NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan...

153
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Transcript of NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan...

Page 1: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)

District Irrigation Plan (2016-2020)NARMADA, GUJARAT

NARMADA

Page 2: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)

District Irrigation Plan (2016-2020)NARMADA, GUJARAT

NARMADA

Page 3: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Table of Contents

INTRODUCTION ................................................................................................................................. 12

Background ....................................................................................................................................... 12

Vision .................................................................................................................................................17

Objective ............................................................................................................................................17

Strategy/approach .............................................................................................................................17

Programme Components .................................................................................................................. 18

1. Accelerated Irrigation Benefit Programme (AIBP) ................................................................... 18

2. PMKSY (Har Khet ko Pani) ....................................................................................................... 18

3. PMKSY (Per Drop More Crop).................................................................................................. 19

4. PMKSY (Watershed Development) .......................................................................................... 20

Rationale/ Justification .................................................................................................................... 20

Methodology ..................................................................................................................................... 20

CHAPTER I .......................................................................................................................................... 22

GENERAL INFORMATION OF THE DISTRICT ................................................................................ 22

1.1 District Profile............................................................................................................................. 22

1.1.1 Administrative Setup ............................................................................................................. 23

1.1.2 Towns and Villages ............................................................................................................... 25

1.2 Demography ............................................................................................................................... 25

1.3 Biomass and Livestock ................................................................................................................ 27

1.4 Agro -Ecology, Climate, Hydrology and Topography ................................................................. 29

1.5 Soil Classification ........................................................................................................................ 31

1.6 Soil Erosion and Runoff Status ................................................................................................... 33

1.7 Land Use Pattern ......................................................................................................................... 34

Chapter 2 .............................................................................................................................................. 37

District Water Profile ........................................................................................................................... 37

2.1.1 Area-wise, Crop-wise Irrigation Status ................................................................................... 37

2.1.2 Irrigation status of horticulture and plantation crops ............................................................. 40

2.2 Production and Productivity of major Crops ............................................................................. 42

2.3 Irrigation based classification .................................................................................................... 44

Chapter III ............................................................................................................................................ 46

Water Availability ................................................................................................................................. 46

3.1 Status of water availability .......................................................................................................... 46

3.2 Status of Ground water availability ............................................................................................ 47

3.3 Status of Command Area ............................................................................................................ 49

Page 4: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

3.4 Existing Type of Irrigation .......................................................................................................... 51

Chapter IV ............................................................................................................................................ 55

Water Demand ..................................................................................................................................... 55

4.1 Domestic Water demand ............................................................................................................ 55

4.2 Water demands for crops ........................................................................................................... 56

4.3 Water demand for Livestock ...................................................................................................... 58

4.4 Water Demand for Industries..................................................................................................... 59

4.5 Water demand for Power generation ......................................................................................... 60

4.6 Sector wise water demand .......................................................................................................... 60

4.7 Water Budget .............................................................................................................................. 62

Chapter V .............................................................................................................................................. 64

Strategic Action Plan ............................................................................................................................ 64

5.1 Taluka wise total plan of the district ........................................................................................... 64

5.2 Component Wise Plan ................................................................................................................ 69

5.3 Year Wise Plan ............................................................................................................................ 69

5.4 Expected Outcome ...................................................................................................................... 70

5.5 Strategic Action Plan under PMKSY ........................................................................................... 73

Annexure .............................................................................................................................................. 79

1. Strategic Action Plan for Irrigation in District under PMKSY: District Irrigation Department

(WRD) ............................................................................................................................................... 79

2. Strategic Action Plan for Irrigation in District under PMKSY: GGRC ..................................... 83

3. Strategic Action Plan for Irrigation in District under PMKSY: GWRDC .................................. 85

4. Strategic Action Plan for Irrigation in District under PMKSY: SSNL....................................... 86

5. Strategic Action Plan for Irrigation in District under PMKSY: GLDC ...................................... 87

6. Strategic Action Plan for Irrigation in District under PMKSY: GSWMA.................................. 88

Page 5: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

List of Tables

Table 1. 1 District Profile .............................................................................................. 22

Table 1.1 1: List of towns and villages .......................................................................... 25

Table 1.2. 1: Demography details of the district (Male, female, Children).................. 26

Table 1.2. 2: Demography details of the district (SC, ST, General) ............................. 26

Table 1.3. 1: Population of Small Animal in the district .............................................. 28

Table 1.3. 2: Population of large animal in the district ............................................... 28

Table 1.4. 1: Agro-ecological zones of the district and there characteristics ............... 29

Table 1.4. 2: Rainfall and Temperature ....................................................................... 30

Table 1.4. 3: Year wise rainfall in different blocks in Narmada District (mm) ........... 31

Table 1.5. 1: Soil classification in the district ............................................................... 31

Table 1.6. 1: Agro-Climatic Zones ................................................................................ 34

Table 1.7. 1: Land Use Pattern and area under agriculture ......................................... 34

Table 1.7. 2: Land Use Pattern and area under non-agriculture ................................. 35

Table 2.1. 1: Crop area under Kharif, Rabi and Summer ............................................. 38

Table 2.1. 2: Horticultural & Plantation crop area in the district ............................... 40

Table 2.2. 1: Production and productivity of major crops in the district .................... 42

Table 2.3. 1: Irrigation Based classification ................................................................. 44

Table 3.1. 1: Status of water availability in the district ................................................ 46

Table 3.2. 1: Status of Ground water availability in the district .................................. 48

Table 3.3. 1: Status of canal command area in the district .......................................... 49

Table 3.4. 1: Taluk wise existing irrigation structures ................................................. 51

Table 3.4. 2: Taluk wise canal based, tanks/reservoir irrigation structures ............... 52

Table 4.1. 1: Domestic water requirement ................................................................... 56

Table 4.2. 2: Crop Water Requirement ........................................................................ 57

Table 4.3. 1: Livestock Water Demand ........................................................................ 59

Table 4.4 1: Industrial water demand .......................................................................... 59

Table 4.6. 1: Sector wise water requirement in 2015 ................................................... 60

Table 4.6. 2: Sector wise water requirement in 2020 ................................................. 61

Table 4.7. 1: Water budget in the district ..................................................................... 62

Table 5.1. 1: Taluka Wise outlay ................................................................................... 64

Table 5.2. 1: Component wise financial outlay (Amount in Rs. lakhs) ....................... 69

Table 5.3. 1: Year Wise financial outlay under different department ......................... 70

Table 5.4. 1: Department wise area proposed (Area in ha)……………………………………71

Page 6: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

List of Figures

Figure 1. 1: Demography profile of the district (Male, Female and Children) ......... 26

Figure 1. 2: Demography Profile of the district (SC, ST and General) ...................... 27

Figure 1. 3: Percentage area under agriculture ......................................................... 35

Figure 2.1. 1: Percentage share of kharif crop area in different taluk ...................... 38

Figure 2.1. 2: Percentage share of rabi crop area in different taluk ......................... 39

Figure 2.1. 3: Percentage share of summer crop area in different taluk .................. 39

Figure 2.1. 4: Percentage share of rainfed and irrigated area in different taluk ..... 40

Figure 2.1. 5: Percentage distribution of horticultural areas in different taluk ....... 41

Figure 2.2. 1: Taluk wise distribution of crop production under rainfed condition . 43

Figure 2.2. 2: Taluk wise distribution of crop production under irrigated condition43

Figure 2.2. 3: Taluk wise distribution of horticultural crop production .................. 44

Figure 2.3. 1: Percentage area under irrigation based classification ....................... 45

Figure 3.2. 1: Percentage distribution of draft and recharge among different taluk48

Figure 3.3. 1: Percentage district Canal Command Area .......................................... 49

Figure 3.3. 2: Percentage distribution of developed area under canal command ... 50

Figure 3.4. 1: Percentage distribution of tube-wells and dug-wells in the district ... 52

Figure 4.2. 1: Percentage distribution of water potential ......................................... 57

Figure 4.6. 1: Percentage share of water requirement in various sector in 2015 .... 61

Figure 4.6. 2: Percentage share of water requirement in various sector in 2020 ... 62

Figure 5.1. 1: Department wise percentage share of total outlay ............................. 65

Figure 5.1. 2: Percentage share of District irrigation departments .......................... 65

Figure 5.1. 3: Percentage share of State Irrigation department (SSNL) .................. 66

Figure 5.1. 4: Percentage share of GWRDC ................................................................ 66

Figure 5.1. 5: Percentage share of District irrigation departments .......................... 67

Figure 5.1. 6: Percentage share of GGRC ................................................................... 67

Figure 5.1. 7: Percentage share of GSWMA ................................................................ 68

Figure 5.1. 8: Percentage share of ATMA under Agriculture Department ............... 68

Figure 5.2. 1: Component wise percentage share of financial outlay ....................... 69

Figure 5.3. 1: Percentage share of different departments ......................................... 70

Figure 5.4. 1: Department wise year wise proposed area……………………………………………..71

List of Maps

Map 1: Narmada district ........................................................................................................ 22

Map 2: Soil classification of district ....................................................................................... 33

Map 3: Land Use Pattern in the district ................................................................................ 36

Map 4: Canal of the district ..................................................................................................... 51

Map 5: River water bodies of district .................................................................................... 54

Page 7: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Abbreviations

NDC : National Development Council

GoI : Government of India

C-DAP : Comprehensive District Agriculture Plan

ICT : information and communications technology

BCM : Billion Cubic Metres

GDP : Gross Domestic Product

AIBP : Accelerated Irrigation Benefits Programme

CADWM : Command Area Development and Water Management

MI : Micro Irrigation

SWMA : Supplementary Water Management Activities

NITI Aayog : National Institution for Transforming India Aayog

NRM : Natural resource Management

IWMP : Integrated Watershed Management Programme

PRI : Panchayati Raj Institutions

DRDA : District Rural Development Agencies

NRLM : National Rural Livelihoods Mission

C.D. Blocks : Community development block

BPL : Below Poverty Line

SC/ST : Scheduled Caste/ Scheduled Tribe

Nos. : Number

ATMA : Agriculture Technology Management Agency

MSL : Mean Sea Level

mm : Millimeter

ha : Hectare

TGA : Total Geographical Area

Page 8: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

GCA : Gross Cropped Area

GIA : Gross Irrigated Area

NSA : Net Sown Area

AIBP : Accelerated Irrigation Benefits Programme

MGNREGA : Mahatma Gandhi National Rural Employment Gurantee Act

CI : Cropping Intensity

Qtl/yr : Quintal per year

GIA : Gross Irrigated Area

MCM : million cubic metres

Bgl : Below ground Level

CCA : Culturable Command Area

LPD : Liter Per Day

CAD : Command Area Development

DIP : District Irrigation Plan

SIP : State Irrigation Plan

DLIC : District Level Implementation Committee

STP : Sewage Treatment Plant

WRD : Water Resource Department

GSWMA : Gujarat State Watershed Management Agency

GGRC : Gujarat Green Revolution Company Ltd.

SSNL : Sardar Sarovar Narmada Nigam Ltd.

GWRDC : Gujarat Water Resources Development Corporation Ltd.

GLDC : Gujarat Land Development Corporation

ATMA : Agricultural Technology Management Agency

Page 9: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Executive Summary

Out of about 141 million ha of net area sown of the country, only 65 million hectare (46%) is

currently covered under irrigation. Substantial dependence on rainfall makes cultivation in

remaining areas a high risk and less productive profession. Empirical evidences suggest that

assured/protective irrigation/in-situ moisture conservation encourages farmers to invest

more in farming technology and inputs leading to productivity enhancement and increased

farm income. Government has conceived the Pradhan Mantri Krishi Sinchayee Yojana

(PMKSY) with the objective of extending the coverage of irrigation in a focused manner,

with end-to-end solution on source creation, distribution, management, field application

and extension activities.

Further, Pradhan Mantri Krishi Sinchayee Yojana incentivizes states to enhance

expenditures on irrigation and water resources management by making the access to

PMKSY funds to states conditional i.e., state will have access only if the expenditure in water

resource development for agriculture sector in the year under consideration is not less than

the baseline expenditure, which is defined as the average of the expenditure in irrigation

sector irrespective of the department in the state plan in three years prior to the year under

consideration.

PMKSY will be implemented in area development mode only by adopting a ‗decentralized

state level planning and projectised execution‘ structure that will allow states to draw up

their own irrigation development plans based on DIPs and SIPs with a horizon of 5-7 years.

A three tier structure at national, state and district level will oversee implementation and

coordination of the program.

District Water Profile

The population of Narmada district is predominantly dependent on agriculture and allied

activities for their livelihood. The gross cropped area in the district is 1,73,348 ha (1,50,457

ha is under agricultural crops and 22,891 ha is under horticultural crops). About 1,18,675 ha

of the area under crop is grown under kharif season while 24,500 ha. of crop area is under

rabi season. Cereals are the major agricultural crops grown in the district with an area

covering of about 86.79 percent of the total area under various agricultural crops.

Crop Diversification

In Narmada there are four major objectives of agricultural diversification. First to increase

the income of the small households, second to attain the fuller employment in the farm

household, third to stabilize the farm income over the seasons, and fourth conservation and

enhancement of natural resources specially irrigation sources. Irrigation plays a decisive

role in cropping pattern, cropping intensity, crop combinations, the extent of yield and to a

certain extent the season of sowing. This process ensures that farmer receive decent income

while the existing food grain production takes care of the food security needs of the

households. In Narmada district, about 51 percent of the area lies under rainfed cultivation

while only 49 percent of the total gross cropped area has irrigation facilities. The majority of

Page 10: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

the farmers in the district are engaged in traditional cultivation of food grains (92% of the

area under agricultural crops is grown under cereals and millets), not being able to divert to

more profitable commodities such as vegetables and fruits. In order to boost the agricultural

development and enhance the farm income in the rural areas, it is therefore important to

increase the productivity of the existing cultivated area, through shifting from self-

subsistence crop cultivation to diversified agriculture, by adopting cash crops such as cotton,

vegetables cultivation and the same can be achieved by providing assured irrigation sources

all the year round to different parts of the district.

Availability of water sources

District is drained from east to west mainly by three rivers namely the Narmada, the Kim

and the Tapi. The district receives the rainfall through South-West monsoon which normally

starts from middle of June. July and August are the months of heavy rainfall. The average

rainfall varies from 800 mm to 1100 mm. The district as a whole was deficient in surface

water resources and have also faced droughts in past. After initiation of Narmada Canal

Project nearly 472,219 hectares of district area will come under irrigation command.

Groundwater occurs under unconfined conditions in all the rock formations in most of the

area of the district. Weathered zone below water table acts as good repository for storage of

groundwater in Deccan Trap areas. Ground water recharge during monsoon season has

been computed using water level fluctuation method and compared with recharge by the

infiltration factors. Depending upon percent deviation value, Gross Recharge has been

calculated as per the recommended methodology. Besides rainfall, the recharge due to

seepage from canal, return flow from irrigation, recharge from tanks, ponds & water

conservation structures, etc. were also considered. The total annual recharge was obtained

as the sum of the monsoon and non-monsoon periods comes out to be 218.26 MCM per year

while the annual draft is 74.47 MCM. The total water availability under surface water

includes canal water from Narmada dam. The water availability under Kharif season is

65.06 MCM and under Rabi season the water availability is 209.65 MCM while under

summer 54.98 MCM of water availability is in the district. The total water availability under

canal (major and minor) is 313.45 MCM while under lift irrigation it is 4.85 MCM and from

other sources, it is 11.39 MCM.

Existing Type of Irrigation

The major source of irrigation in the district is constituted by canal which forms the surface

irrigation sources. There are 7 canal based source of surface irrigation. Besides this there are

ground water sources that also prevails in the district. Under ground water sources there are

dugwells and tube wells as major source. The benefits to be accrued, out of groundwater

based irrigation and domestic / industrial supply in conjunction with Narmada Project

surface water sources are of manifolds. Sustainable and dependable supply from ground

water reservoir, with Narmada Canal Water in command areas, may help farmer raising

additional crops suitable to the areas so as to ensure optimum utilization of available land,

water and human resources. In Narmada district the total command area under canal

command is 48578.50 ha. out of which 40335 ha. falls under developed under canal

command leaving a gap of 8244 ha. which can be further developed for agricultural

purposes.

Page 11: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Demand for water sources

It can be observed from the table above that the water potential for the present scenario

stands at 819.21 MCM while for the year 2020 it is expected to be 853.46 MCM. The surface

water availability through various sources stands at 348 MCM while the ground water

availability is 74.47 MCM. The total existing water availability is 422.5 MCM in the district

leaving a gap of 396.8 MCM which needs to be filled with coming year. The projected gap for

2020 is 432 MCM. The efficient use of water through micro irrigation and conservation of

water from source to sink can help in meeting the growing demand.

Water budget in the district

The water budget shows wide gaps between water availability and water demand in the

district. While the availability at present is 369.29 MCM, the present water demand is

819.21 MCM. But with growth in urbanisation and subsequent growth in food grain

requirement the water demand is likely to increase to 853.46 MCM by the year 2020 leaving

an unmet demand of 484.17 MCM which needs to be further addressed. The water budget

analysis suggest that urgent efforts are required to meet the water requirements of the

district as the gap is likely to increase in future. Utilizing the surface & ground water

potential in the district, activities that promote ground water re-charge and soil moisture

and water conservation etc. are proposed in the Strategic Action plan, 2016-20 that will

address the challenge. The scope to tap ground water in the district is feasible as the district

falls in safe category.

Component wise planned coverage of area

The strategic action plan envisages providing assured irrigation in a command area of

24232.26 ha. Under AIBP, 4348.98 ha is proposed to be developed under the plan while

under Har Khet Ko Pani an area of 2537.38 ha will be developed. The watershed component

is projected to achieve a culturable command area of 2104.7 ha by creation of 282 new water

harvesting structures and renovation of 60 water harvesting structures. Under, the

component Per Drop More Crop, efficient water conveyance and precision water application

by drip irrigation system for wide spaced and narrow spaced crops for developing an area of

9144.72 ha. has been proposed. While Sprinklers has been proposed to develop an area of

6096.48 ha. A training programme will also be scheduled under PMKSY to enhance the

better knowledge of efficient use of water through drip and other micro irrigation structures.

A training programme will also be scheduled under PMKSY to enhance the better

knowledge of efficient use of water through drip and other micro irrigation structures.

Department wise planned coverage of area

Under department wise development of command area or irrigation potential, the total area

to be developed under proposed PMKSY will be 24232.26 ha. for which irrigation potential

needs to be developed. GGRC under Per Drop More Crop will develop an area of 2104.70 ha

through various drip and sprinkler irrigation system. The watershed component under

GSWMA will develop an irrigation potential of 15241.20 ha through its various activities

Page 12: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

proposed such as Land Development, Soil and Moisture Conservation, developing new

water harvesting structure and renovating existing one, etc. The GLDC under Agriculture

department will cover an area of 1517.76 ha to develop an irrigation potential. The district

irrigation department will cover an area of 3935 ha under WRD while state irrigation

department under SSNL will develop an area of 436 ha. The GWRDC has proposed to

develop an area of 997.60 ha through various irrigation structures. Agricultural Technology

Management Agency (ATMA) focused on awareness generation and capacity building of the

beneficiary farmers on water distribution, efficient use of water and water saving

technologies etc.

Block wise planned financial outlay

The outlay for the district amount to Rs.30853.02 lakhs out of which Nandod taluk shares

the maximum percentage of the total outlay i.e., 51.20% followed by Sagbara with 17.13%,

Dediyapada with 16.26%, Garudeshwar with 10.30% and Tilakwada with 5.12%.

Component wise planned financial outlay

The component wise total outlay of the district constitutes about Rs.31528.14 lakhs. AIBP

and Hark Khet Ko Pani components are to be executed mainly by State and District

Irrigation departments and GLDC under Agriculture department. Per drop more crop

component will be executed by GGRC. Water shed component will be taken care of by

GSWMA under Rural Development Department and Extension & Training component will

be executed by ATMA under Agriculture department. However, all the stakeholders need to

have coordination among them to have the maximum irrigation efficiency and to avoid

duplicity. It is observed that maximum share of 39.75% is for AIBP component followed by

Per Drop More Crop 22.13%, PMKSY Watershed component with a share of 21.86%, Har

Khet Ko Pani 13.45% and ATMA component constitutes about 0.20% of the total outlay.

Component Wise 2016-17 2017-18 2018-19 2019-20 Grand Total

AIBP 2160.79 2936.80 3177.80 3989.80 12265.20

Har Khet Ko Pani 641.92 450.92 1144.92 1910.92 4148.68

Per Drop More Crop 2100.94 1575.71 1575.71 1575.71 6828.06

PMKSY Watershed 4824.18 1357.28 376.65 186.46 6744.57

ATMA 14.39 14.94 15.71 16.50 61.54

Convergence with MGNREGA

526.57 228.75 7.85 41.80 804.96

Total 10268.80 6564.39 6298.65 7721.19 30853.02

Implementation Time Period

The planned activities and outlay will be spent between 2016-17 and 2019-20 period. Some

of the activities may require 5 to 7 years and some other activities relating to extension,

small irrigation works etc., are recurring and hence will have a period of implementation

less than a year.

Monitoring and evaluation

The Strategic Action Plan of PMKSY will be monitored by the respective departments

through the regular reporting system and component wise progress will be monitored by the

Page 13: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

District Level Irrigation Committee. Further, the activities, outputs and outcomes will be

reported in web based MIS of PMKSY for review at state and national level.

Page 14: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

INTRODUCTION

Background

Preparation of decentralized area specific district planning process visualized in

various plans took concrete shape through the years and initiatives like specific

guidelines on methodologies and processes for preparation of district plans;

framework for preparation of perspective plan, medium term and annual plans by

then planning commission in 1969 and the 73rd and 74th constitutional amendments

conferring constitutional status to Panchayats at district and sub district level; local

self-government in urban areas; constitution of district planning committee to

consolidate the plans prepared at Panchayats and municipalities and prepare a draft

development plan for the whole district.

The decentralized planning process was further strengthened through emphasis by

planning commission on preparation of district level plans and making it an integral

part of the process of preparation of the states 11th five year plan. The Planning

commission issued guidelines in August 2006 for preparation of the district plans.

The guidelines define the District Planning as ‗the process of preparing an integrated

plan for the local government sector in a district taking into account the resources

(natural, human and financial) available and covering the sectoral activities and

schemes assigned to the district level and below and those implemented through

local governments in a state. The document that embodies this statement of

resources and their allocation for various purposes is known as the District Plan‖.

Government of India through a resolution in National Development Council on 29th

May 2007 conceived a special Additional Central Assistance Scheme (ACAS) to

address the slow growth of agriculture and allied sectors by incentivizing states to

draw up plans for their agriculture sectors more comprehensively. The NDC

resolution states "GoI introduced a new Additional Central Assistance Scheme to

incentivize states to draw up plans for their agriculture sector more comprehensively,

taking agro-climatic conditions, natural resource issues and technology into account,

and integrating livestock, poultry and fisheries, etc. This involved a new scheme for

Additional Central Assistance (ACA) to State Plans, administered by the Union

Ministry of Agriculture over and above its existing Centrally Sponsored Schemes, to

supplement the State-specific strategies including special schemes for beneficiaries

of land reforms. The newly created National Rainfed Area Authority on request, was

to assist States in planning for rainfed areas".

The NDC in its resolution advised the states to prepare a comprehensive district

agriculture plans (C-DAP) that will fully utilize available resources and include allied

agriculture sectors. Further, GOI issued a manual on preparation of comprehensive

district agriculture plans to help the states prepare C-DAP. As per these guidelines,

the objective of district planning is ‗to design an integrated and participatory action

plan for the development of local area in general and agriculture and allied sectors in

particular‘. The objectives of Comprehensive District Agriculture Plan (C-DAP) were:

Page 15: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

To prepare a Comprehensive District Agriculture Plan (C-DAP) through

participatory process involving various organisations and stakeholders.

To enable optimum utilisation of scarce natural, physical & financial

resources.

To assess and plan for the infrastructure required to support the agriculture

development.

To establish linkages with the required institutional support services, like

credit, technology transfer, ICT, research etc.

To evolve an action plan for achieving sustainable agricultural growth with

food security and cropping system that will improve farmers‘ income.

The guidelines required the state/district authorities to (i) ensure that the

agricultural plans are prepared for the district and then integrated into the

agricultural plans of the State based on the agro-climatic conditions, availability of

technology, trained manpower and natural resources; (ii) local needs / crops / feed

and fodder / animal husbandry / dairying / fisheries / priorities are reflected in the

plan; (iii) productivity gaps for important crops and livestock and fisheries are

reduced; and (iv) the returns to the farmers from these are maximized.

The latest move in the process of strengthening of decentralized planning process

was the Government of India guidelines issued in 2015 in the form of a template for

the preparation of District Irrigation Plan (DIP) and State Irrigation Plan (SIP) as

part of the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) program and made the

preparation of DIP and SIP mandatory for the states to receive funds from the

program. The present report is a product of these long drawn efforts of Government

of India to strengthen the decentralized planning process in the country focusing on

the vital resource i.e., water.

Water is of vital importance for human & animal life, maintenance of ecological

balance and promotion of developmental activities. Considering its vital importance

and ever increasing demand for water, in the face of population growth, urbanization

& industrialization and considerations of climatic change, making water, an

increasingly a scarce resource, available to multiple uses, planning and management

of this vital resources, utilization of water economically, optimally and equitably

assumes greater importance.

According to the 12th Five year Plan the water budget estimates of India by Ministry

of Water Resources suggests an availability of 1123 billion cubic meters (BCM)

against a current estimated demand of 710 BCM. The Standing Committee of the

Ministry of Water Resources estimates that this water demand will rise to 1093 BCM

by 2025. Though the existing water availability in the immediate future seems to be

adequate, with the near constant supply of water resources in the face of increasing

demand on account of population growth, urbanisation and industrialization will

strain the water supply-demand balance.

Page 16: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

The per capita water availability which stood at 5,177 cubic meters in 1951 was

reduced to 1820 cubic meters in 2001 while the international prescribed limit is 1800

cubic meters. The projected per capita availability of water is 1341 cubic meters in

2025 and 1140 cubic meters in 2050 suggesting shortage of water in the medium

term1. Further, the all India water balance estimates does not reflect the variations in

water balance across time and space- certain areas having a positive water balance

and the others facing acute shortage. The problem is further accentuated by water

quality related issues.

With the abundant surface and ground water supply in the first five decades since

independence, more than 80 percent of the total available water resources were

allocated for irrigation purposes and the rest meeting the domestic and industrial

demands. In a recent study2on the demand for water from agriculture, domestic and

industrial uses in 2000, 2025 and 2050 seems to suggest that domestic demand (34

BCM in 2000, 66 BCM in 2025 and 101 BCM in 2050) and industrial demand (42

BCM in 2000, 92 BCM in 2025 and 161 BCM in 2050) for water will utilize the total

balance water available while agriculture demand for water will be (605 BCM in

2000, 675 BCM in 2025 and 637 BCM in 2050). This change is partly because of the

changing sectoral contributions of India‘s GDP and also partly because of dynamics

of irrigation development in the country where the initial expansion in area under

irrigation is propelled by the availability of abundant water resources and availability

of good quality land. This is no longer the case in many of the states where the

availability of land and water are serious constraints for further expansion of

irrigation. Further, as per the erstwhile planning commission up to March 2012 out

of 141 million hectares of net sown area in the country 114 (or 81%) million hectares

is Irrigation Potential Created (IPC) and 88 (or 62%) million hectares is Irrigation

Potential Utilised (IPU) leaving almost 20% of irrigated potential unutilized. This

leaves 40 percent of the net sown area in the country dependent on rainfall which

makes farming a high risk and less productive.

The competing demands for water resources and the emerging issues and concerns

were to be addressed through certain basic principles and commonality in

approaches in dealing with planning, development and management of water

resources3 under an Integrated Water Resource Management framework. The main

objectives of water resource management as delineated in National Water Policy

2012 are:

a) Planning, development and management of water resources need to be

governed by common integrated perspective considering local, regional, State

1Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, Government of India,

New Delhi. 2Amarasinghe, U.A., Shah T., Turral, H. and Anand, B.K. 2007. India’s water future to 2025-

2050:Business-as-usual scenario and deviations. Research Report 123, International Water

Management Institute, Colombo. 3Ministry of Water Resources, National Water Policy, 2012, Government of India, New Delhi.

Page 17: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

and national context, having an environmentally sound basis, keeping in view

the human, social and economic needs.

b) Principle of equity and social justice must inform use and allocation of water.

c) Good governance through transparent informed decision making is crucial to

the objectives of equity, social justice and sustainability. Meaningful intensive

participation, transparency and accountability should guide decision making

and regulation of water resources.

d) Water needs to be managed as a common pool community resource held, by

the state, under public trust doctrine to achieve food security, support

livelihood, and ensure equitable and sustainable development for all.

e) Water is essential for sustenance of eco-system, and therefore, minimum

ecological needs should be given due consideration.

f) Safe Water for drinking and sanitation should be considered as pre-emptive

needs, followed by high priority allocation for other basic domestic needs

(including needs of animals), achieving food security, supporting sustenance

agriculture and minimum eco-system needs. Available water, after meeting

the above needs, should be allocated in a manner to promote its conservation

and efficient use.

g) All the elements of the water cycle, i.e., evapo-transpiration, precipitation,

runoff, river, lakes, soil moisture, and ground water, sea, etc., are

interdependent and the basic hydrological unit is the river basin, which should

be considered as the basic hydrological unit for planning.

h) Given the limits on enhancing the availability of utilizable water resources and

increased variability in supplies due to climate change, meeting the future

needs will depend more on demand management, and hence, this needs to be

given priority, especially through (a) evolving an agricultural system which

economizes on water use and maximizes value from water, and (b) bringing in

maximum efficiency in use of water and avoiding wastages.

i) Water quality and quantity are interlinked and need to be managed in an

integrated manner, consistent with broader environmental management

approaches inter-alia including the use of economic incentives and penalties

to reduce pollution and wastage.

j) The impact of climate change on water resources availability must be factored

into water management related decisions. Water using activities need to be

regulated keeping in mind the local geo climatic and hydrological situation.

Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to

address the constraints in providing assured irrigation as well as increasing efficiency

and productivity of current water use to bring more prosperity to the rural areas.

Priorities of Government of India were reflected in the Hon‘ble President‘s address to

the joint Session of the Parliament of 16th Lok Sabha where he indicated that ―Each

drop of water is precious. Government is committed to giving high

priority to water security. It will complete the long pending irrigation

projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee

Page 18: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for

seriously considering all options including linking of rivers, where

feasible; for ensuring optimal use of our water resources to prevent the

recurrence of floods and drought. By harnessing rain water through

‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water conservation and

ground water recharge. Micro irrigation will be popularised to ensure

‘Per drop-More crop”.

PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period

of five years from 2015-16 to 2019-20. The programme is an amalgamation of on-

going schemes of Ministry of Water Resources, River Development and Ganga

Rejuvenation, Ministry of Agriculture & Cooperation and Ministry of Rural

Development. The existing schemes AIBP, CADWM, MI, SWMA, Watershed &

Convergence with MGNREGA were brought together under the umbrella program of

PMKSY. Further the scheme seeks convergence with scheme likeMahatma Gandhi

National Rural Employment Guarantee Scheme (MGNRES), Rashtriya Krishi Vikas

Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural Electrification

programmes (JLNNSM&REP), Rural Infrastructure Development Fund (RIDF),

Members of Parliament Local Area Development Scheme (MPLAD), Members of

Legislative Assembly Local Area Development Fund (MLALAD), Local Body Funds

(LBF), Working Plan of State Forest Department (WPSFD) etc. The PMKSY will be

implemented in an area development mode only by adopting a decentralized state

level planning and projectised execution structure that will allow the state to draw up

their own irrigation development plans based on DIPs and SIPs with a horizon of 5-7

years. The program will be implemented as part of Rashtriya Krishi Vikas Yojana

(RKVY) with state agriculture department acting as the State Nodal Agency.

However, the implementing departments for the four components like AIBP, PMKSY

(Har Khet Ko Pani), PMKSY (Per drop more crop) and PMKSY (watershed

development) will be decided by the respective program ministry/department.

The funds under this program would be provided to the states as per the pattern of

assistance of Centrally Sponsored Schemes (CSS) decided by the Ministry of Finance

and NITI Aayog. During 2015-16 the existing pattern of assistance of ongoing scheme

was continued. An outlay of Rs. 50,000 crore has been approved for 2015-20. The

financial assistance provided to the state governments from this centrally sponsored

scheme is subject to fulfillment of certain conditions. Firstly, a state will become

eligible to access PMKSY fund only if it has prepared the District Irrigation Plans

(DIP) and State Irrigation Plan (SIP), excepting for the initial year, and the

expenditure in water resource development for agriculture sector in the year under

consideration is not less than the baseline expenditure, which is defined as the

average of the expenditure in irrigation sector irrespective of the department in the

state plan in three years prior to the year under consideration. Secondly, States will

be given additional weightage for levying charges on water and electricity for

irrigation purposes, so as to ensure sustainability of the programme. Thirdly,

interstate allocation of PMKSY fund will be decided based on

Page 19: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Share of percentage of unirrigated area in the state vis-à-vis national average

including prominence of areas classified under Desert Development

Programme (DDP) and Drought Prone Area Development Programme

(DPAP)

Increase in percentage share of expenditure on water resource development

for agriculture sector in State Plan expenditure in the previous year over three

years prior to it and

Improvement in irrigation efficiency in the state.

Vision

The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be

to ensure access to some means of protective irrigation to all agricultural farms in the

country, to produce ‗per drop more crop‘, thus bringing much desired rural

prosperity.

Objective

The objectives of the PMKSY are to:

a) Achieve convergence of investments in irrigation at the field level (preparation

of district level and, if required, sub district level water use plans).

b) Enhance the physical access of water on the farm and expand cultivable area

under assured irrigation (Har Khet Ko Pani),

c) Integration of water source, distribution and its efficient use, to make best use

of water through appropriate technologies and practices.

d) Improve on-farm water use efficiency to reduce wastage and increase

availability both in duration and extent,

e) Enhance the adoption of precision-irrigation and other water saving

technologies (More crop per drop).

f) Enhance recharge of aquifers and introduce sustainable water conservation

practices

g) Ensure the integrated development of rainfed areas using the watershed

approach towards soil and water conservation, regeneration of ground water,

arresting runoff, providing livelihood options and other NRM activities.

h) Promote extension activities relating to water harvesting, water management

and crop alignment for farmers and grass root level field functionaries.

i) Explore the feasibility of reusing treated municipal waste water for peri-urban

agriculture, and

j) Attract greater private investments in irrigation.

Strategy/approach

To achieve these objectives PMKSY adopted strategies that include

a) Creation of new water sources; repair, restoration and renovation of defunct

water sources; construction of water harvesting structures, secondary & micro

storage, groundwater development, enhancing potentials of traditional water

Page 20: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

bodies at village level like Jal Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo

(Nagaland); Eri, Ooranis (T.N.); Dongs (Assam); Katas, Bandhas (Odisha and

M.P.) etc.

b) Developing/augmenting distribution network where irrigation sources (both

assured and protective) are available or created;

c) Promotion of scientific moisture conservation and run off control measures to

improve ground water recharge so as to create opportunities for farmers to

access recharged water through shallow tube/dug wells;

d) Promoting efficient water conveyance and field application devices within the

farm viz, underground piping system, Drip & Sprinklers, pivots, rain-guns and

other application devices etc.;

e) Encouraging community irrigation through registered user groups/farmer

producers‘ organisations/ NGOs; and

f) Farmer oriented activities like capacity building, training and exposure visits,

demonstrations, farm schools, skill development in efficient water and crop

management practices (crop alignment) including large scale awareness on

more crop per drop of water through mass media campaign, exhibitions, field

days, and extension activities through short animation films etc.

Programme Components

PMKSY has following four components:

1. Accelerated Irrigation Benefit Programme (AIBP)

To focus on faster completion of ongoing Major and Medium Irrigation including

National Projects.

2. PMKSY (Har Khet ko Pani)

This component focuses on-

a) Creation of new water sources through Minor Irrigation (both surface and

ground water)

b) Repair, restoration and renovation of water bodies; strengthening carrying

capacity of traditional water sources, construction rain water harvesting

structures (Jal Sanchay);

c) Command area development, strengthening and creation of distribution

network from source to the farm;

d) Ground water development in the areas where it is abundant, so that sink is

created to store runoff/ flood water during peak rainy season.

e) Improvement in water management and distribution system for water bodies

to take advantage of the available source which is not tapped to its fullest

capacity (deriving benefits from low hanging fruits). At least 10% of the

command area to be covered under micro/precision irrigation.

f) Diversion of water from source of different location where it is plenty to

nearby water scarce areas, lift irrigation from water bodies/rivers at lower

Page 21: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

elevation to supplement requirements beyond IWMP and MGNREGS

irrespective of irrigation command.

g) Creating and rejuvenating traditional water storage systems like Khatri, Kuhl

etc. at feasible locations.

3. PMKSY (Per Drop More Crop)

a) Programme management, preparation of State/District Irrigation Plan,

approval of annual action plan, Monitoring etc.

b) Promoting efficient water conveyance and precision water application devices

like drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan);

c) Topping up of input cost particularly under civil construction beyond

permissible limit (40%), under MGNREGS for activities like lining inlet,

outlet, silt traps, distribution system etc.

d) Construction of micro irrigation structures to supplement source creation

activities including tube wells and dug wells (in areas where ground water is

available and not under semi critical/ critical/ over exploited category of

development) which are not supported under AIBP, PMKSY (Har Khet Ko

Pani), PMKSY (Watershed) and MGNREGS as per block/district irrigation

plan.

e) Secondary storage structures at tail end of canal system to store water when

available in abundance (rainy season) or from perennial sources like streams

for use during dry periods through effective on-farm water management;

f) Water lifting devices like diesel/ electric/ solar pumpsets including water

carriage pipes, underground piping system.

g) Extension activities for promotion of scientific moisture conservation and

agronomic measures including cropping alignment to maximise use of

available water including rainfall and minimise irrigation requirement (Jal

Sarankchan);

h) Capacity building, training and awareness campaign including low cost

publications, use of pico projectors and low cost films for encouraging

potential use water source through technological, agronomic and management

practices including community irrigation.

i) The extension workers will be empowered to disseminate relevant

technologies under PMKSY only after requisite training is provided to them

especially in the area of promotion of scientific moisture conservation and

agronomic measures, improved/ innovative distribution system like pipe and

box outlet system, etc. Appropriate Domain Experts will act as Master

Trainers.

j) Information Communication Technology (ICT) interventions through NeGP-A

to be made use in the field of water use efficiency, precision irrigation

technologies, on farm water management, crop alignment etc. and also to do

intensive monitoring of the Scheme.

Page 22: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

4. PMKSY (Watershed Development)

a) Effective management of runoff water and improved soil & moisture

conservation activities such as ridge area treatment, drainage line treatment,

rain water harvesting, in-situ moisture conservation and other allied activities

on watershed basis.

b) Converging with MGNREGS for creation of water source to full potential in

identified backward rainfed blocks including renovation of traditional water

bodies

Rationale/ Justification

In reference to the status and need of irrigation, the water resource management

including irrigation related priorities was identified for Narmada district by the

peoples‘ representatives of district with support from administration and technical

experts. For instance the reports of Strategic Research and Extension Plan (SREP)

prepared under ATMA program, Comprehensive District Agriculture Plan (C-DAP)

prepared as part of Rashtriya Krishi Vikas Yojana (RKVY), Potential Linked Credit

Plans (PLP) of NABARD and the Integrated District Development Plan etc. identified

number of irrigation related issues for Narmada district including (i) promoting

water use efficiency through sprinkler and drip irrigation; (iii) promoting protected

polyhouse cultivation to minimize risk factors and enhance quality and productivity;

(iv) Improvement of on-farm water delivery and efficiency of existing irrigation

systems; (v) promotion of soil conservation of arable & non-arable land through

engineering measures; (vi) creation of new water harvesting structures, check dams,

ponds, tanks, etc (vii) increase the forest cover in the district and (viii) land

improvement measures.

Methodology

During the course of preparation of District Irrigation Plan (DIP) the team visited

Narmada district to collect data and have interaction with all the stakeholders.

Methodology adopted to prepare DIP is outlined in brief as under:

a) Collection of primary and secondary data from field from various sources

including published documents and websites.

b) Various meetings were held to obtain ground level realities and data from

key personnel/stakeholders through structured, unstructured interviews,

focused group discussions etc.

c) Meetings with various State Government departments and related

institutions were held

d) Meeting through VC was also held with State Level authorities.

e) GIS maps of the area‘s/clusters were studied to understand the land

morphology, topography of the district.

f) Focused group discussions and interaction with of agriculture officers,

horticulture officers, soil conservation officers, extension officers, rural

development department, animal husbandry department, irrigation officers

Page 23: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

both at blocks and district level for identifying the key issues and focus

areas of the region.

g) Discussion with NABARD officer of Narmada district was also held during

the visit.

h) Team members also participated in the State Level workshop and held

active discussions with GoI officers, State Level officers and scientists of

various institutions

i) In the district at Panchayat level schemes were identified as per the need

and potential and resolutions were passed by the Panchayat to include the

schemes in PMKSY. The Panchayat resolutions were then consolidated and

put up in the Block Development Committee and a block plan was put up in

the Zila Parishad along with the programme of other line departments

participating in implementation of PMKSY. Besides IWMP prepared by

District Water Development agency was also proposed and approved by the

Zila Parishad Narmada in its meeting.

On the basis of detailed discussion and analysis of data, the team arrived at the

projections of various components of PMKSY and Department wise plan for four

years from 2016-17 to 2019-20 as detailed in the plan.

Page 24: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

CHAPTER I

GENERAL INFORMATION OF THE DISTRICT

1.1 District Profile

The Narmada district was a part of Bharuch district. The district was formed on

October 2, 1997 with three Talukas i.e. Sagbara, Dediapada and Nandod. Later

Tilakwada taluka was inducted from Vadodara.

The district is situated in the South of Gujarat State and lies between North Latitude

21 25‖ 45‖ and East Longitude of 72 34‖ 19‖. The district headquarters are located at

Rajpipla. The district is bounded by Vadodara district in the north, by Maharashtra

state in the east, by Tapi district in the south and by Bharuch district in the west.

In this Direction Satpuda‘s Hills are situated Large Portion of Land is with Pit and

Hills, with Slant. Tilakvada and Nandod‘s many Lands are of Pit and Hills. The Land

of District are Type medium, black and brown.

Table 1. 1 District Profile

1.1 District Profile

District District Code Latitude Longitude

Narmada 487 21.240 to 220 North 72.40 to 73.150 East

Source: Census 2011

Map 1: Narmada district

Page 25: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

1.1.1 Administrative Setup

With a view to run the administration of the State smoothly, it has been divided into

Districts, which in turn have been further sub-divided into Talukas (Tahsils). In the

State of Gujarat, the community development blocks are co-terminus with the

Talukas. The Talukas contain large number of villages and possibly several towns.

The villages have Village Panchayats to run the local administration. A Village

Panchayat may constitute of one revenue village, several revenue villages or a part of

a large village. Similarly, the towns have Municipality or Municipal Corporation as

the seat of local self-government. There are 4 talukas in the district, 609 villages out

of which 558 are inhabited and 5 towns in 2011.

The District Collector looks after the general administration, maintenance of

collection of land revenue and settlement of law related disputes, civil supplies,

district planning, mid-day meal scheme, etc at the district level. The functions of

administration of law and order and control and investigation of crime are done by

the Superintendent of Police of the district with the help of Police Stations working

under him. For the purpose of maintaining law and order there are 6 police stations,

0 police chowkies and 11 out-posts as per statement below.

Figure 1: Adminstrative Structure of district

At the Taluka level, Mamlatdar looks after the land development and revenue

collection and law and order.

The Panchayati Raj institutions are fairly strong and most of the development works

have been transferred to the District Panchayats and its subordinate bodies. The

District Panchayat has an elected President and District Development Officer

appointed by the Government, works as its Secretary, who looks after day-to-day

Collector

Dy. District Election Officer

Dy. Collector Land Reform/

ULC

Dy. Collector M.D.M.

District Planning Officer

Resident Additional Collector

SDM

Prant Officer

Page 26: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

work related to the development. Similarly, at the Taluka level, Taluka Panchayats

have been constituted which have an elected President.

The Taluka Development Officer, placed by the Government as Secretary of the

Taluka Panchayats and he conducts the regular administrative work. Like wise, an

elected President heads the Municipality and the Chief Officer works as the Secretary

of the Municipality, who looks after the day-to-day work. In case of the large cities,

the State Government has constituted Municipal Corporation, which are headed by

an elected Mayor and the Municipal Commissioner, appointed by the Government,

looks after the routine work.

At the Village level, the Sarpanch is the elected Chief and the Talati (Village Mantri)

works as the Secretary to the Village Panchayat and looks after the day today work.

In view of the expanding role of the public administration in a state like Gujarat, the

Government has taken-up many activities and has set up several offices. Such offices

which came into the existence are as under:

(1) Education (Primary and Higher Education)

(2) Agricultural and Research

(3) Animal Husbandry and Poultry

(4) Forest and Environment

(5) Roads and Building Bridges

(6) Co-operation and Co-operative Societies

(7) Industries, Small and Large as well as Cottage

(8) Health and Medical Services, Medical

Education and Research, Family Welfare

and Nutrition

(9) Information Department

(10) Irrigation Minor and Major

(11) Social Welfare and Social Defence

The functions of above offices are managed and controlled by concerned Head of

Departments and in some cases also by District and Taluka Panchayats.

Page 27: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

1.1.2 Towns and Villages

The taluka wise break up of towns and villages for the district is shown below.

Table 1.1 1: List of towns and villages

Sl. No. Name of Taluk No. of Towns No. of Villages

Total Inhabited

1 Tilakwada 0 97 97

2 Nandod 2 203 202

3 Dediapada 1 213 168

4 Sagbara 2 96 91

Total 5 609 558

Source: Census 2011

The civic status of the 5 towns is as under:

Municipality :01

Census Towns :04

There are 609 villages in the district out of which 558 are inhabited and the rest

comes under uninhabited.

*Note: The data regarding Garudeshwar is not available since the taluk

was formed in 2014-15 and no survey has been conducted for collection

of data so far.

1.2 Demography

Narmada covers 1.44% of total area of Gujarat State. Density (Population per sq.

km) of the district is 6th lowest & is 210. Narmada district is the 3rd lowest

populated district in the State. In Narmada district, Sub-district Nandod has the

highest population (241053) whereas sub-district Tilakwada has the lowest

(63871). Among villages Chikda village of Sub-district Dediapada is the most

populated village (3921).

Narmada district has sex ratio of 961 (no. of females per 1000 (males). Among sub-

districts, Sagbra has the highest sex ratio of 1013 and Tilakwada has the lowest sex

ratio of 924. Narmada has child sex ratio of 941.Sub-district Sagbra has the highest

child sex ratio of 966 and Tilakwada has the least child sex ratio of 891. District has

the literacy rate of 72.31 % and female literacy rate 63.09%.Sub – district Tilakwada

has the highest literacy rate of 79.03% and Dediapada has the lowest literacy rate of

64.54%.

The total number of household in the district stands at 122174. The total population

of the district is 590297 of which male population constitutes about 301086 and

female population is 289211. 10.48% of the total population is urban which

constitutes about 61863 while the remaining population resides in rural area which

constitutes about 528434.

Page 28: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Table 1.2. 1: Demography details of the district (Male, female, Children)

Demography Details

Blocks Male Female CH* (0-6 yrs) Total

Nandod 124560 116493 27919 241053

Dediyapada 88235 86214 27670 174449

Sagbara 55094 55830 14607 110924

Tilakwada 33197 30674 7927 63871

Total 301086 289211 78123 590297

Source: Census 2011

Figure 1. 1: Demography profile of the district (Male, Female and

Children)

The district has 8733 number of SC population. Nandod taluk has the maximum

percentage of SC population of 64.64% of the total SC population of the district while

Dediyapada taluk has lowest percentage of 5.70% of the total SC population of the

district.

The ST SC population for different taluk in the district is given in the table below.

Table 1.2. 2: Demography details of the district (SC, ST, General)

Blocks SC Member ST

Member

General

Member

Total

Nandod 5645 176658 58750 241053

Dediyapada 498 168181 5770 174449

Sagbara 625 101157 9142 110924

Tilakwada 1965 35396 26510 63871

Total 8733 481392 100172 590297

Source: Census 2011

0

20000

40000

60000

80000

100000

120000

140000

Nandod Dediyapada Sagbara Tilakwada

Male

Female

CH* (0-6 yrs)

Page 29: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Figure 1. 2: Demography Profile of the district (SC, ST and General)

The total ST population of the district stands at 481392. Vadodara taluk has the

maximum percentage of ST population which stands at 36.70% followed by

Dediyapada and Sagbara taluk which are 34.94% and 21.01% of the total ST

population of the district, respectively.

The ST population comprises 81.55% of the total population of the district while for

the state the population of ST is 14.75%.

The SC population in the district is 1.48% of the total population of the district while

for the state it is 6.74%.

1.3 Biomass and Livestock

The main animal wealth being reared by the farmers in the district is cattle,

buffaloes, goats & poultry while other domestic species like sheep, horses, ponies,

donkeys and camels are also reared by a small section of society for earning their

livelihood.

Under small animal category, poultry pigs, goats and sheep are included. As given in

the table below, Nandod taluk has the maximum percentage of small animal

population of about 38.60% followed by Dediyapada with 38%, Sagabara with

17.30% and Tilakwada with 6.04%. The total number of small animals in the district

as per the 19th Livestock Census 2012, is 343110. The total poultry population of the

district is 150806, pigs population is 34, goats constitutes about 191520 and sheep

constitutes about 403. Among small animal category goats has the largest population

and constitutes about 55.82% of the total small animals followed by poultry

population which is 43.95% of the total small animal population.

0

20000

40000

60000

80000

100000

120000

140000

160000

180000

200000

Nandod Dediyapada Sagbara Tilakwada

SC Member

ST Member

General Member

Page 30: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Table 1.3. 1: Population of Small Animal in the district

Block Poultry

(No.)

Ducks

(No.)

Pigs

(No.)

Goats

(No.)

Sheep

(No.)

Total

Nandod 41472 347 34 90223 380 132456

Dediyapada 65557 0 0 65011 0 130568

Sagbara 38826 0 0 20541 0 59367

Tilakwada 4951 0 0 15745 23 20719

Total 150806 347 34 191520 403 343110

Source: Livestock census 2012

Figure 1.3. 1: Percentage population of small animals in different

blocks/tehsil

The large animal category under livestock in district includes Indigenous cow, Exotic

cow, Buffaloes and other draft animals. The total population of large animal in the

district is 426957 out of which Indigenous cow constitutes about 40.57%. the largest

population under large animal Category is of Buffaloes which constitutes about

58.09%. The exotic breeds of cow and draft animals has a share of 1.08% and 0.08%

respectively, of the total population of large animals.

Table 1.3. 2: Population of large animal in the district

Block Large Animal Draft

Animal

(Buffalo/

yak/ bulls/

any other

(No.)

Total

Indigenous

Cow (Nos.)

Hybrid

Cow (No.)

Buffalo

(No.)

Nandod 64812 2071 56300 249 123432

38.54%

38.10%

17.32%

6.04%

Percentage Population

Nandod

Dediyapada

Sagbara

Tilakwada

Page 31: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Dediyapada 66316 1435 74808 64 142623

Sagbara 28775 847 22648 12 52282

Tilakwada 14083 250 94276 11 108620

Total 173986 4603 248032 336 426957

Source: Livestock census 2012

Figure 1.3. 2: Percentage population of largel animals in different

blocks/tehsil

Dediyapada taluk shares the maximum percentage of about 33.40% of large animal

population out of total large animal population followed by Nandod, Tilakwada and

Sagabara with a share of about 28.91%, 25.44% and 12.25% respectively.

1.4 Agro -Ecology, Climate, Hydrology and Topography

According to climate, topography, soil characteristics and cropping pattern Narmada

district lies in South Gujarat Agro Climatic Zone II. (AES I ) and Middle Gujarat

Agro-climatic Zone III (AES IX). As regards to Agro Ecological situations on the basis

of Phsiography and soil texture, Nandod, Dediapada and Sagbara belong to AES I

while Tilakwada belongs to AES IX.

Table 1.4. 1: Agro-ecological zones of the district and there

characteristics

Agro

Climatic

Zones and

AES

Rainfall

(mm)

Soil

Texture

Principal

Crops

Special

Features

Talukas

Coverage

South

Gujarat

Zone-II,

1000-1250

mm

Undulating

Shallow to

medium in

depth fine

Cotton,

Paddy,

Sugarcane,

Banana,

Highly

erosive, low

fertile land

and hilly

Nandod,

Dediapada,

Sagbara

28.91%

33.40%

12.25%

25.44%

Percentage Population

Nandod

Dediyapada

Sagbara

Tilakwada

Page 32: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

AES-I textured Maize,

Sorghum,

Pulses

terrain with

dense forest

`Middle

Gujarat

Zone-III,

AES-IX

>850 mm Deep Black

Soil

Cotton,

Pigeon Pea,

Maize,

Sorghum

Medium in

NPK

content

Tilakwada

Source: C-DAP, Narmada district 2013-14

The Hills of Rajpipla has been divided into three parts (i) in the Northern part is the

planes of Narmada River which is 16 Km, from East to West is the dense forest area,

(ii) in the south the low land planes of Tapi River which is flowing from North to

South and then turn towards East which is 32 Km (iii) in the East the Hilly area

between Narmada and Tapi. About 2000 ft high patch of hilly area from East of

Rajpipla to North which gradually linked to the planes. The Ringe range is between

889 meter high Dhamnamal (about 25-29 Km from Dediapada) and 950 meter high

Sandiya Tekra (hilly area).

Climate and Rainfall

The district has semi-arid climate with three distinguished seasons i.e. kharif (June

to September), winter (October to January) and summer (February to May). The

district receives the rainfall through South-West monsoon which normally starts

from middle of June. July and August are the months of heavy rainfall. The average

rainfall varies from 800 mm to 1100 mm. however, scanty and uneven rainfall

pattern is not uncommon. The temperature varies from 14.25°C to 42.5°C. The

December and January are the coldest months while April and May are the hottest

months of the year. The Narmada district receives an average of 973.5 mm of rainfall

with highest in Dediapada (1034 mm) during the year 2011-12. As regards the

distribution of rainfall the rains commence in June and continue up to October. The

highest rain received in month of August in different blocks except Sagbara, which

received good amount of rain in July.

The total amount of rainfall and the average rainy days is important determinant

while planning for interventions aimed at water harvesting and prescribed any

change in the cropping pattern. Dediapada though receives good amount of rain but

due to sloppy terrain, the water drains out at high velocity leaving very less water for

ground water recharge. It is also seen that there is high soil erosion leaving the top

soil to as low as few inches in many places. As a result, the agriculture productivity of

the taluka is less as compared to the other three talukas. Even as per geology data of

GWSSB the ground water table in Dediapada is the lowest as compared to other

three talukas. For raising ground water tables in Dediapada area, watershed

management and other in situ water conservation technologies can be proposed for

recharge and life saving irrigation at the time of stretch of monsoon.

Table 1.4. 2: Rainfall and Temperature

Sl. No. Taluka No. of Rainfall Temperature

Page 33: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Weather

Stations

No. of

Rainy Days

Average

rainfall (mm)

Min. oC Max. oC

1. Nandod 1 51 930 15 42

2. Dediapada 1 53 1034 13 43

3. Sagbara 1 57 1000 15 43

4. Tilakwada 1 52 930 14 42

Average - 53.25 973.50 14.25 42.5

Source: Revenue Dept., Gandhinagar, 2012

Table 1.4. 3: Year wise rainfall in different blocks in Narmada District (mm)

Sl.

No.

Taluka Year

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Mean

1 Nandod 802 1275 1124 1169 1455 1378 1066 603 1071 930 1074

2 Dediapada 996 1442 1255 1210 1793 1695 1160 1125 1274 1034 1296

3 Sagbara 810 1462 1073 1270 1717 1381 1335 1141 1223 963 1224

4 Tilakwada 814 1176 1069 1007 1399 1100 909 457 938 1073 973

Mean Narmada 855 1338 1130 1164 1591 1388 1117 831 1126 1000 1159

Source: Revenue Dept., Gandhinagar, 2012

There is no good weather watch system in the district. Increasing concern with

climate change and climate resilient agriculture, there is a need to establish a unique

weather watch and forecasting system in the district.

1.5 Soil Classification

An analysis of the soil condition, in conjunction with the slope classification of the

Narmada district clearly demarcates the hilly region and the relatively plain areas of

Narmada, Karjan and Tapi. The Eastern and South eastern belt of the district-

extending from part of Nandod to Dediapada and Sagbara is characterized by high

slope, shallow to medium soil depth and severe to very severe level of soil erosion. In

the Northern part and North West part of the district mainly Tilakwada and part of is

characterized by the planes with high soil depth. In some places the soil depth is as

high as 20'-30'.

Soil in the district is dominantly distributed to very deep soil depth class followed by

shallow depth. The soil drainage is well to moderately drained in general whereas the

soil salinity is moderate in the district. Based on fertility status and type of terrain,

thye soil in the district has been divided into two types as given below in the table:

Table 1.5. 1: Soil classification in the district

Sr. No. Soil type Characteristics Area in

ha.

1 Undulating, shallow to medium

in depth, fine textured, highly

erosive

Low fertility land and

hilly terrain with

dense forest.

80%

Page 34: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

2 Deep black soil- Plain Deep black soil with

high rainfall- plain

20%

Source: C-DAP Narmada District, 2012-13

The soil in the district has also been classified based on the soil texture. The soil in

the district is mainly from deep black, medium black to loamy type sandy soil which

is found in every blocks of the district.

The district has deep black soil dominating in every taluk of the district. The soils are

dark brown to very dark greyish brown in colour. They contain 40 to 70 percent clay

minerals. The deep black soils, in general, are clay-like in texture, poor in drainage,

and neutral to alkaline in reaction. These soils are most fertile soil in Black soils.

Page 35: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Map 2: Soil classification of district

1.6 Soil Erosion and Runoff Status

An analysis of the soil condition, in conjunction with the slope classification of the

Narmada district clearly demarcates the hilly region and the relatively plain areas of

Narmada, Karjan and Tapi. The Eastern and South eastern belt of the district

extending from part of Nandod to Dediapada and Sagbara is characterized by high

Page 36: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

slope, shallow to medium soil depth and severe to very severe level of soil erosion. In

the Northern part and North West part of the district mainly Tilakwada and part of is

characterized by the planes with high soil depth.

According to climate, topography, soil characteristics and cropping pattern Narmada

district lies in South Gujarat Agro Climatic Zone II. (AES I ) and Middle Gujarat

Agro-climatic Zone III (AES IX). As regards to Agro Ecological situations on the basis

of Phsiography and soil texture, Nandod, Dediapada and Sagbara belong to AES I

while Tilakwada belongs to AES IX.

Table 1.6. 1: Agro-Climatic Zones

Agro-Climatic Zones

and AES

Features Taluka Coverage

South Gujarat Zone-II,

AES-I

Highly erosive Nandod, Dediapada,

Sagbara

Middle Gujarat Zone-III,

AES-IX

Medium erosive Tilakwada

Source: C-DAP Narmada District, 2012-13

1.7 Land Use Pattern

The total geographical area of the district is 275536 ha. out of which area under

agriculture constitutes about 122253 ha. as the gross cropped area. The total net

sown area of the district is 111100 ha. while the area sown more than once is 11153 ha.

Out of the total gross cropped area of the district Nandod taluk has the maximum

gross cropped area with a share of 42% followed by Tilakwada, Dediyapada and

Sagbara which shares about 25.75%, 16.93 and 15.47% respectively. Cropping

intensity of the district is 110.04%.

Table 1.7. 1: Land Use Pattern and area under agriculture

Sl/ Blocks Number

of

villages

covered

Total

Geographical

area (ha)

Area under Agriculture (ha)

Gross

Cropped

Area (1)

Net

Sown

Area

(2)

Area Sown

More

Than Once

(1-)

Cropping

intensity

(%)

Nandod 202 111968 51157 46490 4667 110.04%

Dediyapada 168 102386 20700 18812 1888.44 110.04%

Sagbara 91 36740 18910 17185 1725.14 110.04%

Tilakwada 97 24442 31486 28614 2872.43 110.04%

Total 558 275536 122253 111101 11153.01

Source: Gandhinagar Agriculture Department

Page 37: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Figure 1. 3: Percentage area under agriculture

Table 1.7. 2: Land Use Pattern and area under non-agriculture

Blocks Area under forest

(ha)

Area under

Wasteland

(ha)

Area under other

uses (ha)

Nandod 41540 6666 12605

Dediyapada 66396 5421 4083

Sagbara 11636 5635 559

Tilakwada 921 623 2198

Total 120493 18345 19445

Source: Gandhinagar Agriculture Department

The area under non cultivation has been divided into area under forest, area under

wasteland and area under other uses. The area under forest constitutes about 43.73%

of the total geographical area in the district while area under wasteland and other

uses constitutes about 6.67% and 7.06% of the total geographical area of the district.

The area under waste land has the potential to be converted to fit for agriculture

prupose, if provided with assured source of irrigation and proper soil and crop

management practises. The area under other uses includes roads, infrastructural

make-ups, etc. The taluk wise distribution of the area under non-cultivation is shown

in the table below. Dediyapada has maximum area under forest with share of 55.10%

followed by Nandod, Sagbara and Tilakwada with a share of 34.48%, 9.67% and

0.76% respectively. Nandod taluk has maximum area under wasteland and other

uses and constitutes about 36.34% and 64.82%.

41.85%

16.93%

15.47%

25.75%

Percentage Area under Agriculture

Nandod

Dediyapada

Sagbara

Tilakwada

Page 38: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Map 3: Land Use Pattern in the district

Page 39: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Chapter II

District Water Profile

According to climate, topography, soil characteristics and cropping pattern in

Narmada district lies in Agro Climatic South Gujarat Zone II characterized by rainfall

ranging from 800 mm to 1100 mm . Organic carbon as well as Nitrogen content-low,

Phosphorus-Medium, Potash is high. So, overall, the soil fertility indices are good

from the agriculture point of view. In Vadodara district the predominating existing

farming system is Agriculture + Animal Husbandry followed by Agriculture + Animal

Husbandry + Horticulture. The major cropping system under the existing farming

systems is primarily, Cotton alone, pigeon pea alone, sugarcane alone, paddy wheat

cropping with buffalo, Maize – Banana cropping with buffalo, Maize–Groundnut

cropping with buffalo. Tobacco alone or tobacco-Bajara (summer). The district has

significant areas under other cropping systems of paddy- wheat, Kharif pulse -

Sugarcane, sorghum-wheat, vegetable-vegetable, vegetable-wheat, fallow-wheat.

Now a days total cropped area of cotton & castor was increased instead of other

cereals crop while, in some part of Vadodara district Horticulture cultivation

increased with Agriculture crop.

The district is having two agro-climatic zones and two Agro ecological situations. The

soil topography, resource availability is different in all the four blocks of the district.

The land of Dediapada, Sagbara and some part of Nandod having shallow soil with

hilly tarennian while, that of Tilakwada block is black cotton soils. The soil is poor in

organic carbon, medium in phosphorous and rich in potash. The Tilakwada and

Nandod blocks enjoying good irrigation facilities and major source of irrigation is

canal water from Sardar Sarovar and Karajan projects. The Dediapada and Sagbara

block having very limited irrigation facilities and major source of irrigation is wells.

The Nandod blocks have made tremendous progress due to cultivation of banana,

sugarcane and cotton. The contract farming in banana is unique example of success

in the state. Majority of the farmers in Dediapada and Sagbara are growing their

crops only for their subsistence, since last three four years, the farmers have the

visualized the importance of scientific method of cultivation of crops and their

hunger for such technologies have increased. There is tremendous potentiality for

increasing growth of the district by diversifying the farming system, in favor of

vegetables and fruits and efficient management of inputs.

2.1.1 Area-wise, Crop-wise Irrigation Status

The major crops include Paddy, Wheat, Jowar, bajra, Maize, Mung, Udid, Tur,

Groundnut, Cotton, Castor, Sesamum and Soyabean. The crips are grown in three

season i.e., Kharif, Rabi and Summer season. The table below shows the taluk wise

area under different crops grown under irrigated and rainfed conditions. The total

area under different agricultural crops is 150457 ha. of which crops grown under

irrigated condition is 63265 ha. while under rainfed condition is 87192 ha.

Page 40: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Table 2.1. 1: Crop area under Kharif, Rabi and Summer

Tehsil/ Sub

tehsil

Kharif (Area in ha.) Rabi (Area in ha.) Summer (Area in ha.)

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

Nandod 15121 27537 42658 11289 1409 12698 2626 0 2626

Dediyapada 2301 33056 35357 2594 900 3494 1965 0 1965

Sagbara 2747 15720 18467 5050 789 5839 1449 0 1449

Tilakwada 14556 7637 22193 2325 144 2469 1242 0 1242

Garudeshwar N/A N/A 0 N/A N/A 0 N/A 0 N/A

Total 34725 83950 118675 21258 3242 24500 7282 0 7282

Source: Gandhinagar Agriculture Department

*Note: The data regarding Garudeshwar is not available since the taluk

was formed in 2014-15 and no survey has been conducted for collection

of data so far.

About 78.88% of area under different agricultural crops is grown in Kharif season

while 16.28% of the total area under different agricultural crops is grown in Rabi

season. The rest of the crops are grown in summer season which constitutes about

4.84% of the total area under different agricultural crops. Among Taluks as given in

the figure below, 35.95% of the area under Kharif season is grown in Nandod

followed by Dediyapada which constitutes about 29.79%. the rest is distributed

among Tilakwada with 18.70% and Sagbara 15.56%.

Figure 2.1. 1: Percentage share of kharif crop area in different taluk

Among Rabi crops grown in the district, 51.83% is grown in Nandod taluk followed

by Sagbara (23.83%), Dediyapada (14.26%) and Tilakwada (10.08%). The figure

given below shows the percentage wise distribution of different crops in Rabi season

in different taluk.

35.95%

29.79%

15.56%

18.70%

Percentage Share Kharif Crops

Nandod Dediyapada Sagbara Tilakwada

Page 41: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Figure 2.1. 2: Percentage share of rabi crop area in different taluk

Under summer season crops, Nandod taluk shares the maximum area with 36.06%

of the total area under summer season crops followed by Dediyapada (26.98%),

Sagbara (19.90%) and Tilakwada (17.06%).

Figure 2.1. 3: Percentage share of summer crop area in different taluk

As stated above the total area under rainfed condition is 57.95% while under

irrigated condition is 42.05% of the total area under different agricultural crops.

Under different taluk, Nandod has maximum area under irrigation which constitutes

about 45.90% of the total irrigated area while Dediyapada has maximum area under

rainfed and it constitutes about 38.94% of the total rainfed area.

51.83%

14.26%

23.83%

10.08%

Percentage Share Rabi Crops

Nandod Dediyapada Sagbara Tilakwada

36.06%

26.98%

19.90%

17.06%

Percentage Share Summer Crops

Nandod Dediyapada Sagbara Tilakwada

Page 42: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Figure 2.1. 4: Percentage share of rainfed and irrigated area in different

taluk

2.1.2 Irrigation status of horticulture and plantation crops

Under horticultural crops, fruit crops, different vegetable crops, Spices and flower

are grown in the district. The total area under horticulture includes 22891 ha. The

total area under fruit crops in the district stands at 12952 ha. while under vegetable

crops it is 9372 ha. 384 ha. of the total horticultural area under district is grown

under spices and 183 ha under flower crops.

Table 2.1. 2: Horticultural & Plantation crop area in the district

Tehsil/ Sub tehsil Horticulture & Plantation Crops (Area in ha)

Irrigated Rainfed Total

Nandod 12683.6 0 12683.6

Dediyapada 4533.1 0 4533.1

Sagbara 3633.5 0 3633.5

Tilakwada 2040.8 0 2040.8

Garudeshwar N/A N/A 0

Total 22891 0 22891

Source: Gandhinagar Agriculture Department

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

45.00%

50.00%

Nandod Dediyapada Sagbara Tilakwada

Percentage Share of Irrigated Area Percentage Share of Rainfed Area

Page 43: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Figure 2.1. 5: Percentage distribution of horticultural areas in different

taluk

Under Horticultural crops, fruits vegetables, masala and flowers are grown. The

major fruits grown in the district includes banana, mango and papaya which are

grown in area of 66.41%, 26.81% and 2.63% of the total area under fruit production

in the district. Nandod taluk has maximum area under banana and papaya

cultivation i.e., 7568 ha and 260 ha respectively. While Dediapada has maximum

area under Mango production which is 1042 ha.

Under Vegetable production, cucurbits, clusterbeans, brinjal and Okra are majorily

grown in the district and constitutes about 27%, 11.56%, 9.78% and 9.25%

respectively, of the total area under vegetable production in the district. Nandod

taluk has maximum area under vegetable production and constitutes about 36.60%

followed by Dediapada which constitutes about 31.91%, Sagbara with 20.45% and

Tilakwada 11.07%.

Ginger, Fenugreek, Turmeric and Chilli are the main spices grown in the district and

constitute about 30.47%, 24.22%, 23.44% and 19.53% respectively. Nandod taluk has

the maximum area under spice procution and constitute about 41.67% followed by

Dediapada with 35.55% Sagbara with 17.99% and Tilakwada with 4.79%.

The district also grows flower as one of the ornamental crops under horticulture on

an area of 183 ha of the total area under horticulture. Marigold and Rose are the

major flowers grown in the district and constitutes about 45.90% and 41.53%

respectively of the total area under flower production. Among taluk, Nandod has

maximum area under flower cultivation and constitute about 51.15% followed by

Dediapada with 22.73%, Sagbara with 17.70% and Tilakwada with 8.42%.

55.41%

19.80%

15.87%

8.92%

Percentage Share

Nandod Dediyapada Sagbara Tilakwada

Page 44: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

2.2 Production and Productivity of major Crops

The total production under different agricultural crops is 1416931 quintal per annum.

Under horticultural crops the total production stands at 786291 quintal per annum.

The average productivity of agricultural crops in the district under irrigated situation

stands at 1213 kg per ha. while under rainfed condition the productivity is 605 kg per

ha. The average productivity of horticultural crops is 2089 kg per ha.

Table 2.2. 1: Production and productivity of major crops in the district

Tehsil/ Sub-

tehsil

Gross

Cropped

Area

(ha)

Rainfed Irrigated Horticulture

Production

(Qtl/yr)

Yield

(Kg/ha)

Production

(Qtl/yr)

Yield

(Kg/ha)

Production

(Qtl/yr)

Yield

(Kg/ha)

Nandod 70666 213362 737.10 575198 1980.98 600505 4735

Dediyapada 45349 187245 551.43 80183 1168.84 66982 1478

Sagbara 29389 100043 605.99 92156 996.71 74051 2038

Tilakwada 27945 40831 524.75 127913 705.80 44752 2193

Garudeshwar N/A N/A N/A N/A N/A N/A N/A

Total 173348 541481 604.82 875450 1213 786291 2089

Source: Gandhinagar Agriculture Department

The total area under rainfed is 87192 ha while under irrigated condition, it is 63265

ha but it can be observed from the table above that the total production under

irrigated is more than the rainfed condition. It implies that the year round

availability of water for the criops help in increase in its production and also more

number of crops can be taken in a field as compared to rainfed condition. The

productivity of the irrigated condition is higher as compared to rainfed condition.

The taluka wise distribution of crop production under rainfed area is given in the

figure below. Nandod taluk constitutes about 39.40% of total production under

rainfed condition followed by Dediyapada with 34.58%, Sagbara with 18.48% and

Tilakwada 7.54%.

Page 45: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Figure 2.2. 1: Taluk wise distribution of crop production under rainfed

condition

The figure below shows percentage distribution of irrigated production under

different taluk in the district.

Figure 2.2. 2: Taluk wise distribution of crop production under

irrigated condition

39.40%

34.58%

18.48%

7.54%

Percentage share Rainfed

Nandod Dediyapada Sagbara Tilakwada

65.70%

9.16%

10.53%

14.61%

Percentage share Irrigated

Nandod Dediyapada Sagbara Tilakwada

Page 46: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Nandod taluk shares the maximum area under irrigated condition of about 65.70%

followed by Tilakwada which constitutes about 14.61%, Sagbara with 10.53% and

Dediyapada with 9.16%.

The figure below shows percentage distribution of horticultural production under

different taluk in the district.

Figure 2.2. 3: Taluk wise distribution of horticultural crop production

2.3 Irrigation based classification

The district has been classified into gross irrigate, net irrigated and rainfed areas.

Under irrigation based classification, the gross irrigated area in the district stands at

86156 ha. while the net irrigated area is 39104 ha. The gross rainfed area in the

district is 87192 ha.

Table 2.3. 1: Irrigation Based classification

Name of

Block/ Taluka

Irrigated (Area in ha) Rainfed (Area in ha) Total sowing

area Partially

Irrigated/Protective

Irrigation

Un-

lrrigated or

Totally

Rainfed

Gross

Irrigated

Area

Net Irrigated

Area

Nandod 41719.6 22428 Nil 28946 70665.6

Dediyapada 11393.1 544 Nil 33956 45349.1

Sagbara 12879.5 2148 Nil 16509 29388.5

Tilakwada 20163.8 13984 Nil 7781 27944.8

Garudeshwar N/A N/A Nil N/A N/A

Total 86156 39104 0 87192 173348

Source: Gandhinagar Agriculture Department

The figure below shows taluk wise percentage share of area under gross irrigated,

rainfed and net irrigated.

76.37%

8.52%

9.42%5.69%

Percentage share horticultural crop production

Nandod Dediyapada Sagbara Tilakwada

Page 47: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Figure 2.3. 1: Percentage area under irrigation based classification

Nandod taluk has the maximum area under net irrigated area and constitutes about

57.35% followed by Tilakwada which has 35.76%, Sagbara with 5.49% and

Dediyapada with 1.39%. The maximum area under rainfed is of Dediyapada which

constitutes about 38.94% followed by Nandod with 33.20%.

48.42%

13.22%14.95%

23.40%

57.35%

1.39%

5.49%

35.76%33.20%

38.94%

18.93%

8.92%

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

Nandod Dediyapada Sagbara Tilakwada

Percentage share gross irrigated area

Percentage share net irrigated area

Percentage share gross rainfed area

Page 48: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Chapter III

Water Availability

District is drained from east to west mainly by three rivers namely the Narmada, the

Kim and the Tapi The river Narmada after entering the low level of Gujarat plains

near Markai, flows westward to the Gulf of Khambat in Bharuch district. Narmada

moves through a rich flat plain, between high rough banks of hard clay and sand

deposits located mostly in Tilakwada taluka. In its course through the district, the

Narmada receives important tributaries namely the Karjan, the Orsang, the Heran,

the Aswan, and the Men. Rising in the Rajpipla hills, the Kim, for the first part of its

course passes through the Nandod taluka and Valia Mahal territory. The south

eastern extremity of the district touches the Tapi, the second important river of south

Gujarat.

3.1 Status of water availability

The district as a whole was deficient in surface water resources and have also faced

droughts in past. After initiation of Narmada Canal Project nearly 472,219 hectares

of district area will come under irrigation command.

Groundwater occurs under unconfined conditions in all the rock formations in most

of the area of the district. Weathered zone below water table acts as good repository

for storage of groundwater in Deccan Trap areas. In the Infratrapean rocks (Bagh

beds- sandstone, marls and limestone), apart from occurrence of water in the pore

spaces between sand grains, the principal joints, fissures and other planes of

structural weakness play an important role in the movement of groundwater. In the

alluvium, groundwater occupies the open spaces between particles of sand, gravel

and boulder.

Table 3.1. 1: Status of water availability in the district

S.No. Sources Kharif Rabi Summer Total

1 Surface Irrigation

(i) Canal(Major & Medium Irrigation) 66.48 175.15 90.10 331.73

Nandod 41.41 90.98 38.38 170.77

Garudeshwar 5.07 11.15 4.70 20.92

Tilakwada 0.00 0.00 0.00 0.00

Dediyapada 0.00 0.00 0.00 0.00

Sagabara 0.00 20.02 20.02 40.04

(ii) Minor Irrigation tanks 0.00 0.00 0.00 0.00

Nandod 0.00 0.00 0.00 0.00

Garudeshwar 0.00 0.00 0.00 0.00

Tilakwada 0.00 0.00 0.00 0.00

Dediyapada 0.00 0.00 0.00 0.00

Sagabara 0.00 0.00 0.00 0.00

(iii) Lift Irrigation/Diversion 2.67 2.18 0.00 4.85

Nandod 0.00 0.00 0.00 0.00

Garudeshwar 0.00 0.00 0.00 0.00

Tilakwada 0.00 0.00 0.00 0.00 Dediyapada 0.72 0.59 0.00 1.31

Page 49: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Sagabara 1.95 1.59 0.00 3.54

(iv) Various Water Bodies including Rain Water Harvesting/ Check Dam

5.92 5.47 0.00 11.39

Nandod 0.24 0.21 0.00 0.45

Garudeshwar 0.12 0.10 0.00 0.22

Tilakwada 0.23 0.20 0.00 0.43

Dediyapada 1.51 1.36 0.00 2.87

Sagabara 3.82 3.60 0.00 7.42 (v) Treated Effluent Received from STP 0.00 0.00 0.00 0.00

(vi) Untreated Effluent 0.00 0.00 0.00 0.00

(vii) Perennial sources of water 0.00 0.00 0.00 0.00

Total 75.07 182.80 90.10 347.97

Source: Irrigation Department of Narmada district

The total water availability under surface water includes canal water from Narmada

dam. The water availability under Kharif season is 75.06 MCM and under Rabi

season the water availability is 182.8 MCM while under summer 90.1 MCM of water

availability is in the district. The total water availability under canal (major and

minor) is 347.97.

*Note: The data regarding Garudeshwar is not available since the taluk was formed

in 2014-15 and no survey has been conducted for collection of data so far.

3.2 Status of Ground water availability

Groundwater occurs under unconfined conditions in the limestone and sandstone

aquifers. Occurrences and movement of groundwater is restricted mainly to the

fractures and joints in the limestones and sandstones. Due to the cherty nature of

limestone aquifers and calcareous nature of the sandstones, the primary porosity as

well as development of solution cavities is very poor. The Basal conglomerate beds

are poorly permeable on account of calcareous cement. However, these

conglomerates when exposed to surface, give rise to good aquifers which support

shallow wells. The discharge in dug wells varies from 30 to 50 m3 /day. In highly

weathered conglomerates and sandstones, the yield of wells ranges up to 700 lpm for

drawdown of 1 to 2 m and recuperation is fast.

Ground water recharge during monsoon season has been computed using water level

fluctuation method and compared with recharge by the infiltration factors.

Depending upon percent deviation value, Gross Recharge has been calculated as per

the recommended methodology. Besides rainfall, the recharge due to seepage from

canal, return flow from irrigation, recharge from tanks, ponds & water conservation

structures, etc. were also considered. The total annual recharge was obtained as the

sum of the monsoon and non-monsoon periods comes out to be 218.26 MCM per

year while the annual draft is 74.47 MCM.

Page 50: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Table 3.2. 1: Status of Ground water availability in the district

Taluk Status of Block as per Central

Ground Water Board Notification

Ground Water (MCM)

Critical Semi-

Critical

Safe Draft Recharge Gap

Nandod Nil Nil Yes 52.89 107.39 54.50

Dediyapada Nil Nil Yes 7.54 30.85 23.31

Sagbara Nil Nil Yes 6.92 50.11 43.19

Tilakwada Nil Nil Yes 7.12 29.90 22.79

Garudeshwar Nil Nil Nil N/A N/A N/A

Total 74.47 218.26 143.80

Source: GWRDC

Figure 3.2. 1: Percentage distribution of draft and recharge among

different taluk

All the taluk of the district falls under safe category which states that there is lot

potential of the region to harness the ground water for domestic and irrigation

purposes. As per the Central Ground Water Board report the alluvial aquifers in the

district are exploited with the help of dug wells, dug-cum-bored wells and tube wells

for irrigation. The yield of wells in alluvial formation varies from 400 to 700 litre per

minute (lpm) for drawdowns varying from a few meters to as much as 21 m. There

are 2872 wells of all types in the district are in use as per the MI Census 2000-2001

and the total annual draft is computed to of the order of 6503 ha. m (GEC 2011).

Groundwater development in Nandod taluka is highest (40.57%). The wells in hard

rocks generally have low to moderate recuperation. The development of groundwater

in Dendiapada taluka is low (16.61%) as the taluka is entirely occupied by hard rocks

which have low to medium potentialities.

Rain water is the major source of recharge of ground water in the district. Besides

natural source, artificial sources can also be developed to recharge the ground water.

The Vadodara district has moderate to high rate of ground water development,

71.02%

10.12% 9.29% 9.56%

49.21%

14.14%

22.96%

13.70%

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

Nandod Dediyapada Sagbara Tilakwada

Draft

Recharge

Page 51: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

mainly in areas of western part where multilayer aquifer system exists. This area has

come under Narmada Irrigation Command since last two years. There is likely to be

surplus surface water resources in various stretches of canal command which can be

diverted to numerous tanks & dry rivulets of the areas which will help to recharge

subsurface aquifers. With efficient water management practice, seepage losses and

any other surplus water can be diverted to purposes build structure for artificial

recharge.

3.3 Status of Command Area

The benefits to be accrued, out of groundwater based irrigation and domestic /

industrial supply in conjunction with Narmada Project surface water sources are of

manifolds. Sustainable and dependable supply from ground water reservoir, with

Narmada Canal Water in command areas, may help farmer raising additional crops

suitable to the areas so as to ensure optimum utilization of available land, water and

human resources.

In Narmada district the total command area under canal command is 48578.50 ha.

out of which 40335 ha. falls under developed under canal command leaving a gap of

8244 ha. which can be further developed for agricultural purposes. The taluk wise

percentage of total canal command area is given in the figure below:

Figure 3.3. 1: Percentage district Canal Command Area

Table 3.3. 1: Status of canal command area in the district Name of the Blocks Information of canal command

Total Area Developed Area Undeveloped Area

Nandod 24842.4 17499 7343.4

Dediyapada 0 0 0

Sagbara 1818 1818 0

Tilakwada 13436 13436 0

Garudeshwar 8482.1 7582 900

Total 48578.5 40335 8244

Source: District Irrigation Department

51.14%

3.74%

27.66%

17.46%

Percentage of Canal Command Area

Nandod Sagbara Tilakwada Garudeshwar

Page 52: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

In the district, Nandod taluk shares the maximum percentage of developed area

under canal command which is 43.38% followed by Tilakwada, Garudeshwar and

Sagbara with a share of 33.31%, 18.80% and 4.51% respectively. The percentage

share of each taluk under total canal command area developed is given in the figure

below:

Figure 3.3. 2: Percentage distribution of developed area under canal

command

43.38%

4.51%

33.31%

18.80%

Percentage of Developed Canal Command Area

Nandod Sagbara Tilakwada Garudeshwar

Page 53: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Map 4: Canal of the district

The undeveloped area under Canal command is maximum in Nandod taluk with

7343 ha. followed by Garudeshwar taluk with 900 ha.

3.4 Existing Type of Irrigation

The major source of irrigation in the district is constituted by canal which forms the

surface irrigation sources. There are 7 canal based source of surface irrigation.

Besides this there are ground water sources that also prevails in the district. Under

ground water sources there are dugwells and tube wells as major source. Taluk wise

ground water structure is given below.

Table 3.4. 1: Taluk wise existing irrigation structures

Taluk Dugwell Tube well Total

Nandod 896 317 1213

Dediayapada 656 11 667

Sagbara 567 5 572

Tilakwada 291 129 420

Total 2410 462 2872

Source: District Irrigation Department

Page 54: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

From the table above it can be stated that dug wells are the major sources of ground

water in the district. There are 2410 dugwells in the district as compared to 462 tube

wells. The maximum number of dugwells is found in Nandod district which also falls

under safe category of ground water development.

Figure 3.4. 1: Percentage distribution of tube-wells and dug-wells in the

district

It can be observed from the figure above that dug-well is the major source of

irrigation in the district the largest number of dugwell can be found in Nandod taluk

which constitutes about 37.18% of the total number of dug-wells in the district

followed by Dediyapada and Sagbara which constitutes about 27.22% and 23.53%

respectively. Tilakwada constitute about 12.07% of total dug well in th district. The

maximum nuber of tube-wells is located in two district i.e., Nandod and Tilakwada

and constitutes about 68.61% and 27.92% respectively of the total number of tube

wells in the district. Dediyapada constitutes about 2.38% and Sagbara 1.08% of the

total number of tube wells in the district.

Table 3.4. 2: Taluk wise canal based, tanks/reservoir irrigation

structures

Taluk Canal Based Tanks/ Reservoir/

Ponds

Total

Nandod 2 0 2

Dediayapada 0 0 0

Sagbara 2 0 2

Tilakwada 1 0 1

Garudeshwar 2 0 2

Total 7 0 7

37.18%

27.22%23.53%

12.07%

68.61%

2.38% 1.08%

27.92%

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

Nandod Dediayapada Sagbara Tilakwada

Dugwell

Tube well

Page 55: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Source: District Irrigation Department

In areas under irrigation, especially in canal command, development of ground water

acting as a vertical drainage would create more avenues for recharge of rainfall and

thus would minimize water logging. Optimum withdrawal of ground water would

facilitate induce recharge from return seepage of irrigation and other surface water

bodies and ultimately it will result in prevention of undue built up water levels (water

logging) in subsurface.

With conjunctive use of both surface water and ground water, there would be large

scope for ground water conservation by which deep aquifer can be reserved as ‗Safe

Spot Source‘ for providing immediate drinking water supply. Similarly in drought

situation when surface water sources are subject to depletion or dry up, it is only the

dependable source of ground water that can be harnessed to provide immediate

relief.

Page 56: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Map 5: River water bodies of district

Page 57: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Chapter IV

Water Demand

Water is life because plants and animals cannot live without water. Water is needed

to ensure food security, feed livestock, maintain organic life, take up industrial

production and to conserve the biodiversity and environment. Hence, there is no life

without water. Earth is the only plant, so far known to have water and this makes it

fit for human living. However, with reckless abuse and increasing demand, due to

growing population and unsustainable lifestyle, many countries are facing severe

water crisis. In the absence of suitable corrective measures, many developing

countries including India, will have to face crisis of food and water security in the

near future.

India‘s population is increasing but will stabilize in the middle of this century. The

BAU scenario assumes that the population will increase at 1.3 % over the period

2000-2025, and at 0.52 % between 2025 and 2050. The population growth is

expected to stabilize in the early 2050s, although several large states will have

peaked in their population growth well before the year 2050, and certain states will

even record declining trends as early as the 2030s and 2040s. Urbanization will also

continue to expand, and slightly over half of India‘s population will live in urban

areas by 2050.

Although, India is not a water poor country, due to growing human population,

severe neglect and over-exploitation of this resource, water is becoming a scarce

commodity. India is more vulnerable because of the growing population and in-

disciplined lifestyle. This calls for immediate attention by the stakeholders to make

sustainable use of the available water resources.

Major consumption of water is for agriculture, industrial production and domestic

purposes, apart from being used for fishery, hydro-power generation, transportation

and maintaining biodiversity and ecological balance.

4.1 Domestic Water demand

Data of Census 2011 and 2001 has been considered to arrive at the growth rate of

population of the district. As per Census 2011, the district has shown an decadal

growth rate of 14.75%. Table 4.1.1 below indicates the block-wise population of the

district. Current population (2015) has been calculated by compounded annual

growth rate over a period of four years (2011-2015). Projected population has been

calculated in similar way by assuming compounded annual growth rate over the

period of five years (2015-2020). It has been assumed that per capita daily water

requirement of people residing in the district is 140 Liters and for population in rural

areas, the daily per capita water requirement is 100 Liters. As per the table below it

can be inferred that the gross requirement of the water in 2020 for domestic

consumption will be 25.03 MCM.

Page 58: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Table 4.1. 1: Domestic water requirement

Blocks 2011 2015 Gross

water

demand

in MCM

(2015)

Population 2020 Gross

water

demand

in MCM

(2020)

Nandod 241053 255593 9.43 275007 10.15

Dediyapada 174449 184971 6.89 199022 7.41

Sagbara 110924 117615 4.47 126549 4.81

Tilakwada 63871 67724 2.47 72868 2.66

Garudeshwar N/A N/A N/A N/A N/A

Total 590297 625903 23.26 673445 25.03

As per the table above it can be inferred that the gross requirement of the water in

2020 for domestic consumption will be 25.03 MCM and the consumption of water

for drinking and other domestic purpose will increase by 7.60% by the year 2020.

4.2 Water demands for crops

Presently, inspite of good rainfall distribution, the country is unable to make good

use of rain water, because of lack of awareness and poor infrastructure to construct

dams and reservoirs. As a result, only about 35-40% of the cropping area receives

irrigation to take 1-2 crops in a year.

Crop water requirement is the water required by the plants for its survival, growth,

development and to produce economic parts. It is essential to know that the water

requirement of the crop is the total quantity of water required from its sowing time

up to harvest. Thus, different crops may have different requirement. This

requirement is applied either naturally by precipitation or artificially by irrigation.

The crop water requirement includes several losses such as:

a. Transpiration loss through leaves

b. Evaporation loss through soil surface in the cropped area

c. Amount of water used by plants for its metabolic activities which is estimated

at less than 1% of the total water absorption

d. Other application losses are conveyance loss, percolation loss, run-off loss, etc.

e. The water required for special purposes like ploughing operation, land

preparations, weeding, etc.

The main source of irrigation is from deep/ medium/ shallow tube wells in the

district and Lift Irrigation Schemes. There are no canals in the district as such

irrigation is mainly from tube wells.

Calculation of water requirement for crops

Page 59: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Crop water requirement is calculated based on water depth required for each crop

and area sown. The major crops grown in the Una district includes Paddy, Maize and

Wheat. The depth of irrigation and number of watering required for these crops is

given in the Annexure.

The tehsil wise crop water requirement was calculated based on the total area under

cultivation in Kharif and Rabi season. All the cropped area including area under

horticultural crops has been considered for demand estimation. The net irrigated

area for different tehsil was taken for the calculations of water requirement for

different crops.

Table 4.2. 1: Crop Water Requirement

Block Area

sown

(Ha)

Irrigated

area

(ha)

Crop

Water

Demand

Water

Potential

Required

Existing

Water

Potential

Water

Potential

to be

created

Nandod 70666 41720 47.15 47.15 17.68 29.47

Dediyapada 45349 11393 50.38 50.38 40.65 9.72

Sagbara 29389 12880 15.16 15.16 8.03 7.13

Tilakwada 27945 20164 4.61 4.61 1.70 2.90

Garudeshwar N/A N/A N/A N/A N/A N/A

Total 173348 86156 117.30 117.30 68.07 49.23

Figure 4.2. 1: Percentage distribution of water potential

0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00%

Nandod

Dediyapada

Sagbara

Tilakwada

Water Potential to be created Existing Water Potential Water Potential Required

Page 60: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

4.3 Water demand for Livestock

Livestock is the major source of livelihood in rural areas and provides a source of

income during the lean period. The daily water requirement of livestock varies

significantly amongst the animal species. The animal‘s size and growth stage will also

have a strong influence on daily water intake. Consumption rates can be affected by

environmental and management factors. The quality of the water, which includes

temperature, salinity and impurities affecting taste and odour, will also have an

effect. The water content of the animal‘s diet will influence its drinking habits. Feed

with relatively high moisture content decreases the quantity of drinking water

required. The following assumptions have been made in the water demand

calculation for the livestock:

Poultry bird 0.2 LPD

Goat and Sheep 6 LPD

Cows 40 LPD

Buffaloes 60 LPD

The tehsil wise livestock population is the total number of livestock including small

and large animals. The present water demand is for the year 2015 and it is the gross

water demand for all the small and large animals calculated tehsil wise. The annual

growth rate for the livestock population is taken as growth from the two consecutive

livestock census i.e., 18th and 19th livestock census and the same is described below

for all the small and large animals:

Poultry growth rate of 21.77%

Ducks growth rate of 21.77%

Goat population with a growth rate of 166.38%

Sheep population with growth rate of 207.63%

Cattle growth rate of 27%

Buffaloes growth rate of 321%

Draft Animal growth rate of 147%

The population thus calculated for the period from 19th livestock census to the

current year of 2015 and projected for the next five years i.e., from 2016-17 to 2019-

2020.

In case of livestock with decreasing growth rate of population, the present population

has been considered for the subsequent years as well. It is assumed that present

water requirement of livestock is met from existing water usage and hence existing

potential is equal to existing demand.

Page 61: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Table 4.3. 1: Livestock Water Demand

Tehsil/Sub

tehsil

Livestock Population (No.) Water Requirement (MCM) Existing

Water

Potential

(MCM)

Water

Potential

to be

created

(MCM)

2012 2015 2020 2015 2020

Nandod 255888 266908 287076 2.60 2.86 2.60 0.26

Dediyapada 273191 284900 306483 3.01 3.34 3.01 0.34

Sagbara 111650 115436 122380 1.06 1.17 1.06 0.10

Tilakwada 129338 139652 159050 2.52 2.92 2.52 0.39

Garudeshwar N/A N/A N/A N/A N/A N/A N/A

Total 770067 806895 874988 9.19 10.29 9.19 1.10

The projected water demand for the livestock population in 2020 has been estimated

to be 10.29 MCM. Hence, the additional water potential which has to be created for

projected population of livestock in 2020 is 1.10 MCM.

4.4 Water Demand for Industries

The main sources of water for the industrial sector are groundwater and surface

water. Groundwater has emerged as an important source to meet the water

requirements of industries. Choice of source of water depends on the availability of

sufficient and regular supply of water and the cost of water from the source. While

the running cost of surface water is mainly the price paid to the supplier—the

municipal bodies; the cost of groundwater is the extraction cost—energy used

(electricity/diesel). Since the prices of all the inputs, water, electricity, and diesel are

administered or regulated by the government, the inefficient use of water remains a

normal practice. Since the surface water supply from municipal sources is not

sufficiently guaranteed, industrial units tend to depend on groundwater.

Industrial water demand has been increasing with the pace of industrial

development. The growth in some of the water intensive industries has been quite

significant, putting further pressure on the industrial demand for water.

Water supply for the industrial purposes in the district can be obtained from three

main sources like Gujarat Water Supply and Sewerage Board, irrigation canal and

Sardar Sarovar Project.

Table 4.4 1: Industrial water demand

Tehsil/ Sub-tehsil Present water

demand

(MCM)

Water demand in

2020 (MCM)

Existing water

potential

(MCM)

Water potential to be

created (MCM)

Nandod 0 0 0 0

Dediyapada 0 0 0 0

Sagbara 12.41 43.8 12.41 31.39

Tilakwada 0 0 0 0

Garudeshwar N/A N/A N/A N/A

Total 12.41 43.8 12.41 31.39

Page 62: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

The project envisages supply of water for drinking purposes, irrigation and industrial

use. Water is made available for the industrial use through the branch canals laid

down in the different talukas spread over 3.65 km. Wadia, the branch canal supplies

water to Narmada district starting from Nandod and end point at Koliary.

4.5 Water demand for Power generation

The power generation is mainly done through hydro power, based in the district

4.6 Sector wise water demand

After analysing the water requirement from every sector, it can be concluded that the

total present water requirement of the district from all the sectors is 819.21 MCM and

from all the sector the highest water demand is from the agriculture which requires

774.34 MCM of water annually. With the growth in population and increase in per

capita food requirement in the district, the total water requirement is going to see an

upward trend by the year 2020.

The growth in living standards of the people and urbanization, will tend to increase

the industrial water demand in the district. Since, power generation is hydel based so

the consumption of water has not been shown under power generation. Livestock

tends to shows a minimal growth from the year 2008, 18th livestock census.

Table 4.6. 1: Sector wise water requirement in 2015

Sl. No. Tehsil/ Sub tehsil Sector-wise water demand (2015) Total

(MCM) Domestic

(MCM)

Crop

(MCM)

Livestock

(MCM)

Industries

(MCM)

1 Nandod 9.43 397.46 2.60 0.00 409.49

2 Dediyapada 6.89 157.06 3.01 0.00 166.96

3 Sagbara 4.47 102.13 1.06 12.41 120.07

4 Tilakwada 2.47 117.69 2.52 0.00 122.69

5 Garudeshwar N/A N/A N/A N/A N/A

Total 23.26 774.34 9.19 12.41 819.21

Page 63: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Figure 4.6. 1: Percentage share of water requirement in various sector

in 2015

While water for consumption is most crucial, it is equally important to provide water

for irrigation to increase the food production and livestock husbandry, to ensure food

security for the increasing population. Growing population, as everyone is aware, is

a serious concern as it will create further burden on the per capita water availability

in the future.

For the year 2020, the water demand for various sector is expected to increase to

853.46 MCM. The percentage wise distribution to various taluk has been provided in

the figure below.

Table 4.6. 2: Sector wise water requirement in 2020

Sr. Tehsil/ Sub

tehsil

Sector-wise water demand (2020) Total

(MCM) Domestic

(MCM)

Crop

(MCM)

Livestock

(MCM)

Industries

(MCM)

1 Nandod 10.15 397.46 2.86 0.00 410.47

2 Dediyapada 7.41 157.06 3.34 0.00 167.82

3 Sagbara 4.81 102.13 1.17 43.80 151.90

4 Tilakwada 2.66 117.69 2.92 0.00 123.27

5 Garudeshwar N/A N/A N/A N/A N/A

Total 25.03 774.34 10.29 43.80 853.46

49.99%

20.38%

14.66%

14.98%

Percentage Share of present water requirement under various sector

Nandod Dediyapada Sagbara Tilakwada

Page 64: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Figure 4.6. 2: Percentage share of water requirement in various sector in 2020

4.7 Water Budget

From the above estimation of water requirement and the present water demand, a

water budget is prepared. A water budget reflects the relationship between input and

output of water through a region. Thus we have a direct comparison of supply of

water and the natural demand for water. The following data provides current water

gap and projected water gap for the year 2015 and 2020 respectively. The water

budget has been estimated based on the assumption and figures arrived from the

tables listed above in various components.

Table 4.7. 1: Water budget in the district

Tehsil/ Sub- tehsil

Existing water availability (MCM) Total

(MCM)

Water Demand (MCM)

Water Gap (MCM)

Surface Water

Ground Water

Present (2015)

Projected (2020)

Present (2015)

Projected (2020)

Nandod 189.07 52.89 241.96 409.49 410.47 167.53 168.5129

Dediyapada 47.273 7.54 54.813 166.96 167.82 112.15 113.0073

Sagbara 26.794 6.92 33.714 120.07 151.9 86.356 118.1863

Tilakwada 84.855 7.12 91.975 122.69 123.27 30.715 31.29527 Garudeshwar N/A N/A N/A N/A N/A N/A NA

Total 348 74.47 422.5 819.2 853.5 396.8 431

It can be observed from the table above that the water potential for the present

scenario stands at 819.21 MCM while for the year 2020 it is expected to be 853.46

MCM. The surface water availability through various sources stands at 348 MCM

48.10%

19.66%

17.80%

14.44%

Percentage Share of projectedwater requirement under various sector

Nandod Dediyapada Sagbara Tilakwada

Page 65: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

while the ground water availability is 74.47 MCM. The total existing water

availability is 422.5 MCM in the district leaving a gap of 396.8 MCM which needs to

be filled with coming year. The projected gap for 2020 is 432 MCM. The efficient use

of water through micro irrigation and conservation of water from source to sink can

help in meeting the growing demand

Note: Surface water taken as: SSNL covering Tilakwada; Vyara covering Sagbara;

20% of karjan for dediyapada and 80% Karjan project covering Nandod

With regard to the water use efficiency in agriculture, district still uses traditional

system of irrigation which is predominately flood irrigation and over-watering which

leads to loss of water efficiency and wastage of water. The wastage of water is also

due to improper water conservation measures and crop varieties which demand

more water. However, farmers are not motivated to conserve water as there is no

incentive for them to do so. Global warming is posing further challenge, as the water

requirement for crops will increase due to higher evapo-transpiration thereby

suppressing agricultural production.

Page 66: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Chapter V

Strategic Action Plan

The District‘s Strategic Plan is a guide or roadmap for how the District will respond

to current and future challenges. The plan provides the District with overall direction

on how to achieve future success. It does not, however, describe all of the specific

actions we will need to take in order to achieve our objectives. These actions are

spelled out in a series of master plans, business plans, and a rehabilitation and

betterment plan; each plan outlining the tasks, milestones, and key dates for the

various objectives contained in the Strategic Plan.

5.1 Taluka wise total plan of the district

The outlay for the district amount to Rs.30853.02 lakhs out of which Nandod taluk

shares the maximum percentage of the total outlay i.e., 51.20% followed by Sagbara

with 17.13%, Dediyapada with 16.26%, Garudeshwar with 10.30% and Tilakwada

with 5.12%.

Table 5.1. 1: Taluka Wise outlay

Taluk Wise Outlay (Amount in Rs. Lakhs) Talukas WRD SSNL GWRDC GLDC GGRC GSWMA ATMA Grand Total Nandod 9900.00 Nil 52.6 Nil 2832 3011.13 0.00 14237.30 Dediyapada 1845.00 Nil 161 234.4 1306 1452.70 16.40 6574.07 Sagbara 520.00 Nil 1341.36 205.44 1607 1596.47 14.37 5284.43 Tilakwada 260.00 209.1 Nil 238.88 854 0.00 16.71 1578.66 Garudeshwar 990.00 14.9 240.24 200.96 229 1489.23 14.06 3178.56 Grand Total 13515.00 224.00 1795.20 879.68 6828.06 7549.53 61.54 30853.02

In the total outlay proposed for different taluk in the district, WRD department

constitues the maximum share with 43.80% followed by watershed under GSWMA

with 24.47%, GGRC with 22.13%, GWRDC with 5.82%, GLDC with 2.85%, SSNL with

0.73% and ATMA with 0.20%.

Page 67: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Figure 5.1. 1: Department wise percentage share of total outlay

Figure 5.1. 2: Percentage share of District irrigation departments

51.20%

16.26%

17.13%

5.12% 10.30%

Percentage Share

Nandod

Dediyapada

Sagbara

Tilakwada

Garudeshwar

73.25%

13.65%

3.85% 1.92%7.33%

Percentage Share of WRD

Nandod

Dediyapada

Sagbara

Tilakwada

Garudeshwar

Page 68: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Figure 5.1. 3: Percentage share of State Irrigation department (SSNL)

Figure 5.1. 4: Percentage share of GWRDC

93.35%

6.65%

Percentage Share of SSNL

Nandod

Dediyapada

Sagbara

Tilakwada

Garudeshwar

3.66%

11.21%

93.40%

0.00% 16.73%

Percentage Share of GWRDC

Nandod

Dediyapada

Sagbara

Tilakwada

Garudeshwar

Page 69: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Figure 5.1. 5: Percentage share of District irrigation departments

Figure 5.1. 6: Percentage share of GGRC

33.31%

29.19%33.94%

28.56%

Percentage Share of GLDC

Nandod

Dediyapada

Sagbara

Tilakwada

Garudeshwar

41.48%

19.13%

23.53%

12.51%

3.36%

Percentage Share of GGRC

Nandod

Dediyapada

Sagbara

Tilakwada

Garudeshwar

Page 70: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Figure 5.1. 7: Percentage share of GSWMA

Figure 5.1. 8: Percentage share of ATMA under Agriculture Department

39.89%

19.24%

21.15%

0.00%

19.73%

Percentage Share of GSWMA

Nandod

Dediyapada

Sagbara

Tilakwada

Garudeshwar

26.65%

23.35%27.16%

22.84%

Percentage Share of ATMA

Nandod

Dediyapada

Sagbara

Tilakwada

Garudeshwar

Page 71: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

5.2 Component Wise Plan

The component wise total outlay of the district constitutes about Rs.31528.14 lakhs.

AIBP and Hark Khet Ko Pani components are to be executed mainly by State and

District Irrigation departments and GLDC under Agriculture department. Per drop

more crop component will be executed by GGRC. Water shed component will be

taken care of by GSWMA under Rural Development Department and Extension &

Training component will be executed by ATMA under Agriculture department.

However, all the stakeholders need to have coordination among them to have the

maximum irrigation efficiency and to avoid duplicity. It is observed that maximum

share of 39.75% is for AIBP component followed by Per Drop More Crop 22.13%,

PMKSY Watershed component with a share of 21.86%, Har Khet Ko Pani 13.45% and

ATMA component constitutes about 0.20% of the total outlay.

Table 5.2. 1: Component wise financial outlay (Amount in Rs. lakhs)

Component Wise 2016-17 2017-18 2018-19 2019-20 Grand Total AIBP 2160.79 2936.80 3177.80 3989.80 12265.20 Har Khet Ko Pani 641.92 450.92 1144.92 1910.92 4148.68 Per Drop More Crop 2100.94 1575.71 1575.71 1575.71 6828.06 PMKSY Watershed 4824.18 1357.28 376.65 186.46 6744.57 ATMA 14.39 14.94 15.71 16.50 61.54 Convergence with MGNREGA 526.57 228.75 7.85 41.80 804.96 Total 10268.80 6564.39 6298.65 7721.19 30853.02

Figure 5.2. 1: Component wise percentage share of financial outlay

5.3 Year Wise Plan

Of the total outlay of Rs.30853.02 lakhs, the year wise expenditure plan states the

outlay to be proposed under different departments for four years starting from 2016-

17 to 2019-2020. It has been proposed that the maximum share of outlay under

39.75%

13.45%

22.13%

21.86%

0.20%

Percentage Share

AIBP

Har Khet Ko Pani

Per Drop More Crop

PMKSY Watershed

ATMA

Page 72: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

different departments will maximum for the year 2016-17 which constitutes about

33.28% of the total outlay. The expenditure under plan will be shared at an almost

equal percentage for the year 2017-18 to 2018-19 which will constitute about 21.28%

and 20.42%, respectively. The outlay for the year 2019-2020 will be 25.03% of the

total outlay to spend by different departments. Under different departments, the

maximum share of outlay is under WRD of District and State which is 43.80% and

0.73% respectively followed by GGRC with 22.13% and GSWMA with a share of

24.47%. The GLDC and ATMA under Department of Agriculture have a share of

2.85% and 0.20% respectively. The GWRDC has a share of 5.82% of the total outlay.

Table 5.3. 1: Year Wise financial outlay under different department

(Amount in Rs. lakhs)

Department wise 2016-17 2017-18 2018-19 2019-20 Grand Total WRD 1910.00 2719.00 3654.00 5232.00 13515.00 SSNL 224.00 0.00 0.00 0.00 224.00 GWRDC 448.80 448.80 448.80 448.80 1795.20 GLDC 219.92 219.92 219.92 219.92 879.68 GGRC 5350.74 1586.02 384.50 228.26 7549.53 GSWMA 2100.94 1575.71 1575.71 1575.71 6828.07 ATMA 14.39 14.94 15.71 16.50 61.54 Total 10268.80 6564.39 6298.65 7721.19 30853.02

Figure 5.3. 1: Percentage share of different departments

5.4 Expected Outcome

The strategic action plan envisages providing assured irrigation in a command area

of 24232.26 ha. The watershed component is projected to achieve a culturable

command area of 15241.20 ha by creation of 282 new water harvesting structures

43.80%

0.73%

5.82%

2.85%

22.13%

24.47%

0.20%

Percentage Share

WRD

SSNL

GWRDC

GLDC

GGRC

GSWMA

ATMA

Page 73: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

and renovation of 60 water harvesting structures. Under, the component Per Drop

More Crop, efficient water conveyance and precision water application by drip

irrigation system for wide spaced and narrow spaced crops for developing an area of

9144.72 ha. has been proposed. While Sprinklers has been proposed to develop an

area of 6096.48 ha.

Table 5.4. 1: Department wise area proposed (Area in ha)

Department wise 2016-17 2017-18 2018-19 2019-20 Grand Total WRD 1027.00 589.00 837.00 1482.00 3935.00 SSNL 436.00 0.00 0.00 0.00 436.00 GWRDC 249.40 249.40 249.40 249.40 997.60 GLDC 379.44 379.44 379.44 379.44 1517.76 GGRC 1931.30 75.98 22.98 74.45 2104.70 GSWMA 4689.60 3517.20 3517.20 3517.20 15241.20 Total 8712.74 4811.02 5006.02 5702.49 24232.26

Under department wise development of command area or irrigation potential, the

maximum area to be developed has been proposed GSWMA which envisages

developing an area of 62.90% of the total area under plan proposed followed by

district irrigation department which constitutes about 16.24% of the command area

to be developed under PMKSY. The percentage area of other departments is given in

the figure below:

Figure 5.4. 1: Department wise year wise proposed area

As the water requirement of crops for the existing cropping pattern works out to be

353.56 MCM and if the rainfed area is to be brought under irrigated area, 774.31

MCM water is required. The current water availability in the district both from

surface and ground constitutes about 369.29 MCM leaving a gap of 484.17 MCM. It

not only requires development of new sources but also a holistic approach toward

16.24% 1.80%

4.12%

6.26%

8.69%62.90%

Percentage area

WRD

SSNL

GWRDC

GLDC

GGRC

GSWMA

Page 74: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

development of existing water harvesting structure and conservation of water

through inclusion of drip and sprinkler system in irrigation. Also, the traditional

water needs to be rejuvenated.

In terms of economic benefit, the assured water supply to the farm land will result in

enhancement of production and productivity of the crops. This is likely to generate

an additional income of Rs.12391.38 lakh to the farmers of the district. This is based

on the assumption of atleast 60% of potential utilised and Rs. 40,000 per ha

incremental income from rainfed to irrigated farming. This is also likely to create

22.21 lakh mandays of non-recurring employment and 25815 jobs will be created

annually on recurring basis.

This intervention may result into increased acreage under crops thereby contributing

to both agricultural and horticultural production. At the same time, it will create

livelihood opportunities for the local population and contribute in generating direct

and indirect employment.

Page 75: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

5.5 Strategic Action Plan under PMKSY

Sl.No.

Taluka Concerned Ministry/

Department Component Activity

Total Number/Capacity(

cum )

Command

Area/ lrrigatio

n Potentia

l (Ha)

Period of Implementation 5 / 7 yrs)

Estimated cost (in Rs. Lacs)

1 Dediapada

MoWR/GWRDC

AIBP Lift Irrigation Scheme

5 125 4 Year 143

Garudeshvar

5 210 4 Year 240.24

Sagbara 9 867 4 Year 1323.36 Nandod 1 25 4 Year 28.6 Nandod

Har Khet ko Pani Exploratory Tubewell 4 8 4 Year 24

Dediapada 3 6 4 Year 18 Sagbara 3 6 4 Year 18

Grand Total

30 1247 0 1795.2

2

Garudeshvar

MoWR/SSNL Har Khet ko Pani Lined Field Channels 1 / 0.009 5437 / 29 1 Year 14.9

Tilakvada 12 / 0.138 13436 /407

1 Year 209.1

Grand Total

13/0.147 18873/4

36 224

3

Sagbara

MoWR/ Ver -2 dn Vyara

AIBP

Medium irri scheme Chopadvav dam

1 1020 4 80

MoWR/ Ver -2

dn Vyara Medium irri scheme

kakadiambadam 1 798 4 150

Garudeshw

ar

MoWR/ Karjan Project EEIPDN

No 4 Rajpipla

Repair and restoration of various works of canal structures service road and highlevel canal Right

bank

15 2145 4 700.00

Nandod

MoWR/ Karjan Project EEIPDN

No 4 Rajpipla

Repair and restoration of various works of canal structures service road and highlevel canal Right

bank

70 8394 4 2600

MoWR/ Karjan Project

EEMIPDN A nkleshwar

Repair & Restoration of vaious canal and structure of LBMC sec

5 to 8 50 9105 4 7000

Sub 137 21462 20 10530

Page 76: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Total

Dediayapa

da MoWR/

Panchayat Irrigation Division

Har Khet Ko Pani

Lift Irrigation 10 120 4 Year 120

Sagbara 15 175 4 Year 180

Sub Total

25 295 0 300

Dediyapad

a MoWR/

Panchayat Irrigation Division

Check Dam

25 80 4 Year 125

Garudeshw

ar 15 65 4 Year 90.00

Nandod 20 70 4 Year 100.00 Sagbara 20 75 4 Year 110.00 Tilakwada 10 60 4 Year 60.00

Sub Total

90 350 0 485

Dediyapad

a MoWR/Karjan

Project EEIPDN No 4 Rajpipla

Har Khet Ko Pani Big checkdam

10 320 4 Year 1600.00

Garudeshw

ar 2 80 4 Year 200.00

Nandod 2 80 4 Year 200.00 Tilakwada 2 80 4 Year 200.00

Sub Total

16 560 2200

Grand Total

268 22667 13515

4

Garudeshwar

Agriculture & Co-

opration/GLDC Har Khet ko Pani

Farm pond 100 144.00 4 Year 89.60

Dediyapad

a Farm pond 110 158.40 4 Year 98.56

Tilakwada Farm pond 115 165.60 4 Year 103.04 Sagbara Farm pond 105 151.20 4 Year 94.08 Sub Total 430 619.2 385.28

Garudeshw

ar Agriculture &

Co-opration/GLDC

Har Khet ko Pani

Sim pond 20 84.00 4 Year 80.00

Dediyapad

a Sim pond 25 105.00 4 Year 100.00

Tilakwada Sim pond 25 105.00 4 Year 100.00 Sagbara Sim pond 20 84.00 4 Year 80.00 Sub Total 90 378 360

Garudeshw

ar Agriculture &

Co-Har Khet ko Pani WHS 35 210.00 4 Year 31.36

Page 77: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Dediyapad

a opration/GLDC

WHS 40 240.00 4 Year 35.84

Tilakwada WHS 40 240.00 4 Year 35.84 Sagbara WHS 35 210.00 4 Year 31.36 Sub Total 150 900 134.4

Grand Total

670 1897.2 0 879.68

5

Dediyapad

a

Horticulture/GGRC

Perdrop More Crop DPAP/ Drip Irrigation System

1346 2153 4 Year 1176

Garudeshw

ar 236 378 4 Year 206

Nandod 2918 4668 4 Year 2549 Sagbara 1655 2649 4 Year 1446 Tilakwada 880 1408 4 Year 769 Sub Total 7034 11255 6145

Dediyapad

a

Horticulture/GGRC

Perdrop More Crop DPAP/ Sprinkler Irrigation

System

897 1435 4 Year 131

Garudeshw

ar 157 252 4 Year 23

Nandod 1945 3112 4 Year 283 Sagbara 1104 1766 4 Year 161 Tilakwada 587 938 4 Year 85 Sub Total 4690 7503 682.8

Grand Total

11724.0 18758.4 6828.1

6 Dediapada GSWMA

PMKSY Watershed

EPA

0.00 0.00 4 Year 0.00 Nandod 0.00 0.00 4 Year 0.00 Sagbara 0.00 0.00 4 Year 20.03

Garudeshwar 4.00 0.00 4 Year 4.10

Sub Total 4.00 0.00 24.13 0.00 0.00 0.00 0.00 Dediapada

Land Development

40356.03 0.00 4 Year 141.86 Nandod 3411.00 0.00 4 Year 214.92 Sagbara 22553.45 0.00 4 Year 132.49

Garudeshwar 8505.10 0.00 4 Year 59.41

Sub Total 74825.58 0.00 548.69 Dediapada Soil and Moisture Conservation 33481.35 5431.74 4 Year 1034.69

Page 78: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Nandod 3933.00 226.49 4 Year 795.68 Sagbara 18075.56 22.16 4 Year 492.73

Garudeshwar 9367.10 145.52 4 Year 727.13

Sub Total 64857.01 5825.91 3050.23 Dediapada

Water Harvesting Structure

138.00 337.06 4 Year 771.83 Nandod 92.00 103.98 4 Year 237.94 Sagbara 26.00 151.82 4 Year 343.90

Garudeshwar 26.00 91.06 4 Year 198.74

Sub Total 282.00 683.92 0.00 1552.41 Dediapada

Existing/Old Water Harvesting Structure Maintance (Renovation

& Repair)

7.00 30.74 4 Year 9.06 Nandod 2.00 3.00 4 Year 2.05 Sagbara 29.00 21.00 4 Year 39.33

Garudeshwar 22.00 45.32 4 Year 47.77

Sub Total 60.00 100.06 0.00 98.21 Dediapada

Ground Water Recharging Structures

0.00 0.00 4 Year 0.00 Nandod 0.00 0.00 4 Year 0.00 Sagbara 30.00 0.00 4 Year 15.99

Garudeshwar 7.00 15.25 4 Year 3.20

Sub Total 37.00 15.25 0.00 19.19 Dediapada

Capacity Building

29303.07 0.00 4 Year 82.83 Nandod 10734.20 0.00 4 Year 30.34 Sagbara 14678.07 0.00 4 Year 41.49

Garudeshwar 11292.45 0.00 4 Year 31.92

Sub Total 66007.78 0.00 0.00 186.58 Dediapada

Evaluation and Monitoring

19.07 0.00 4 Year 42.52 Nandod 0.00 0.00 4 Year 18.24 Sagbara 0.00 0.00 4 Year 23.46

Garudeshwar 0.00 0.00 4 Year 14.85

Sub Total 19.07 0.00 0.00 99.06 Dediapada Adminstration & Consolidation 0.00 0.00 4 Year 581.93

Page 79: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Nandod Phase 0.00 0.00 4 Year 138.12 Sagbara 0.00 0.00 4 Year 299.84

Garudeshwar 0.00 0.00 4 Year 146.19

Sub Total 0.00 0.00 0.00 1166.08

206092.43 6625.14 0.00 6744.57

7 Dediapada

Convergence With MGNREGA

EPA 0.00 0.00 4 Year 0.00 Nandod 2.00 0.00 4 Year 1.70 Sagbara 1.00 0.00 4 Year 1.32

Garudeshwar 0.00 0.00 4 Year 0.00

Sub Total 3.00 0.00 0.00 3.02 0.00 0.00 0.00 0.00 Dediapada Land Development 0.00 0.00 4 Year 0.00 Nandod 433.00 0.00 4 Year 53.34 Sagbara 14423.00 0.00 4 Year 19.90

Garudeshwar 103.77 0.00 4 Year 44.82

Sub Total 14959.77 0.00 0.00 118.06 0.00 0.00 0.00 0.00 Dediapada Soil & Moisture Conservation 5625.00 0.00 4 Year 34.34 Nandod 953.00 0.00 4 Year 101.54 Sagbara 1572.00 0.00 4 Year 113.20

Garudeshwar 333.77 0.00 4 Year 120.33

Sub Total 8483.77 0.00 0.00 369.41 0.00 0.00 0.00 0.00 Dediapada Water Harvesting Structure 16.00 0.00 4 Year 47.72 Nandod 6.00 0.00 4 Year 60.83 Sagbara 2.00 0.00 4 Year 4.25

Garudeshwar 10.00 0.00 4 Year 46.80

Sub Total 34.00 0.00 0.00 159.60 0.00 0.00 0.00 0.00

Dediapada

Existing/ Old Water Harvesting Structure 0.00 0.00 4 Year 0.00

Nandod 1.00 0.00 4 Year 1.00 Sagbara 1.00 0.00 4 Year 1.00

Garudeshwar 14.00 0.00 4 Year 25.00

Sub Total 16.00 0.00 0.00 27.00

Page 80: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

0.00 0.00 0.00 0.00 Dediapada Ground Water Recharge Structure 5781.00 0.00 4 Year 124.07 Nandod 1.00 0.00 4 Year 1.00 Sagbara 0.00 0.00 4 Year 0.00

Garudeshwar 7.00 0.00 4 Year 2.80

Sub Total 5789.00 0.00 0.00 127.87

0.00 0.00 0.00 804.96

Grand Total

235377.97 6625.14 7549.53

8 Narmada

Agriculture & Co-opration ATMA Extension Activities 11112.00 0.00 0.00 61.54

Page 81: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Annexure

1. Strategic Action Plan for Irrigation in District under PMKSY: District Irrigation Department (WRD)

Area in Hactare

Rs in lac

S.No

Name of theBlocks

/ Sub Districts

Concerned

Ministry/ Departm

ent

Component

Activity Total Numbe

r/ Capacity (cum)

Total command area

Existing

Irrigation

area

2016-17 2017-18 2018-19 2019-20 Total

Implimenting Agency

Dediyapada

State irri Deptt

Har Khet ko pani

Lift irrigation

10 120 0 22 23 28 25 36 37 34 35 120 120 Panchaya Irrigation

17.2

Dediyapada

State irri Deptt

Har Khet ko pani Checkdam

25 80 0 24 35 16 25 20 30 20 35 80 125 Panchaya Irrigation

4 Dediyapada

State irri Deptt

Har Khet ko pani

Big checkdam

10 320 0 400

0 0 25 0 600 320

975 720 1600 Karjan Project EEIPDN No 4 Rajpipla

Total 45 520 0

446

58 44 75 56 667 374

1045

920 1845

Garudeshvar

State irri Deptt

AIBP Repair and restoration of various works of canal structures service road and highlevel

15 2145 1225 50 50 100

100 200

300 200

250 550 700

Karjan Project EEIPDN No 4 Rajpipla

Page 82: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

canal Right bank

Garudeshvar

State irri Deptt

Har Khet ko pani

Checkdam

15 65 0 14 24 14 24 12 12 25 30 65 90

Panchaya Irrigation

3

Garudeshvar

State irri Deptt

Har Khet ko pani Big

checkdam

2 80 0 80 0 0 5 0 30 80 165 160 200 Karjan Project EEIPDN No 4 Rajpipla

Total 32 2290 1225 144

74 114

129 212

342 305

445 775 990

Nandod State irri Deptt

AIBP Repair and restoration of various works of canal structures service road and highlevel canal Right bank

70 8394 2166 100

100 100

300 200

900 300

1300

700 2600

Karjan Project EEIPDN No 4 Rajpipla

Nandod State irri Deptt

AIBP Repair & Restoration of vaious canal and structure of

50 9105.00 1695.0

0 150

1500

200

2000

250

1500

250

2000

850 7000 Karjan Project EEMIPDN A nkleshwar

Page 83: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

LBMC sec 5 to 8

Nandod State irri Deptt

Har Khet ko pani

Checkdam

20 70 0 14 20 18 25 20 30 18 25 70 100

Panchaya Irrigation

2

Nandod State irri Deptt

Har Khet ko pani

Big checkdam

2 80 0 80 0 0 5 0 30 80 165 160 200 Karjan Project EEIPDN No 4 Rajpipla

Total 142 17649 3861 344

1620

318

2330

470

2460

648

3490

1780 9900

Sagbara State irri Deptt

AIBP Medium irri scheme Chopadvav dam

1 1020 354 10 30 20 50 0 0 0 0 30 80

Ver -2 dn Vyara

Sagbara State irri Deptt

AIBP Medium irri scheme kakadiambadam

1 798 209 15 50 15 50 10 50 0 0 40 150

Ver -2 dn Vyara

sagabara State irri Deptt

Har Khet ko pani

Lift irrigation 15 175 0 44 48 48 45 44 48 39 39 175 180

Panchaya Irrigation

sagabara State irri Deptt

Har Khet ko pani

Checkdam 20 75 0 14 20 20 25 25 35 16 30 75 110

Panchaya Irrigation

Page 84: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

5

Sagbara State irri Deptt

Har Khet ko pani

Big checkdam

0 0 0 0 0 0 0 0 0 0 0 0 0 Karjan Project EEMIPDN A nkleshwar

Total 37 2068 563 83 148 103

170 79 133 55 69 320 520

Tilakwada State irri Deptt

Har Khet ko pani

Checkdam

10 60 0 10 10 10 10 20 22 20 18 60 60

Panchaya Irrigation

1

Tilakwada State irri Deptt

Har Khet ko pani

Big checkdam

2 80 0 0 0 0 5 0 30 80 165 80 200 Karjan Project EEIPDN No 4 Rajpipla

ABSTRACT

AIBP Har Khet ko Paani Others

Block 2016-17 2017-18 2018-19 2019-20 2016-17 2017-18 2018-19 2019-20 2016-17 2017-18 2018-19 2019-20

Amount in Lac

Amount in Lac

Amount in Lac

Amount in Lac

Amount in Lac

Amount in Lac

Amount in Lac

Amount in Lac Amount in Lac

Amount in Lac

Amount in Lac

Amount in Lac

Dediyapada 0 0 0 0 58 75 667 1045 0 0 0 0

Garudeshvar 50 100 300 250 24 29 42 195 0 0 0 0

Nandod 1600 2300 2400 3300 20 30 60 190 0 0 0 0

sagabara 80 100 50 0 68 70 83 69 0 0 0 0

Tilakwada 0 0 0 0 10 15 52 183 0 0 0 0

Total 1730 2500 2750 3550 180 219 904 1682 0 0 0 0

Executive Engineer, Irri. Project, Division, Rajpipla

Page 85: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

2. Strategic Action Plan for Irrigation in District under PMKSY: GGRC

Sr.

No

. District Taluka

Target for 2016-17

Total Drip Irrigation System (DIS) Sprinkler Irrigation System (SIS)

Total

Number

(Farmers

)

Area

(Ha.)

Estimate

d Total

Cost (Rs.

in lakh)

Estimate

d

Assistanc

e (Rs. in

lakh)

Total

Number

(Farmers

)

Area

(Ha.)

Estimat

ed

Total

Cost

(Rs. in

lakh)

Estimated

Assistanc

e (Rs. in

lakh)

Total

Number

(Farmers

)

Area

(Ha.)

Estimate

d Total

Cost

(Rs. in

lakh)

Estimated

Assistance

(Rs. in

lakh)

1

NARMAD

A

DEDIAPADA 561 897.07 717.66 401.89 336 538.24 645.89 361.7 224 358.83 71.77 40.19

GARUDESHW

AR 98 157.4 125.92 70.51 59 94.44 113.33 63.46 39 62.96 12.59 7.05

NANDOD(Rajp

ipla) 1216

1945.0

6 1556.05 871.39 729 1167.03 1400.44 784.25 486 778.02 155.6 87.14

SAGBARA 690

1103.5

6 882.85 494.39 414 662.13 794.56 444.95 276 441.42 88.28 49.44

TILAKVADA 367 586.52 469.21 262.76 220 351.91 422.29 236.48 147 234.61 46.92 26.28

TOTAL 2931 4689.6 3751.68 2100.94 1759 2813.76 3376.51 1890.85 1172 1875.84 375.17 210.09

Target for 2017-18

2

NARMAD

A

DEDIAPADA 421 672.81 538.24 301.42 252 403.68 484.42 271.28 168 269.12 53.82 30.14

GARUDESHW

AR 74 118.05 94.44 52.89 44 70.83 84.99 47.6 30 47.22 9.44 5.29

NANDOD(Rajp

ipla) 912

1458.7

9 1167.03 653.54 547 875.28 1050.33 588.19 365 583.52 116.7 65.35

SAGBARA 517 827.67 662.13 370.8 310 496.6 595.92 333.72 207 331.07 66.21 37.08

TILAKVADA 275 439.89 351.91 197.07 165 263.93 316.72 177.36 110 175.95 35.19 19.71

TOTAL 2198 3517.2 2813.76 1575.71 1319 2110.32 2532.39 1418.14 879 1406.88 281.38 157.57

Target for 2018-19

3

NARMAD

A

DEDIAPADA 421 672.81 538.24 301.42 252 403.68 484.42 271.28 168 269.12 53.82 30.14

GARUDESHW

AR 74 118.05 94.44 52.89 44 70.83 84.99 47.6 30 47.22 9.44 5.29

NANDOD(Rajp

ipla) 912

1458.7

9 1167.03 653.54 547 875.28 1050.33 588.19 365 583.52 116.7 65.35

Page 86: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

SAGBARA 517 827.67 662.13 370.8 310 496.6 595.92 333.72 207 331.07 66.21 37.08

TILAKVADA 275 439.89 351.91 197.07 165 263.93 316.72 177.36 110 175.95 35.19 19.71

TOTAL 2198 3517.2 2813.76 1575.71 1319 2110.32 2532.39 1418.14 879 1406.88 281.38 157.57

Target for 2019-20

4

NARMAD

A

DEDIAPADA 421 672.81 538.24 301.42 252 403.68 484.42 271.28 168 269.12 53.82 30.14

GARUDESHW

AR 74 118.05 94.44 52.89 44 70.83 84.99 47.6 30 47.22 9.44 5.29

NANDOD(Rajp

ipla) 912

1458.7

9 1167.03 653.54 547 875.28 1050.33 588.19 365 583.52 116.7 65.35

SAGBARA 517 827.67 662.13 370.8 310 496.6 595.92 333.72 207 331.07 66.21 37.08

TILAKVADA 275 439.89 351.91 197.07 165 263.93 316.72 177.36 110 175.95 35.19 19.71

TOTAL 2198 3517.2 2813.76 1575.71 1319 2110.32 2532.39 1418.14 879 1406.88 281.38 157.57

Page 87: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

3. Strategic Action Plan for Irrigation in District under PMKSY: GWRDC

Sr. No

District Taluka Concerned Ministry/

Department

Component Activity Total Number/Capacity(cum )

Command Area/

lrrigation Potential

(Ha)

Period of Implementation 5 / 7

yrs)

Estimated cost (in

Rs.)(LacS)

1 Narmada Dediapada MoWR Har Khet ko

Pani Exploratory Tube-

well 3 6 5 years 22.5

2 Narmada Dediapada MoWR AIBP Lift Irrigation

Scheme 5 125 5 Years 178.75

3 Narmada Garudeshvar MoWR AIBP Lift Irrigation

Scheme 5 210 5 Years 300.30

4 Narmada Nandod MoWR AIBP Lift Irrigation

Scheme 1 25 5 Years 35.75

5 Narmada Nandod MoWR Har Khet ko

Pani Exploratory Tube-

well 4 8 5 years 30

6 Narmada Sagbara MoWR AIBP Lift Irrigation

Scheme 9 867 5 Years 1654.20

7 Narmada Sagbara MoWR Har Khet ko

Pani Exploratory Tube-

well 3 6 5 years 22.5

Page 88: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

4. Strategic Action Plan for Irrigation in District under PMKSY: SSNL

5. Strategic Action plan for Irrigation in District under PMKSY 2016-17 2017-18 Sr. No

Name of the Blocks/Sub Districts

Concerned Ministry/

Department

Component

Activity Total No /

Capacity in

CUM

Command Area/ lrrigation Potential (Ha)

Period of Implementation^/ 7 yrs)

Estimated cost (in Rs. In Crore)

Area in Ha

Fin Rs. In Lakhs

Area in Ha

Fin

l Garudeshvar

MoWR AIBP Major Irrigatio

n

0/0 5437/0 completed 0 0 0 0 0

Tilakvada 0/0 13436/0 completed 0.00 0 0 0 0 7 MoWR Construction of Field Channels

7.1 Garudeshvar

MoWR Har khet ko pani

Lined Field

Channels

1 / 0.007 5437 / 29 1 0.149 29 14.9 0 0

Tilakvada 12 / 0.1 13436 /407 1 2.091 407 209.1 0 0

Total 13/0.10

7 18873 /436 1 2.24 436 224 0 0

Page 89: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

5. Strategic Action Plan for Irrigation in District under PMKSY: GLDC

Sr.

No.

Name of the blocks/ sub

districts

Converened

Ministry/

Department

Component Activity Total Number/

Capacity (cum)

Command

area/irrigation

potential (Ha.)

Period of

implemented

year 2016-17

to 2020-21

Estimated

cost (in Rs.

lakh)

7 Narmada Garudeshwar Agriculture &

Co-opration

Har Khet ko

Pani

Farm pond 100 144.00 5 yrs 112.00

Sim pond 20 84.00 " 100.00

WHS 35 210.00 " 39.20

Dediyapada Agriculture &

Co-opration

Har Khet ko

Pani

Farm pond 110 158.40 " 123.20

Sim pond 25 105.00 " 125.00

WHS 40 240.00 " 44.80

Tilakwada Agriculture &

Co-opration

Har Khet ko

Pani

Farm pond 115 165.60 " 128.80

Sim pond 25 105.00 " 125.00

WHS 40 240.00 " 44.80

Sagbara Agriculture &

Co-opration

Har Khet ko

Pani

Farm pond 105 151.20 " 117.60

Sim pond 20 84.00 " 100.00

WHS 35 210.00 " 39.20

TOTAL Farm pond 430 619.20 481.60

Sim pond 90 378.00 450.00

WHS 150 900.00 168.00

Page 90: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

6. Strategic Action Plan for Irrigation in District under PMKSY: GSWMA

Planning of the works for Narmada District Irrigation Plan (DIP) & Annual Action Plan for SLSC

District

Sr.No Activity Unit

Total Target of DPR Achievement up to FY-2015-16

Unit

Cost (In Lakhs) IWMP

Storage Volume (Cubic Meter)

Command Area/ Irrigation Potential In (Ha.)

Person days/Mandays Planned

Convergence Details

Unit

Expenditure till March 2016 (In Lakhs)

Storage Volume (Cubic Meter)

Command Area/ Irrigation Potential created (Ha.)

Person days/Mandays generated

Convergence Details

Unit

Amount (In Lakhs)

Name of Schemes

Unit

Amount (In Lakhs)

Name of Schemes

Narmada 1 EPA

Narmada 1

Animal camp No. 61

17.2888 0 3 224 6 1.34

Animal Dept. 57

16.82518 0.49 0 214 0 0 0

Narmada 2

Animal water trough (Havada) No. 107

35.8015 0 11 425 9 3.06

Wasmo 106

34.87043 3.27 0 262 0 0 0

Narmada 3

Causeway on connecting roads No. 12

15.27 0 0 1948 0 0 3

4.66296 0 0 0 0 0 0

Narmad 4

Check / Protectio No. 94

100.556 20650 17.2 5221 13 15.43

Wasmo 88

95.65459 19800 7.2 3115 0 0 0

Page 91: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

a n wall

Narmada 5

Demonstration for Agricultural / Animal Husbandry Productivity Enhancement No. 20 9.16 0 0 276 1 0.65 Other 19

8.73612 0 0 252 0 0 0

Narmada 6

Drainage line correction (To prevent flooding of Gamtal) rmt 64

12.03 0 0 839 0 0 62 10.2 0 0 727 0 0 0

Narmada 7

Drinking water facility No. 596

129.357 0 14 6133 55 14.11

Wasmo 558

115.58052 7.94 0 2926 0 0 0

Narmada 8

Fencing for protection from wild animals rmt. 57 7.5 0 0 0 1 0.11

Wasmo 7 6.79 0 0 0 0 0 0

Narmada 9

Grassland/Gauchar Develop Ha. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 92: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

ment

Narmada 10

Improvised and energy efficient smashan gruh (Cemetery ) No. 4 2.07 0 0 0 1 0.44

Wasmo 4 2.07 0 0 0 0 0 0

Narmada 12

Panchayat Well Repair & Pump Room No. 8

2.0366 0 0 181 1 0.65

Wasmo 0 0 0 0 0 0 0 0

Narmada 13

Rain water harvesting system No. 22

18.4471 0 0 133 1 0.39

MGNREGA 21

17.80246 0 0 0 0 0 0

Narmada 14

Recharge / Repair of open wells No. 59 8.75 0 0 427 22 4.47

MGNREGA 23 2.18 0 0 0 0 0 0

Narmada 15

Repair / development of artificial water bodies No. 163

25.8665 0 2 123 56 7.12

Wasmo 129

23.54383 0 0 122 0 0 0

Narmada 16

Revival of natural water bodies with No. 3 1.64 0 0 0 1 0.34

MGNREGA 1

1.24872 0 0 0 0 0 0

Page 93: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

recharge activities

Narmada 17

Sanitation facilities/Sewerage line rmt 15

7.2553 0 0 0 3 0.97

MGNREGA 15

5.21228 0 0 0 0 0 0

Narmada 18

Use solar power for productive activities No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 19

Wind energy development No. 1 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 20

OTHERS (Specifiy activities ) No. 2

1.30896 0 0 294 0 0 7 3.45 0 0 0 0 0 0

Narmada 21

Vegitable kits Distribution No. 23

6.5155 0 0 0 1 0.1

MGNREGA 23

6.49688 0 0 0 0 0 0

Narmada 22

Anganwadi Repairing No. 4 0.96 0 0 0 0 0 4

0.93044 0 0 0 0 0 0

Narmada 23

Dhobi Ghat No. 3 1.29 0 0 0 0 0 3 1.27 0 0 0 0 0 0

Narmad 24

chotro Repairing No. 1 0.15 0 0 0 1 0.4

MGNREGA 1 0.15 0 0 0 0 0 0

Page 94: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

a

Narmada 25

Samsan fencing No. 794 6.22 0 0 0 0 0 794 6.21 0 0 0 0 0 0

Narmada 26

Kitchen Garden kits No. 14 4.04 0 0 0 0 0 14 4.04 0 0 0 0 0 0

Narmada 27

Books For School Library No. 6 0.8 0 0 0 2 5

MGNREGA 6 0.8 0 0 0 0 0 0

Narmada 28

Afforestation No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 29

Fancing & Plantation in Gramvatika No. 261 1.71 0 0 0 0 0 261

1.72532 0 0 0 0 0 0

Narmada 30

Fancing & Plantation in Aanganwadi 5 3.85 0 0 0 0 0 4 2.51 0 0 0 0 0 0

Narmada 31

Community hall Repairing 3 0.6 0 0 0 0 0 3 0.6 0 0 0 0 0 0

Narmada 32

Floriculture Development 1 1.5 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 95: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada Total

2403

422.023 20650 47.2 16225 174 54.58 0

2213

373.55973

19811.7 7.2 7618 0 0 0

Narmada 1

LAND DEVELOPMENT

Narmada 1

Farm Bunding rmt.

87009

141.425 0 0 44952

49386

77.1832

MGNREGA

13865.1

21.31017 0 5370 2243 0 0

Narmada 2

Afforestation Ha.

35.6

60.22 0 0 9190 8 11.94

MGNREGA 12 17.67 0 10 2853 0 0

Narmada 3

Agriculture Demo No. 0 0 0 0 0 0 0

MGNREGA 0 0 0 0 0 0 0

Narmada 4

Agro Forestry Ha. 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 5

Horticulture Ha. 0 0 0 0 0 0 0

MGNREGA 0 0 0 0 0 0 0

Narmada 6

Land leveling Ha.

2820.3

745.811 0 0 43463

761.565

214.22231

1148.9

375.29416 0 25 534 0 0

Narmada 7

Pasture development Ha. 0 0 0 0 0 0 0

MGNREGA 0 0 0 0 0 0 0

Narmada 8

OTHERS (Specifiy activities ) 0 0 0 0 0 0 0

MGNREGA 0 0 0 0 0 0 0

Narmad 9

Bambu Bottling

1302 22.3 0 0 0 0 0

MGNREGA 1.5

1.15101 0 0 0 0 0

Page 96: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

a

Narmada 10

Border/forest plantation 0 0 0 0 0 150 2.5 0 0 0 0 0 0 0

Narmada 2

Soil & Moisture Conservation 0 0 0 0 0 0 0

MGNREGA

Narmada 1

Check wall No.

1521

1485.33

2709635.46

1255.699911 274836 216

288.44

MGNREGA 445

655.6925

877204.6

937.9098828 84042 0 0

Narmada 2

Earthen bund No. 0 0 0 0 0 0 0

MGNREGA 0 0 0 0 0 0 0

Narmada 3

Protection Wall No. 169

96.51

117020 44.48 18745 31 22.79

MGNREGA 21 14.25 200 2 561 0 0

Narmada 4

Waste weir No. 347

284.735

152382 372.75 40120 126

118.96

MGNREGA 89

91.46684

40476.92 124.71 9267 0 0

Narmada 5

Bench Terracing

cumec 0 0 0 0 0 0 0

MGNREGA 0 0 0 0 0 0 0

Narmada 6

Bori bandh No. 0 0 0 0 0 0 0

MGNREGA 0 0 0 0 0 0 0

Narmada 7

Brushwood Checks No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 8

Countour Bunding rmt. 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 97: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 9

Countour Trenches rmt.

174699

118.04 0 39600 44749 0 0

MGNREGA

135080

75.56575 0 0 14348 0 0

Narmada 10

Earthern Dam No. 0 0 0 0 0 0 0

MGNREGA 0 0 0 0 0 0 0

Narmada 11

Field Outlet No. 851

230.546 0 0 31339 72

10.12629

MGNREGA 59

9.56994 0 0 391 0 0

Narmada 12

Gabion structure No.

1421

423.887 0 0 77888 90 37.56 338

150.46888 0 0 29397 0 0

Narmada 13

Graded Bunding rmt.

1116

11.93 0 0 2011 0 4.37

1116 9.14 0 0 0 0 0

Narmada 14

Gully plug No. 56

10.0612 0 0 581 0 1.35 0 0 0 0 0 0 0

Narmada 15

Loose boulder Checks No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 16 Nala Plug No. 442

318.724 0 0 55174 34 36.69

MGNREGA 75 33.59 0 0 2186 0 0

Narmada 17

Stone bunding rmt.

45198

308.846 0 0 61935

1956.7

61.972

14560.5

116.65276 0 0 19170 0 0

Narmada 18

Straggred Contour trenching(Terrace Talavadi) rmt

203153

111.811 2900 0 56890 5556 2.23

MGNREGA

167125

81.4931 0 0 38065 0 0

Nar 19 OTHERS 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 98: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

mada

(Specifiy activities )

Narmada 20

Water Way (Diversation of water Draingae) 3 2.01 0 0 1428 0 0

MGNREGA 3

1.9278 0 0 1428 0 0

Narmada 3

Water Harvesting Structure 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 1

Cause way cum Chek dam No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 2

Check dam No. 316

1053.52

2203348

29065.24777

1838211 78

369.91 52

201.89058

476500

185.9029657 21159 0 0

Narmada 3

Village/Community Pond No. 9

19.49 12410

4.924012158 167 2 6.26 3 9.75 4300

1.705714286 0 0 0

Narmada 4

Farm Pond No. 116

147.58

207200.5

33954.621 7353 4 10.5 41

55.55093 86336

37.42726444 0 0 0

Narmada 5

Percolation Tank No. 1 0.2 937.5

0.39893617 0 0 0 1 0.2 937.5

0.39893617 0 0 0

Narmada 6

Pond Inlet No. 2 2.4 0 0 539 0 0 0 0 0 0 0 0 0

Nar 7 Pond No. 2 2.4 0 0 539 0 0 0 0 0 0 0 0 0

Page 99: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

mada

Outlet

Narmada 8

OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 4

Existing/Old Water Harvesting Structure Maintance (Renovation & Repair) 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 1

Deepening/Desiltation Of Pond No. 22

41.286 76607

66.43665957 5897 3 8.5 2

7.03436 5640

10.97021277 214 0 0

Narmada 2

Deepening Of Percolation Tank No. 14 2 25200

10.72340426 0 0 0 0 0 0 0 0 0 0

Narmada 3

De-siltation of Checkdam No. 35

38.39

218691

91.82553191 16010 14 19.5 4

4.08449

3679.720721

1.565838605 0 0 0

Narmada 4

Repairing of Checkda No. 37

59.28

146030

98.75574468 8949 3 5.94 4

6.92356 7350

6.821276596 606 0 0

Page 100: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

m

Narmada 5

OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 5

Ground Water Recharging Structures 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 1

Dugwell Recharge structure No. 106

39.09 3693 45.75 3790 10 4.11

MGNREGA 24

6.38708 2461 30.5 881 0 0

Narmada 2

Farm Recharge Filter No. 0 0 0 0 0 0 0

Agri. Dept. 0 0 0 0 0 0 0

Narmada 3

Holiya in farm/Field No. 0 0 0 0 0 0 0

Agri. Dept. 0 0 0 0 0 0 0

Narmada 4

Pond Recharge structure No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 5

OTHERS (Specifiy activities ) 0 0 0 0 0 0 0

Agri. Dept. 0 0 0 0 0 0 0

Narmada 9 Total

520803

5777.82

5876054.46

104611.613

2644757

58501.265

1315.0538 0

334070

1947.06391

1505085.741

6744.912091 227345 0 0 0

Narmada

LH & ME & Producti 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 101: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

on System

Narmada 1

AGRICULTURE ACTIVITIES 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 1

Agro Center No. 20

39.13 0 0 0 7 14.5

Agri. Dept. 0 0 0 0 0 0 0

Narmada 2

Agricultural Implements No. 333

153.55 0 0 0 58 35.84

Agri. Dept. 109

53.99035 0 13 1088 0 0

Narmada 3

Agro- Forestry 11

32.43 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 4

Crop Demonstration Plot No.

197.1

153.4 0 0 0 36 44.07

Agri. Dept. 15

11.74149 0 3 3 0 0

Narmada 5

Fishery Development No. 22

35.27 0 0 0 4 3.5

Fishery Dept. 3

1.39095 0 1 2 0 0

Narmada 6

Floriculture Development Ha.

21.3

32.97 0 0 0 8 6.4

Agri. Dept. 3 4.47 0 0 0 0 0

Narmada 7

Fodder Bank Development 2 0.5 0 0 0 2 0.5

Agri. Dept. 0 0 0 0 0 0 0

Narmad 8

Green House No. 53

39.43 0 0 0 14 20.69

Agri. Dept. 7 3.24 0 0 0 0 0

Page 102: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

a

Narmada 9

Horticulture Plantation Ha.

145.5

176.517 0 0 0 16 19.83

Agri. Dept. 125

37.511 0 4 2 0 0

Narmada 10

Kitchen Garden 15

20.32 0 0 0 1 1.5

Agri. Dept. 5

3.64402 0 2 2 0 0

Narmada 11

Nursery raising 55

73.31 0 0 0 4 4.05 GGRC 26

29.5723 0 4 2 0 0

Narmada 12

Vermi compost 76

127.16 0 0 0 4 7 GGRC 56

95.51521 0 0 0 0 0

Narmada 13

INPUT SUPPORT 0 0 0 0 0 0 0 GGRC 0 0 0 0 0 0 0

Narmada 14

Promoting Micro-Irrigation Systems like drip and Sprinkler Irrigation No.

185.5

69.29 0 0 0 81 84.56 GGRC 11 1 0 1 1 0 0

Narmada 15

Sprinkler Demo. 1 0.5 0 0 0 1 0.35 GGRC 0 0 0 0 0 0 0

Narmada 16

Vegetable Nursery Raising with drip irrigation 111

213.52 0 0 0 34 73.78 GGRC 15

13.325 0 3 5 0 0

Page 103: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 17 OTHERS 1 5.02 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 18

Low Cost Poly House 7 8.19 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 19

Lift Irrgation 52

47.66 0 0 0 12 20.67 GGRC 3 1.51 0 13 8 0 0

Narmada 20

Paddy Trasing Machine 1 0.75 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 21

Creeper Vegetable Production

152.5

102.27 0 0 0 24 19.26 GGRC 1 1.034 0 14 16 0 0

Narmada 22

Rotavator 1 0.5 0 0 0 0 0.5

Agri. Dept. 0 0 0 0 0 0 0

Narmada 23

Power Weeder 3 1.2 0 0 0 0 1.2

Agri. Dept. 0 0 0 0 0 0 0

Narmada 24

Chaffcuter No. 53

12.93 0 0 0 1 1.08

Agri. Dept. 8 2.7 0 0 0 0 0

Narmada 25

Mini Tractor with rotary and cultivator No. 10 29 0 0 0 0 0 0 0 0 1 3 0 0

Nar 26 Thresher No. 15 24.3 0 0 0 0 1.5 Other 0 0 0 2 3 0 0

Page 104: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

mada

Machine 8

Narmada 27

Organic Manual No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 28

Spray pump No. 17 1.05 0 0 0 0 0.6 0 0 0 0 0 0 0

Narmada 29

Vegetable Production No.

23.4

26.83 0 0 0 15.2 26.12 GGRC 0 0 0 0 0 0 0

Narmada 30

Multi crop harverter 1 0.5 0 0 0 0 0.5 0 0 0 0 0 0 0

Narmada 2

AGRO PROCESSING ACTIVITIES No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 1

Dal Making Unit No. 16

28.75 0 0 0 4 14 0 0 0 0 0 0 0

Narmada 2

Flour & Dal/Rice Processing unit 80

92.92 0 0 1002 0 4.99 13

12.9785 0 12 219 0 0

Narmada 3

Garam Masala 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 4

Grading and packagin No. 1 0.5 0 0 0 0 0 0 0 0 1 1 0 0

Page 105: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

g of agricultural produces,

Narmada 5

Jam-jelly making No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 6

Microenterprises based on Minor Forest Produce (MFP) 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 7

Oil extraction mill 14 32.5 0 0 1400 0 0 4

4.34108 0 0 0 0 0

Narmada 8

Value added products from milk 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 9

Package Food Products 4 1.81 0 0 100 1 2.5 0 0 0 0 0 0 0

Narmada 10

Pulp making 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 11 Rice mill 51

105.04 0 0 100 3 9.5

Ah Dept 9

11.11608 0 2 2 0 0

Narmad 12

OTHERS (Specifiy 8

21.39 0 0 0 0 0 0 0 0 0 0 0 0

Page 106: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

a activities )

Narmada 13

Sugar cane Juice Machine 3 0.75 0 0 0 0 0.75

Ah Dept 0 0 0 0 0 0 0

Narmada 12

Chilly Powder Unit 11 8.7 0 0 0 0 2.7

Ah Dept 0 0 0 0 0 0 0

Narmada 13

Papad making unit 2 1 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 3

Animal Husbandry 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 1

Cattle Feed and Nutrition Store 7 2.5 0 0 0 0 0 6 1.5 0 0 0 0 0

Narmada 2

Animal Health camps 161

50.7483 0 0 147 87 47.05

Animal Dept. 6

1.69182 0 0 0 0 0

Narmada 3

Animal Travis (Pinjaru) 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 4

Apiculture (Bee keeping) 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 5

Artificial insemination 0 0 0 0 0 3 2.5 Other 0 0 0 0 0 0 0

Narmad 6

Back-yard 2 2.9 0 0 0 0 1.4 Other 0 0 0 0 0 0 0

Page 107: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

a poultry

Narmada 7

Dairy cooperative promotion, No. 4 6.5 0 0 0 1 1 0 0 0 0 0 0 0

Narmada 8

Cattle Shed No. 152

43.165 0 0 0 0 1.245

Animal Dept. 28 7.75 0 0 0 0 0

Narmada 9

Pasture development No. 2 6.5 0 0 0 1 0.3 0 0 0 0 0 0 0

Narmada 10

Poultry Farming to individuals No. 2 3.5 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 11

Sericulture No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 12

Small ruminants 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 13

Veterinary Aid for livestock 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 14

OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 4

Establishing linkages 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 108: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 1

Credit linkages 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 2

Linkages with Future Markets, No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 3

Market linkages, 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 4

Raw material supply channel, 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 5

OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 5

Local traditional handicraft 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 1

Bamboo based products, 3 5.8 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 2

Kutchi Bandhini, 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 3 Pottery 0 0 0 0 3 3 0 0 0 0 0 0 0 0

Nar 4 OTHERS 0 0 0 0 2 0.4 0 0 0 0 0 0 0 0

Page 109: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

mada

(Specifiy activities )

Narmada 6

Minor Activities 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 1

Embroidery Unit 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 2

Handicraft Unit No 2 0.61 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 3

Vegetable shop 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 4

Provision Store 2 1.18 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 5

stiching machine 16 4 0 0 0 1 0.5 3 0.5 0 0 0 0 0

Narmada 6

Up Gradation of centering materials 13

10.85 0 0 0 1 2.1 0 0 0 0 0 0 0

Narmada 7

OTHERS (Specifiy activities ) No 2 0.68 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 8

Musical instrument 5 8.62 0 0 0 0 0 2 1.917 0 0 0 0 0

Page 110: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 9

Madap Decoration 74

108.84 0 0 0 0 1.82 24 34.22 0 0 0 0 0

Narmada 10

Catering Set 68 93.2 0 0 1601 0 0 26

35.07968 0 0 379 0 0

Narmada 11

ConcreteMixure Machine 7 8.25 0 0 0 0 1.2 1 1.65 0 0 0 0 0

Narmada 12

Pepar dish& bowl making unit 23

19.03 0 0 0 0 0 7 4.929 0 0 0 0 0

Narmada 13

Vegetable Trolley 13 2.5 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 14

Carpenter instrument 4 1.5 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 15

Construction instrument 2 0.3 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 16

Canteen House 6 6.17 0 0 0 1 1 3 3 0 0 0 0 0

Narmada

Tyre Repairing Unit 1 0.2 0 0 0 0 0 0 0 0 0 0 0 0

Narmad 17

Non-conventi 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 111: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

a onal Energy Sources

Narmada 18

Bio gas plant, 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 19

Bio-fuel plantation, 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 20

energy conservation measures, 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 21

Wind energy production, 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 22

Solar energy promotion, 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Narmada 23

OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Total 2348.3

2109.48 0 0 4355 428.6

482.555 0 519

381.31748 0 76 1734 0 0

Narmada

Capacity Building

319.182 0 0 0 0 0 0 0 132.6 0 0

46910.37736 0 0 0

Narmad

Evaluation &

106.34 0 0 0 0 0 0 0 7.28 0 0 0 0 0 0

Page 112: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

a Monitoring

Narmada

Administration

1063.38 0 0 0 0 0 0 0

575.93 0 0 0 0 0 0

Narmada

Consolidation Phase

378.63 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Total

Planning of the works for Narmada District Irrigation Plan (DIP) & Annual Action Plan for SLSC

District Sr.No Activity Unit

Physical Target for FY (2016-17)

Unit

Cost (In Lakhs) IWMP

Storage Volumes (Cubic Meter)

Command Area/ Irrigation Potential (Ha.)

Person days/Mandays Planned

Convergence

Unit

Amount (In Lakhs) Name of Schemes

Narmada 1 EPA 0 0 0 0 0

Narmada 1 Animal camp No. 4 0.99984 0 0 0 0 0

Narmada 2 Animal water trough (Havada) No. 0 0 0 0 0 0 0 Agri. Dept.

Narmada 3 Causeway on connecting roads No. 7 8.67 0 0 1948 0 0 Agri. Dept.

Narmada 4 Check / Protection wall No. 4 4.1 0 0 921 0 0

Narmada 5 Demonstration for Agricultural / Animal No. 0 0 0 0 0 0 0 Agri. Dept.

Page 113: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Husbandry Productivity Enhancement

Narmada 6

Drainage line correction (To prevent flooding of Gamtal) rmt 1 0.5 0 0 112 0 0 Fishery Dept.

Narmada 7 Drinking water facility No. 36 13.4202 0 0 2903 0 0 Agri. Dept.

Narmada 8 Fencing for protection from wild animals rmt. 0 0 0 0 0 0 0 Agri. Dept.

Narmada 9 Grassland/Gauchar Development Ha. 0 0 0 0 0 0 0 Agri. Dept.

Narmada 10

Improvised and energy efficient smashan gruh (Cemetery ) No. 0 0 0 0 0 0 0 Agri. Dept.

Narmada 12 Panchayat Well Repair & Pump Room No. 2 0.8066 0 0 181 0 0 Agri. Dept.

Narmada 13 Rain water harvesting system No. 1 0.59 0 0 133 0 0 GGRC

Narmada 14 Recharge / Repair of open wells No. 3 1.9 0 0 427 0 0 GGRC

Narmada 15

Repair / development of artificial water bodies No. 0 0 0 0 0 0 0 GGRC

Narmada 16

Revival of natural water bodies with recharge activities No. 0 0 0 0 0 0 0 GGRC

Narmada 17

Sanitation facilities/Sewerage line rmt 0 0 0 0 0 0 0 GGRC

Narmada 18 Use solar power for productive activities No. 0 0 0 0 0 0 0

Page 114: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 19 Wind energy development No. 0 0 0 0 0 0 0

Narmada 20 OTHERS (Specifiy activities ) No. 2 1.30896 0 0 294 0 0 GGRC

Narmada 21 Vegitable kits Distribution No. 0 0 0 0 0 0 0 GGRC

Narmada 22 Anganwadi Repairing No. 0 0 0 0 0 0 0

Narmada 23 Dhobi Ghat No. 0 0 0 0 0 0 0 GGRC

Narmada 24 chotro Repairing No. 0 0 0 0 0 0 0 GGRC

Narmada 25 Samsan fencing No. 0 0 0 0 0 0 0

Narmada 26 Kitchen Garden kits No. 0 0 0 0 0 0 0 GGRC

Narmada 27 Books For School Library No. 0 0 0 0 0 0 0

Narmada 28 Afforestation No. 0 0 0 0 0 0 0 GGRC

Narmada 29 Fancing & Plantation in Gramvatika No. 0 0 0 0 0 0 0

Narmada 30 Fancing & Plantation in Aanganwadi 0 0 0 0 0 0 0

Narmada 31 Community hall Repairing 0 0 0 0 0 0 0 GGRC

Narmada 32 Floriculture Development 1 1.5 0 0 0 0 0 GGRC

Narmada Total 61 33.7956 0 0 6920 0 0

Narmada 1 LAND DEVELOPMENT

Narmada 1 Farm Bunding rmt. 47921 44.75375 0 0 18784 14120 15.9252 MGNREGA

Narmada 2 Afforestation Ha. 19.2 37.28 0 0 2864 5 5.44 MGNREGA

Narmada 3 Agriculture Demo No. 0 0 0 0 0 0 0

Narmada 4 Agro Forestry Ha. 0 0 0 0 0 0 0

Narmada 5 Horticulture Ha. 0 0 0 0 0 121.03 48.41 MGNREGA

Narmada 6 Land leveling Ha. 775.88 211.29584 0 0 0 82.77 28.8703 MGNREGA

Page 115: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 7 Pasture development Ha. 0 0 0 0 0 0 0

Narmada 8 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0

Narmada 9 Bambu Bottling 1300.5 21.14899 0 0 0 0 0

Narmada 10 Border/forest plantation 0 0 0 0 0 150 2.5 Ah Dept

Narmada 2 Soil & Moisture Conservation

Narmada 1 Check wall No. 1043 765.8865 931967.9 399.2524 165107 160 212.16 MGNREGA

Narmada 2 Earthen bund No. 0 0 0 0 0 6 5 MGNREGA

Narmada 3 Protection Wall No. 83 55.59 116820 0 12557 3 2.75 MGNREGA

Narmada 4 Waste weir No. 220 184.96538 111905.1 283.04 21161 115 106.58

Narmada 5 Bench Terracing cumec 0 0 0 0 0 0 0

Narmada 6 Bori bandh No. 0 0 0 0 0 0 0 MGNREGA

Narmada 7 Brushwood Checks No. 0 0 0 0 0 0 0

Narmada 8 Countour Bunding rmt. 0 0 0 0 0 0 0

Narmada 9 Countour Trenches rmt. 40899 42.65 0 0 28112 0 0

Narmada 10 Earthern Dam No. 0 0 0 0 0 0 0

Narmada 11 Field Outlet No. 457 171.53012 0 0 14330 0 0

Narmada 12 Gabion structure No. 513 211.34942 0 510 37351 37 17.62 MGNREGA

Narmada 13 Graded Bunding rmt. 0 2.79 0 0 0 0 0

Narmada 14 Gully plug No. 0 0 0 0 7 0 0

Narmada 15 Loose boulder Checks No. 0 0 0 0 0 32 27.44 MGNREGA

Narmada 16 Nala Plug No. 256 138.927 0 0 24490 2 4.4 MGNREGA

Narmada 17 Stone bunding rmt. 18618 125.7442 0 0 39877 7177.7 27.682 MGNREGA

Narmada 18

Straggred Contour trenching(Terrace Talavadi) rmt 36026 24.1279 0 0 15607 1 1.38 MGNREGA

Narmada 19 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0

Page 116: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 20

Water Way (Diversation of water Draingae) 0 0.08 0 0 0 0 0

Narmada 3 Water Harvesting Structure 0 0 0 0 0 0 0

Narmada 1 Cause way cum Chek dam No. 0 0 0 0 0 14 72.39 MGNREGA

Narmada 2 Check dam No. 221 677.26942 1183488 575.2455 1796940 13 90.84 MGNREGA

Narmada 3 Village/Community Pond No. 3 4.74 1150 0.42 167 1 1.25 MGNREGA

Narmada 4 Farm Pond No. 46 46.37907 36007 34.39426 3273 0 0

Narmada 5 Percolation Tank No. 0 0 0 0 0 0 0

Narmada 6 Pond Inlet No. 2 2.4 0 0 539 0 0

Narmada 7 Pond Outlet No. 2 2.4 0 0 539 0 0

Narmada 8 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0

Narmada 4

Existing/Old Water Harvesting Structure Maintance (Renovation & Repair) 0 0 0 0 0 0 0

Narmada 1 Deepening/Desiltation Of Pond No. 12 26.05564 53687 48.11336 1079 2 6

Narmada 2 Deepening Of Percolation Tank No. 14 2 25200 10.7234 0 0 0

Narmada 3 De-siltation of Checkdam No. 18 18.5 54900 23.3617 3370 0 3.44 MGNREGA

Narmada 4 Repairing of Checkdam No. 14 23.07644 72780 46.74468 3852 0 0

Narmada 5 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0

Narmada 5 Ground Water 0 0 0 0 0 0 0

Page 117: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Recharging Structures

Narmada 1 Dugwell Recharge structure No. 79 31.58 1232 0 2909 7 2.8 MGNREGA

Narmada 2 Farm Recharge Filter No. 0 0 0 0 0 0 0

Narmada 3 Holiya in farm/Field No. 0 0 0 0 0 0 0

Narmada 4 Pond Recharge structure No. 0 0 0 0 0 0 0

Narmada 5 OTHERS (Specifiy activities ) 1 0.5 0 0 0 5781 224.07 Ah Dept

Narmada 9 Total 148544 2873.0 2589137 1931.3 2192914 27831 906.948

Narmada LH & ME & Production System 0 0 0 0 0 0 0

Narmada 1 AGRICULTURE ACTIVITIES 0 0 0 0 0 0 0

Narmada 1 Agro Center No. 9 10.77 0 0 0 3 4 Agri. Dept.

Narmada 2 Agricultural Implements No. 194 88.708867 0 0 1000 20.5 10.5175 Agri. Dept.

Narmada 3 Agro- Forestry 11 32.43 0 0 0 0 0

Narmada 4 Crop Demonstration Plot No. 119 117.6735 0 0 0 12 27.1 Agri. Dept.

Narmada 5 Fishery Development No. 19 33.87905 0 0 0 2 1.5 Fishery Dept.

Narmada 6 Floriculture Development Ha. 13 25.07 0 0 0 2 2 Agri. Dept.

Narmada 7 Fodder Bank Development 2 0.5 0 0 0 2 0.5 Agri. Dept.

Narmada 8 Green House No. 18 20.19 0 0 0 11 16.84 Agri. Dept.

Narmada 9 Horticulture Plantation Ha. 102 124.0958 0 0 0 6 8.17 Agri. Dept.

Narmada 10 Kitchen Garden 9 16.67788 0 0 0 1 1.5 Agri. Dept.

Narmada 11 Nursery raising 27 42.1377 0 0 0 1 1 GGRC

Narmada 12 Vermi compost 19 30.14407 0 0 0 2 3.5 GGRC

Page 118: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 13 INPUT SUPPORT 0 0 0 0 0 0 0

Narmada 14

Promoting Micro-Irrigation Systems like drip and Sprinkler Irrigation No. 163.5 59.11 0 0 0 9 44.92 GGRC

Narmada 15 Sprinkler Demo. 1 0.5 0 0 0 1 0.35 GGRC

Narmada 16

Vegetable Nursery Raising with drip irrigation 90 189.01496 0 0 0 34 73.78 GGRC

Narmada 17 OTHERS 1 5.02 0 0 0 0 0

Narmada 18 Low Cost Poly House 7 8.19 0 0 0 0 0

Narmada 19 Lift Irrgation 35 41.35 0 0 0 3 19.42 GGRC

Narmada 20 Paddy Trasing Machine 1 0.75 0 0 0 0 0

Narmada 21 Creeper Vegetable Production 59.5 45.706 0 0 0 5 10.28 GGRC

Narmada 22 Rotavator 1 0.5 0 0 0 0 0.5 Agri. Dept.

Narmada 23 Power Weeder 0 0 0 0 0 0 0 0

Narmada 24 Chaffcuter No. 22 5.13 0 0 0 1 1.08 Agri. Dept.

Narmada 25 Mini Tractor with rotary and cultivator No. 7 21 0 0 0 0 0

Narmada 26 Thresher Machine No. 11 21.02 0 0 0 0 0

Narmada 27 Organic Manual No. 0 0 0 0 0 0 0

Narmada 28 Spray pump No. 17 1.05 0 0 0 0 0.6 GGRC

Narmada 29 Vegetable Production No. 18.4 22.12 0 0 0 10.2 19.86 GGRC

Narmada 30 Multi crop harverter 0 0 0 0 0 0 0 0

Narmada 2 AGRO PROCESSING ACTIVITIES No. 0 0 0 0 0 0 0 0

Narmada 1 Dal Making Unit No. 9 23.85 0 0 402 1 3

Narmada 2 Flour & Dal/Rice Processing unit 37 48.6255 0 0 100 0 0 0

Page 119: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 3 Garam Masala 0 0 0 0 0 0 0 0

Narmada 4

Grading and packaging of agricultural produces, No. 1 0.5 0 0 0 0 0 0

Narmada 5 Jam-jelly making No. 0 0 0 0 0 0 0 0

Narmada 6

Microenterprises based on Minor Forest Produce (MFP) 1 0.5 0 0 0 0 0 0

Narmada 7 Oil extraction mill 8 23.15892 0 0 1000 0 0 0

Narmada 8 Value added products from milk 0 0 0 0 0 0 0 0

Narmada 9 Package Food Products 3 1.31 0 0 100 1 2 Ah Dept

Narmada 10 Pulp making 0 0 0 0 0 0 0 0

Narmada 11 Rice mill 34 82.92392 0 0 100 1 3 Ah Dept

Narmada 12 OTHERS (Specifiy activities ) 8 21.39 0 0 0 0 0 0

Narmada 13 Sugar cane Juice Machine 0 0 0 0 0 0 0 0

Narmada 12 Chilly Powder Unit 0 0 0 0 0 0 0 0

Narmada 13 Papad making unit 2 1 0 0 0 0 0 0

Narmada 3 Animal Husbandry 0 0 0 0 0 0 0 0

Narmada 1 Cattle Feed and Nutrition Store 0 1 0 0 0 20 10.65 0

Narmada 2 Animal Health camps 56 25.66648 0 0 154 27 20.6 Animal he

Narmada 3 Animal Travis (Pinjaru) 0 0 0 0 0 0 0 0

Narmada 4 Apiculture (Bee keeping) 0 0 0 0 0 0 0 0

Narmada 5 Artificial insemination 0 0 0 0 0 3 2.5 other

Narmada 6 Back-yard poultry 1 1.5 0 0 0 0 0 0

Narmada 7 Dairy cooperative No. 3 6.5 0 0 0 0 0 0

Page 120: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

promotion,

Narmada 8 Cattle Shed No. 66 19.26 0 0 2 0 0 0

Narmada 9 Pasture development No. 2 6.5 0 0 0 1 0.3

Narmada 10 Poultry Farming to individuals No. 1 2 0 0 0 0 0 0

Narmada 11 Sericulture No. 0 0 0 0 0 0 0 0

Narmada 12 Small ruminants 0 0 0 0 0 0 0 0

Narmada 13 Veterinary Aid for livestock 0 0 0 0 0 0 0 0

Narmada 14 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0

Narmada 4 Establishing linkages 0 0 0 0 0 0 0 0

Narmada 1 Credit linkages 0 0 0 0 0 0 0 0

Narmada 2 Linkages with Future Markets, No. 0 0 0 0 0 0 0 0

Narmada 3 Market linkages, 0 0 0 0 0 0 0 0

Narmada 4 Raw material supply channel, 0 0 0 0 0 0 0 0

Narmada 5 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 5 Local traditional handicraft 0 0 0 0 0 0 0 0

Narmada 1 Bamboo based products, 3 5.8 0 0 0 0 0 0

Narmada 2 Kutchi Bandhini, 0 0 0 0 0 0 0 0

Narmada 3 Pottery 0 0 0 0 0 0 0 0

Narmada 4 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 6 Minor Activities 0 0 0 0 0 0 0 0

Narmada 1 Embroidery Unit 0 0 0 0 0 0 0 0

Narmada 2 Handicraft Unit No 2 0.61 0 0 0 0 0 0

Page 121: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 3 Vegetable shop 1 0.5 0 0 0 0 0 0

Narmada 4 Provision Store 0 0 0 0 0 0 0 0

Narmada 5 stiching machine 6 1 0 0 0 0 0 0

Narmada 6 Up Gradation of centering materials 9 9 0 0 0 0 0 0

Narmada 7 OTHERS (Specifiy activities ) No 0 0 0 0 0 0 0 0

Narmada 8 Musical instrument 3 6.703 0 0 0 0 0 0

Narmada 9 Madap Decoration 27 45.22 0 0 0 0 0 0

Narmada 10 Catering Set 26 35.65032 0 0 1222 0 0 0

Narmada 11 ConcreteMixure Machine 1 0.001 0 0 0 0 0 0

Narmada 12 Pepar dish& bowl making unit 10 6.131 0 0 0 0 0 0

Narmada 13 Vegetable Trolley 0 0 0 0 0 0 0 0

Narmada 14 Carpenter instrument 0 0 0 0 0 0 0 0

Narmada 15 Construction instrument 0 0 0 0 0 0 0 0

Narmada 16 Canteen House 1 1.57 0 0 0 0 0 0

Narmada Tyre Repairing Unit 0 0 0 0 0 0 0 0

Narmada 17 Non-conventional Energy Sources 0 0 0 0 0 0 0 0

Narmada 18 Bio gas plant, 0 0 0 0 0 0 0 0

Narmada 19 Bio-fuel plantation, 0 0 0 0 0 0 0 0

Narmada 20 energy conservation measures, 0 0 0 0 0 0 0 0

Narmada 21 Wind energy production, 0 0 0 0 0 0 0 0

Narmada 22 Solar energy promotion, 0 0 0 0 0 0 0 0

Narmada 23 OTHERS (Specifiy 0 0 0 0 0 20 10.65 0

Page 122: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

activities )

Total 1297.4 1340.608 0 0 4071 179.7 289.468 0

Narmada

Capacity Building 0 103.6 0 0 36650.9 0 0 0

Narmada

Evaluation & Monitoring 0 51.02 0 0 0 0 0 0

Narmada Administration 0 273.1266 0 0 0 0 0 0

Narmada Consolidation Phase 0 149.04 0 0 0 0 0 0

Total 576.7866

District Sr.No Activity Unit

Physical Target for FY (2017-18)

Unit

Cost (In Lakhs) IWMP

Storage Volumes (Cubic Meter)

Command Area/ Irrigation Potential (Ha.)

Person days/Mandays Planned

Convergence

Unit

Amount (In Lakhs) Name of Schemes

Narmada 1 EPA

Narmada 1 Animal camp No. 0 0 0 0 0 0 0 0

Narmada 2 Animal water trough (Havada) No. 0 0 0 0 0 0 0 0

Narmada 3 Causeway on connecting roads No. 0 0 0 0 0 0 0 0

Narmada 4 Check / Protection wall No. 0 0 0 0 0 0 0 0

Narmada 5

Demonstration for Agricultural / Animal Husbandry Productivity Enhancement No. 0 0 0 0 0 0 0 0

Page 123: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 6

Drainage line correction (To prevent flooding of Gamtal) rmt 0 0 0 0 0 0 0 0

Narmada 7 Drinking water facility No. 0 0 0 0 0 0 0 0

Narmada 8 Fencing for protection from wild animals rmt. 0 0 0 0 0 0 0 0

Narmada 9 Grassland/Gauchar Development Ha. 0 0 0 0 0 0 0 0

Narmada 10

Improvised and energy efficient smashan gruh (Cemetery ) No. 0 0 0 0 0 0 0 0

Narmada 12 Panchayat Well Repair & Pump Room No. 0 0 0 0 0 0 0 0

Narmada 13 Rain water harvesting system No. 0 0 0 0 0 0 0 0

Narmada 14 Recharge / Repair of open wells No. 0 0 0 0 0 0 0 0

Narmada 15

Repair / development of artificial water bodies No. 0 0 0 0 0 0 0 0

Narmada 16

Revival of natural water bodies with recharge activities No. 0 0 0 0 0 0 0 0

Narmada 17

Sanitation facilities/Sewerage line rmt 0 0 0 0 0 0 0 0

Narmada 18 Use solar power for productive activities No. 0 0 0 0 0 0 0 0

Narmada 19 Wind energy development No. 0 0 0 0 0 0 0 0

Narmada 20 OTHERS (Specifiy No. 0 0 0 0 0 0 0 0

Page 124: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

activities )

Narmada 21 Vegitable kits Distribution No. 0 0 0 0 0 0 0 0

Narmada 22 Anganwadi Repairing No. 0 0 0 0 0 0 0 0

Narmada 23 Dhobi Ghat No. 0 0 0 0 0 0 0 0

Narmada 24 chotro Repairing No. 0 0 0 0 0 0 0 0

Narmada 25 Samsan fencing No. 0 0 0 0 0 0 0 0

Narmada 26 Kitchen Garden kits No. 0 0 0 0 0 0 0 0

Narmada 27 Books For School Library No. 0 0 0 0 0 0 0 0

Narmada 28 Afforestation No. 0 0 0 0 0 0 0 0

Narmada 29 Fancing & Plantation in Gramvatika No. 0 0 0 0 0 0 0 0

Narmada 30 Fancing & Plantation in Aanganwadi 0 0 0 0 0 0 0 0

Narmada 31 Community hall Repairing 0 0 0 0 0 0 0 0

Narmada 32 Floriculture Development 0 0 0 0 0 0 0 0

Narmada Total 0 0 0 0 0 0 0 0

Narmada 1 LAND DEVELOPMENT

Narmada 1 Farm Bunding rmt. 33545 82.0219 0 0 22493 426 27.3532 MGNREGA

Narmada 2 Afforestation Ha. 4.4 5.27 0 0 112 2 2.5 MGNREGA

Narmada 3 Agriculture Demo No. 0 0 0 0 0 0 0 0

Narmada 4 Agro Forestry Ha. 0 0 0 0 0 0 0 0

Narmada 5 Horticulture Ha. 0 0 0 0 0 0 0 0

Narmada 6 Land leveling Ha. 895.6 159.226 0 0 42938 173.77 35.432 MGNREGA

Narmada 7 Pasture development Ha. 0 0 0 0 0 0 0 0

Narmada 8 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Page 125: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 9 Bambu Bottling 0 0 0 0 0 0 0 0

Narmada 10 Border/forest plantation 0 0 0 0 0 0 0 0

Narmada 2 Soil & Moisture Conservation

Narmada 1 Check wall No. 0 0 0 0 0 20 29.26 MGNREGA

Narmada 2 Earthen bund No. 0 0 0 0 0 0 0 0

Narmada 3 Protection Wall No. 65 26.67 0 0 5993 22 15.04 MGNREGA

Narmada 4 Waste weir No. 38 8.3 0 0 809 2 1.8 MGNREGA

Narmada 5 Bench Terracing cumec 0 0 0 0 0 0 0 0

Narmada 6 Bori bandh No. 0 0 0 0 562 0 0 0

Narmada 7 Brushwood Checks No. 0 0 0 0 0 0 0 0

Narmada 8 Countour Bunding rmt. 0 0 0 0 4494 0 6.666 MGNREGA

Narmada 9 Countour Trenches rmt. 0 0.02 0 0 0 0 0 0

Narmada 10 Earthern Dam No. 0 0 0 0 0 0 0 0

Narmada 11 Field Outlet No. 335 49.4439 0 0 8333 72 10.1263 MGNREGA

Narmada 12 Gabion structure No. 570 62.07 0 0 5358 6 2.4 MGNREGA

Narmada 13 Graded Bunding rmt. 0 0 0 0 0 0 0 0

Narmada 14 Gully plug No. 56 10.0612 0 0 581 0 1.35 MGNREGA

Narmada 15 Loose boulder Checks No. 0 0 0 0 0 0 0 0

Narmada 16 Nala Plug No. 46 67.3 0 0 0 0 0 0

Narmada 17 Stone bunding rmt. 12020 66.45 0 0 6118 329 34.79 MGNREGA

Narmada 18

Straggred Contour trenching(Terrace Talavadi) rmt 2 6.19 2900 0 3000 0 0 0

Narmada 19 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 20

Water Way (Diversation of water Draingae) 0 0 0 0 0 0 0 0

Page 126: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 3 Water Harvesting Structure 0 0 0 0 0 0 0 0

Narmada 1 Cause way cum Chek dam No. 0 0 0 0 0 0 0 0

Narmada 2 Check dam No. 0 0 0 30 105 15 61.03 MGNREGA

Narmada 3 Village/Community Pond No. 2 3.5 4320 2.8383 2 0 0

Narmada 4 Farm Pond No. 20 25.21 25110 16.14 4087 0 0 0

Narmada 5 Percolation Tank No. 0 0 0 0 0 0 0 0

Narmada 6 Pond Inlet No. 0 0 0 0 0 0 0 0

Narmada 7 Pond Outlet No. 0 0 0 0 0 0 0 0

Narmada 8 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0

Narmada 4

Existing/Old Water Harvesting Structure Maintance (Renovation & Repair) 0 0 0 0 0 0 0 0

Narmada 1 Deepening/Desiltation Of Pond No. 0 0 0 0 0 0 0 0

Narmada 2 Deepening Of Percolation Tank No. 0 0 0 0 0 0 0 0

Narmada 3 De-siltation of Checkdam No. 2 5.80551 0 0 0 0 0 0

Narmada 4 Repairing of Checkdam No. 17 24.63 14660 27 3710 1 1 MGNREGA

Narmada 5 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0

Narmada 5 Ground Water Recharging Structures 0 0 0 0 0 0 0 0

Narmada 1 Dugwell Recharge structure No. 2 0.6 0 0 0 0 0 0

Page 127: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 2 Farm Recharge Filter No. 0 0 0 0 0 0 0 0

Narmada 3 Holiya in farm/Field No. 0 0 0 0 0 0 0 0

Narmada 4 Pond Recharge structure No. 0 0 0 0 0 0 0 0

Narmada 5 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 9 Total 47620 602.8 46990 76.0 108694 1068.77 228.747 0

Narmada LH & ME & Production System 0 0 0 0 0 0 0 0

Narmada 1 AGRICULTURE ACTIVITIES 0 0 0 0 0 0 0 0

Narmada 1 Agro Center No. 11 28.36 0 0 0 4 10.5 Agri. Dept.

Narmada 2 Agricultural Implements No. 24 8.67917 0 0 0 18.5 9.0175 Agri. Dept.

Narmada 3 Agro- Forestry 0 0 0 0 0 0 0 0

Narmada 4 Crop Demonstration Plot No. 54.1 21.345 0 0 0 11 5.25 Agri. Dept.

Narmada 5 Fishery Development No. 0 0 0 0 0 0 0 0

Narmada 6 Floriculture Development Ha. 4.3 3.43 0 0 0 3 0.9 Agri. Dept.

Narmada 7 Fodder Bank Development 0 0 0 0 0 0 0 0

Narmada 8 Green House No. 28 16 0 0 0 1 3.85 Agri. Dept.

Narmada 9 Horticulture Plantation Ha. 18.5 14.91 0 0 0 8 9.16 Agri. Dept.

Narmada 10 Kitchen Garden 0 0 0 0 0 0 0 0

Narmada 11 Nursery raising 2 1.6 0 0 0 1 0.75 GGRC

Narmada 12 Vermi compost 1 1.5 0 0 0 0 0 0

Narmada 13 INPUT SUPPORT 0 0 0 0 0 0 0 0

Narmada 14 Promoting Micro-Irrigation Systems like No. 11 9.18 0 0 0 4 23.44 GGRC

Page 128: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

drip and Sprinkler Irrigation

Narmada 15 Sprinkler Demo. 0 0 0 0 0 0 0 0

Narmada 16

Vegetable Nursery Raising with drip irrigation 6 11.18 0 0 0 0 0 0

Narmada 17 OTHERS 0 0 0 0 0 0 0 0

Narmada 18 Low Cost Poly House 0 0 0 0 0 0 0 0

Narmada 19 Lift Irrgation 5 1.25 0 0 0 0 1.25 GGRC

Narmada 20 Paddy Trasing Machine 0 0 0 0 0 0 0

Narmada 21 Creeper Vegetable Production 94 55.53 0 0 0 19 8.98 GGRC

Narmada 22 Rotavator 0 0 0 0 0 0 0 0

Narmada 23 Power Weeder 2 0.8 0 0 0 0 0.8 Agri. Dept.

Narmada 24 Chaffcuter No. 23 5.1 0 0 0 0 0 0

Narmada 25 Mini Tractor with rotary and cultivator No. 3 8 0 0 0 0 0 0

Narmada 26 Thresher Machine No. 3 2.86 0 0 0 0 1 other

Narmada 27 Organic Manual No. 0 0 0 0 0 0 0 0

Narmada 28 Spray pump No. 0 0 0 0 0 0 0 0

Narmada 29 Vegetable Production No. 5 4.71 0 0 0 5 6.26 GGRC

Narmada 30 Multi crop harverter 0 0 0 0 0 0 0 0

Narmada 2 AGRO PROCESSING ACTIVITIES No. 0 0 0 0 0 0 0 0

Narmada 1 Dal Making Unit No. 5 3.9 0 0 0 0 1

Narmada 2 Flour & Dal/Rice Processing unit 24 28.33 0 0 0 0 2

Narmada 3 Garam Masala 0 0 0 0 0 0 0 0

Page 129: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 4

Grading and packaging of agricultural produces, No. 0 0 0 0 0 0 0 0

Narmada 5 Jam-jelly making No. 0 0 0 0 0 0 0 0

Narmada 6

Microenterprises based on Minor Forest Produce (MFP) 0 0 0 0 0 0 0 0

Narmada 7 Oil extraction mill 2 5 0 0 0 0 0 0

Narmada 8 Value added products from milk 0 0 0 0 0 0 0 0

Narmada 9 Package Food Products 0 0 0 0 0 0 0 0

Narmada 10 Pulp making 0 0 0 0 0 0 0 0

Narmada 11 Rice mill 7 10.5 0 0 0 0 0 0

Narmada 12 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 13 Sugar cane Juice Machine 0 0 0 0 0 0 0 0

Narmada 12 Chilly Powder Unit 6 4.2 0 0 0 0 0 0

Narmada 13 Papad making unit 0 0 0 0 0 0 0 0

Narmada 3 Animal Husbandry 0 0 0 0 0 0 0 0

Narmada 1 Cattle Feed and Nutrition Store 0 0 0 0 0 0 0 0

Narmada 2 Animal Health camps 45 18.51 0 0 0 1 0.3 animal

Narmada 3 Animal Travis (Pinjaru) 0 0 0 0 0 0 0 0

Narmada 4 Apiculture (Bee keeping) 0 0 0 0 0 0 0 0

Narmada 5 Artificial insemination 0 0 0 0 0 0 0 0

Narmada 6 Back-yard poultry 0 0 0 0 0 0 0 0

Narmada 7 Dairy cooperative promotion, No. 0 0 0 0 0 0 0 0

Page 130: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 8 Cattle Shed No. 21 6.5 0 0 0 0 0 0

Narmada 9 Pasture development No. 0 0 0 0 0 0 0 0

Narmada 10 Poultry Farming to individuals No. 1 1.5 0 0 0 0 0 0

Narmada 11 Sericulture No. 0 0 0 0 0 0 0 0

Narmada 12 Small ruminants 0 0 0 0 0 0 0 0

Narmada 13 Veterinary Aid for livestock 0 0 0 0 0 0 0 0

Narmada 14 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0

Narmada 4 Establishing linkages 0 0 0 0 0 0 0 0

Narmada 1 Credit linkages 0 0 0 0 0 0 0 0

Narmada 2 Linkages with Future Markets, No. 0 0 0 0 0 0 0 0

Narmada 3 Market linkages, 0 0 0 0 0 0 0 0

Narmada 4 Raw material supply channel, 0 0 0 0 0 0 0 0

Narmada 5 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 5 Local traditional handicraft 0 0 0 0 0 0 0 0

Narmada 1 Bamboo based products, 0 0 0 0 0 0 0 0

Narmada 2 Kutchi Bandhini, 0 0 0 0 0 0 0 0

Narmada 3 Pottery 0 0 0 0 0 0 0 0

Narmada 4 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 6 Minor Activities 0 0 0 0 0 0 0 0

Narmada 1 Embroidery Unit 0 0 0 0 0 0 0 0

Narmada 2 Handicraft Unit No 0 0 0 0 0 0 0 0

Narmada 3 Vegetable shop 0 0 0 0 0 0 0 0

Page 131: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 4 Provision Store 2 1.18 0 0 0 0 0 0

Narmada 5 stiching machine 5 0.5 0 0 2 1 0.5 0

Narmada 6 Up Gradation of centering materials 0 0 0 0 0 0 0 0

Narmada 7 OTHERS (Specifiy activities ) No 0 0 0 0 1 0 0 0

Narmada 8 Musical instrument 0 0 0 0 0 0 0 0

Narmada 9 Madap Decoration 12 15.37 0 0 12 0 0 0

Narmada 10 Catering Set 7 7.6 0 0 15 0 0 0

Narmada 11 ConcreteMixure Machine 1 0.6 0 0 5 0 0 0

Narmada 12 Pepar dish& bowl making unit 6 7.97 0 0 0 0 0 0

Narmada 13 Vegetable Trolley 13 2.5 0 0 0 0 0 0

Narmada 14 Carpenter instrument 2 0.8 0 0 1 0 0 0

Narmada 15 Construction instrument 2 0.3 0 0 0 0 0 0

Narmada 16 Canteen House 2 1.6 0 0 0 0 0 0

Narmada Tyre Repairing Unit 0 0 0 0 0 0 0 0

Narmada 17 Non-conventional Energy Sources 0 0 0 0 0 0 0 0

Narmada 18 Bio gas plant, 0 0 0 0 0 0 0 0

Narmada 19 Bio-fuel plantation, 0 0 0 0 0 0 0 0

Narmada 20 energy conservation measures, 0 0 0 0 0 0 0 0

Narmada 21 Wind energy production, 0 0 0 0 0 0 0 0

Narmada 22 Solar energy promotion, 0 0 0 0 0 0 0 0

Narmada 23 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Page 132: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Total 457.9 311.294 0 0 0 76.5 84.9575 0

Narmada

Capacity Building 0 68.862 0 0 24362 0 0 0

Narmada

Evaluation & Monitoring 0 39.69 0 0 0 0 0 0

Narmada Administration 0 154.143 0 0 0 0 0 0

Narmada Consolidation Phase 0 187.18 0 0 0 0 0 0

Total 449.875

District Sr.No Activity Unit

Physical Target for FY (2018-19)

Unit

Cost (In Lakhs) IWMP

Storage Volumes (Cubic Meter)

Command Area/ Irrigation Potential (Ha.)

Person days/Mandays Planned

Convergence

Unit

Amount (In Lakhs) Name of Schemes

Narmada 1 EPA

Narmada 1 Animal camp No. 0 0 0 0 0 0 0 0

Narmada 2 Animal water trough (Havada) No. 0 0 0 0 0 0 0 0

Narmada 3 Causeway on connecting roads No. 0 0 0 0 0 0 0 0

Narmada 4 Check / Protection wall No. 0 0 0 0 0 0 0 0

Narmada 5

Demonstration for Agricultural / Animal Husbandry Productivity Enhancement No. 0 0 0 0 0 0 0 0

Page 133: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 6

Drainage line correction (To prevent flooding of Gamtal) rmt 0 0 0 0 0 0 0 0

Narmada 7 Drinking water facility No. 0 0 0 0 0 0 0 0

Narmada 8 Fencing for protection from wild animals rmt. 0 0 0 0 0 0 0 0

Narmada 9 Grassland/Gauchar Development Ha. 0 0 0 0 0 0 0 0

Narmada 10

Improvised and energy efficient smashan gruh (Cemetery ) No. 0 0 0 0 0 0 0 0

Narmada 12 Panchayat Well Repair & Pump Room No. 0 0 0 0 0 0 0 0

Narmada 13 Rain water harvesting system No. 0 0 0 0 0 0 0 0

Narmada 14 Recharge / Repair of open wells No. 0 0 0 0 0 0 0 0

Narmada 15

Repair / development of artificial water bodies No. 0 0 0 0 0 0 0 0

Narmada 16

Revival of natural water bodies with recharge activities No. 0 0 0 0 0 0 0 0

Narmada 17

Sanitation facilities/Sewerage line rmt 0 0 0 0 0 0 0 0

Narmada 18 Use solar power for productive activities No. 0 0 0 0 0 0 0 0

Narmada 19 Wind energy development No. 0 0 0 0 0 0 0 0

Narmada 20 OTHERS (Specifiy No. 0 0 0 0 0 0 0 0

Page 134: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

activities )

Narmada 21 Vegitable kits Distribution No. 0 0 0 0 0 0 0 0

Narmada 22 Anganwadi Repairing No. 0 0 0 0 0 0 0 0

Narmada 23 Dhobi Ghat No. 0 0 0 0 0 0 0 0

Narmada 24 chotro Repairing No. 0 0 0 0 0 0 0 0

Narmada 25 Samsan fencing No. 0 0 0 0 0 0 0 0

Narmada 26 Kitchen Garden kits No. 0 0 0 0 0 0 0 0

Narmada 27 Books For School Library No. 0 0 0 0 0 0 0 0

Narmada 28 Afforestation No. 0 0 0 0 0 0 0 0

Narmada 29 Fancing & Plantation in Gramvatika No. 0 0 0 0 0 0 0 0

Narmada 30 Fancing & Plantation in Aanganwadi 0 0 0 0 0 0 0 0

Narmada 31 Community hall Repairing 0 0 0 0 0 0 0 0

Narmada 32 Floriculture Development 0 0 0 0 0 0 0 0

Narmada Total 0 0 0 0 0 0 0 0

Narmada 1 LAND DEVELOPMENT

Narmada 1 Farm Bunding rmt. 0 0 0 0 0 0 0 0

Narmada 2 Afforestation Ha. 0 0 0 0 0 0 0 0

Narmada 3 Agriculture Demo No. 0 0 0 0 0 0 0 0

Narmada 4 Agro Forestry Ha. 0 0 0 0 0 0 0 0

Narmada 5 Horticulture Ha. 0 0 0 0 0 0 0 0

Narmada 6 Land leveling Ha. 0 0 0 0 0 0 0 0

Narmada 7 Pasture development Ha. 0 0 0 0 0 0 0 0

Narmada 8 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Page 135: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 9 Bambu Bottling 0 0 0 0 0 0 0 0

Narmada 10 Border/forest plantation 0 0 0 0 0 0 0 0

Narmada 2 Soil & Moisture Conservation

Narmada 1 Check wall No. 33 63.75 47520 20.2213 14325 0 0 0

Narmada 2 Earthen bund No. 0 0 0 0 0 0 0 0

Narmada 3 Protection Wall No. 0 0 0 0 0 0 0 0

Narmada 4 Waste weir No. 0 0 0 0 0 0 0 0

Narmada 5 Bench Terracing cumec 0 0 0 0 0 0 0 0

Narmada 6 Bori bandh No. 0 0 0 0 0 0 0 0

Narmada 7 Brushwood Checks No. 0 0 0 0 0 0 0 0

Narmada 8 Countour Bunding rmt. 0 0 0 0 0 0 0 0

Narmada 9 Countour Trenches rmt. 0 0 0 0 0 0 0 0

Narmada 10 Earthern Dam No. 0 0 0 0 0 0 0 0

Narmada 11 Field Outlet No. 0 0 0 0 0 0 0 0

Narmada 12 Gabion structure No. 0 0 0 0 0 0 0 0

Narmada 13 Graded Bunding rmt. 0 0 0 0 0 0 0 0

Narmada 14 Gully plug No. 0 0 0 0 0 0 0 0

Narmada 15 Loose boulder Checks No. 0 0 0 0 0 0 0 0

Narmada 16 Nala Plug No. 65 78.907 0 0 13299 0 4.85 MGNREGA

Narmada 17 Stone bunding rmt. 0 0 0 0 0 0 0 0

Narmada 18

Straggred Contour trenching(Terrace Talavadi) rmt 0 0 0 0 0 0 0 0

Narmada 19 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 20

Water Way (Diversation of water Draingae) 0 0 0 0 0 0 0 0

Page 136: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 3 Water Harvesting Structure 0 0 0 0 0 0 0 0

Narmada 1 Cause way cum Chek dam No. 0 0 0 0 0 0 0 0

Narmada 2 Check dam No. 30 104.86 0 0 0 0 0 0

Narmada 3 Village/Community Pond No. 1 1.5 0 0 0 0 0 0

Narmada 4 Farm Pond No. 3 2.91 6480 2.75745 0 1 3 MGNREGA

Narmada 5 Percolation Tank No. 0 0 0 0 0 0 0 0

Narmada 6 Pond Inlet No. 0 0 0 0 0 0 0 0

Narmada 7 Pond Outlet No. 0 0 0 0 0 0 0 0

Narmada 8 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0

Narmada 4

Existing/Old Water Harvesting Structure Maintance (Renovation & Repair) 0 0 0 0 0 0 0 0

Narmada 1 Deepening/Desiltation Of Pond No. 0 0 0 0 0 0 0 0

Narmada 2 Deepening Of Percolation Tank No. 0 0 0 0 0 0 0 0

Narmada 3 De-siltation of Checkdam No. 0 0 0 0 0 0 0 0

Narmada 4 Repairing of Checkdam No. 0 0 0 0 0 0 0 0

Narmada 5 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0

Narmada 5 Ground Water Recharging Structures 0 0 0 0 0 0 0 0

Narmada 1 Dugwell Recharge structure No. 0 0 0 0 0 0 0 0

Page 137: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 2 Farm Recharge Filter No. 0 0 0 0 0 0 0 0

Narmada 3 Holiya in farm/Field No. 0 0 0 0 0 0 0 0

Narmada 4 Pond Recharge structure No. 0 0 0 0 0 0 0 0

Narmada 5 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 9 Total 132 251.9 54000 23.0 27624 1 7.85 0

Narmada LH & ME & Production System 0 0 0 0 0 0 0 0

Narmada 1 AGRICULTURE ACTIVITIES 0 0 0 0 0 0 0 0

Narmada 1 Agro Center No. 0 0 0 0 0 0 0 0

Narmada 2 Agricultural Implements No. 5 2.15167 0 0 0 5 4.305 Agri. Dept.

Narmada 3 Agro- Forestry 0 0 0 0 0 0 0 0

Narmada 4 Crop Demonstration Plot No. 8.67 2.64 0 0 0 0 0 0

Narmada 5 Fishery Development No. 0 0 0 0 0 0 0 0

Narmada 6 Floriculture Development Ha. 0 0 0 0 0 0 0 0

Narmada 7 Fodder Bank Development 0 0 0 0 0 0 0 0

Narmada 8 Green House No. 0 0 0 0 0 0 0 0

Narmada 9 Horticulture Plantation Ha. 0 0 0 0 0 0 0 0

Narmada 10 Kitchen Garden 0 0 0 0 0 0 0 0

Narmada 11 Nursery raising 0 0 0 0 0 0 0 0

Narmada 12 Vermi compost 0 0 0 0 0 0 0 0

Narmada 13 INPUT SUPPORT 0 0 0 0 0 0 0 0

Narmada 14 Promoting Micro-Irrigation Systems like No. 0 0 0 0 0 68 16.2 GGRC

Page 138: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

drip and Sprinkler Irrigation

Narmada 15 Sprinkler Demo. 0 0 0 0 0 0 0 0

Narmada 16

Vegetable Nursery Raising with drip irrigation 0 0 0 0 0 0 0 0

Narmada 17 OTHERS 0 0 0 0 0 0 0 0

Narmada 18 Low Cost Poly House 0 0 0 0 0 0 0 0

Narmada 19 Lift Irrgation 9 3.55 0 0 0 9 0 0

Narmada 20 Paddy Trasing Machine 0 0 0 0 0 0 0 0

Narmada 21 Creeper Vegetable Production 0 0 0 0 0 0 0 0

Narmada 22 Rotavator 0 0 0 0 0 0 0 0

Narmada 23 Power Weeder 1 0.4 0 0 0 0 0.4 Agri. Dept.

Narmada 24 Chaffcuter No. 0 0 0 0 0 0 0 0

Narmada 25 Mini Tractor with rotary and cultivator No. 0 0 0 0 0 0 0 0

Narmada 26 Thresher Machine No. 1 0.5 0 0 0 0 0.5 other

Narmada 27 Organic Manual No. 0 0 0 0 0 0 0 0

Narmada 28 Spray pump No. 0 0 0 0 0 0 0 0

Narmada 29 Vegetable Production No. 0 0 0 0 0 0 0 0

Narmada 30 Multi crop harverter 1 0.5 0 0 0 0 0.5 GGRC

Narmada 2 AGRO PROCESSING ACTIVITIES No. 0 0 0 0 0 0 0 0

Narmada 1 Dal Making Unit No. 0 0 0 0 0 0 0 0

Narmada 2 Flour & Dal/Rice Processing unit 0 0 0 0 0 0 0 0

Narmada 3 Garam Masala 0 0 0 0 0 0 0 0

Page 139: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 4

Grading and packaging of agricultural produces, No. 0 0 0 0 0 0 0 0

Narmada 5 Jam-jelly making No. 0 0 0 0 0 0 0 0

Narmada 6

Microenterprises based on Minor Forest Produce (MFP) 0 0 0 0 0 0 0 0

Narmada 7 Oil extraction mill 0 0 0 0 0 0 0 0

Narmada 8 Value added products from milk 0 0 0 0 0 0 0 0

Narmada 9 Package Food Products 1 0.5 0 0 0 0 0.5 ah.dep

Narmada 10 Pulp making 0 0 0 0 0 0 0 0

Narmada 11 Rice mill 1 0.5 0 0 0 0 0.5 ah.dep

Narmada 12 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 13 Sugar cane Juice Machine 3 0.75 0 0 0 0 0.75 ah.dep

Narmada 12 Chilly Powder Unit 5 4.5 0 0 0 0 2.7 ah.dep

Narmada 13 Papad making unit 0 0 0 0 0 0 0 0

Narmada 3 Animal Husbandry 0 0 0 0 0 0 0 0

Narmada 1 Cattle Feed and Nutrition Store 0 0 0 0 0 0 0 0

Narmada 2 Animal Health camps 48 4.88 0 0 0 3 1.2 ah.dep

Narmada 3 Animal Travis (Pinjaru) 0 0 0 0 0 0 0 0

Narmada 4 Apiculture (Bee keeping) 0 0 0 0 0 0 0 0

Narmada 5 Artificial insemination 0 0 0 0 0 0 0 0

Narmada 6 Back-yard poultry 0 0 0 0 0 0 0 0

Narmada 7 Dairy cooperative promotion, No. 0 0 0 0 0 0 0 0

Page 140: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 8 Cattle Shed No. 0 0 0 0 0 0 0 0

Narmada 9 Pasture development No. 0 0 0 0 0 0 0 0

Narmada 10 Poultry Farming to individuals No. 0 0 0 0 0 0 0 0

Narmada 11 Sericulture No. 0 0 0 0 0 0 0 0

Narmada 12 Small ruminants 0 0 0 0 0 0 0 0

Narmada 13 Veterinary Aid for livestock 0 0 0 0 0 0 0 0

Narmada 14 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0

Narmada 4 Establishing linkages 0 0 0 0 0 0 0 0

Narmada 1 Credit linkages 0 0 0 0 0 0 0 0

Narmada 2 Linkages with Future Markets, No. 0 0 0 0 0 0 0 0

Narmada 3 Market linkages, 0 0 0 0 0 0 0 0

Narmada 4 Raw material supply channel, 0 0 0 0 0 0 0 0

Narmada 5 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 5 Local traditional handicraft 0 0 0 0 0 0 0 0

Narmada 1 Bamboo based products, 0 0 0 0 0 0 0 0

Narmada 2 Kutchi Bandhini, 0 0 0 0 0 0 0 0

Narmada 3 Pottery 0 0 0 0 0 0 0 0

Narmada 4 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 6 Minor Activities 0 0 0 0 0 0 0 0

Narmada 1 Embroidery Unit 0 0 0 0 0 0 0 0

Narmada 2 Handicraft Unit No 0 0 0 0 0 0 0 0

Narmada 3 Vegetable shop 0 0 0 0 0 0 0 0

Page 141: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 4 Provision Store 0 0 0 0 0 0 0 0

Narmada 5 stiching machine 2 2 0 0 0 0 0 0

Narmada 6 Up Gradation of centering materials 0 0 0 0 0 0 0 0

Narmada 7 OTHERS (Specifiy activities ) No 2 0.68 0 0 0 0 0 0

Narmada 8 Musical instrument 0 0 0 0 0 0 0 0

Narmada 9 Madap Decoration 9 12.2 0 0 0 0 0 0

Narmada 10 Catering Set 9 14.87 0 0 0 0 0 0

Narmada 11 ConcreteMixure Machine 3 4.8 0 0 0 0 0 0

Narmada 12 Pepar dish& bowl making unit 0 0 0 0 0 0 0 0

Narmada 13 Vegetable Trolley 0 0 0 0 0 0 0 0

Narmada 14 Carpenter instrument 2 0.7 0 0 0 0 0 0

Narmada 15 Construction instrument 0 0 0 0 0 0 0 0

Narmada 16 Canteen House 0 0 0 0 0 0 0 0

Narmada Tyre Repairing Unit 0 0 0 0 0 0 0 0

Narmada 17 Non-conventional Energy Sources 0 0 0 0 0 0 0 0

Narmada 18 Bio gas plant, 0 0 0 0 0 0 0 0

Narmada 19 Bio-fuel plantation, 0 0 0 0 0 0 0 0

Narmada 20 energy conservation measures, 0 0 0 0 0 0 0 0

Narmada 21 Wind energy production, 0 0 0 0 0 0 0 0

Narmada 22 Solar energy promotion, 0 0 0 0 0 0 0 0

Narmada 23 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Page 142: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Total 111 56.1217 0 0 0 85 27.555 0

Narmada

Capacity Building 0 7.34 0 0 2596.7 0 0 0

Narmada

Evaluation & Monitoring 0 4.35 0 0 0 0 0 0

Narmada Administration 0 38.413 0 0 0 0 0 0

Narmada Consolidation Phase 0 18.5 0 0 0 0 0 0

Total 68.603

District Sr.No Activity Unit

Physical Target for FY (2019-20)

Unit

Cost (In Lakhs) IWMP

Storage Volumes (Cubic Meter)

Command Area/ Irrigation Potential (Ha.)

Person days/Mandays Planned

Convergence

Unit

Amount (In Lakhs) Name of Schemes

Narmada 1 EPA

Narmada 1 Animal camp No. 0 0 0 0 0 0 0 0

Narmada 2 Animal water trough (Havada) No. 0 0 0 0 0 0 0 0

Narmada 3 Causeway on connecting roads No. 0 0 0 0 0 0 0 0

Narmada 4 Check / Protection wall No. 0 0 0 0 0 0 0 0

Narmada 5

Demonstration for Agricultural / Animal Husbandry Productivity Enhancement No. 0 0 0 0 0 0 0 0

Page 143: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 6

Drainage line correction (To prevent flooding of Gamtal) rmt 0 0 0 0 0 0 0 0

Narmada 7 Drinking water facility No. 0 0 0 0 0 0 0 0

Narmada 8 Fencing for protection from wild animals rmt. 0 0 0 0 0 0 0 0

Narmada 9 Grassland/Gauchar Development Ha. 0 0 0 0 0 0 0 0

Narmada 10

Improvised and energy efficient smashan gruh (Cemetery ) No. 0 0 0 0 0 0 0 0

Narmada 12 Panchayat Well Repair & Pump Room No. 0 0 0 0 0 0 0 0

Narmada 13 Rain water harvesting system No. 0 0 0 0 0 0 0 0

Narmada 14 Recharge / Repair of open wells No. 0 0 0 0 0 0 0 0

Narmada 15

Repair / development of artificial water bodies No. 0 0 0 0 0 0 0 0

Narmada 16

Revival of natural water bodies with recharge activities No. 0 0 0 0 0 0 0 0

Narmada 17

Sanitation facilities/Sewerage line rmt 0 0 0 0 0 0 0 0

Narmada 18 Use solar power for productive activities No. 0 0 0 0 0 0 0 0

Narmada 19 Wind energy development No. 0 0 0 0 0 0 0 0

Narmada 20 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0

Page 144: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 21 Vegitable kits Distribution No. 0 0 0 0 0 0 0 0

Narmada 22 Anganwadi Repairing No. 0 0 0 0 0 0 0 0

Narmada 23 Dhobi Ghat No. 0 0 0 0 0 0 0 0

Narmada 24 chotro Repairing No. 0 0 0 0 0 0 0 0

Narmada 25 Samsan fencing No. 0 0 0 0 0 0 0 0

Narmada 26 Kitchen Garden kits No. 0 0 0 0 0 0 0 0

Narmada 27 Books For School Library No. 0 0 0 0 0 0 0 0

Narmada 28 Afforestation No. 0 0 0 0 0 0 0 0

Narmada 29 Fancing & Plantation in Gramvatika No. 0 0 0 0 0 0 0 0

Narmada 30 Fancing & Plantation in Aanganwadi 0 0 0 0 0 0 0 0

Narmada 31 Community hall Repairing 0 0 0 0 0 0 0 0

Narmada 32 Floriculture Development 0 0 0 0 0 0 0 0

Narmada Total 0 0 0 0 0 0 0 0

Narmada 1 LAND DEVELOPMENT

Narmada 1 Farm Bunding rmt. 0 0 0 0 0 0 0 0

Narmada 2 Afforestation Ha. 0 0 0 0 0 0 0 0

Narmada 3 Agriculture Demo No. 0 0 0 0 0 0 0 0

Narmada 4 Agro Forestry Ha. 0 0 0 0 0 0 0 0

Narmada 5 Horticulture Ha. 0 0 0 0 0 0 0 0

Narmada 6 Land leveling Ha. 0 0 0 0 0 0 0 0

Narmada 7 Pasture development Ha. 0 0 0 0 0 0 0 0

Narmada 8 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 9 Bambu Bottling 0 0 0 0 0 0 0 0

Page 145: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 10 Border/forest plantation 0 0 0 0 0 0 0 0

Narmada 2 Soil & Moisture Conservation

Narmada 1 Check wall No. 0 0 0 0 0 0 0 0

Narmada 2 Earthen bund No. 0 0 0 0 0 0 0 0

Narmada 3 Protection Wall No. 0 0 0 0 0 0 0 0

Narmada 4 Waste weir No. 0 0 0 0 0 0 0 0

Narmada 5 Bench Terracing cumec 0 0 0 0 0 0 0 0

Narmada 6 Bori bandh No. 0 0 0 0 0 0 0 0

Narmada 7 Brushwood Checks No. 0 0 0 0 0 0 0 0

Narmada 8 Countour Bunding rmt. 0 0 0 0 0 0 0 0

Narmada 9 Countour Trenches rmt. 0 0 0 0 0 0 0 0

Narmada 10 Earthern Dam No. 0 0 0 0 0 0 0 0

Narmada 11 Field Outlet No. 0 0 0 0 0 0 0 0

Narmada 12 Gabion structure No. 0 0 0 0 0 0 0 0

Narmada 13 Graded Bunding rmt. 0 0 0 0 0 0 0 0

Narmada 14 Gully plug No. 0 0 0 0 0 0 0 0

Narmada 15 Loose boulder Checks No. 0 0 0 0 0 0 0 0

Narmada 16 Nala Plug No. 0 0 0 0 0 0 0 0

Narmada 17 Stone bunding rmt. 0 0 0 0 0 0 0 0

Narmada 18

Straggred Contour trenching(Terrace Talavadi) rmt 0 0 0 0 0 0 0 0

Narmada 19 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 20

Water Way (Diversation of water Draingae) 0 0 0 0 0 0 0 0

Narmada 3 Water Harvesting 0 0 0 0 0 0 0 0

Page 146: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Structure

Narmada 1 Cause way cum Chek dam No. 0 0 0 0 0 0 0 0

Narmada 2 Check dam No. 13 69.5 117000 49.7872 9761 2 17.3 MGNREGA

Narmada 3 Village/Community Pond No. 0 0 0 0 0 0 0 0

Narmada 4 Farm Pond No. 6 17.53 12960 5.51489 0 2 4.5 MGNREGA

Narmada 5 Percolation Tank No. 0 0 0 0 0 0 0 0

Narmada 6 Pond Inlet No. 0 0 0 0 0 0 0 0

Narmada 7 Pond Outlet No. 0 0 0 0 0 0 0 0

Narmada 8 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0

Narmada 4

Existing/Old Water Harvesting Structure Maintance (Renovation & Repair) 0 0 0 0 0 0 0 0

Narmada 1 Deepening/Desiltation Of Pond No. 8 8.196 0 0 4604 1 2.5 MGNREGA

Narmada 2 Deepening Of Percolation Tank No. 0 0 0 0 0 0 0 0

Narmada 3 De-siltation of Checkdam No. 11 10 36000 15.3191 5618 12 17.5 MGNREGA

Narmada 4 Repairing of Checkdam No. 2 4.65 9000 3.82979 784 0 0 0

Narmada 5 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0

Narmada 5 Ground Water Recharging Structures 0 0 0 0 0 0 0 0

Narmada 1 Dugwell Recharge structure No. 0 0 0 0 0 0 0 0

Narmada 2 Farm Recharge Filter No. 0 0 0 0 0 0 0 0

Narmada 3 Holiya in farm/Field No. 0 0 0 0 0 0 0 0

Page 147: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 4 Pond Recharge structure No. 0 0 0 0 0 0 0 0

Narmada 5 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 9 Total 40 109.9 174960 74.5 20767 17 41.8 0

Narmada LH & ME & Production System 0 0 0 0 0 0 0 0

Narmada 1 AGRICULTURE ACTIVITIES 0 0 0 0 0 0 0 0

Narmada 1 Agro Center No. 0 0 0 0 0 0 0 0

Narmada 2 Agricultural Implements No. 0 0 0 0 0 0 0 0

Narmada 3 Agro- Forestry 0 0 0 0 0 0 0 0

Narmada 4 Crop Demonstration Plot No. 0 0 0 0 0 0 0 0

Narmada 5 Fishery Development No. 0 0 0 0 0 0 0 0

Narmada 6 Floriculture Development Ha. 0 0 0 0 0 0 0 0

Narmada 7 Fodder Bank Development 0 0 0 0 0 0 0 0

Narmada 8 Green House No. 0 0 0 0 0 0 0 0

Narmada 9 Horticulture Plantation Ha. 0 0 0 0 0 0 0 0

Narmada 10 Kitchen Garden 0 0 0 0 0 0 0 0

Narmada 11 Nursery raising 0 0 0 0 0 0 0 0

Narmada 12 Vermi compost 0 0 0 0 0 0 0 0

Narmada 13 INPUT SUPPORT 0 0 0 0 0 0 0 0

Narmada 14

Promoting Micro-Irrigation Systems like drip and Sprinkler Irrigation No. 0 0 0 0 0 0 0 0

Narmada 15 Sprinkler Demo. 0 0 0 0 0 0 0 0

Page 148: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 16

Vegetable Nursery Raising with drip irrigation 0 0 0 0 0 0 0 0

Narmada 17 OTHERS 0 0 0 0 0 0 0 0

Narmada 18 Low Cost Poly House 0 0 0 0 0 0 0 0

Narmada 19 Lift Irrgation 0 0 0 0 0 0 0 0

Narmada 20 Paddy Trasing Machine 0 0 0 0 0 0 0 0

Narmada 21 Creeper Vegetable Production 0 0 0 0 0 0 0 0

Narmada 22 Rotavator 0 0 0 0 0 0 0 0

Narmada 23 Power Weeder 0 0 0 0 0 0 0 0

Narmada 24 Chaffcuter No. 0 0 0 0 0 0 0 0

Narmada 25 Mini Tractor with rotary and cultivator No. 0 0 0 0 0 0 0 0

Narmada 26 Thresher Machine No. 0 0 0 0 0 0 0 0

Narmada 27 Organic Manual No. 0 0 0 0 0 0 0 0

Narmada 28 Spray pump No. 0 0 0 0 0 0 0 0

Narmada 29 Vegetable Production No. 0 0 0 0 0 0 0 0

Narmada 30 Multi crop harverter 0 0 0 0 0 0 0 0

Narmada 2 AGRO PROCESSING ACTIVITIES No. 0 0 0 0 0 0 0 0

Narmada 1 Dal Making Unit No. 2 1 0 0 0 0 1 AGRI DEPT

Narmada 2 Flour & Dal/Rice Processing unit 6 2.99 0 0 0 0 2.99 AGRI DEPT

Narmada 3 Garam Masala 0 0 0 0 0 0 0 0

Narmada 4

Grading and packaging of agricultural produces, No. 0 0 0 0 0 0 0 0

Narmada 5 Jam-jelly making No. 0 0 0 0 0 0 0 0

Page 149: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 6

Microenterprises based on Minor Forest Produce (MFP) 0 0 0 0 0 0 0 0

Narmada 7 Oil extraction mill 0 0 0 0 0 0 0 0

Narmada 8 Value added products from milk 0 0 0 0 0 0 0 0

Narmada 9 Package Food Products 0 0 0 0 0 0 0 0

Narmada 10 Pulp making 0 0 0 0 0 0 0 0

Narmada 11 Rice mill 0 0 0 0 0 0 0 0

Narmada 12 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 13 Sugar cane Juice Machine 0 0 0 0 0 0 0 0

Narmada 12 Chilly Powder Unit 0 0 0 0 0 0 0 0

Narmada 13 Papad making unit 0 0 0 0 0 0 0 0

Narmada 3 Animal Husbandry 0 0 0 0 0 0 0 0

Narmada 1 Cattle Feed and Nutrition Store 0 0 0 0 0 0 0 0

Narmada 2 Animal Health camps 0 0 0 0 0 0 0 0

Narmada 3 Animal Travis (Pinjaru) 0 0 0 0 0 0 0 0

Narmada 4 Apiculture (Bee keeping) 0 0 0 0 0 0 0 0

Narmada 5 Artificial insemination 0 0 0 0 0 0 0 0

Narmada 6 Back-yard poultry 1 1.4 0 0 0 0 1.4 other

Narmada 7 Dairy cooperative promotion, No. 0 0 0 0 0 0 0 0

Narmada 8 Cattle Shed No. 37 9.655 0 0 0 0 1.245 Animal Dept.

Narmada 9 Pasture development No. 0 0 0 0 0 0 0 0

Narmada 10 Poultry Farming to individuals No. 0 0 0 0 0 0 0 0

Page 150: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 11 Sericulture No. 0 0 0 0 0 0 0 0

Narmada 12 Small ruminants 0 0 0 0 0 0 0 0

Narmada 13 Veterinary Aid for livestock 0 0 0 0 0 0 0 0

Narmada 14 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0

Narmada 4 Establishing linkages 0 0 0 0 0 0 0 0

Narmada 1 Credit linkages 0 0 0 0 0 0 0 0

Narmada 2 Linkages with Future Markets, No. 0 0 0 0 0 0 0 0

Narmada 3 Market linkages, 0 0 0 0 0 0 0 0

Narmada 4 Raw material supply channel, 0 0 0 0 0 0 0 0

Narmada 5 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 5 Local traditional handicraft 0 0 0 0 0 0 0 0

Narmada 1 Bamboo based products, 0 0 0 0 0 0 0 0

Narmada 2 Kutchi Bandhini, 0 0 0 0 0 0 0 0

Narmada 3 Pottery 0 0 0 0 0 0 0 0

Narmada 4 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Narmada 6 Minor Activities 0 0 0 0 0 0 0 0

Narmada 1 Embroidery Unit 0 0 0 0 0 0 0 0

Narmada 2 Handicraft Unit No 0 0 0 0 0 0 0 0

Narmada 3 Vegetable shop 0 0 0 0 0 0 0 0

Narmada 4 Provision Store 0 0 0 0 0 0 0 0

Narmada 5 stiching machine 0 0 0 0 0 0 0 0

Narmada 6 Up Gradation of centering materials 4 1.85 0 0 0 0 1.85 AGRI DEPT

Page 151: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada 7 OTHERS (Specifiy activities ) No 0 0 0 0 0 0 0 0

Narmada 8 Musical instrument 0 0 0 0 0 0 0 0

Narmada 9 Madap Decoration 2 1.83 0 0 0 0 1.82 AGRI DEPT

Narmada 10 Catering Set 0 0 0 0 0 0 0 0

Narmada 11 ConcreteMixure Machine 2 1.2 0 0 0 0 1.2 AGRI DEPT

Narmada 12 Pepar dish& bowl making unit 0 0 0 0 0 0 0 0

Narmada 13 Vegetable Trolley 0 0 0 0 0 0 0 0

Narmada 14 Carpenter instrument 0 0 0 0 0 0 0 0

Narmada 15 Construction instrument 0 0 0 0 0 0 0 0

Narmada 16 Canteen House 0 0 0 0 0 0 0 0

Narmada Tyre Repairing Unit 1 0.2 0 0 0 0 0 0

Narmada 17 Non-conventional Energy Sources 0 0 0 0 0 0 0 0

Narmada 18 Bio gas plant, 0 0 0 0 0 0 0 0

Narmada 19 Bio-fuel plantation, 0 0 0 0 0 0 0 0

Narmada 20 energy conservation measures, 0 0 0 0 0 0 0 0

Narmada 21 Wind energy production, 0 0 0 0 0 0 0 0

Narmada 22 Solar energy promotion, 0 0 0 0 0 0 0 0

Narmada 23 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0

Total 55 20.125 0 0 0 0 11.505 0

Narmada

Capacity Building 0 6.78 0 0 2398.58 0 0 0

Narmada

Evaluation & Monitoring 0 4 0 0 0 0 0 0

Page 152: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

Narmada Administration 0 21.777 0 0 0 0 0 0

Narmada Consolidation Phase 0 23.9 0 0 0 0 0 0

Total 56.457

Page 153: NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) NARMADA, GUJARAT NARMADA

BANANA

SUGARCANE