under-
standing of the subject matter presented here. Specically, the con-
tributions of Perry King (Bionetics), Scott Mimbs (NASA), and Jim
Wachter (Millennium Engineering and Integration) at Kennedy Space
Center were invaluable. Several graphics were generated using PTCs
MathCad 14. Where numerical methods were more appropriate,
Microsoft Excel was used incorporating VBA functions developed
by Dr. Dennis Jackson of the Naval Surface Warfare Center in Corona,
California.
12. References
[1] JCGM, International vocabulary of metrology Basic
and general concepts and associated terms (VIM), JCGM
200:2008, 2008.
[2] ANSI/NCSLI, Requirements for the Calibration of Measuring
and Test Equipment,ANSI/NCSL Z540.3:2006, 2006.
[3] D. Deaver and J. Somppi, A Study of and Recommendations
for Applying the False Acceptance Risk Specification of
Z540.3,Proceedings of the Measurement Science Conference,
Anaheim, California, 2010.
[4] H. Castrup, Risk Analysis Methods for Complying with
Z540.3,Proceedings of the NCSL International Workshop and
Symposium, St. Paul, Minnesota, 2007.
[5] M. Dobbert, A Pragmatic Method for Pass/Fail Conformance
Reporting that Complies with ANSI Z540.3, ISO 17025, and
ILAC-G8,Proceedings of the NCSL International Workshop
and Symposium, Providence, Rhode Island, 2009.
[6] ANSI/NCSLI, Calibration & Measurement & Test Equipment- General Requirements,ANSI/NCSL Z540.1:2002, 2002
[7] ISO/IEC, General requirements for the competence of testing
and calibration laboratories,ISO/IEC 17025:2005(E), 2005.
[8] A2LA, Specifi c Requirements: Calibrat ion Laboratory
Accreditation Program,A2LA:R205, 2011.
[9] ILAC, Guidelines on Assesment and Reporting of Compliance
with Specification (based on measurements and tests in a
laboratory),ILAC-G8:1996, 1996.
[10] UKAS, The Expression of Uncertainty and Confidence in
Measurement (Appendix M), UKAS:M3003, 2007.
[11] ASME, Guidelines for Decisio n Rules: Considering
Measurement Uncertainty in Determining Conformance to
Specications,ASME B89.7.3.1-2001, 2001.[12] ISO, Geometrical Product Specications (GPS) - Inspection by
measurement of workpieces and measuring equipment - Part 1:
Decision Rules for proving conformance or non-conformance
with specications,ISO-14253-1:1998(E), 1998.
[13] ASME, Measurement Uncertainty Conformance Testing: Risk
Analysis,ASME B89.7.4.1-2005(Technical Report), 2006.
[14] NCSLI, Response to NASA Interpretation Request (IR2),
NCSLI 174 Standards Writing Committee, March 2008.
[15] S. Mimbs, Request for Interpretation; Correspondence Letter,
July 2007.
[16] ANSI/NCSLI, Handbook for the Application of ANSI/NCSL
Z540.3:2006 - Requirements for the Calibration of Measuring
and Test Equipment,ANSI/NCSL Z540.3 Handbook, 2009.
[17] J. Bucher, ed., The Metrology Handbook, American Society for
Quality, Measurement Quality Division, ASQ Quality Press,
ISBN 0-87389-620-3, 2004.
[18] J. Hayes, Factors Affecting Measuring Reliabi lity, U.S.
Naval Ordnance Laboratory Technical Memorandum No. 63-
106, October 1955.
[19] NCSLI, Response to NASA Interpretation Request (IR1),
NCSLI174 Standards Writing Committee, March 2008.
[20] M. Nicholas and L. Anderson, Guardbanding Using Automated
Calibration Software,Proceedings of the NCSL International
Workshop and Symposium, Salt Lake City, Utah, 2004.
[21] Fluke Corporation, Calibration: Philosopy in Practice, ISBN:
978-0963865007, May 1994.[22] T. Skwircznski, Uncertainty of the calibrating instrument,
condence in the measurement process and the relation between
them,International Organization of Legal Metrology (OIML)
Bulletin, vol. XLII, no.3, July 2001.
[23] NASA, Estimation and Evaluation of Measurement Decision
Risk, NASA Measurement Quality Assurance Handbook
ANNEX 4,NASA-HDBK-8739.19-4, July 2010.
[24] M. Dobbert, Understanding Measurement Decision Risk,
Proceedings of the NCSL Internat ional Workshop and
Symposium, St. Paul, Minnesota, 2007.
[25] M. Dobbert, A Guard Band Strategy for Managing False
Accept Risk,Proceedings of the NCSL International Workshop
and Symposium, Orlando, Florida, 2008, .
[26] A. Eagle, A Method for Handling Error in Testing and
Measuring,Industrial Quality Control, March 1954.
[27] F. Grubbs and H. Coon, On Setting Test Limits Relative to
Specication Limits,Industrial Quality Control, March 1954.
[28] S. Mimbs, Measurement Decision Risk - The Importance
of Definitions, Proceedings of the Measurement Science
Conference, Anaheim, California, 2008.
[29] J. Ferling, The Role of Accuracy Ratios in Test and
Measurement Processes, Proceedings of the Measurement
Science Conference, Long Beach, California, 1984.
[30] I. Lira, A Bayesian approach to the consumers and producerss
risk in measurement, Metrologia , vol. 36, pp. 397-402,October 1999.
[31] H. Castrup, Analytical Metrology SPC Methods for ATE
Implementation, Proceedings of the NCSL Workshop and
Symposium, Albuquerque, New Mexico, 1991.
[32] ISO/IEC, Uncertainty of measurement -- Part 3: Guide to the
expression of uncertainty in measurement,ISO/IEC Guide 98-
3:2008, 2008.