NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan...
Transcript of NARMADA, GUJARAT - PMKSY · Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan...
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
District Irrigation Plan (2016-2020)NARMADA, GUJARAT
NARMADA
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
District Irrigation Plan (2016-2020)NARMADA, GUJARAT
NARMADA
Table of Contents
INTRODUCTION ................................................................................................................................. 12
Background ....................................................................................................................................... 12
Vision .................................................................................................................................................17
Objective ............................................................................................................................................17
Strategy/approach .............................................................................................................................17
Programme Components .................................................................................................................. 18
1. Accelerated Irrigation Benefit Programme (AIBP) ................................................................... 18
2. PMKSY (Har Khet ko Pani) ....................................................................................................... 18
3. PMKSY (Per Drop More Crop).................................................................................................. 19
4. PMKSY (Watershed Development) .......................................................................................... 20
Rationale/ Justification .................................................................................................................... 20
Methodology ..................................................................................................................................... 20
CHAPTER I .......................................................................................................................................... 22
GENERAL INFORMATION OF THE DISTRICT ................................................................................ 22
1.1 District Profile............................................................................................................................. 22
1.1.1 Administrative Setup ............................................................................................................. 23
1.1.2 Towns and Villages ............................................................................................................... 25
1.2 Demography ............................................................................................................................... 25
1.3 Biomass and Livestock ................................................................................................................ 27
1.4 Agro -Ecology, Climate, Hydrology and Topography ................................................................. 29
1.5 Soil Classification ........................................................................................................................ 31
1.6 Soil Erosion and Runoff Status ................................................................................................... 33
1.7 Land Use Pattern ......................................................................................................................... 34
Chapter 2 .............................................................................................................................................. 37
District Water Profile ........................................................................................................................... 37
2.1.1 Area-wise, Crop-wise Irrigation Status ................................................................................... 37
2.1.2 Irrigation status of horticulture and plantation crops ............................................................. 40
2.2 Production and Productivity of major Crops ............................................................................. 42
2.3 Irrigation based classification .................................................................................................... 44
Chapter III ............................................................................................................................................ 46
Water Availability ................................................................................................................................. 46
3.1 Status of water availability .......................................................................................................... 46
3.2 Status of Ground water availability ............................................................................................ 47
3.3 Status of Command Area ............................................................................................................ 49
3.4 Existing Type of Irrigation .......................................................................................................... 51
Chapter IV ............................................................................................................................................ 55
Water Demand ..................................................................................................................................... 55
4.1 Domestic Water demand ............................................................................................................ 55
4.2 Water demands for crops ........................................................................................................... 56
4.3 Water demand for Livestock ...................................................................................................... 58
4.4 Water Demand for Industries..................................................................................................... 59
4.5 Water demand for Power generation ......................................................................................... 60
4.6 Sector wise water demand .......................................................................................................... 60
4.7 Water Budget .............................................................................................................................. 62
Chapter V .............................................................................................................................................. 64
Strategic Action Plan ............................................................................................................................ 64
5.1 Taluka wise total plan of the district ........................................................................................... 64
5.2 Component Wise Plan ................................................................................................................ 69
5.3 Year Wise Plan ............................................................................................................................ 69
5.4 Expected Outcome ...................................................................................................................... 70
5.5 Strategic Action Plan under PMKSY ........................................................................................... 73
Annexure .............................................................................................................................................. 79
1. Strategic Action Plan for Irrigation in District under PMKSY: District Irrigation Department
(WRD) ............................................................................................................................................... 79
2. Strategic Action Plan for Irrigation in District under PMKSY: GGRC ..................................... 83
3. Strategic Action Plan for Irrigation in District under PMKSY: GWRDC .................................. 85
4. Strategic Action Plan for Irrigation in District under PMKSY: SSNL....................................... 86
5. Strategic Action Plan for Irrigation in District under PMKSY: GLDC ...................................... 87
6. Strategic Action Plan for Irrigation in District under PMKSY: GSWMA.................................. 88
List of Tables
Table 1. 1 District Profile .............................................................................................. 22
Table 1.1 1: List of towns and villages .......................................................................... 25
Table 1.2. 1: Demography details of the district (Male, female, Children).................. 26
Table 1.2. 2: Demography details of the district (SC, ST, General) ............................. 26
Table 1.3. 1: Population of Small Animal in the district .............................................. 28
Table 1.3. 2: Population of large animal in the district ............................................... 28
Table 1.4. 1: Agro-ecological zones of the district and there characteristics ............... 29
Table 1.4. 2: Rainfall and Temperature ....................................................................... 30
Table 1.4. 3: Year wise rainfall in different blocks in Narmada District (mm) ........... 31
Table 1.5. 1: Soil classification in the district ............................................................... 31
Table 1.6. 1: Agro-Climatic Zones ................................................................................ 34
Table 1.7. 1: Land Use Pattern and area under agriculture ......................................... 34
Table 1.7. 2: Land Use Pattern and area under non-agriculture ................................. 35
Table 2.1. 1: Crop area under Kharif, Rabi and Summer ............................................. 38
Table 2.1. 2: Horticultural & Plantation crop area in the district ............................... 40
Table 2.2. 1: Production and productivity of major crops in the district .................... 42
Table 2.3. 1: Irrigation Based classification ................................................................. 44
Table 3.1. 1: Status of water availability in the district ................................................ 46
Table 3.2. 1: Status of Ground water availability in the district .................................. 48
Table 3.3. 1: Status of canal command area in the district .......................................... 49
Table 3.4. 1: Taluk wise existing irrigation structures ................................................. 51
Table 3.4. 2: Taluk wise canal based, tanks/reservoir irrigation structures ............... 52
Table 4.1. 1: Domestic water requirement ................................................................... 56
Table 4.2. 2: Crop Water Requirement ........................................................................ 57
Table 4.3. 1: Livestock Water Demand ........................................................................ 59
Table 4.4 1: Industrial water demand .......................................................................... 59
Table 4.6. 1: Sector wise water requirement in 2015 ................................................... 60
Table 4.6. 2: Sector wise water requirement in 2020 ................................................. 61
Table 4.7. 1: Water budget in the district ..................................................................... 62
Table 5.1. 1: Taluka Wise outlay ................................................................................... 64
Table 5.2. 1: Component wise financial outlay (Amount in Rs. lakhs) ....................... 69
Table 5.3. 1: Year Wise financial outlay under different department ......................... 70
Table 5.4. 1: Department wise area proposed (Area in ha)……………………………………71
List of Figures
Figure 1. 1: Demography profile of the district (Male, Female and Children) ......... 26
Figure 1. 2: Demography Profile of the district (SC, ST and General) ...................... 27
Figure 1. 3: Percentage area under agriculture ......................................................... 35
Figure 2.1. 1: Percentage share of kharif crop area in different taluk ...................... 38
Figure 2.1. 2: Percentage share of rabi crop area in different taluk ......................... 39
Figure 2.1. 3: Percentage share of summer crop area in different taluk .................. 39
Figure 2.1. 4: Percentage share of rainfed and irrigated area in different taluk ..... 40
Figure 2.1. 5: Percentage distribution of horticultural areas in different taluk ....... 41
Figure 2.2. 1: Taluk wise distribution of crop production under rainfed condition . 43
Figure 2.2. 2: Taluk wise distribution of crop production under irrigated condition43
Figure 2.2. 3: Taluk wise distribution of horticultural crop production .................. 44
Figure 2.3. 1: Percentage area under irrigation based classification ....................... 45
Figure 3.2. 1: Percentage distribution of draft and recharge among different taluk48
Figure 3.3. 1: Percentage district Canal Command Area .......................................... 49
Figure 3.3. 2: Percentage distribution of developed area under canal command ... 50
Figure 3.4. 1: Percentage distribution of tube-wells and dug-wells in the district ... 52
Figure 4.2. 1: Percentage distribution of water potential ......................................... 57
Figure 4.6. 1: Percentage share of water requirement in various sector in 2015 .... 61
Figure 4.6. 2: Percentage share of water requirement in various sector in 2020 ... 62
Figure 5.1. 1: Department wise percentage share of total outlay ............................. 65
Figure 5.1. 2: Percentage share of District irrigation departments .......................... 65
Figure 5.1. 3: Percentage share of State Irrigation department (SSNL) .................. 66
Figure 5.1. 4: Percentage share of GWRDC ................................................................ 66
Figure 5.1. 5: Percentage share of District irrigation departments .......................... 67
Figure 5.1. 6: Percentage share of GGRC ................................................................... 67
Figure 5.1. 7: Percentage share of GSWMA ................................................................ 68
Figure 5.1. 8: Percentage share of ATMA under Agriculture Department ............... 68
Figure 5.2. 1: Component wise percentage share of financial outlay ....................... 69
Figure 5.3. 1: Percentage share of different departments ......................................... 70
Figure 5.4. 1: Department wise year wise proposed area……………………………………………..71
List of Maps
Map 1: Narmada district ........................................................................................................ 22
Map 2: Soil classification of district ....................................................................................... 33
Map 3: Land Use Pattern in the district ................................................................................ 36
Map 4: Canal of the district ..................................................................................................... 51
Map 5: River water bodies of district .................................................................................... 54
Abbreviations
NDC : National Development Council
GoI : Government of India
C-DAP : Comprehensive District Agriculture Plan
ICT : information and communications technology
BCM : Billion Cubic Metres
GDP : Gross Domestic Product
AIBP : Accelerated Irrigation Benefits Programme
CADWM : Command Area Development and Water Management
MI : Micro Irrigation
SWMA : Supplementary Water Management Activities
NITI Aayog : National Institution for Transforming India Aayog
NRM : Natural resource Management
IWMP : Integrated Watershed Management Programme
PRI : Panchayati Raj Institutions
DRDA : District Rural Development Agencies
NRLM : National Rural Livelihoods Mission
C.D. Blocks : Community development block
BPL : Below Poverty Line
SC/ST : Scheduled Caste/ Scheduled Tribe
Nos. : Number
ATMA : Agriculture Technology Management Agency
MSL : Mean Sea Level
mm : Millimeter
ha : Hectare
TGA : Total Geographical Area
GCA : Gross Cropped Area
GIA : Gross Irrigated Area
NSA : Net Sown Area
AIBP : Accelerated Irrigation Benefits Programme
MGNREGA : Mahatma Gandhi National Rural Employment Gurantee Act
CI : Cropping Intensity
Qtl/yr : Quintal per year
GIA : Gross Irrigated Area
MCM : million cubic metres
Bgl : Below ground Level
CCA : Culturable Command Area
LPD : Liter Per Day
CAD : Command Area Development
DIP : District Irrigation Plan
SIP : State Irrigation Plan
DLIC : District Level Implementation Committee
STP : Sewage Treatment Plant
WRD : Water Resource Department
GSWMA : Gujarat State Watershed Management Agency
GGRC : Gujarat Green Revolution Company Ltd.
SSNL : Sardar Sarovar Narmada Nigam Ltd.
GWRDC : Gujarat Water Resources Development Corporation Ltd.
GLDC : Gujarat Land Development Corporation
ATMA : Agricultural Technology Management Agency
Executive Summary
Out of about 141 million ha of net area sown of the country, only 65 million hectare (46%) is
currently covered under irrigation. Substantial dependence on rainfall makes cultivation in
remaining areas a high risk and less productive profession. Empirical evidences suggest that
assured/protective irrigation/in-situ moisture conservation encourages farmers to invest
more in farming technology and inputs leading to productivity enhancement and increased
farm income. Government has conceived the Pradhan Mantri Krishi Sinchayee Yojana
(PMKSY) with the objective of extending the coverage of irrigation in a focused manner,
with end-to-end solution on source creation, distribution, management, field application
and extension activities.
Further, Pradhan Mantri Krishi Sinchayee Yojana incentivizes states to enhance
expenditures on irrigation and water resources management by making the access to
PMKSY funds to states conditional i.e., state will have access only if the expenditure in water
resource development for agriculture sector in the year under consideration is not less than
the baseline expenditure, which is defined as the average of the expenditure in irrigation
sector irrespective of the department in the state plan in three years prior to the year under
consideration.
PMKSY will be implemented in area development mode only by adopting a ‗decentralized
state level planning and projectised execution‘ structure that will allow states to draw up
their own irrigation development plans based on DIPs and SIPs with a horizon of 5-7 years.
A three tier structure at national, state and district level will oversee implementation and
coordination of the program.
District Water Profile
The population of Narmada district is predominantly dependent on agriculture and allied
activities for their livelihood. The gross cropped area in the district is 1,73,348 ha (1,50,457
ha is under agricultural crops and 22,891 ha is under horticultural crops). About 1,18,675 ha
of the area under crop is grown under kharif season while 24,500 ha. of crop area is under
rabi season. Cereals are the major agricultural crops grown in the district with an area
covering of about 86.79 percent of the total area under various agricultural crops.
Crop Diversification
In Narmada there are four major objectives of agricultural diversification. First to increase
the income of the small households, second to attain the fuller employment in the farm
household, third to stabilize the farm income over the seasons, and fourth conservation and
enhancement of natural resources specially irrigation sources. Irrigation plays a decisive
role in cropping pattern, cropping intensity, crop combinations, the extent of yield and to a
certain extent the season of sowing. This process ensures that farmer receive decent income
while the existing food grain production takes care of the food security needs of the
households. In Narmada district, about 51 percent of the area lies under rainfed cultivation
while only 49 percent of the total gross cropped area has irrigation facilities. The majority of
the farmers in the district are engaged in traditional cultivation of food grains (92% of the
area under agricultural crops is grown under cereals and millets), not being able to divert to
more profitable commodities such as vegetables and fruits. In order to boost the agricultural
development and enhance the farm income in the rural areas, it is therefore important to
increase the productivity of the existing cultivated area, through shifting from self-
subsistence crop cultivation to diversified agriculture, by adopting cash crops such as cotton,
vegetables cultivation and the same can be achieved by providing assured irrigation sources
all the year round to different parts of the district.
Availability of water sources
District is drained from east to west mainly by three rivers namely the Narmada, the Kim
and the Tapi. The district receives the rainfall through South-West monsoon which normally
starts from middle of June. July and August are the months of heavy rainfall. The average
rainfall varies from 800 mm to 1100 mm. The district as a whole was deficient in surface
water resources and have also faced droughts in past. After initiation of Narmada Canal
Project nearly 472,219 hectares of district area will come under irrigation command.
Groundwater occurs under unconfined conditions in all the rock formations in most of the
area of the district. Weathered zone below water table acts as good repository for storage of
groundwater in Deccan Trap areas. Ground water recharge during monsoon season has
been computed using water level fluctuation method and compared with recharge by the
infiltration factors. Depending upon percent deviation value, Gross Recharge has been
calculated as per the recommended methodology. Besides rainfall, the recharge due to
seepage from canal, return flow from irrigation, recharge from tanks, ponds & water
conservation structures, etc. were also considered. The total annual recharge was obtained
as the sum of the monsoon and non-monsoon periods comes out to be 218.26 MCM per year
while the annual draft is 74.47 MCM. The total water availability under surface water
includes canal water from Narmada dam. The water availability under Kharif season is
65.06 MCM and under Rabi season the water availability is 209.65 MCM while under
summer 54.98 MCM of water availability is in the district. The total water availability under
canal (major and minor) is 313.45 MCM while under lift irrigation it is 4.85 MCM and from
other sources, it is 11.39 MCM.
Existing Type of Irrigation
The major source of irrigation in the district is constituted by canal which forms the surface
irrigation sources. There are 7 canal based source of surface irrigation. Besides this there are
ground water sources that also prevails in the district. Under ground water sources there are
dugwells and tube wells as major source. The benefits to be accrued, out of groundwater
based irrigation and domestic / industrial supply in conjunction with Narmada Project
surface water sources are of manifolds. Sustainable and dependable supply from ground
water reservoir, with Narmada Canal Water in command areas, may help farmer raising
additional crops suitable to the areas so as to ensure optimum utilization of available land,
water and human resources. In Narmada district the total command area under canal
command is 48578.50 ha. out of which 40335 ha. falls under developed under canal
command leaving a gap of 8244 ha. which can be further developed for agricultural
purposes.
Demand for water sources
It can be observed from the table above that the water potential for the present scenario
stands at 819.21 MCM while for the year 2020 it is expected to be 853.46 MCM. The surface
water availability through various sources stands at 348 MCM while the ground water
availability is 74.47 MCM. The total existing water availability is 422.5 MCM in the district
leaving a gap of 396.8 MCM which needs to be filled with coming year. The projected gap for
2020 is 432 MCM. The efficient use of water through micro irrigation and conservation of
water from source to sink can help in meeting the growing demand.
Water budget in the district
The water budget shows wide gaps between water availability and water demand in the
district. While the availability at present is 369.29 MCM, the present water demand is
819.21 MCM. But with growth in urbanisation and subsequent growth in food grain
requirement the water demand is likely to increase to 853.46 MCM by the year 2020 leaving
an unmet demand of 484.17 MCM which needs to be further addressed. The water budget
analysis suggest that urgent efforts are required to meet the water requirements of the
district as the gap is likely to increase in future. Utilizing the surface & ground water
potential in the district, activities that promote ground water re-charge and soil moisture
and water conservation etc. are proposed in the Strategic Action plan, 2016-20 that will
address the challenge. The scope to tap ground water in the district is feasible as the district
falls in safe category.
Component wise planned coverage of area
The strategic action plan envisages providing assured irrigation in a command area of
24232.26 ha. Under AIBP, 4348.98 ha is proposed to be developed under the plan while
under Har Khet Ko Pani an area of 2537.38 ha will be developed. The watershed component
is projected to achieve a culturable command area of 2104.7 ha by creation of 282 new water
harvesting structures and renovation of 60 water harvesting structures. Under, the
component Per Drop More Crop, efficient water conveyance and precision water application
by drip irrigation system for wide spaced and narrow spaced crops for developing an area of
9144.72 ha. has been proposed. While Sprinklers has been proposed to develop an area of
6096.48 ha. A training programme will also be scheduled under PMKSY to enhance the
better knowledge of efficient use of water through drip and other micro irrigation structures.
A training programme will also be scheduled under PMKSY to enhance the better
knowledge of efficient use of water through drip and other micro irrigation structures.
Department wise planned coverage of area
Under department wise development of command area or irrigation potential, the total area
to be developed under proposed PMKSY will be 24232.26 ha. for which irrigation potential
needs to be developed. GGRC under Per Drop More Crop will develop an area of 2104.70 ha
through various drip and sprinkler irrigation system. The watershed component under
GSWMA will develop an irrigation potential of 15241.20 ha through its various activities
proposed such as Land Development, Soil and Moisture Conservation, developing new
water harvesting structure and renovating existing one, etc. The GLDC under Agriculture
department will cover an area of 1517.76 ha to develop an irrigation potential. The district
irrigation department will cover an area of 3935 ha under WRD while state irrigation
department under SSNL will develop an area of 436 ha. The GWRDC has proposed to
develop an area of 997.60 ha through various irrigation structures. Agricultural Technology
Management Agency (ATMA) focused on awareness generation and capacity building of the
beneficiary farmers on water distribution, efficient use of water and water saving
technologies etc.
Block wise planned financial outlay
The outlay for the district amount to Rs.30853.02 lakhs out of which Nandod taluk shares
the maximum percentage of the total outlay i.e., 51.20% followed by Sagbara with 17.13%,
Dediyapada with 16.26%, Garudeshwar with 10.30% and Tilakwada with 5.12%.
Component wise planned financial outlay
The component wise total outlay of the district constitutes about Rs.31528.14 lakhs. AIBP
and Hark Khet Ko Pani components are to be executed mainly by State and District
Irrigation departments and GLDC under Agriculture department. Per drop more crop
component will be executed by GGRC. Water shed component will be taken care of by
GSWMA under Rural Development Department and Extension & Training component will
be executed by ATMA under Agriculture department. However, all the stakeholders need to
have coordination among them to have the maximum irrigation efficiency and to avoid
duplicity. It is observed that maximum share of 39.75% is for AIBP component followed by
Per Drop More Crop 22.13%, PMKSY Watershed component with a share of 21.86%, Har
Khet Ko Pani 13.45% and ATMA component constitutes about 0.20% of the total outlay.
Component Wise 2016-17 2017-18 2018-19 2019-20 Grand Total
AIBP 2160.79 2936.80 3177.80 3989.80 12265.20
Har Khet Ko Pani 641.92 450.92 1144.92 1910.92 4148.68
Per Drop More Crop 2100.94 1575.71 1575.71 1575.71 6828.06
PMKSY Watershed 4824.18 1357.28 376.65 186.46 6744.57
ATMA 14.39 14.94 15.71 16.50 61.54
Convergence with MGNREGA
526.57 228.75 7.85 41.80 804.96
Total 10268.80 6564.39 6298.65 7721.19 30853.02
Implementation Time Period
The planned activities and outlay will be spent between 2016-17 and 2019-20 period. Some
of the activities may require 5 to 7 years and some other activities relating to extension,
small irrigation works etc., are recurring and hence will have a period of implementation
less than a year.
Monitoring and evaluation
The Strategic Action Plan of PMKSY will be monitored by the respective departments
through the regular reporting system and component wise progress will be monitored by the
District Level Irrigation Committee. Further, the activities, outputs and outcomes will be
reported in web based MIS of PMKSY for review at state and national level.
INTRODUCTION
Background
Preparation of decentralized area specific district planning process visualized in
various plans took concrete shape through the years and initiatives like specific
guidelines on methodologies and processes for preparation of district plans;
framework for preparation of perspective plan, medium term and annual plans by
then planning commission in 1969 and the 73rd and 74th constitutional amendments
conferring constitutional status to Panchayats at district and sub district level; local
self-government in urban areas; constitution of district planning committee to
consolidate the plans prepared at Panchayats and municipalities and prepare a draft
development plan for the whole district.
The decentralized planning process was further strengthened through emphasis by
planning commission on preparation of district level plans and making it an integral
part of the process of preparation of the states 11th five year plan. The Planning
commission issued guidelines in August 2006 for preparation of the district plans.
The guidelines define the District Planning as ‗the process of preparing an integrated
plan for the local government sector in a district taking into account the resources
(natural, human and financial) available and covering the sectoral activities and
schemes assigned to the district level and below and those implemented through
local governments in a state. The document that embodies this statement of
resources and their allocation for various purposes is known as the District Plan‖.
Government of India through a resolution in National Development Council on 29th
May 2007 conceived a special Additional Central Assistance Scheme (ACAS) to
address the slow growth of agriculture and allied sectors by incentivizing states to
draw up plans for their agriculture sectors more comprehensively. The NDC
resolution states "GoI introduced a new Additional Central Assistance Scheme to
incentivize states to draw up plans for their agriculture sector more comprehensively,
taking agro-climatic conditions, natural resource issues and technology into account,
and integrating livestock, poultry and fisheries, etc. This involved a new scheme for
Additional Central Assistance (ACA) to State Plans, administered by the Union
Ministry of Agriculture over and above its existing Centrally Sponsored Schemes, to
supplement the State-specific strategies including special schemes for beneficiaries
of land reforms. The newly created National Rainfed Area Authority on request, was
to assist States in planning for rainfed areas".
The NDC in its resolution advised the states to prepare a comprehensive district
agriculture plans (C-DAP) that will fully utilize available resources and include allied
agriculture sectors. Further, GOI issued a manual on preparation of comprehensive
district agriculture plans to help the states prepare C-DAP. As per these guidelines,
the objective of district planning is ‗to design an integrated and participatory action
plan for the development of local area in general and agriculture and allied sectors in
particular‘. The objectives of Comprehensive District Agriculture Plan (C-DAP) were:
To prepare a Comprehensive District Agriculture Plan (C-DAP) through
participatory process involving various organisations and stakeholders.
To enable optimum utilisation of scarce natural, physical & financial
resources.
To assess and plan for the infrastructure required to support the agriculture
development.
To establish linkages with the required institutional support services, like
credit, technology transfer, ICT, research etc.
To evolve an action plan for achieving sustainable agricultural growth with
food security and cropping system that will improve farmers‘ income.
The guidelines required the state/district authorities to (i) ensure that the
agricultural plans are prepared for the district and then integrated into the
agricultural plans of the State based on the agro-climatic conditions, availability of
technology, trained manpower and natural resources; (ii) local needs / crops / feed
and fodder / animal husbandry / dairying / fisheries / priorities are reflected in the
plan; (iii) productivity gaps for important crops and livestock and fisheries are
reduced; and (iv) the returns to the farmers from these are maximized.
The latest move in the process of strengthening of decentralized planning process
was the Government of India guidelines issued in 2015 in the form of a template for
the preparation of District Irrigation Plan (DIP) and State Irrigation Plan (SIP) as
part of the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) program and made the
preparation of DIP and SIP mandatory for the states to receive funds from the
program. The present report is a product of these long drawn efforts of Government
of India to strengthen the decentralized planning process in the country focusing on
the vital resource i.e., water.
Water is of vital importance for human & animal life, maintenance of ecological
balance and promotion of developmental activities. Considering its vital importance
and ever increasing demand for water, in the face of population growth, urbanization
& industrialization and considerations of climatic change, making water, an
increasingly a scarce resource, available to multiple uses, planning and management
of this vital resources, utilization of water economically, optimally and equitably
assumes greater importance.
According to the 12th Five year Plan the water budget estimates of India by Ministry
of Water Resources suggests an availability of 1123 billion cubic meters (BCM)
against a current estimated demand of 710 BCM. The Standing Committee of the
Ministry of Water Resources estimates that this water demand will rise to 1093 BCM
by 2025. Though the existing water availability in the immediate future seems to be
adequate, with the near constant supply of water resources in the face of increasing
demand on account of population growth, urbanisation and industrialization will
strain the water supply-demand balance.
The per capita water availability which stood at 5,177 cubic meters in 1951 was
reduced to 1820 cubic meters in 2001 while the international prescribed limit is 1800
cubic meters. The projected per capita availability of water is 1341 cubic meters in
2025 and 1140 cubic meters in 2050 suggesting shortage of water in the medium
term1. Further, the all India water balance estimates does not reflect the variations in
water balance across time and space- certain areas having a positive water balance
and the others facing acute shortage. The problem is further accentuated by water
quality related issues.
With the abundant surface and ground water supply in the first five decades since
independence, more than 80 percent of the total available water resources were
allocated for irrigation purposes and the rest meeting the domestic and industrial
demands. In a recent study2on the demand for water from agriculture, domestic and
industrial uses in 2000, 2025 and 2050 seems to suggest that domestic demand (34
BCM in 2000, 66 BCM in 2025 and 101 BCM in 2050) and industrial demand (42
BCM in 2000, 92 BCM in 2025 and 161 BCM in 2050) for water will utilize the total
balance water available while agriculture demand for water will be (605 BCM in
2000, 675 BCM in 2025 and 637 BCM in 2050). This change is partly because of the
changing sectoral contributions of India‘s GDP and also partly because of dynamics
of irrigation development in the country where the initial expansion in area under
irrigation is propelled by the availability of abundant water resources and availability
of good quality land. This is no longer the case in many of the states where the
availability of land and water are serious constraints for further expansion of
irrigation. Further, as per the erstwhile planning commission up to March 2012 out
of 141 million hectares of net sown area in the country 114 (or 81%) million hectares
is Irrigation Potential Created (IPC) and 88 (or 62%) million hectares is Irrigation
Potential Utilised (IPU) leaving almost 20% of irrigated potential unutilized. This
leaves 40 percent of the net sown area in the country dependent on rainfall which
makes farming a high risk and less productive.
The competing demands for water resources and the emerging issues and concerns
were to be addressed through certain basic principles and commonality in
approaches in dealing with planning, development and management of water
resources3 under an Integrated Water Resource Management framework. The main
objectives of water resource management as delineated in National Water Policy
2012 are:
a) Planning, development and management of water resources need to be
governed by common integrated perspective considering local, regional, State
1Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, Government of India,
New Delhi. 2Amarasinghe, U.A., Shah T., Turral, H. and Anand, B.K. 2007. India’s water future to 2025-
2050:Business-as-usual scenario and deviations. Research Report 123, International Water
Management Institute, Colombo. 3Ministry of Water Resources, National Water Policy, 2012, Government of India, New Delhi.
and national context, having an environmentally sound basis, keeping in view
the human, social and economic needs.
b) Principle of equity and social justice must inform use and allocation of water.
c) Good governance through transparent informed decision making is crucial to
the objectives of equity, social justice and sustainability. Meaningful intensive
participation, transparency and accountability should guide decision making
and regulation of water resources.
d) Water needs to be managed as a common pool community resource held, by
the state, under public trust doctrine to achieve food security, support
livelihood, and ensure equitable and sustainable development for all.
e) Water is essential for sustenance of eco-system, and therefore, minimum
ecological needs should be given due consideration.
f) Safe Water for drinking and sanitation should be considered as pre-emptive
needs, followed by high priority allocation for other basic domestic needs
(including needs of animals), achieving food security, supporting sustenance
agriculture and minimum eco-system needs. Available water, after meeting
the above needs, should be allocated in a manner to promote its conservation
and efficient use.
g) All the elements of the water cycle, i.e., evapo-transpiration, precipitation,
runoff, river, lakes, soil moisture, and ground water, sea, etc., are
interdependent and the basic hydrological unit is the river basin, which should
be considered as the basic hydrological unit for planning.
h) Given the limits on enhancing the availability of utilizable water resources and
increased variability in supplies due to climate change, meeting the future
needs will depend more on demand management, and hence, this needs to be
given priority, especially through (a) evolving an agricultural system which
economizes on water use and maximizes value from water, and (b) bringing in
maximum efficiency in use of water and avoiding wastages.
i) Water quality and quantity are interlinked and need to be managed in an
integrated manner, consistent with broader environmental management
approaches inter-alia including the use of economic incentives and penalties
to reduce pollution and wastage.
j) The impact of climate change on water resources availability must be factored
into water management related decisions. Water using activities need to be
regulated keeping in mind the local geo climatic and hydrological situation.
Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to
address the constraints in providing assured irrigation as well as increasing efficiency
and productivity of current water use to bring more prosperity to the rural areas.
Priorities of Government of India were reflected in the Hon‘ble President‘s address to
the joint Session of the Parliament of 16th Lok Sabha where he indicated that ―Each
drop of water is precious. Government is committed to giving high
priority to water security. It will complete the long pending irrigation
projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee
Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for
seriously considering all options including linking of rivers, where
feasible; for ensuring optimal use of our water resources to prevent the
recurrence of floods and drought. By harnessing rain water through
‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water conservation and
ground water recharge. Micro irrigation will be popularised to ensure
‘Per drop-More crop”.
PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period
of five years from 2015-16 to 2019-20. The programme is an amalgamation of on-
going schemes of Ministry of Water Resources, River Development and Ganga
Rejuvenation, Ministry of Agriculture & Cooperation and Ministry of Rural
Development. The existing schemes AIBP, CADWM, MI, SWMA, Watershed &
Convergence with MGNREGA were brought together under the umbrella program of
PMKSY. Further the scheme seeks convergence with scheme likeMahatma Gandhi
National Rural Employment Guarantee Scheme (MGNRES), Rashtriya Krishi Vikas
Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural Electrification
programmes (JLNNSM&REP), Rural Infrastructure Development Fund (RIDF),
Members of Parliament Local Area Development Scheme (MPLAD), Members of
Legislative Assembly Local Area Development Fund (MLALAD), Local Body Funds
(LBF), Working Plan of State Forest Department (WPSFD) etc. The PMKSY will be
implemented in an area development mode only by adopting a decentralized state
level planning and projectised execution structure that will allow the state to draw up
their own irrigation development plans based on DIPs and SIPs with a horizon of 5-7
years. The program will be implemented as part of Rashtriya Krishi Vikas Yojana
(RKVY) with state agriculture department acting as the State Nodal Agency.
However, the implementing departments for the four components like AIBP, PMKSY
(Har Khet Ko Pani), PMKSY (Per drop more crop) and PMKSY (watershed
development) will be decided by the respective program ministry/department.
The funds under this program would be provided to the states as per the pattern of
assistance of Centrally Sponsored Schemes (CSS) decided by the Ministry of Finance
and NITI Aayog. During 2015-16 the existing pattern of assistance of ongoing scheme
was continued. An outlay of Rs. 50,000 crore has been approved for 2015-20. The
financial assistance provided to the state governments from this centrally sponsored
scheme is subject to fulfillment of certain conditions. Firstly, a state will become
eligible to access PMKSY fund only if it has prepared the District Irrigation Plans
(DIP) and State Irrigation Plan (SIP), excepting for the initial year, and the
expenditure in water resource development for agriculture sector in the year under
consideration is not less than the baseline expenditure, which is defined as the
average of the expenditure in irrigation sector irrespective of the department in the
state plan in three years prior to the year under consideration. Secondly, States will
be given additional weightage for levying charges on water and electricity for
irrigation purposes, so as to ensure sustainability of the programme. Thirdly,
interstate allocation of PMKSY fund will be decided based on
Share of percentage of unirrigated area in the state vis-à-vis national average
including prominence of areas classified under Desert Development
Programme (DDP) and Drought Prone Area Development Programme
(DPAP)
Increase in percentage share of expenditure on water resource development
for agriculture sector in State Plan expenditure in the previous year over three
years prior to it and
Improvement in irrigation efficiency in the state.
Vision
The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be
to ensure access to some means of protective irrigation to all agricultural farms in the
country, to produce ‗per drop more crop‘, thus bringing much desired rural
prosperity.
Objective
The objectives of the PMKSY are to:
a) Achieve convergence of investments in irrigation at the field level (preparation
of district level and, if required, sub district level water use plans).
b) Enhance the physical access of water on the farm and expand cultivable area
under assured irrigation (Har Khet Ko Pani),
c) Integration of water source, distribution and its efficient use, to make best use
of water through appropriate technologies and practices.
d) Improve on-farm water use efficiency to reduce wastage and increase
availability both in duration and extent,
e) Enhance the adoption of precision-irrigation and other water saving
technologies (More crop per drop).
f) Enhance recharge of aquifers and introduce sustainable water conservation
practices
g) Ensure the integrated development of rainfed areas using the watershed
approach towards soil and water conservation, regeneration of ground water,
arresting runoff, providing livelihood options and other NRM activities.
h) Promote extension activities relating to water harvesting, water management
and crop alignment for farmers and grass root level field functionaries.
i) Explore the feasibility of reusing treated municipal waste water for peri-urban
agriculture, and
j) Attract greater private investments in irrigation.
Strategy/approach
To achieve these objectives PMKSY adopted strategies that include
a) Creation of new water sources; repair, restoration and renovation of defunct
water sources; construction of water harvesting structures, secondary & micro
storage, groundwater development, enhancing potentials of traditional water
bodies at village level like Jal Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo
(Nagaland); Eri, Ooranis (T.N.); Dongs (Assam); Katas, Bandhas (Odisha and
M.P.) etc.
b) Developing/augmenting distribution network where irrigation sources (both
assured and protective) are available or created;
c) Promotion of scientific moisture conservation and run off control measures to
improve ground water recharge so as to create opportunities for farmers to
access recharged water through shallow tube/dug wells;
d) Promoting efficient water conveyance and field application devices within the
farm viz, underground piping system, Drip & Sprinklers, pivots, rain-guns and
other application devices etc.;
e) Encouraging community irrigation through registered user groups/farmer
producers‘ organisations/ NGOs; and
f) Farmer oriented activities like capacity building, training and exposure visits,
demonstrations, farm schools, skill development in efficient water and crop
management practices (crop alignment) including large scale awareness on
more crop per drop of water through mass media campaign, exhibitions, field
days, and extension activities through short animation films etc.
Programme Components
PMKSY has following four components:
1. Accelerated Irrigation Benefit Programme (AIBP)
To focus on faster completion of ongoing Major and Medium Irrigation including
National Projects.
2. PMKSY (Har Khet ko Pani)
This component focuses on-
a) Creation of new water sources through Minor Irrigation (both surface and
ground water)
b) Repair, restoration and renovation of water bodies; strengthening carrying
capacity of traditional water sources, construction rain water harvesting
structures (Jal Sanchay);
c) Command area development, strengthening and creation of distribution
network from source to the farm;
d) Ground water development in the areas where it is abundant, so that sink is
created to store runoff/ flood water during peak rainy season.
e) Improvement in water management and distribution system for water bodies
to take advantage of the available source which is not tapped to its fullest
capacity (deriving benefits from low hanging fruits). At least 10% of the
command area to be covered under micro/precision irrigation.
f) Diversion of water from source of different location where it is plenty to
nearby water scarce areas, lift irrigation from water bodies/rivers at lower
elevation to supplement requirements beyond IWMP and MGNREGS
irrespective of irrigation command.
g) Creating and rejuvenating traditional water storage systems like Khatri, Kuhl
etc. at feasible locations.
3. PMKSY (Per Drop More Crop)
a) Programme management, preparation of State/District Irrigation Plan,
approval of annual action plan, Monitoring etc.
b) Promoting efficient water conveyance and precision water application devices
like drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan);
c) Topping up of input cost particularly under civil construction beyond
permissible limit (40%), under MGNREGS for activities like lining inlet,
outlet, silt traps, distribution system etc.
d) Construction of micro irrigation structures to supplement source creation
activities including tube wells and dug wells (in areas where ground water is
available and not under semi critical/ critical/ over exploited category of
development) which are not supported under AIBP, PMKSY (Har Khet Ko
Pani), PMKSY (Watershed) and MGNREGS as per block/district irrigation
plan.
e) Secondary storage structures at tail end of canal system to store water when
available in abundance (rainy season) or from perennial sources like streams
for use during dry periods through effective on-farm water management;
f) Water lifting devices like diesel/ electric/ solar pumpsets including water
carriage pipes, underground piping system.
g) Extension activities for promotion of scientific moisture conservation and
agronomic measures including cropping alignment to maximise use of
available water including rainfall and minimise irrigation requirement (Jal
Sarankchan);
h) Capacity building, training and awareness campaign including low cost
publications, use of pico projectors and low cost films for encouraging
potential use water source through technological, agronomic and management
practices including community irrigation.
i) The extension workers will be empowered to disseminate relevant
technologies under PMKSY only after requisite training is provided to them
especially in the area of promotion of scientific moisture conservation and
agronomic measures, improved/ innovative distribution system like pipe and
box outlet system, etc. Appropriate Domain Experts will act as Master
Trainers.
j) Information Communication Technology (ICT) interventions through NeGP-A
to be made use in the field of water use efficiency, precision irrigation
technologies, on farm water management, crop alignment etc. and also to do
intensive monitoring of the Scheme.
4. PMKSY (Watershed Development)
a) Effective management of runoff water and improved soil & moisture
conservation activities such as ridge area treatment, drainage line treatment,
rain water harvesting, in-situ moisture conservation and other allied activities
on watershed basis.
b) Converging with MGNREGS for creation of water source to full potential in
identified backward rainfed blocks including renovation of traditional water
bodies
Rationale/ Justification
In reference to the status and need of irrigation, the water resource management
including irrigation related priorities was identified for Narmada district by the
peoples‘ representatives of district with support from administration and technical
experts. For instance the reports of Strategic Research and Extension Plan (SREP)
prepared under ATMA program, Comprehensive District Agriculture Plan (C-DAP)
prepared as part of Rashtriya Krishi Vikas Yojana (RKVY), Potential Linked Credit
Plans (PLP) of NABARD and the Integrated District Development Plan etc. identified
number of irrigation related issues for Narmada district including (i) promoting
water use efficiency through sprinkler and drip irrigation; (iii) promoting protected
polyhouse cultivation to minimize risk factors and enhance quality and productivity;
(iv) Improvement of on-farm water delivery and efficiency of existing irrigation
systems; (v) promotion of soil conservation of arable & non-arable land through
engineering measures; (vi) creation of new water harvesting structures, check dams,
ponds, tanks, etc (vii) increase the forest cover in the district and (viii) land
improvement measures.
Methodology
During the course of preparation of District Irrigation Plan (DIP) the team visited
Narmada district to collect data and have interaction with all the stakeholders.
Methodology adopted to prepare DIP is outlined in brief as under:
a) Collection of primary and secondary data from field from various sources
including published documents and websites.
b) Various meetings were held to obtain ground level realities and data from
key personnel/stakeholders through structured, unstructured interviews,
focused group discussions etc.
c) Meetings with various State Government departments and related
institutions were held
d) Meeting through VC was also held with State Level authorities.
e) GIS maps of the area‘s/clusters were studied to understand the land
morphology, topography of the district.
f) Focused group discussions and interaction with of agriculture officers,
horticulture officers, soil conservation officers, extension officers, rural
development department, animal husbandry department, irrigation officers
both at blocks and district level for identifying the key issues and focus
areas of the region.
g) Discussion with NABARD officer of Narmada district was also held during
the visit.
h) Team members also participated in the State Level workshop and held
active discussions with GoI officers, State Level officers and scientists of
various institutions
i) In the district at Panchayat level schemes were identified as per the need
and potential and resolutions were passed by the Panchayat to include the
schemes in PMKSY. The Panchayat resolutions were then consolidated and
put up in the Block Development Committee and a block plan was put up in
the Zila Parishad along with the programme of other line departments
participating in implementation of PMKSY. Besides IWMP prepared by
District Water Development agency was also proposed and approved by the
Zila Parishad Narmada in its meeting.
On the basis of detailed discussion and analysis of data, the team arrived at the
projections of various components of PMKSY and Department wise plan for four
years from 2016-17 to 2019-20 as detailed in the plan.
CHAPTER I
GENERAL INFORMATION OF THE DISTRICT
1.1 District Profile
The Narmada district was a part of Bharuch district. The district was formed on
October 2, 1997 with three Talukas i.e. Sagbara, Dediapada and Nandod. Later
Tilakwada taluka was inducted from Vadodara.
The district is situated in the South of Gujarat State and lies between North Latitude
21 25‖ 45‖ and East Longitude of 72 34‖ 19‖. The district headquarters are located at
Rajpipla. The district is bounded by Vadodara district in the north, by Maharashtra
state in the east, by Tapi district in the south and by Bharuch district in the west.
In this Direction Satpuda‘s Hills are situated Large Portion of Land is with Pit and
Hills, with Slant. Tilakvada and Nandod‘s many Lands are of Pit and Hills. The Land
of District are Type medium, black and brown.
Table 1. 1 District Profile
1.1 District Profile
District District Code Latitude Longitude
Narmada 487 21.240 to 220 North 72.40 to 73.150 East
Source: Census 2011
Map 1: Narmada district
1.1.1 Administrative Setup
With a view to run the administration of the State smoothly, it has been divided into
Districts, which in turn have been further sub-divided into Talukas (Tahsils). In the
State of Gujarat, the community development blocks are co-terminus with the
Talukas. The Talukas contain large number of villages and possibly several towns.
The villages have Village Panchayats to run the local administration. A Village
Panchayat may constitute of one revenue village, several revenue villages or a part of
a large village. Similarly, the towns have Municipality or Municipal Corporation as
the seat of local self-government. There are 4 talukas in the district, 609 villages out
of which 558 are inhabited and 5 towns in 2011.
The District Collector looks after the general administration, maintenance of
collection of land revenue and settlement of law related disputes, civil supplies,
district planning, mid-day meal scheme, etc at the district level. The functions of
administration of law and order and control and investigation of crime are done by
the Superintendent of Police of the district with the help of Police Stations working
under him. For the purpose of maintaining law and order there are 6 police stations,
0 police chowkies and 11 out-posts as per statement below.
Figure 1: Adminstrative Structure of district
At the Taluka level, Mamlatdar looks after the land development and revenue
collection and law and order.
The Panchayati Raj institutions are fairly strong and most of the development works
have been transferred to the District Panchayats and its subordinate bodies. The
District Panchayat has an elected President and District Development Officer
appointed by the Government, works as its Secretary, who looks after day-to-day
Collector
Dy. District Election Officer
Dy. Collector Land Reform/
ULC
Dy. Collector M.D.M.
District Planning Officer
Resident Additional Collector
SDM
Prant Officer
work related to the development. Similarly, at the Taluka level, Taluka Panchayats
have been constituted which have an elected President.
The Taluka Development Officer, placed by the Government as Secretary of the
Taluka Panchayats and he conducts the regular administrative work. Like wise, an
elected President heads the Municipality and the Chief Officer works as the Secretary
of the Municipality, who looks after the day-to-day work. In case of the large cities,
the State Government has constituted Municipal Corporation, which are headed by
an elected Mayor and the Municipal Commissioner, appointed by the Government,
looks after the routine work.
At the Village level, the Sarpanch is the elected Chief and the Talati (Village Mantri)
works as the Secretary to the Village Panchayat and looks after the day today work.
In view of the expanding role of the public administration in a state like Gujarat, the
Government has taken-up many activities and has set up several offices. Such offices
which came into the existence are as under:
(1) Education (Primary and Higher Education)
(2) Agricultural and Research
(3) Animal Husbandry and Poultry
(4) Forest and Environment
(5) Roads and Building Bridges
(6) Co-operation and Co-operative Societies
(7) Industries, Small and Large as well as Cottage
(8) Health and Medical Services, Medical
Education and Research, Family Welfare
and Nutrition
(9) Information Department
(10) Irrigation Minor and Major
(11) Social Welfare and Social Defence
The functions of above offices are managed and controlled by concerned Head of
Departments and in some cases also by District and Taluka Panchayats.
1.1.2 Towns and Villages
The taluka wise break up of towns and villages for the district is shown below.
Table 1.1 1: List of towns and villages
Sl. No. Name of Taluk No. of Towns No. of Villages
Total Inhabited
1 Tilakwada 0 97 97
2 Nandod 2 203 202
3 Dediapada 1 213 168
4 Sagbara 2 96 91
Total 5 609 558
Source: Census 2011
The civic status of the 5 towns is as under:
Municipality :01
Census Towns :04
There are 609 villages in the district out of which 558 are inhabited and the rest
comes under uninhabited.
*Note: The data regarding Garudeshwar is not available since the taluk
was formed in 2014-15 and no survey has been conducted for collection
of data so far.
1.2 Demography
Narmada covers 1.44% of total area of Gujarat State. Density (Population per sq.
km) of the district is 6th lowest & is 210. Narmada district is the 3rd lowest
populated district in the State. In Narmada district, Sub-district Nandod has the
highest population (241053) whereas sub-district Tilakwada has the lowest
(63871). Among villages Chikda village of Sub-district Dediapada is the most
populated village (3921).
Narmada district has sex ratio of 961 (no. of females per 1000 (males). Among sub-
districts, Sagbra has the highest sex ratio of 1013 and Tilakwada has the lowest sex
ratio of 924. Narmada has child sex ratio of 941.Sub-district Sagbra has the highest
child sex ratio of 966 and Tilakwada has the least child sex ratio of 891. District has
the literacy rate of 72.31 % and female literacy rate 63.09%.Sub – district Tilakwada
has the highest literacy rate of 79.03% and Dediapada has the lowest literacy rate of
64.54%.
The total number of household in the district stands at 122174. The total population
of the district is 590297 of which male population constitutes about 301086 and
female population is 289211. 10.48% of the total population is urban which
constitutes about 61863 while the remaining population resides in rural area which
constitutes about 528434.
Table 1.2. 1: Demography details of the district (Male, female, Children)
Demography Details
Blocks Male Female CH* (0-6 yrs) Total
Nandod 124560 116493 27919 241053
Dediyapada 88235 86214 27670 174449
Sagbara 55094 55830 14607 110924
Tilakwada 33197 30674 7927 63871
Total 301086 289211 78123 590297
Source: Census 2011
Figure 1. 1: Demography profile of the district (Male, Female and
Children)
The district has 8733 number of SC population. Nandod taluk has the maximum
percentage of SC population of 64.64% of the total SC population of the district while
Dediyapada taluk has lowest percentage of 5.70% of the total SC population of the
district.
The ST SC population for different taluk in the district is given in the table below.
Table 1.2. 2: Demography details of the district (SC, ST, General)
Blocks SC Member ST
Member
General
Member
Total
Nandod 5645 176658 58750 241053
Dediyapada 498 168181 5770 174449
Sagbara 625 101157 9142 110924
Tilakwada 1965 35396 26510 63871
Total 8733 481392 100172 590297
Source: Census 2011
0
20000
40000
60000
80000
100000
120000
140000
Nandod Dediyapada Sagbara Tilakwada
Male
Female
CH* (0-6 yrs)
Figure 1. 2: Demography Profile of the district (SC, ST and General)
The total ST population of the district stands at 481392. Vadodara taluk has the
maximum percentage of ST population which stands at 36.70% followed by
Dediyapada and Sagbara taluk which are 34.94% and 21.01% of the total ST
population of the district, respectively.
The ST population comprises 81.55% of the total population of the district while for
the state the population of ST is 14.75%.
The SC population in the district is 1.48% of the total population of the district while
for the state it is 6.74%.
1.3 Biomass and Livestock
The main animal wealth being reared by the farmers in the district is cattle,
buffaloes, goats & poultry while other domestic species like sheep, horses, ponies,
donkeys and camels are also reared by a small section of society for earning their
livelihood.
Under small animal category, poultry pigs, goats and sheep are included. As given in
the table below, Nandod taluk has the maximum percentage of small animal
population of about 38.60% followed by Dediyapada with 38%, Sagabara with
17.30% and Tilakwada with 6.04%. The total number of small animals in the district
as per the 19th Livestock Census 2012, is 343110. The total poultry population of the
district is 150806, pigs population is 34, goats constitutes about 191520 and sheep
constitutes about 403. Among small animal category goats has the largest population
and constitutes about 55.82% of the total small animals followed by poultry
population which is 43.95% of the total small animal population.
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
200000
Nandod Dediyapada Sagbara Tilakwada
SC Member
ST Member
General Member
Table 1.3. 1: Population of Small Animal in the district
Block Poultry
(No.)
Ducks
(No.)
Pigs
(No.)
Goats
(No.)
Sheep
(No.)
Total
Nandod 41472 347 34 90223 380 132456
Dediyapada 65557 0 0 65011 0 130568
Sagbara 38826 0 0 20541 0 59367
Tilakwada 4951 0 0 15745 23 20719
Total 150806 347 34 191520 403 343110
Source: Livestock census 2012
Figure 1.3. 1: Percentage population of small animals in different
blocks/tehsil
The large animal category under livestock in district includes Indigenous cow, Exotic
cow, Buffaloes and other draft animals. The total population of large animal in the
district is 426957 out of which Indigenous cow constitutes about 40.57%. the largest
population under large animal Category is of Buffaloes which constitutes about
58.09%. The exotic breeds of cow and draft animals has a share of 1.08% and 0.08%
respectively, of the total population of large animals.
Table 1.3. 2: Population of large animal in the district
Block Large Animal Draft
Animal
(Buffalo/
yak/ bulls/
any other
(No.)
Total
Indigenous
Cow (Nos.)
Hybrid
Cow (No.)
Buffalo
(No.)
Nandod 64812 2071 56300 249 123432
38.54%
38.10%
17.32%
6.04%
Percentage Population
Nandod
Dediyapada
Sagbara
Tilakwada
Dediyapada 66316 1435 74808 64 142623
Sagbara 28775 847 22648 12 52282
Tilakwada 14083 250 94276 11 108620
Total 173986 4603 248032 336 426957
Source: Livestock census 2012
Figure 1.3. 2: Percentage population of largel animals in different
blocks/tehsil
Dediyapada taluk shares the maximum percentage of about 33.40% of large animal
population out of total large animal population followed by Nandod, Tilakwada and
Sagabara with a share of about 28.91%, 25.44% and 12.25% respectively.
1.4 Agro -Ecology, Climate, Hydrology and Topography
According to climate, topography, soil characteristics and cropping pattern Narmada
district lies in South Gujarat Agro Climatic Zone II. (AES I ) and Middle Gujarat
Agro-climatic Zone III (AES IX). As regards to Agro Ecological situations on the basis
of Phsiography and soil texture, Nandod, Dediapada and Sagbara belong to AES I
while Tilakwada belongs to AES IX.
Table 1.4. 1: Agro-ecological zones of the district and there
characteristics
Agro
Climatic
Zones and
AES
Rainfall
(mm)
Soil
Texture
Principal
Crops
Special
Features
Talukas
Coverage
South
Gujarat
Zone-II,
1000-1250
mm
Undulating
Shallow to
medium in
depth fine
Cotton,
Paddy,
Sugarcane,
Banana,
Highly
erosive, low
fertile land
and hilly
Nandod,
Dediapada,
Sagbara
28.91%
33.40%
12.25%
25.44%
Percentage Population
Nandod
Dediyapada
Sagbara
Tilakwada
AES-I textured Maize,
Sorghum,
Pulses
terrain with
dense forest
`Middle
Gujarat
Zone-III,
AES-IX
>850 mm Deep Black
Soil
Cotton,
Pigeon Pea,
Maize,
Sorghum
Medium in
NPK
content
Tilakwada
Source: C-DAP, Narmada district 2013-14
The Hills of Rajpipla has been divided into three parts (i) in the Northern part is the
planes of Narmada River which is 16 Km, from East to West is the dense forest area,
(ii) in the south the low land planes of Tapi River which is flowing from North to
South and then turn towards East which is 32 Km (iii) in the East the Hilly area
between Narmada and Tapi. About 2000 ft high patch of hilly area from East of
Rajpipla to North which gradually linked to the planes. The Ringe range is between
889 meter high Dhamnamal (about 25-29 Km from Dediapada) and 950 meter high
Sandiya Tekra (hilly area).
Climate and Rainfall
The district has semi-arid climate with three distinguished seasons i.e. kharif (June
to September), winter (October to January) and summer (February to May). The
district receives the rainfall through South-West monsoon which normally starts
from middle of June. July and August are the months of heavy rainfall. The average
rainfall varies from 800 mm to 1100 mm. however, scanty and uneven rainfall
pattern is not uncommon. The temperature varies from 14.25°C to 42.5°C. The
December and January are the coldest months while April and May are the hottest
months of the year. The Narmada district receives an average of 973.5 mm of rainfall
with highest in Dediapada (1034 mm) during the year 2011-12. As regards the
distribution of rainfall the rains commence in June and continue up to October. The
highest rain received in month of August in different blocks except Sagbara, which
received good amount of rain in July.
The total amount of rainfall and the average rainy days is important determinant
while planning for interventions aimed at water harvesting and prescribed any
change in the cropping pattern. Dediapada though receives good amount of rain but
due to sloppy terrain, the water drains out at high velocity leaving very less water for
ground water recharge. It is also seen that there is high soil erosion leaving the top
soil to as low as few inches in many places. As a result, the agriculture productivity of
the taluka is less as compared to the other three talukas. Even as per geology data of
GWSSB the ground water table in Dediapada is the lowest as compared to other
three talukas. For raising ground water tables in Dediapada area, watershed
management and other in situ water conservation technologies can be proposed for
recharge and life saving irrigation at the time of stretch of monsoon.
Table 1.4. 2: Rainfall and Temperature
Sl. No. Taluka No. of Rainfall Temperature
Weather
Stations
No. of
Rainy Days
Average
rainfall (mm)
Min. oC Max. oC
1. Nandod 1 51 930 15 42
2. Dediapada 1 53 1034 13 43
3. Sagbara 1 57 1000 15 43
4. Tilakwada 1 52 930 14 42
Average - 53.25 973.50 14.25 42.5
Source: Revenue Dept., Gandhinagar, 2012
Table 1.4. 3: Year wise rainfall in different blocks in Narmada District (mm)
Sl.
No.
Taluka Year
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Mean
1 Nandod 802 1275 1124 1169 1455 1378 1066 603 1071 930 1074
2 Dediapada 996 1442 1255 1210 1793 1695 1160 1125 1274 1034 1296
3 Sagbara 810 1462 1073 1270 1717 1381 1335 1141 1223 963 1224
4 Tilakwada 814 1176 1069 1007 1399 1100 909 457 938 1073 973
Mean Narmada 855 1338 1130 1164 1591 1388 1117 831 1126 1000 1159
Source: Revenue Dept., Gandhinagar, 2012
There is no good weather watch system in the district. Increasing concern with
climate change and climate resilient agriculture, there is a need to establish a unique
weather watch and forecasting system in the district.
1.5 Soil Classification
An analysis of the soil condition, in conjunction with the slope classification of the
Narmada district clearly demarcates the hilly region and the relatively plain areas of
Narmada, Karjan and Tapi. The Eastern and South eastern belt of the district-
extending from part of Nandod to Dediapada and Sagbara is characterized by high
slope, shallow to medium soil depth and severe to very severe level of soil erosion. In
the Northern part and North West part of the district mainly Tilakwada and part of is
characterized by the planes with high soil depth. In some places the soil depth is as
high as 20'-30'.
Soil in the district is dominantly distributed to very deep soil depth class followed by
shallow depth. The soil drainage is well to moderately drained in general whereas the
soil salinity is moderate in the district. Based on fertility status and type of terrain,
thye soil in the district has been divided into two types as given below in the table:
Table 1.5. 1: Soil classification in the district
Sr. No. Soil type Characteristics Area in
ha.
1 Undulating, shallow to medium
in depth, fine textured, highly
erosive
Low fertility land and
hilly terrain with
dense forest.
80%
2 Deep black soil- Plain Deep black soil with
high rainfall- plain
20%
Source: C-DAP Narmada District, 2012-13
The soil in the district has also been classified based on the soil texture. The soil in
the district is mainly from deep black, medium black to loamy type sandy soil which
is found in every blocks of the district.
The district has deep black soil dominating in every taluk of the district. The soils are
dark brown to very dark greyish brown in colour. They contain 40 to 70 percent clay
minerals. The deep black soils, in general, are clay-like in texture, poor in drainage,
and neutral to alkaline in reaction. These soils are most fertile soil in Black soils.
Map 2: Soil classification of district
1.6 Soil Erosion and Runoff Status
An analysis of the soil condition, in conjunction with the slope classification of the
Narmada district clearly demarcates the hilly region and the relatively plain areas of
Narmada, Karjan and Tapi. The Eastern and South eastern belt of the district
extending from part of Nandod to Dediapada and Sagbara is characterized by high
slope, shallow to medium soil depth and severe to very severe level of soil erosion. In
the Northern part and North West part of the district mainly Tilakwada and part of is
characterized by the planes with high soil depth.
According to climate, topography, soil characteristics and cropping pattern Narmada
district lies in South Gujarat Agro Climatic Zone II. (AES I ) and Middle Gujarat
Agro-climatic Zone III (AES IX). As regards to Agro Ecological situations on the basis
of Phsiography and soil texture, Nandod, Dediapada and Sagbara belong to AES I
while Tilakwada belongs to AES IX.
Table 1.6. 1: Agro-Climatic Zones
Agro-Climatic Zones
and AES
Features Taluka Coverage
South Gujarat Zone-II,
AES-I
Highly erosive Nandod, Dediapada,
Sagbara
Middle Gujarat Zone-III,
AES-IX
Medium erosive Tilakwada
Source: C-DAP Narmada District, 2012-13
1.7 Land Use Pattern
The total geographical area of the district is 275536 ha. out of which area under
agriculture constitutes about 122253 ha. as the gross cropped area. The total net
sown area of the district is 111100 ha. while the area sown more than once is 11153 ha.
Out of the total gross cropped area of the district Nandod taluk has the maximum
gross cropped area with a share of 42% followed by Tilakwada, Dediyapada and
Sagbara which shares about 25.75%, 16.93 and 15.47% respectively. Cropping
intensity of the district is 110.04%.
Table 1.7. 1: Land Use Pattern and area under agriculture
Sl/ Blocks Number
of
villages
covered
Total
Geographical
area (ha)
Area under Agriculture (ha)
Gross
Cropped
Area (1)
Net
Sown
Area
(2)
Area Sown
More
Than Once
(1-)
Cropping
intensity
(%)
Nandod 202 111968 51157 46490 4667 110.04%
Dediyapada 168 102386 20700 18812 1888.44 110.04%
Sagbara 91 36740 18910 17185 1725.14 110.04%
Tilakwada 97 24442 31486 28614 2872.43 110.04%
Total 558 275536 122253 111101 11153.01
Source: Gandhinagar Agriculture Department
Figure 1. 3: Percentage area under agriculture
Table 1.7. 2: Land Use Pattern and area under non-agriculture
Blocks Area under forest
(ha)
Area under
Wasteland
(ha)
Area under other
uses (ha)
Nandod 41540 6666 12605
Dediyapada 66396 5421 4083
Sagbara 11636 5635 559
Tilakwada 921 623 2198
Total 120493 18345 19445
Source: Gandhinagar Agriculture Department
The area under non cultivation has been divided into area under forest, area under
wasteland and area under other uses. The area under forest constitutes about 43.73%
of the total geographical area in the district while area under wasteland and other
uses constitutes about 6.67% and 7.06% of the total geographical area of the district.
The area under waste land has the potential to be converted to fit for agriculture
prupose, if provided with assured source of irrigation and proper soil and crop
management practises. The area under other uses includes roads, infrastructural
make-ups, etc. The taluk wise distribution of the area under non-cultivation is shown
in the table below. Dediyapada has maximum area under forest with share of 55.10%
followed by Nandod, Sagbara and Tilakwada with a share of 34.48%, 9.67% and
0.76% respectively. Nandod taluk has maximum area under wasteland and other
uses and constitutes about 36.34% and 64.82%.
41.85%
16.93%
15.47%
25.75%
Percentage Area under Agriculture
Nandod
Dediyapada
Sagbara
Tilakwada
Map 3: Land Use Pattern in the district
Chapter II
District Water Profile
According to climate, topography, soil characteristics and cropping pattern in
Narmada district lies in Agro Climatic South Gujarat Zone II characterized by rainfall
ranging from 800 mm to 1100 mm . Organic carbon as well as Nitrogen content-low,
Phosphorus-Medium, Potash is high. So, overall, the soil fertility indices are good
from the agriculture point of view. In Vadodara district the predominating existing
farming system is Agriculture + Animal Husbandry followed by Agriculture + Animal
Husbandry + Horticulture. The major cropping system under the existing farming
systems is primarily, Cotton alone, pigeon pea alone, sugarcane alone, paddy wheat
cropping with buffalo, Maize – Banana cropping with buffalo, Maize–Groundnut
cropping with buffalo. Tobacco alone or tobacco-Bajara (summer). The district has
significant areas under other cropping systems of paddy- wheat, Kharif pulse -
Sugarcane, sorghum-wheat, vegetable-vegetable, vegetable-wheat, fallow-wheat.
Now a days total cropped area of cotton & castor was increased instead of other
cereals crop while, in some part of Vadodara district Horticulture cultivation
increased with Agriculture crop.
The district is having two agro-climatic zones and two Agro ecological situations. The
soil topography, resource availability is different in all the four blocks of the district.
The land of Dediapada, Sagbara and some part of Nandod having shallow soil with
hilly tarennian while, that of Tilakwada block is black cotton soils. The soil is poor in
organic carbon, medium in phosphorous and rich in potash. The Tilakwada and
Nandod blocks enjoying good irrigation facilities and major source of irrigation is
canal water from Sardar Sarovar and Karajan projects. The Dediapada and Sagbara
block having very limited irrigation facilities and major source of irrigation is wells.
The Nandod blocks have made tremendous progress due to cultivation of banana,
sugarcane and cotton. The contract farming in banana is unique example of success
in the state. Majority of the farmers in Dediapada and Sagbara are growing their
crops only for their subsistence, since last three four years, the farmers have the
visualized the importance of scientific method of cultivation of crops and their
hunger for such technologies have increased. There is tremendous potentiality for
increasing growth of the district by diversifying the farming system, in favor of
vegetables and fruits and efficient management of inputs.
2.1.1 Area-wise, Crop-wise Irrigation Status
The major crops include Paddy, Wheat, Jowar, bajra, Maize, Mung, Udid, Tur,
Groundnut, Cotton, Castor, Sesamum and Soyabean. The crips are grown in three
season i.e., Kharif, Rabi and Summer season. The table below shows the taluk wise
area under different crops grown under irrigated and rainfed conditions. The total
area under different agricultural crops is 150457 ha. of which crops grown under
irrigated condition is 63265 ha. while under rainfed condition is 87192 ha.
Table 2.1. 1: Crop area under Kharif, Rabi and Summer
Tehsil/ Sub
tehsil
Kharif (Area in ha.) Rabi (Area in ha.) Summer (Area in ha.)
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
Nandod 15121 27537 42658 11289 1409 12698 2626 0 2626
Dediyapada 2301 33056 35357 2594 900 3494 1965 0 1965
Sagbara 2747 15720 18467 5050 789 5839 1449 0 1449
Tilakwada 14556 7637 22193 2325 144 2469 1242 0 1242
Garudeshwar N/A N/A 0 N/A N/A 0 N/A 0 N/A
Total 34725 83950 118675 21258 3242 24500 7282 0 7282
Source: Gandhinagar Agriculture Department
*Note: The data regarding Garudeshwar is not available since the taluk
was formed in 2014-15 and no survey has been conducted for collection
of data so far.
About 78.88% of area under different agricultural crops is grown in Kharif season
while 16.28% of the total area under different agricultural crops is grown in Rabi
season. The rest of the crops are grown in summer season which constitutes about
4.84% of the total area under different agricultural crops. Among Taluks as given in
the figure below, 35.95% of the area under Kharif season is grown in Nandod
followed by Dediyapada which constitutes about 29.79%. the rest is distributed
among Tilakwada with 18.70% and Sagbara 15.56%.
Figure 2.1. 1: Percentage share of kharif crop area in different taluk
Among Rabi crops grown in the district, 51.83% is grown in Nandod taluk followed
by Sagbara (23.83%), Dediyapada (14.26%) and Tilakwada (10.08%). The figure
given below shows the percentage wise distribution of different crops in Rabi season
in different taluk.
35.95%
29.79%
15.56%
18.70%
Percentage Share Kharif Crops
Nandod Dediyapada Sagbara Tilakwada
Figure 2.1. 2: Percentage share of rabi crop area in different taluk
Under summer season crops, Nandod taluk shares the maximum area with 36.06%
of the total area under summer season crops followed by Dediyapada (26.98%),
Sagbara (19.90%) and Tilakwada (17.06%).
Figure 2.1. 3: Percentage share of summer crop area in different taluk
As stated above the total area under rainfed condition is 57.95% while under
irrigated condition is 42.05% of the total area under different agricultural crops.
Under different taluk, Nandod has maximum area under irrigation which constitutes
about 45.90% of the total irrigated area while Dediyapada has maximum area under
rainfed and it constitutes about 38.94% of the total rainfed area.
51.83%
14.26%
23.83%
10.08%
Percentage Share Rabi Crops
Nandod Dediyapada Sagbara Tilakwada
36.06%
26.98%
19.90%
17.06%
Percentage Share Summer Crops
Nandod Dediyapada Sagbara Tilakwada
Figure 2.1. 4: Percentage share of rainfed and irrigated area in different
taluk
2.1.2 Irrigation status of horticulture and plantation crops
Under horticultural crops, fruit crops, different vegetable crops, Spices and flower
are grown in the district. The total area under horticulture includes 22891 ha. The
total area under fruit crops in the district stands at 12952 ha. while under vegetable
crops it is 9372 ha. 384 ha. of the total horticultural area under district is grown
under spices and 183 ha under flower crops.
Table 2.1. 2: Horticultural & Plantation crop area in the district
Tehsil/ Sub tehsil Horticulture & Plantation Crops (Area in ha)
Irrigated Rainfed Total
Nandod 12683.6 0 12683.6
Dediyapada 4533.1 0 4533.1
Sagbara 3633.5 0 3633.5
Tilakwada 2040.8 0 2040.8
Garudeshwar N/A N/A 0
Total 22891 0 22891
Source: Gandhinagar Agriculture Department
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
45.00%
50.00%
Nandod Dediyapada Sagbara Tilakwada
Percentage Share of Irrigated Area Percentage Share of Rainfed Area
Figure 2.1. 5: Percentage distribution of horticultural areas in different
taluk
Under Horticultural crops, fruits vegetables, masala and flowers are grown. The
major fruits grown in the district includes banana, mango and papaya which are
grown in area of 66.41%, 26.81% and 2.63% of the total area under fruit production
in the district. Nandod taluk has maximum area under banana and papaya
cultivation i.e., 7568 ha and 260 ha respectively. While Dediapada has maximum
area under Mango production which is 1042 ha.
Under Vegetable production, cucurbits, clusterbeans, brinjal and Okra are majorily
grown in the district and constitutes about 27%, 11.56%, 9.78% and 9.25%
respectively, of the total area under vegetable production in the district. Nandod
taluk has maximum area under vegetable production and constitutes about 36.60%
followed by Dediapada which constitutes about 31.91%, Sagbara with 20.45% and
Tilakwada 11.07%.
Ginger, Fenugreek, Turmeric and Chilli are the main spices grown in the district and
constitute about 30.47%, 24.22%, 23.44% and 19.53% respectively. Nandod taluk has
the maximum area under spice procution and constitute about 41.67% followed by
Dediapada with 35.55% Sagbara with 17.99% and Tilakwada with 4.79%.
The district also grows flower as one of the ornamental crops under horticulture on
an area of 183 ha of the total area under horticulture. Marigold and Rose are the
major flowers grown in the district and constitutes about 45.90% and 41.53%
respectively of the total area under flower production. Among taluk, Nandod has
maximum area under flower cultivation and constitute about 51.15% followed by
Dediapada with 22.73%, Sagbara with 17.70% and Tilakwada with 8.42%.
55.41%
19.80%
15.87%
8.92%
Percentage Share
Nandod Dediyapada Sagbara Tilakwada
2.2 Production and Productivity of major Crops
The total production under different agricultural crops is 1416931 quintal per annum.
Under horticultural crops the total production stands at 786291 quintal per annum.
The average productivity of agricultural crops in the district under irrigated situation
stands at 1213 kg per ha. while under rainfed condition the productivity is 605 kg per
ha. The average productivity of horticultural crops is 2089 kg per ha.
Table 2.2. 1: Production and productivity of major crops in the district
Tehsil/ Sub-
tehsil
Gross
Cropped
Area
(ha)
Rainfed Irrigated Horticulture
Production
(Qtl/yr)
Yield
(Kg/ha)
Production
(Qtl/yr)
Yield
(Kg/ha)
Production
(Qtl/yr)
Yield
(Kg/ha)
Nandod 70666 213362 737.10 575198 1980.98 600505 4735
Dediyapada 45349 187245 551.43 80183 1168.84 66982 1478
Sagbara 29389 100043 605.99 92156 996.71 74051 2038
Tilakwada 27945 40831 524.75 127913 705.80 44752 2193
Garudeshwar N/A N/A N/A N/A N/A N/A N/A
Total 173348 541481 604.82 875450 1213 786291 2089
Source: Gandhinagar Agriculture Department
The total area under rainfed is 87192 ha while under irrigated condition, it is 63265
ha but it can be observed from the table above that the total production under
irrigated is more than the rainfed condition. It implies that the year round
availability of water for the criops help in increase in its production and also more
number of crops can be taken in a field as compared to rainfed condition. The
productivity of the irrigated condition is higher as compared to rainfed condition.
The taluka wise distribution of crop production under rainfed area is given in the
figure below. Nandod taluk constitutes about 39.40% of total production under
rainfed condition followed by Dediyapada with 34.58%, Sagbara with 18.48% and
Tilakwada 7.54%.
Figure 2.2. 1: Taluk wise distribution of crop production under rainfed
condition
The figure below shows percentage distribution of irrigated production under
different taluk in the district.
Figure 2.2. 2: Taluk wise distribution of crop production under
irrigated condition
39.40%
34.58%
18.48%
7.54%
Percentage share Rainfed
Nandod Dediyapada Sagbara Tilakwada
65.70%
9.16%
10.53%
14.61%
Percentage share Irrigated
Nandod Dediyapada Sagbara Tilakwada
Nandod taluk shares the maximum area under irrigated condition of about 65.70%
followed by Tilakwada which constitutes about 14.61%, Sagbara with 10.53% and
Dediyapada with 9.16%.
The figure below shows percentage distribution of horticultural production under
different taluk in the district.
Figure 2.2. 3: Taluk wise distribution of horticultural crop production
2.3 Irrigation based classification
The district has been classified into gross irrigate, net irrigated and rainfed areas.
Under irrigation based classification, the gross irrigated area in the district stands at
86156 ha. while the net irrigated area is 39104 ha. The gross rainfed area in the
district is 87192 ha.
Table 2.3. 1: Irrigation Based classification
Name of
Block/ Taluka
Irrigated (Area in ha) Rainfed (Area in ha) Total sowing
area Partially
Irrigated/Protective
Irrigation
Un-
lrrigated or
Totally
Rainfed
Gross
Irrigated
Area
Net Irrigated
Area
Nandod 41719.6 22428 Nil 28946 70665.6
Dediyapada 11393.1 544 Nil 33956 45349.1
Sagbara 12879.5 2148 Nil 16509 29388.5
Tilakwada 20163.8 13984 Nil 7781 27944.8
Garudeshwar N/A N/A Nil N/A N/A
Total 86156 39104 0 87192 173348
Source: Gandhinagar Agriculture Department
The figure below shows taluk wise percentage share of area under gross irrigated,
rainfed and net irrigated.
76.37%
8.52%
9.42%5.69%
Percentage share horticultural crop production
Nandod Dediyapada Sagbara Tilakwada
Figure 2.3. 1: Percentage area under irrigation based classification
Nandod taluk has the maximum area under net irrigated area and constitutes about
57.35% followed by Tilakwada which has 35.76%, Sagbara with 5.49% and
Dediyapada with 1.39%. The maximum area under rainfed is of Dediyapada which
constitutes about 38.94% followed by Nandod with 33.20%.
48.42%
13.22%14.95%
23.40%
57.35%
1.39%
5.49%
35.76%33.20%
38.94%
18.93%
8.92%
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
Nandod Dediyapada Sagbara Tilakwada
Percentage share gross irrigated area
Percentage share net irrigated area
Percentage share gross rainfed area
Chapter III
Water Availability
District is drained from east to west mainly by three rivers namely the Narmada, the
Kim and the Tapi The river Narmada after entering the low level of Gujarat plains
near Markai, flows westward to the Gulf of Khambat in Bharuch district. Narmada
moves through a rich flat plain, between high rough banks of hard clay and sand
deposits located mostly in Tilakwada taluka. In its course through the district, the
Narmada receives important tributaries namely the Karjan, the Orsang, the Heran,
the Aswan, and the Men. Rising in the Rajpipla hills, the Kim, for the first part of its
course passes through the Nandod taluka and Valia Mahal territory. The south
eastern extremity of the district touches the Tapi, the second important river of south
Gujarat.
3.1 Status of water availability
The district as a whole was deficient in surface water resources and have also faced
droughts in past. After initiation of Narmada Canal Project nearly 472,219 hectares
of district area will come under irrigation command.
Groundwater occurs under unconfined conditions in all the rock formations in most
of the area of the district. Weathered zone below water table acts as good repository
for storage of groundwater in Deccan Trap areas. In the Infratrapean rocks (Bagh
beds- sandstone, marls and limestone), apart from occurrence of water in the pore
spaces between sand grains, the principal joints, fissures and other planes of
structural weakness play an important role in the movement of groundwater. In the
alluvium, groundwater occupies the open spaces between particles of sand, gravel
and boulder.
Table 3.1. 1: Status of water availability in the district
S.No. Sources Kharif Rabi Summer Total
1 Surface Irrigation
(i) Canal(Major & Medium Irrigation) 66.48 175.15 90.10 331.73
Nandod 41.41 90.98 38.38 170.77
Garudeshwar 5.07 11.15 4.70 20.92
Tilakwada 0.00 0.00 0.00 0.00
Dediyapada 0.00 0.00 0.00 0.00
Sagabara 0.00 20.02 20.02 40.04
(ii) Minor Irrigation tanks 0.00 0.00 0.00 0.00
Nandod 0.00 0.00 0.00 0.00
Garudeshwar 0.00 0.00 0.00 0.00
Tilakwada 0.00 0.00 0.00 0.00
Dediyapada 0.00 0.00 0.00 0.00
Sagabara 0.00 0.00 0.00 0.00
(iii) Lift Irrigation/Diversion 2.67 2.18 0.00 4.85
Nandod 0.00 0.00 0.00 0.00
Garudeshwar 0.00 0.00 0.00 0.00
Tilakwada 0.00 0.00 0.00 0.00 Dediyapada 0.72 0.59 0.00 1.31
Sagabara 1.95 1.59 0.00 3.54
(iv) Various Water Bodies including Rain Water Harvesting/ Check Dam
5.92 5.47 0.00 11.39
Nandod 0.24 0.21 0.00 0.45
Garudeshwar 0.12 0.10 0.00 0.22
Tilakwada 0.23 0.20 0.00 0.43
Dediyapada 1.51 1.36 0.00 2.87
Sagabara 3.82 3.60 0.00 7.42 (v) Treated Effluent Received from STP 0.00 0.00 0.00 0.00
(vi) Untreated Effluent 0.00 0.00 0.00 0.00
(vii) Perennial sources of water 0.00 0.00 0.00 0.00
Total 75.07 182.80 90.10 347.97
Source: Irrigation Department of Narmada district
The total water availability under surface water includes canal water from Narmada
dam. The water availability under Kharif season is 75.06 MCM and under Rabi
season the water availability is 182.8 MCM while under summer 90.1 MCM of water
availability is in the district. The total water availability under canal (major and
minor) is 347.97.
*Note: The data regarding Garudeshwar is not available since the taluk was formed
in 2014-15 and no survey has been conducted for collection of data so far.
3.2 Status of Ground water availability
Groundwater occurs under unconfined conditions in the limestone and sandstone
aquifers. Occurrences and movement of groundwater is restricted mainly to the
fractures and joints in the limestones and sandstones. Due to the cherty nature of
limestone aquifers and calcareous nature of the sandstones, the primary porosity as
well as development of solution cavities is very poor. The Basal conglomerate beds
are poorly permeable on account of calcareous cement. However, these
conglomerates when exposed to surface, give rise to good aquifers which support
shallow wells. The discharge in dug wells varies from 30 to 50 m3 /day. In highly
weathered conglomerates and sandstones, the yield of wells ranges up to 700 lpm for
drawdown of 1 to 2 m and recuperation is fast.
Ground water recharge during monsoon season has been computed using water level
fluctuation method and compared with recharge by the infiltration factors.
Depending upon percent deviation value, Gross Recharge has been calculated as per
the recommended methodology. Besides rainfall, the recharge due to seepage from
canal, return flow from irrigation, recharge from tanks, ponds & water conservation
structures, etc. were also considered. The total annual recharge was obtained as the
sum of the monsoon and non-monsoon periods comes out to be 218.26 MCM per
year while the annual draft is 74.47 MCM.
Table 3.2. 1: Status of Ground water availability in the district
Taluk Status of Block as per Central
Ground Water Board Notification
Ground Water (MCM)
Critical Semi-
Critical
Safe Draft Recharge Gap
Nandod Nil Nil Yes 52.89 107.39 54.50
Dediyapada Nil Nil Yes 7.54 30.85 23.31
Sagbara Nil Nil Yes 6.92 50.11 43.19
Tilakwada Nil Nil Yes 7.12 29.90 22.79
Garudeshwar Nil Nil Nil N/A N/A N/A
Total 74.47 218.26 143.80
Source: GWRDC
Figure 3.2. 1: Percentage distribution of draft and recharge among
different taluk
All the taluk of the district falls under safe category which states that there is lot
potential of the region to harness the ground water for domestic and irrigation
purposes. As per the Central Ground Water Board report the alluvial aquifers in the
district are exploited with the help of dug wells, dug-cum-bored wells and tube wells
for irrigation. The yield of wells in alluvial formation varies from 400 to 700 litre per
minute (lpm) for drawdowns varying from a few meters to as much as 21 m. There
are 2872 wells of all types in the district are in use as per the MI Census 2000-2001
and the total annual draft is computed to of the order of 6503 ha. m (GEC 2011).
Groundwater development in Nandod taluka is highest (40.57%). The wells in hard
rocks generally have low to moderate recuperation. The development of groundwater
in Dendiapada taluka is low (16.61%) as the taluka is entirely occupied by hard rocks
which have low to medium potentialities.
Rain water is the major source of recharge of ground water in the district. Besides
natural source, artificial sources can also be developed to recharge the ground water.
The Vadodara district has moderate to high rate of ground water development,
71.02%
10.12% 9.29% 9.56%
49.21%
14.14%
22.96%
13.70%
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
Nandod Dediyapada Sagbara Tilakwada
Draft
Recharge
mainly in areas of western part where multilayer aquifer system exists. This area has
come under Narmada Irrigation Command since last two years. There is likely to be
surplus surface water resources in various stretches of canal command which can be
diverted to numerous tanks & dry rivulets of the areas which will help to recharge
subsurface aquifers. With efficient water management practice, seepage losses and
any other surplus water can be diverted to purposes build structure for artificial
recharge.
3.3 Status of Command Area
The benefits to be accrued, out of groundwater based irrigation and domestic /
industrial supply in conjunction with Narmada Project surface water sources are of
manifolds. Sustainable and dependable supply from ground water reservoir, with
Narmada Canal Water in command areas, may help farmer raising additional crops
suitable to the areas so as to ensure optimum utilization of available land, water and
human resources.
In Narmada district the total command area under canal command is 48578.50 ha.
out of which 40335 ha. falls under developed under canal command leaving a gap of
8244 ha. which can be further developed for agricultural purposes. The taluk wise
percentage of total canal command area is given in the figure below:
Figure 3.3. 1: Percentage district Canal Command Area
Table 3.3. 1: Status of canal command area in the district Name of the Blocks Information of canal command
Total Area Developed Area Undeveloped Area
Nandod 24842.4 17499 7343.4
Dediyapada 0 0 0
Sagbara 1818 1818 0
Tilakwada 13436 13436 0
Garudeshwar 8482.1 7582 900
Total 48578.5 40335 8244
Source: District Irrigation Department
51.14%
3.74%
27.66%
17.46%
Percentage of Canal Command Area
Nandod Sagbara Tilakwada Garudeshwar
In the district, Nandod taluk shares the maximum percentage of developed area
under canal command which is 43.38% followed by Tilakwada, Garudeshwar and
Sagbara with a share of 33.31%, 18.80% and 4.51% respectively. The percentage
share of each taluk under total canal command area developed is given in the figure
below:
Figure 3.3. 2: Percentage distribution of developed area under canal
command
43.38%
4.51%
33.31%
18.80%
Percentage of Developed Canal Command Area
Nandod Sagbara Tilakwada Garudeshwar
Map 4: Canal of the district
The undeveloped area under Canal command is maximum in Nandod taluk with
7343 ha. followed by Garudeshwar taluk with 900 ha.
3.4 Existing Type of Irrigation
The major source of irrigation in the district is constituted by canal which forms the
surface irrigation sources. There are 7 canal based source of surface irrigation.
Besides this there are ground water sources that also prevails in the district. Under
ground water sources there are dugwells and tube wells as major source. Taluk wise
ground water structure is given below.
Table 3.4. 1: Taluk wise existing irrigation structures
Taluk Dugwell Tube well Total
Nandod 896 317 1213
Dediayapada 656 11 667
Sagbara 567 5 572
Tilakwada 291 129 420
Total 2410 462 2872
Source: District Irrigation Department
From the table above it can be stated that dug wells are the major sources of ground
water in the district. There are 2410 dugwells in the district as compared to 462 tube
wells. The maximum number of dugwells is found in Nandod district which also falls
under safe category of ground water development.
Figure 3.4. 1: Percentage distribution of tube-wells and dug-wells in the
district
It can be observed from the figure above that dug-well is the major source of
irrigation in the district the largest number of dugwell can be found in Nandod taluk
which constitutes about 37.18% of the total number of dug-wells in the district
followed by Dediyapada and Sagbara which constitutes about 27.22% and 23.53%
respectively. Tilakwada constitute about 12.07% of total dug well in th district. The
maximum nuber of tube-wells is located in two district i.e., Nandod and Tilakwada
and constitutes about 68.61% and 27.92% respectively of the total number of tube
wells in the district. Dediyapada constitutes about 2.38% and Sagbara 1.08% of the
total number of tube wells in the district.
Table 3.4. 2: Taluk wise canal based, tanks/reservoir irrigation
structures
Taluk Canal Based Tanks/ Reservoir/
Ponds
Total
Nandod 2 0 2
Dediayapada 0 0 0
Sagbara 2 0 2
Tilakwada 1 0 1
Garudeshwar 2 0 2
Total 7 0 7
37.18%
27.22%23.53%
12.07%
68.61%
2.38% 1.08%
27.92%
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
Nandod Dediayapada Sagbara Tilakwada
Dugwell
Tube well
Source: District Irrigation Department
In areas under irrigation, especially in canal command, development of ground water
acting as a vertical drainage would create more avenues for recharge of rainfall and
thus would minimize water logging. Optimum withdrawal of ground water would
facilitate induce recharge from return seepage of irrigation and other surface water
bodies and ultimately it will result in prevention of undue built up water levels (water
logging) in subsurface.
With conjunctive use of both surface water and ground water, there would be large
scope for ground water conservation by which deep aquifer can be reserved as ‗Safe
Spot Source‘ for providing immediate drinking water supply. Similarly in drought
situation when surface water sources are subject to depletion or dry up, it is only the
dependable source of ground water that can be harnessed to provide immediate
relief.
Map 5: River water bodies of district
Chapter IV
Water Demand
Water is life because plants and animals cannot live without water. Water is needed
to ensure food security, feed livestock, maintain organic life, take up industrial
production and to conserve the biodiversity and environment. Hence, there is no life
without water. Earth is the only plant, so far known to have water and this makes it
fit for human living. However, with reckless abuse and increasing demand, due to
growing population and unsustainable lifestyle, many countries are facing severe
water crisis. In the absence of suitable corrective measures, many developing
countries including India, will have to face crisis of food and water security in the
near future.
India‘s population is increasing but will stabilize in the middle of this century. The
BAU scenario assumes that the population will increase at 1.3 % over the period
2000-2025, and at 0.52 % between 2025 and 2050. The population growth is
expected to stabilize in the early 2050s, although several large states will have
peaked in their population growth well before the year 2050, and certain states will
even record declining trends as early as the 2030s and 2040s. Urbanization will also
continue to expand, and slightly over half of India‘s population will live in urban
areas by 2050.
Although, India is not a water poor country, due to growing human population,
severe neglect and over-exploitation of this resource, water is becoming a scarce
commodity. India is more vulnerable because of the growing population and in-
disciplined lifestyle. This calls for immediate attention by the stakeholders to make
sustainable use of the available water resources.
Major consumption of water is for agriculture, industrial production and domestic
purposes, apart from being used for fishery, hydro-power generation, transportation
and maintaining biodiversity and ecological balance.
4.1 Domestic Water demand
Data of Census 2011 and 2001 has been considered to arrive at the growth rate of
population of the district. As per Census 2011, the district has shown an decadal
growth rate of 14.75%. Table 4.1.1 below indicates the block-wise population of the
district. Current population (2015) has been calculated by compounded annual
growth rate over a period of four years (2011-2015). Projected population has been
calculated in similar way by assuming compounded annual growth rate over the
period of five years (2015-2020). It has been assumed that per capita daily water
requirement of people residing in the district is 140 Liters and for population in rural
areas, the daily per capita water requirement is 100 Liters. As per the table below it
can be inferred that the gross requirement of the water in 2020 for domestic
consumption will be 25.03 MCM.
Table 4.1. 1: Domestic water requirement
Blocks 2011 2015 Gross
water
demand
in MCM
(2015)
Population 2020 Gross
water
demand
in MCM
(2020)
Nandod 241053 255593 9.43 275007 10.15
Dediyapada 174449 184971 6.89 199022 7.41
Sagbara 110924 117615 4.47 126549 4.81
Tilakwada 63871 67724 2.47 72868 2.66
Garudeshwar N/A N/A N/A N/A N/A
Total 590297 625903 23.26 673445 25.03
As per the table above it can be inferred that the gross requirement of the water in
2020 for domestic consumption will be 25.03 MCM and the consumption of water
for drinking and other domestic purpose will increase by 7.60% by the year 2020.
4.2 Water demands for crops
Presently, inspite of good rainfall distribution, the country is unable to make good
use of rain water, because of lack of awareness and poor infrastructure to construct
dams and reservoirs. As a result, only about 35-40% of the cropping area receives
irrigation to take 1-2 crops in a year.
Crop water requirement is the water required by the plants for its survival, growth,
development and to produce economic parts. It is essential to know that the water
requirement of the crop is the total quantity of water required from its sowing time
up to harvest. Thus, different crops may have different requirement. This
requirement is applied either naturally by precipitation or artificially by irrigation.
The crop water requirement includes several losses such as:
a. Transpiration loss through leaves
b. Evaporation loss through soil surface in the cropped area
c. Amount of water used by plants for its metabolic activities which is estimated
at less than 1% of the total water absorption
d. Other application losses are conveyance loss, percolation loss, run-off loss, etc.
e. The water required for special purposes like ploughing operation, land
preparations, weeding, etc.
The main source of irrigation is from deep/ medium/ shallow tube wells in the
district and Lift Irrigation Schemes. There are no canals in the district as such
irrigation is mainly from tube wells.
Calculation of water requirement for crops
Crop water requirement is calculated based on water depth required for each crop
and area sown. The major crops grown in the Una district includes Paddy, Maize and
Wheat. The depth of irrigation and number of watering required for these crops is
given in the Annexure.
The tehsil wise crop water requirement was calculated based on the total area under
cultivation in Kharif and Rabi season. All the cropped area including area under
horticultural crops has been considered for demand estimation. The net irrigated
area for different tehsil was taken for the calculations of water requirement for
different crops.
Table 4.2. 1: Crop Water Requirement
Block Area
sown
(Ha)
Irrigated
area
(ha)
Crop
Water
Demand
Water
Potential
Required
Existing
Water
Potential
Water
Potential
to be
created
Nandod 70666 41720 47.15 47.15 17.68 29.47
Dediyapada 45349 11393 50.38 50.38 40.65 9.72
Sagbara 29389 12880 15.16 15.16 8.03 7.13
Tilakwada 27945 20164 4.61 4.61 1.70 2.90
Garudeshwar N/A N/A N/A N/A N/A N/A
Total 173348 86156 117.30 117.30 68.07 49.23
Figure 4.2. 1: Percentage distribution of water potential
0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00%
Nandod
Dediyapada
Sagbara
Tilakwada
Water Potential to be created Existing Water Potential Water Potential Required
4.3 Water demand for Livestock
Livestock is the major source of livelihood in rural areas and provides a source of
income during the lean period. The daily water requirement of livestock varies
significantly amongst the animal species. The animal‘s size and growth stage will also
have a strong influence on daily water intake. Consumption rates can be affected by
environmental and management factors. The quality of the water, which includes
temperature, salinity and impurities affecting taste and odour, will also have an
effect. The water content of the animal‘s diet will influence its drinking habits. Feed
with relatively high moisture content decreases the quantity of drinking water
required. The following assumptions have been made in the water demand
calculation for the livestock:
Poultry bird 0.2 LPD
Goat and Sheep 6 LPD
Cows 40 LPD
Buffaloes 60 LPD
The tehsil wise livestock population is the total number of livestock including small
and large animals. The present water demand is for the year 2015 and it is the gross
water demand for all the small and large animals calculated tehsil wise. The annual
growth rate for the livestock population is taken as growth from the two consecutive
livestock census i.e., 18th and 19th livestock census and the same is described below
for all the small and large animals:
Poultry growth rate of 21.77%
Ducks growth rate of 21.77%
Goat population with a growth rate of 166.38%
Sheep population with growth rate of 207.63%
Cattle growth rate of 27%
Buffaloes growth rate of 321%
Draft Animal growth rate of 147%
The population thus calculated for the period from 19th livestock census to the
current year of 2015 and projected for the next five years i.e., from 2016-17 to 2019-
2020.
In case of livestock with decreasing growth rate of population, the present population
has been considered for the subsequent years as well. It is assumed that present
water requirement of livestock is met from existing water usage and hence existing
potential is equal to existing demand.
Table 4.3. 1: Livestock Water Demand
Tehsil/Sub
tehsil
Livestock Population (No.) Water Requirement (MCM) Existing
Water
Potential
(MCM)
Water
Potential
to be
created
(MCM)
2012 2015 2020 2015 2020
Nandod 255888 266908 287076 2.60 2.86 2.60 0.26
Dediyapada 273191 284900 306483 3.01 3.34 3.01 0.34
Sagbara 111650 115436 122380 1.06 1.17 1.06 0.10
Tilakwada 129338 139652 159050 2.52 2.92 2.52 0.39
Garudeshwar N/A N/A N/A N/A N/A N/A N/A
Total 770067 806895 874988 9.19 10.29 9.19 1.10
The projected water demand for the livestock population in 2020 has been estimated
to be 10.29 MCM. Hence, the additional water potential which has to be created for
projected population of livestock in 2020 is 1.10 MCM.
4.4 Water Demand for Industries
The main sources of water for the industrial sector are groundwater and surface
water. Groundwater has emerged as an important source to meet the water
requirements of industries. Choice of source of water depends on the availability of
sufficient and regular supply of water and the cost of water from the source. While
the running cost of surface water is mainly the price paid to the supplier—the
municipal bodies; the cost of groundwater is the extraction cost—energy used
(electricity/diesel). Since the prices of all the inputs, water, electricity, and diesel are
administered or regulated by the government, the inefficient use of water remains a
normal practice. Since the surface water supply from municipal sources is not
sufficiently guaranteed, industrial units tend to depend on groundwater.
Industrial water demand has been increasing with the pace of industrial
development. The growth in some of the water intensive industries has been quite
significant, putting further pressure on the industrial demand for water.
Water supply for the industrial purposes in the district can be obtained from three
main sources like Gujarat Water Supply and Sewerage Board, irrigation canal and
Sardar Sarovar Project.
Table 4.4 1: Industrial water demand
Tehsil/ Sub-tehsil Present water
demand
(MCM)
Water demand in
2020 (MCM)
Existing water
potential
(MCM)
Water potential to be
created (MCM)
Nandod 0 0 0 0
Dediyapada 0 0 0 0
Sagbara 12.41 43.8 12.41 31.39
Tilakwada 0 0 0 0
Garudeshwar N/A N/A N/A N/A
Total 12.41 43.8 12.41 31.39
The project envisages supply of water for drinking purposes, irrigation and industrial
use. Water is made available for the industrial use through the branch canals laid
down in the different talukas spread over 3.65 km. Wadia, the branch canal supplies
water to Narmada district starting from Nandod and end point at Koliary.
4.5 Water demand for Power generation
The power generation is mainly done through hydro power, based in the district
4.6 Sector wise water demand
After analysing the water requirement from every sector, it can be concluded that the
total present water requirement of the district from all the sectors is 819.21 MCM and
from all the sector the highest water demand is from the agriculture which requires
774.34 MCM of water annually. With the growth in population and increase in per
capita food requirement in the district, the total water requirement is going to see an
upward trend by the year 2020.
The growth in living standards of the people and urbanization, will tend to increase
the industrial water demand in the district. Since, power generation is hydel based so
the consumption of water has not been shown under power generation. Livestock
tends to shows a minimal growth from the year 2008, 18th livestock census.
Table 4.6. 1: Sector wise water requirement in 2015
Sl. No. Tehsil/ Sub tehsil Sector-wise water demand (2015) Total
(MCM) Domestic
(MCM)
Crop
(MCM)
Livestock
(MCM)
Industries
(MCM)
1 Nandod 9.43 397.46 2.60 0.00 409.49
2 Dediyapada 6.89 157.06 3.01 0.00 166.96
3 Sagbara 4.47 102.13 1.06 12.41 120.07
4 Tilakwada 2.47 117.69 2.52 0.00 122.69
5 Garudeshwar N/A N/A N/A N/A N/A
Total 23.26 774.34 9.19 12.41 819.21
Figure 4.6. 1: Percentage share of water requirement in various sector
in 2015
While water for consumption is most crucial, it is equally important to provide water
for irrigation to increase the food production and livestock husbandry, to ensure food
security for the increasing population. Growing population, as everyone is aware, is
a serious concern as it will create further burden on the per capita water availability
in the future.
For the year 2020, the water demand for various sector is expected to increase to
853.46 MCM. The percentage wise distribution to various taluk has been provided in
the figure below.
Table 4.6. 2: Sector wise water requirement in 2020
Sr. Tehsil/ Sub
tehsil
Sector-wise water demand (2020) Total
(MCM) Domestic
(MCM)
Crop
(MCM)
Livestock
(MCM)
Industries
(MCM)
1 Nandod 10.15 397.46 2.86 0.00 410.47
2 Dediyapada 7.41 157.06 3.34 0.00 167.82
3 Sagbara 4.81 102.13 1.17 43.80 151.90
4 Tilakwada 2.66 117.69 2.92 0.00 123.27
5 Garudeshwar N/A N/A N/A N/A N/A
Total 25.03 774.34 10.29 43.80 853.46
49.99%
20.38%
14.66%
14.98%
Percentage Share of present water requirement under various sector
Nandod Dediyapada Sagbara Tilakwada
Figure 4.6. 2: Percentage share of water requirement in various sector in 2020
4.7 Water Budget
From the above estimation of water requirement and the present water demand, a
water budget is prepared. A water budget reflects the relationship between input and
output of water through a region. Thus we have a direct comparison of supply of
water and the natural demand for water. The following data provides current water
gap and projected water gap for the year 2015 and 2020 respectively. The water
budget has been estimated based on the assumption and figures arrived from the
tables listed above in various components.
Table 4.7. 1: Water budget in the district
Tehsil/ Sub- tehsil
Existing water availability (MCM) Total
(MCM)
Water Demand (MCM)
Water Gap (MCM)
Surface Water
Ground Water
Present (2015)
Projected (2020)
Present (2015)
Projected (2020)
Nandod 189.07 52.89 241.96 409.49 410.47 167.53 168.5129
Dediyapada 47.273 7.54 54.813 166.96 167.82 112.15 113.0073
Sagbara 26.794 6.92 33.714 120.07 151.9 86.356 118.1863
Tilakwada 84.855 7.12 91.975 122.69 123.27 30.715 31.29527 Garudeshwar N/A N/A N/A N/A N/A N/A NA
Total 348 74.47 422.5 819.2 853.5 396.8 431
It can be observed from the table above that the water potential for the present
scenario stands at 819.21 MCM while for the year 2020 it is expected to be 853.46
MCM. The surface water availability through various sources stands at 348 MCM
48.10%
19.66%
17.80%
14.44%
Percentage Share of projectedwater requirement under various sector
Nandod Dediyapada Sagbara Tilakwada
while the ground water availability is 74.47 MCM. The total existing water
availability is 422.5 MCM in the district leaving a gap of 396.8 MCM which needs to
be filled with coming year. The projected gap for 2020 is 432 MCM. The efficient use
of water through micro irrigation and conservation of water from source to sink can
help in meeting the growing demand
Note: Surface water taken as: SSNL covering Tilakwada; Vyara covering Sagbara;
20% of karjan for dediyapada and 80% Karjan project covering Nandod
With regard to the water use efficiency in agriculture, district still uses traditional
system of irrigation which is predominately flood irrigation and over-watering which
leads to loss of water efficiency and wastage of water. The wastage of water is also
due to improper water conservation measures and crop varieties which demand
more water. However, farmers are not motivated to conserve water as there is no
incentive for them to do so. Global warming is posing further challenge, as the water
requirement for crops will increase due to higher evapo-transpiration thereby
suppressing agricultural production.
Chapter V
Strategic Action Plan
The District‘s Strategic Plan is a guide or roadmap for how the District will respond
to current and future challenges. The plan provides the District with overall direction
on how to achieve future success. It does not, however, describe all of the specific
actions we will need to take in order to achieve our objectives. These actions are
spelled out in a series of master plans, business plans, and a rehabilitation and
betterment plan; each plan outlining the tasks, milestones, and key dates for the
various objectives contained in the Strategic Plan.
5.1 Taluka wise total plan of the district
The outlay for the district amount to Rs.30853.02 lakhs out of which Nandod taluk
shares the maximum percentage of the total outlay i.e., 51.20% followed by Sagbara
with 17.13%, Dediyapada with 16.26%, Garudeshwar with 10.30% and Tilakwada
with 5.12%.
Table 5.1. 1: Taluka Wise outlay
Taluk Wise Outlay (Amount in Rs. Lakhs) Talukas WRD SSNL GWRDC GLDC GGRC GSWMA ATMA Grand Total Nandod 9900.00 Nil 52.6 Nil 2832 3011.13 0.00 14237.30 Dediyapada 1845.00 Nil 161 234.4 1306 1452.70 16.40 6574.07 Sagbara 520.00 Nil 1341.36 205.44 1607 1596.47 14.37 5284.43 Tilakwada 260.00 209.1 Nil 238.88 854 0.00 16.71 1578.66 Garudeshwar 990.00 14.9 240.24 200.96 229 1489.23 14.06 3178.56 Grand Total 13515.00 224.00 1795.20 879.68 6828.06 7549.53 61.54 30853.02
In the total outlay proposed for different taluk in the district, WRD department
constitues the maximum share with 43.80% followed by watershed under GSWMA
with 24.47%, GGRC with 22.13%, GWRDC with 5.82%, GLDC with 2.85%, SSNL with
0.73% and ATMA with 0.20%.
Figure 5.1. 1: Department wise percentage share of total outlay
Figure 5.1. 2: Percentage share of District irrigation departments
51.20%
16.26%
17.13%
5.12% 10.30%
Percentage Share
Nandod
Dediyapada
Sagbara
Tilakwada
Garudeshwar
73.25%
13.65%
3.85% 1.92%7.33%
Percentage Share of WRD
Nandod
Dediyapada
Sagbara
Tilakwada
Garudeshwar
Figure 5.1. 3: Percentage share of State Irrigation department (SSNL)
Figure 5.1. 4: Percentage share of GWRDC
93.35%
6.65%
Percentage Share of SSNL
Nandod
Dediyapada
Sagbara
Tilakwada
Garudeshwar
3.66%
11.21%
93.40%
0.00% 16.73%
Percentage Share of GWRDC
Nandod
Dediyapada
Sagbara
Tilakwada
Garudeshwar
Figure 5.1. 5: Percentage share of District irrigation departments
Figure 5.1. 6: Percentage share of GGRC
33.31%
29.19%33.94%
28.56%
Percentage Share of GLDC
Nandod
Dediyapada
Sagbara
Tilakwada
Garudeshwar
41.48%
19.13%
23.53%
12.51%
3.36%
Percentage Share of GGRC
Nandod
Dediyapada
Sagbara
Tilakwada
Garudeshwar
Figure 5.1. 7: Percentage share of GSWMA
Figure 5.1. 8: Percentage share of ATMA under Agriculture Department
39.89%
19.24%
21.15%
0.00%
19.73%
Percentage Share of GSWMA
Nandod
Dediyapada
Sagbara
Tilakwada
Garudeshwar
26.65%
23.35%27.16%
22.84%
Percentage Share of ATMA
Nandod
Dediyapada
Sagbara
Tilakwada
Garudeshwar
5.2 Component Wise Plan
The component wise total outlay of the district constitutes about Rs.31528.14 lakhs.
AIBP and Hark Khet Ko Pani components are to be executed mainly by State and
District Irrigation departments and GLDC under Agriculture department. Per drop
more crop component will be executed by GGRC. Water shed component will be
taken care of by GSWMA under Rural Development Department and Extension &
Training component will be executed by ATMA under Agriculture department.
However, all the stakeholders need to have coordination among them to have the
maximum irrigation efficiency and to avoid duplicity. It is observed that maximum
share of 39.75% is for AIBP component followed by Per Drop More Crop 22.13%,
PMKSY Watershed component with a share of 21.86%, Har Khet Ko Pani 13.45% and
ATMA component constitutes about 0.20% of the total outlay.
Table 5.2. 1: Component wise financial outlay (Amount in Rs. lakhs)
Component Wise 2016-17 2017-18 2018-19 2019-20 Grand Total AIBP 2160.79 2936.80 3177.80 3989.80 12265.20 Har Khet Ko Pani 641.92 450.92 1144.92 1910.92 4148.68 Per Drop More Crop 2100.94 1575.71 1575.71 1575.71 6828.06 PMKSY Watershed 4824.18 1357.28 376.65 186.46 6744.57 ATMA 14.39 14.94 15.71 16.50 61.54 Convergence with MGNREGA 526.57 228.75 7.85 41.80 804.96 Total 10268.80 6564.39 6298.65 7721.19 30853.02
Figure 5.2. 1: Component wise percentage share of financial outlay
5.3 Year Wise Plan
Of the total outlay of Rs.30853.02 lakhs, the year wise expenditure plan states the
outlay to be proposed under different departments for four years starting from 2016-
17 to 2019-2020. It has been proposed that the maximum share of outlay under
39.75%
13.45%
22.13%
21.86%
0.20%
Percentage Share
AIBP
Har Khet Ko Pani
Per Drop More Crop
PMKSY Watershed
ATMA
different departments will maximum for the year 2016-17 which constitutes about
33.28% of the total outlay. The expenditure under plan will be shared at an almost
equal percentage for the year 2017-18 to 2018-19 which will constitute about 21.28%
and 20.42%, respectively. The outlay for the year 2019-2020 will be 25.03% of the
total outlay to spend by different departments. Under different departments, the
maximum share of outlay is under WRD of District and State which is 43.80% and
0.73% respectively followed by GGRC with 22.13% and GSWMA with a share of
24.47%. The GLDC and ATMA under Department of Agriculture have a share of
2.85% and 0.20% respectively. The GWRDC has a share of 5.82% of the total outlay.
Table 5.3. 1: Year Wise financial outlay under different department
(Amount in Rs. lakhs)
Department wise 2016-17 2017-18 2018-19 2019-20 Grand Total WRD 1910.00 2719.00 3654.00 5232.00 13515.00 SSNL 224.00 0.00 0.00 0.00 224.00 GWRDC 448.80 448.80 448.80 448.80 1795.20 GLDC 219.92 219.92 219.92 219.92 879.68 GGRC 5350.74 1586.02 384.50 228.26 7549.53 GSWMA 2100.94 1575.71 1575.71 1575.71 6828.07 ATMA 14.39 14.94 15.71 16.50 61.54 Total 10268.80 6564.39 6298.65 7721.19 30853.02
Figure 5.3. 1: Percentage share of different departments
5.4 Expected Outcome
The strategic action plan envisages providing assured irrigation in a command area
of 24232.26 ha. The watershed component is projected to achieve a culturable
command area of 15241.20 ha by creation of 282 new water harvesting structures
43.80%
0.73%
5.82%
2.85%
22.13%
24.47%
0.20%
Percentage Share
WRD
SSNL
GWRDC
GLDC
GGRC
GSWMA
ATMA
and renovation of 60 water harvesting structures. Under, the component Per Drop
More Crop, efficient water conveyance and precision water application by drip
irrigation system for wide spaced and narrow spaced crops for developing an area of
9144.72 ha. has been proposed. While Sprinklers has been proposed to develop an
area of 6096.48 ha.
Table 5.4. 1: Department wise area proposed (Area in ha)
Department wise 2016-17 2017-18 2018-19 2019-20 Grand Total WRD 1027.00 589.00 837.00 1482.00 3935.00 SSNL 436.00 0.00 0.00 0.00 436.00 GWRDC 249.40 249.40 249.40 249.40 997.60 GLDC 379.44 379.44 379.44 379.44 1517.76 GGRC 1931.30 75.98 22.98 74.45 2104.70 GSWMA 4689.60 3517.20 3517.20 3517.20 15241.20 Total 8712.74 4811.02 5006.02 5702.49 24232.26
Under department wise development of command area or irrigation potential, the
maximum area to be developed has been proposed GSWMA which envisages
developing an area of 62.90% of the total area under plan proposed followed by
district irrigation department which constitutes about 16.24% of the command area
to be developed under PMKSY. The percentage area of other departments is given in
the figure below:
Figure 5.4. 1: Department wise year wise proposed area
As the water requirement of crops for the existing cropping pattern works out to be
353.56 MCM and if the rainfed area is to be brought under irrigated area, 774.31
MCM water is required. The current water availability in the district both from
surface and ground constitutes about 369.29 MCM leaving a gap of 484.17 MCM. It
not only requires development of new sources but also a holistic approach toward
16.24% 1.80%
4.12%
6.26%
8.69%62.90%
Percentage area
WRD
SSNL
GWRDC
GLDC
GGRC
GSWMA
development of existing water harvesting structure and conservation of water
through inclusion of drip and sprinkler system in irrigation. Also, the traditional
water needs to be rejuvenated.
In terms of economic benefit, the assured water supply to the farm land will result in
enhancement of production and productivity of the crops. This is likely to generate
an additional income of Rs.12391.38 lakh to the farmers of the district. This is based
on the assumption of atleast 60% of potential utilised and Rs. 40,000 per ha
incremental income from rainfed to irrigated farming. This is also likely to create
22.21 lakh mandays of non-recurring employment and 25815 jobs will be created
annually on recurring basis.
This intervention may result into increased acreage under crops thereby contributing
to both agricultural and horticultural production. At the same time, it will create
livelihood opportunities for the local population and contribute in generating direct
and indirect employment.
5.5 Strategic Action Plan under PMKSY
Sl.No.
Taluka Concerned Ministry/
Department Component Activity
Total Number/Capacity(
cum )
Command
Area/ lrrigatio
n Potentia
l (Ha)
Period of Implementation 5 / 7 yrs)
Estimated cost (in Rs. Lacs)
1 Dediapada
MoWR/GWRDC
AIBP Lift Irrigation Scheme
5 125 4 Year 143
Garudeshvar
5 210 4 Year 240.24
Sagbara 9 867 4 Year 1323.36 Nandod 1 25 4 Year 28.6 Nandod
Har Khet ko Pani Exploratory Tubewell 4 8 4 Year 24
Dediapada 3 6 4 Year 18 Sagbara 3 6 4 Year 18
Grand Total
30 1247 0 1795.2
2
Garudeshvar
MoWR/SSNL Har Khet ko Pani Lined Field Channels 1 / 0.009 5437 / 29 1 Year 14.9
Tilakvada 12 / 0.138 13436 /407
1 Year 209.1
Grand Total
13/0.147 18873/4
36 224
3
Sagbara
MoWR/ Ver -2 dn Vyara
AIBP
Medium irri scheme Chopadvav dam
1 1020 4 80
MoWR/ Ver -2
dn Vyara Medium irri scheme
kakadiambadam 1 798 4 150
Garudeshw
ar
MoWR/ Karjan Project EEIPDN
No 4 Rajpipla
Repair and restoration of various works of canal structures service road and highlevel canal Right
bank
15 2145 4 700.00
Nandod
MoWR/ Karjan Project EEIPDN
No 4 Rajpipla
Repair and restoration of various works of canal structures service road and highlevel canal Right
bank
70 8394 4 2600
MoWR/ Karjan Project
EEMIPDN A nkleshwar
Repair & Restoration of vaious canal and structure of LBMC sec
5 to 8 50 9105 4 7000
Sub 137 21462 20 10530
Total
Dediayapa
da MoWR/
Panchayat Irrigation Division
Har Khet Ko Pani
Lift Irrigation 10 120 4 Year 120
Sagbara 15 175 4 Year 180
Sub Total
25 295 0 300
Dediyapad
a MoWR/
Panchayat Irrigation Division
Check Dam
25 80 4 Year 125
Garudeshw
ar 15 65 4 Year 90.00
Nandod 20 70 4 Year 100.00 Sagbara 20 75 4 Year 110.00 Tilakwada 10 60 4 Year 60.00
Sub Total
90 350 0 485
Dediyapad
a MoWR/Karjan
Project EEIPDN No 4 Rajpipla
Har Khet Ko Pani Big checkdam
10 320 4 Year 1600.00
Garudeshw
ar 2 80 4 Year 200.00
Nandod 2 80 4 Year 200.00 Tilakwada 2 80 4 Year 200.00
Sub Total
16 560 2200
Grand Total
268 22667 13515
4
Garudeshwar
Agriculture & Co-
opration/GLDC Har Khet ko Pani
Farm pond 100 144.00 4 Year 89.60
Dediyapad
a Farm pond 110 158.40 4 Year 98.56
Tilakwada Farm pond 115 165.60 4 Year 103.04 Sagbara Farm pond 105 151.20 4 Year 94.08 Sub Total 430 619.2 385.28
Garudeshw
ar Agriculture &
Co-opration/GLDC
Har Khet ko Pani
Sim pond 20 84.00 4 Year 80.00
Dediyapad
a Sim pond 25 105.00 4 Year 100.00
Tilakwada Sim pond 25 105.00 4 Year 100.00 Sagbara Sim pond 20 84.00 4 Year 80.00 Sub Total 90 378 360
Garudeshw
ar Agriculture &
Co-Har Khet ko Pani WHS 35 210.00 4 Year 31.36
Dediyapad
a opration/GLDC
WHS 40 240.00 4 Year 35.84
Tilakwada WHS 40 240.00 4 Year 35.84 Sagbara WHS 35 210.00 4 Year 31.36 Sub Total 150 900 134.4
Grand Total
670 1897.2 0 879.68
5
Dediyapad
a
Horticulture/GGRC
Perdrop More Crop DPAP/ Drip Irrigation System
1346 2153 4 Year 1176
Garudeshw
ar 236 378 4 Year 206
Nandod 2918 4668 4 Year 2549 Sagbara 1655 2649 4 Year 1446 Tilakwada 880 1408 4 Year 769 Sub Total 7034 11255 6145
Dediyapad
a
Horticulture/GGRC
Perdrop More Crop DPAP/ Sprinkler Irrigation
System
897 1435 4 Year 131
Garudeshw
ar 157 252 4 Year 23
Nandod 1945 3112 4 Year 283 Sagbara 1104 1766 4 Year 161 Tilakwada 587 938 4 Year 85 Sub Total 4690 7503 682.8
Grand Total
11724.0 18758.4 6828.1
6 Dediapada GSWMA
PMKSY Watershed
EPA
0.00 0.00 4 Year 0.00 Nandod 0.00 0.00 4 Year 0.00 Sagbara 0.00 0.00 4 Year 20.03
Garudeshwar 4.00 0.00 4 Year 4.10
Sub Total 4.00 0.00 24.13 0.00 0.00 0.00 0.00 Dediapada
Land Development
40356.03 0.00 4 Year 141.86 Nandod 3411.00 0.00 4 Year 214.92 Sagbara 22553.45 0.00 4 Year 132.49
Garudeshwar 8505.10 0.00 4 Year 59.41
Sub Total 74825.58 0.00 548.69 Dediapada Soil and Moisture Conservation 33481.35 5431.74 4 Year 1034.69
Nandod 3933.00 226.49 4 Year 795.68 Sagbara 18075.56 22.16 4 Year 492.73
Garudeshwar 9367.10 145.52 4 Year 727.13
Sub Total 64857.01 5825.91 3050.23 Dediapada
Water Harvesting Structure
138.00 337.06 4 Year 771.83 Nandod 92.00 103.98 4 Year 237.94 Sagbara 26.00 151.82 4 Year 343.90
Garudeshwar 26.00 91.06 4 Year 198.74
Sub Total 282.00 683.92 0.00 1552.41 Dediapada
Existing/Old Water Harvesting Structure Maintance (Renovation
& Repair)
7.00 30.74 4 Year 9.06 Nandod 2.00 3.00 4 Year 2.05 Sagbara 29.00 21.00 4 Year 39.33
Garudeshwar 22.00 45.32 4 Year 47.77
Sub Total 60.00 100.06 0.00 98.21 Dediapada
Ground Water Recharging Structures
0.00 0.00 4 Year 0.00 Nandod 0.00 0.00 4 Year 0.00 Sagbara 30.00 0.00 4 Year 15.99
Garudeshwar 7.00 15.25 4 Year 3.20
Sub Total 37.00 15.25 0.00 19.19 Dediapada
Capacity Building
29303.07 0.00 4 Year 82.83 Nandod 10734.20 0.00 4 Year 30.34 Sagbara 14678.07 0.00 4 Year 41.49
Garudeshwar 11292.45 0.00 4 Year 31.92
Sub Total 66007.78 0.00 0.00 186.58 Dediapada
Evaluation and Monitoring
19.07 0.00 4 Year 42.52 Nandod 0.00 0.00 4 Year 18.24 Sagbara 0.00 0.00 4 Year 23.46
Garudeshwar 0.00 0.00 4 Year 14.85
Sub Total 19.07 0.00 0.00 99.06 Dediapada Adminstration & Consolidation 0.00 0.00 4 Year 581.93
Nandod Phase 0.00 0.00 4 Year 138.12 Sagbara 0.00 0.00 4 Year 299.84
Garudeshwar 0.00 0.00 4 Year 146.19
Sub Total 0.00 0.00 0.00 1166.08
206092.43 6625.14 0.00 6744.57
7 Dediapada
Convergence With MGNREGA
EPA 0.00 0.00 4 Year 0.00 Nandod 2.00 0.00 4 Year 1.70 Sagbara 1.00 0.00 4 Year 1.32
Garudeshwar 0.00 0.00 4 Year 0.00
Sub Total 3.00 0.00 0.00 3.02 0.00 0.00 0.00 0.00 Dediapada Land Development 0.00 0.00 4 Year 0.00 Nandod 433.00 0.00 4 Year 53.34 Sagbara 14423.00 0.00 4 Year 19.90
Garudeshwar 103.77 0.00 4 Year 44.82
Sub Total 14959.77 0.00 0.00 118.06 0.00 0.00 0.00 0.00 Dediapada Soil & Moisture Conservation 5625.00 0.00 4 Year 34.34 Nandod 953.00 0.00 4 Year 101.54 Sagbara 1572.00 0.00 4 Year 113.20
Garudeshwar 333.77 0.00 4 Year 120.33
Sub Total 8483.77 0.00 0.00 369.41 0.00 0.00 0.00 0.00 Dediapada Water Harvesting Structure 16.00 0.00 4 Year 47.72 Nandod 6.00 0.00 4 Year 60.83 Sagbara 2.00 0.00 4 Year 4.25
Garudeshwar 10.00 0.00 4 Year 46.80
Sub Total 34.00 0.00 0.00 159.60 0.00 0.00 0.00 0.00
Dediapada
Existing/ Old Water Harvesting Structure 0.00 0.00 4 Year 0.00
Nandod 1.00 0.00 4 Year 1.00 Sagbara 1.00 0.00 4 Year 1.00
Garudeshwar 14.00 0.00 4 Year 25.00
Sub Total 16.00 0.00 0.00 27.00
0.00 0.00 0.00 0.00 Dediapada Ground Water Recharge Structure 5781.00 0.00 4 Year 124.07 Nandod 1.00 0.00 4 Year 1.00 Sagbara 0.00 0.00 4 Year 0.00
Garudeshwar 7.00 0.00 4 Year 2.80
Sub Total 5789.00 0.00 0.00 127.87
0.00 0.00 0.00 804.96
Grand Total
235377.97 6625.14 7549.53
8 Narmada
Agriculture & Co-opration ATMA Extension Activities 11112.00 0.00 0.00 61.54
Annexure
1. Strategic Action Plan for Irrigation in District under PMKSY: District Irrigation Department (WRD)
Area in Hactare
Rs in lac
S.No
Name of theBlocks
/ Sub Districts
Concerned
Ministry/ Departm
ent
Component
Activity Total Numbe
r/ Capacity (cum)
Total command area
Existing
Irrigation
area
2016-17 2017-18 2018-19 2019-20 Total
Implimenting Agency
Dediyapada
State irri Deptt
Har Khet ko pani
Lift irrigation
10 120 0 22 23 28 25 36 37 34 35 120 120 Panchaya Irrigation
17.2
Dediyapada
State irri Deptt
Har Khet ko pani Checkdam
25 80 0 24 35 16 25 20 30 20 35 80 125 Panchaya Irrigation
4 Dediyapada
State irri Deptt
Har Khet ko pani
Big checkdam
10 320 0 400
0 0 25 0 600 320
975 720 1600 Karjan Project EEIPDN No 4 Rajpipla
Total 45 520 0
446
58 44 75 56 667 374
1045
920 1845
Garudeshvar
State irri Deptt
AIBP Repair and restoration of various works of canal structures service road and highlevel
15 2145 1225 50 50 100
100 200
300 200
250 550 700
Karjan Project EEIPDN No 4 Rajpipla
canal Right bank
Garudeshvar
State irri Deptt
Har Khet ko pani
Checkdam
15 65 0 14 24 14 24 12 12 25 30 65 90
Panchaya Irrigation
3
Garudeshvar
State irri Deptt
Har Khet ko pani Big
checkdam
2 80 0 80 0 0 5 0 30 80 165 160 200 Karjan Project EEIPDN No 4 Rajpipla
Total 32 2290 1225 144
74 114
129 212
342 305
445 775 990
Nandod State irri Deptt
AIBP Repair and restoration of various works of canal structures service road and highlevel canal Right bank
70 8394 2166 100
100 100
300 200
900 300
1300
700 2600
Karjan Project EEIPDN No 4 Rajpipla
Nandod State irri Deptt
AIBP Repair & Restoration of vaious canal and structure of
50 9105.00 1695.0
0 150
1500
200
2000
250
1500
250
2000
850 7000 Karjan Project EEMIPDN A nkleshwar
LBMC sec 5 to 8
Nandod State irri Deptt
Har Khet ko pani
Checkdam
20 70 0 14 20 18 25 20 30 18 25 70 100
Panchaya Irrigation
2
Nandod State irri Deptt
Har Khet ko pani
Big checkdam
2 80 0 80 0 0 5 0 30 80 165 160 200 Karjan Project EEIPDN No 4 Rajpipla
Total 142 17649 3861 344
1620
318
2330
470
2460
648
3490
1780 9900
Sagbara State irri Deptt
AIBP Medium irri scheme Chopadvav dam
1 1020 354 10 30 20 50 0 0 0 0 30 80
Ver -2 dn Vyara
Sagbara State irri Deptt
AIBP Medium irri scheme kakadiambadam
1 798 209 15 50 15 50 10 50 0 0 40 150
Ver -2 dn Vyara
sagabara State irri Deptt
Har Khet ko pani
Lift irrigation 15 175 0 44 48 48 45 44 48 39 39 175 180
Panchaya Irrigation
sagabara State irri Deptt
Har Khet ko pani
Checkdam 20 75 0 14 20 20 25 25 35 16 30 75 110
Panchaya Irrigation
5
Sagbara State irri Deptt
Har Khet ko pani
Big checkdam
0 0 0 0 0 0 0 0 0 0 0 0 0 Karjan Project EEMIPDN A nkleshwar
Total 37 2068 563 83 148 103
170 79 133 55 69 320 520
Tilakwada State irri Deptt
Har Khet ko pani
Checkdam
10 60 0 10 10 10 10 20 22 20 18 60 60
Panchaya Irrigation
1
Tilakwada State irri Deptt
Har Khet ko pani
Big checkdam
2 80 0 0 0 0 5 0 30 80 165 80 200 Karjan Project EEIPDN No 4 Rajpipla
ABSTRACT
AIBP Har Khet ko Paani Others
Block 2016-17 2017-18 2018-19 2019-20 2016-17 2017-18 2018-19 2019-20 2016-17 2017-18 2018-19 2019-20
Amount in Lac
Amount in Lac
Amount in Lac
Amount in Lac
Amount in Lac
Amount in Lac
Amount in Lac
Amount in Lac Amount in Lac
Amount in Lac
Amount in Lac
Amount in Lac
Dediyapada 0 0 0 0 58 75 667 1045 0 0 0 0
Garudeshvar 50 100 300 250 24 29 42 195 0 0 0 0
Nandod 1600 2300 2400 3300 20 30 60 190 0 0 0 0
sagabara 80 100 50 0 68 70 83 69 0 0 0 0
Tilakwada 0 0 0 0 10 15 52 183 0 0 0 0
Total 1730 2500 2750 3550 180 219 904 1682 0 0 0 0
Executive Engineer, Irri. Project, Division, Rajpipla
2. Strategic Action Plan for Irrigation in District under PMKSY: GGRC
Sr.
No
. District Taluka
Target for 2016-17
Total Drip Irrigation System (DIS) Sprinkler Irrigation System (SIS)
Total
Number
(Farmers
)
Area
(Ha.)
Estimate
d Total
Cost (Rs.
in lakh)
Estimate
d
Assistanc
e (Rs. in
lakh)
Total
Number
(Farmers
)
Area
(Ha.)
Estimat
ed
Total
Cost
(Rs. in
lakh)
Estimated
Assistanc
e (Rs. in
lakh)
Total
Number
(Farmers
)
Area
(Ha.)
Estimate
d Total
Cost
(Rs. in
lakh)
Estimated
Assistance
(Rs. in
lakh)
1
NARMAD
A
DEDIAPADA 561 897.07 717.66 401.89 336 538.24 645.89 361.7 224 358.83 71.77 40.19
GARUDESHW
AR 98 157.4 125.92 70.51 59 94.44 113.33 63.46 39 62.96 12.59 7.05
NANDOD(Rajp
ipla) 1216
1945.0
6 1556.05 871.39 729 1167.03 1400.44 784.25 486 778.02 155.6 87.14
SAGBARA 690
1103.5
6 882.85 494.39 414 662.13 794.56 444.95 276 441.42 88.28 49.44
TILAKVADA 367 586.52 469.21 262.76 220 351.91 422.29 236.48 147 234.61 46.92 26.28
TOTAL 2931 4689.6 3751.68 2100.94 1759 2813.76 3376.51 1890.85 1172 1875.84 375.17 210.09
Target for 2017-18
2
NARMAD
A
DEDIAPADA 421 672.81 538.24 301.42 252 403.68 484.42 271.28 168 269.12 53.82 30.14
GARUDESHW
AR 74 118.05 94.44 52.89 44 70.83 84.99 47.6 30 47.22 9.44 5.29
NANDOD(Rajp
ipla) 912
1458.7
9 1167.03 653.54 547 875.28 1050.33 588.19 365 583.52 116.7 65.35
SAGBARA 517 827.67 662.13 370.8 310 496.6 595.92 333.72 207 331.07 66.21 37.08
TILAKVADA 275 439.89 351.91 197.07 165 263.93 316.72 177.36 110 175.95 35.19 19.71
TOTAL 2198 3517.2 2813.76 1575.71 1319 2110.32 2532.39 1418.14 879 1406.88 281.38 157.57
Target for 2018-19
3
NARMAD
A
DEDIAPADA 421 672.81 538.24 301.42 252 403.68 484.42 271.28 168 269.12 53.82 30.14
GARUDESHW
AR 74 118.05 94.44 52.89 44 70.83 84.99 47.6 30 47.22 9.44 5.29
NANDOD(Rajp
ipla) 912
1458.7
9 1167.03 653.54 547 875.28 1050.33 588.19 365 583.52 116.7 65.35
SAGBARA 517 827.67 662.13 370.8 310 496.6 595.92 333.72 207 331.07 66.21 37.08
TILAKVADA 275 439.89 351.91 197.07 165 263.93 316.72 177.36 110 175.95 35.19 19.71
TOTAL 2198 3517.2 2813.76 1575.71 1319 2110.32 2532.39 1418.14 879 1406.88 281.38 157.57
Target for 2019-20
4
NARMAD
A
DEDIAPADA 421 672.81 538.24 301.42 252 403.68 484.42 271.28 168 269.12 53.82 30.14
GARUDESHW
AR 74 118.05 94.44 52.89 44 70.83 84.99 47.6 30 47.22 9.44 5.29
NANDOD(Rajp
ipla) 912
1458.7
9 1167.03 653.54 547 875.28 1050.33 588.19 365 583.52 116.7 65.35
SAGBARA 517 827.67 662.13 370.8 310 496.6 595.92 333.72 207 331.07 66.21 37.08
TILAKVADA 275 439.89 351.91 197.07 165 263.93 316.72 177.36 110 175.95 35.19 19.71
TOTAL 2198 3517.2 2813.76 1575.71 1319 2110.32 2532.39 1418.14 879 1406.88 281.38 157.57
3. Strategic Action Plan for Irrigation in District under PMKSY: GWRDC
Sr. No
District Taluka Concerned Ministry/
Department
Component Activity Total Number/Capacity(cum )
Command Area/
lrrigation Potential
(Ha)
Period of Implementation 5 / 7
yrs)
Estimated cost (in
Rs.)(LacS)
1 Narmada Dediapada MoWR Har Khet ko
Pani Exploratory Tube-
well 3 6 5 years 22.5
2 Narmada Dediapada MoWR AIBP Lift Irrigation
Scheme 5 125 5 Years 178.75
3 Narmada Garudeshvar MoWR AIBP Lift Irrigation
Scheme 5 210 5 Years 300.30
4 Narmada Nandod MoWR AIBP Lift Irrigation
Scheme 1 25 5 Years 35.75
5 Narmada Nandod MoWR Har Khet ko
Pani Exploratory Tube-
well 4 8 5 years 30
6 Narmada Sagbara MoWR AIBP Lift Irrigation
Scheme 9 867 5 Years 1654.20
7 Narmada Sagbara MoWR Har Khet ko
Pani Exploratory Tube-
well 3 6 5 years 22.5
4. Strategic Action Plan for Irrigation in District under PMKSY: SSNL
5. Strategic Action plan for Irrigation in District under PMKSY 2016-17 2017-18 Sr. No
Name of the Blocks/Sub Districts
Concerned Ministry/
Department
Component
Activity Total No /
Capacity in
CUM
Command Area/ lrrigation Potential (Ha)
Period of Implementation^/ 7 yrs)
Estimated cost (in Rs. In Crore)
Area in Ha
Fin Rs. In Lakhs
Area in Ha
Fin
l Garudeshvar
MoWR AIBP Major Irrigatio
n
0/0 5437/0 completed 0 0 0 0 0
Tilakvada 0/0 13436/0 completed 0.00 0 0 0 0 7 MoWR Construction of Field Channels
7.1 Garudeshvar
MoWR Har khet ko pani
Lined Field
Channels
1 / 0.007 5437 / 29 1 0.149 29 14.9 0 0
Tilakvada 12 / 0.1 13436 /407 1 2.091 407 209.1 0 0
Total 13/0.10
7 18873 /436 1 2.24 436 224 0 0
5. Strategic Action Plan for Irrigation in District under PMKSY: GLDC
Sr.
No.
Name of the blocks/ sub
districts
Converened
Ministry/
Department
Component Activity Total Number/
Capacity (cum)
Command
area/irrigation
potential (Ha.)
Period of
implemented
year 2016-17
to 2020-21
Estimated
cost (in Rs.
lakh)
7 Narmada Garudeshwar Agriculture &
Co-opration
Har Khet ko
Pani
Farm pond 100 144.00 5 yrs 112.00
Sim pond 20 84.00 " 100.00
WHS 35 210.00 " 39.20
Dediyapada Agriculture &
Co-opration
Har Khet ko
Pani
Farm pond 110 158.40 " 123.20
Sim pond 25 105.00 " 125.00
WHS 40 240.00 " 44.80
Tilakwada Agriculture &
Co-opration
Har Khet ko
Pani
Farm pond 115 165.60 " 128.80
Sim pond 25 105.00 " 125.00
WHS 40 240.00 " 44.80
Sagbara Agriculture &
Co-opration
Har Khet ko
Pani
Farm pond 105 151.20 " 117.60
Sim pond 20 84.00 " 100.00
WHS 35 210.00 " 39.20
TOTAL Farm pond 430 619.20 481.60
Sim pond 90 378.00 450.00
WHS 150 900.00 168.00
6. Strategic Action Plan for Irrigation in District under PMKSY: GSWMA
Planning of the works for Narmada District Irrigation Plan (DIP) & Annual Action Plan for SLSC
District
Sr.No Activity Unit
Total Target of DPR Achievement up to FY-2015-16
Unit
Cost (In Lakhs) IWMP
Storage Volume (Cubic Meter)
Command Area/ Irrigation Potential In (Ha.)
Person days/Mandays Planned
Convergence Details
Unit
Expenditure till March 2016 (In Lakhs)
Storage Volume (Cubic Meter)
Command Area/ Irrigation Potential created (Ha.)
Person days/Mandays generated
Convergence Details
Unit
Amount (In Lakhs)
Name of Schemes
Unit
Amount (In Lakhs)
Name of Schemes
Narmada 1 EPA
Narmada 1
Animal camp No. 61
17.2888 0 3 224 6 1.34
Animal Dept. 57
16.82518 0.49 0 214 0 0 0
Narmada 2
Animal water trough (Havada) No. 107
35.8015 0 11 425 9 3.06
Wasmo 106
34.87043 3.27 0 262 0 0 0
Narmada 3
Causeway on connecting roads No. 12
15.27 0 0 1948 0 0 3
4.66296 0 0 0 0 0 0
Narmad 4
Check / Protectio No. 94
100.556 20650 17.2 5221 13 15.43
Wasmo 88
95.65459 19800 7.2 3115 0 0 0
a n wall
Narmada 5
Demonstration for Agricultural / Animal Husbandry Productivity Enhancement No. 20 9.16 0 0 276 1 0.65 Other 19
8.73612 0 0 252 0 0 0
Narmada 6
Drainage line correction (To prevent flooding of Gamtal) rmt 64
12.03 0 0 839 0 0 62 10.2 0 0 727 0 0 0
Narmada 7
Drinking water facility No. 596
129.357 0 14 6133 55 14.11
Wasmo 558
115.58052 7.94 0 2926 0 0 0
Narmada 8
Fencing for protection from wild animals rmt. 57 7.5 0 0 0 1 0.11
Wasmo 7 6.79 0 0 0 0 0 0
Narmada 9
Grassland/Gauchar Develop Ha. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ment
Narmada 10
Improvised and energy efficient smashan gruh (Cemetery ) No. 4 2.07 0 0 0 1 0.44
Wasmo 4 2.07 0 0 0 0 0 0
Narmada 12
Panchayat Well Repair & Pump Room No. 8
2.0366 0 0 181 1 0.65
Wasmo 0 0 0 0 0 0 0 0
Narmada 13
Rain water harvesting system No. 22
18.4471 0 0 133 1 0.39
MGNREGA 21
17.80246 0 0 0 0 0 0
Narmada 14
Recharge / Repair of open wells No. 59 8.75 0 0 427 22 4.47
MGNREGA 23 2.18 0 0 0 0 0 0
Narmada 15
Repair / development of artificial water bodies No. 163
25.8665 0 2 123 56 7.12
Wasmo 129
23.54383 0 0 122 0 0 0
Narmada 16
Revival of natural water bodies with No. 3 1.64 0 0 0 1 0.34
MGNREGA 1
1.24872 0 0 0 0 0 0
recharge activities
Narmada 17
Sanitation facilities/Sewerage line rmt 15
7.2553 0 0 0 3 0.97
MGNREGA 15
5.21228 0 0 0 0 0 0
Narmada 18
Use solar power for productive activities No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 19
Wind energy development No. 1 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 20
OTHERS (Specifiy activities ) No. 2
1.30896 0 0 294 0 0 7 3.45 0 0 0 0 0 0
Narmada 21
Vegitable kits Distribution No. 23
6.5155 0 0 0 1 0.1
MGNREGA 23
6.49688 0 0 0 0 0 0
Narmada 22
Anganwadi Repairing No. 4 0.96 0 0 0 0 0 4
0.93044 0 0 0 0 0 0
Narmada 23
Dhobi Ghat No. 3 1.29 0 0 0 0 0 3 1.27 0 0 0 0 0 0
Narmad 24
chotro Repairing No. 1 0.15 0 0 0 1 0.4
MGNREGA 1 0.15 0 0 0 0 0 0
a
Narmada 25
Samsan fencing No. 794 6.22 0 0 0 0 0 794 6.21 0 0 0 0 0 0
Narmada 26
Kitchen Garden kits No. 14 4.04 0 0 0 0 0 14 4.04 0 0 0 0 0 0
Narmada 27
Books For School Library No. 6 0.8 0 0 0 2 5
MGNREGA 6 0.8 0 0 0 0 0 0
Narmada 28
Afforestation No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 29
Fancing & Plantation in Gramvatika No. 261 1.71 0 0 0 0 0 261
1.72532 0 0 0 0 0 0
Narmada 30
Fancing & Plantation in Aanganwadi 5 3.85 0 0 0 0 0 4 2.51 0 0 0 0 0 0
Narmada 31
Community hall Repairing 3 0.6 0 0 0 0 0 3 0.6 0 0 0 0 0 0
Narmada 32
Floriculture Development 1 1.5 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada Total
2403
422.023 20650 47.2 16225 174 54.58 0
2213
373.55973
19811.7 7.2 7618 0 0 0
Narmada 1
LAND DEVELOPMENT
Narmada 1
Farm Bunding rmt.
87009
141.425 0 0 44952
49386
77.1832
MGNREGA
13865.1
21.31017 0 5370 2243 0 0
Narmada 2
Afforestation Ha.
35.6
60.22 0 0 9190 8 11.94
MGNREGA 12 17.67 0 10 2853 0 0
Narmada 3
Agriculture Demo No. 0 0 0 0 0 0 0
MGNREGA 0 0 0 0 0 0 0
Narmada 4
Agro Forestry Ha. 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 5
Horticulture Ha. 0 0 0 0 0 0 0
MGNREGA 0 0 0 0 0 0 0
Narmada 6
Land leveling Ha.
2820.3
745.811 0 0 43463
761.565
214.22231
1148.9
375.29416 0 25 534 0 0
Narmada 7
Pasture development Ha. 0 0 0 0 0 0 0
MGNREGA 0 0 0 0 0 0 0
Narmada 8
OTHERS (Specifiy activities ) 0 0 0 0 0 0 0
MGNREGA 0 0 0 0 0 0 0
Narmad 9
Bambu Bottling
1302 22.3 0 0 0 0 0
MGNREGA 1.5
1.15101 0 0 0 0 0
a
Narmada 10
Border/forest plantation 0 0 0 0 0 150 2.5 0 0 0 0 0 0 0
Narmada 2
Soil & Moisture Conservation 0 0 0 0 0 0 0
MGNREGA
Narmada 1
Check wall No.
1521
1485.33
2709635.46
1255.699911 274836 216
288.44
MGNREGA 445
655.6925
877204.6
937.9098828 84042 0 0
Narmada 2
Earthen bund No. 0 0 0 0 0 0 0
MGNREGA 0 0 0 0 0 0 0
Narmada 3
Protection Wall No. 169
96.51
117020 44.48 18745 31 22.79
MGNREGA 21 14.25 200 2 561 0 0
Narmada 4
Waste weir No. 347
284.735
152382 372.75 40120 126
118.96
MGNREGA 89
91.46684
40476.92 124.71 9267 0 0
Narmada 5
Bench Terracing
cumec 0 0 0 0 0 0 0
MGNREGA 0 0 0 0 0 0 0
Narmada 6
Bori bandh No. 0 0 0 0 0 0 0
MGNREGA 0 0 0 0 0 0 0
Narmada 7
Brushwood Checks No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 8
Countour Bunding rmt. 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 9
Countour Trenches rmt.
174699
118.04 0 39600 44749 0 0
MGNREGA
135080
75.56575 0 0 14348 0 0
Narmada 10
Earthern Dam No. 0 0 0 0 0 0 0
MGNREGA 0 0 0 0 0 0 0
Narmada 11
Field Outlet No. 851
230.546 0 0 31339 72
10.12629
MGNREGA 59
9.56994 0 0 391 0 0
Narmada 12
Gabion structure No.
1421
423.887 0 0 77888 90 37.56 338
150.46888 0 0 29397 0 0
Narmada 13
Graded Bunding rmt.
1116
11.93 0 0 2011 0 4.37
1116 9.14 0 0 0 0 0
Narmada 14
Gully plug No. 56
10.0612 0 0 581 0 1.35 0 0 0 0 0 0 0
Narmada 15
Loose boulder Checks No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 16 Nala Plug No. 442
318.724 0 0 55174 34 36.69
MGNREGA 75 33.59 0 0 2186 0 0
Narmada 17
Stone bunding rmt.
45198
308.846 0 0 61935
1956.7
61.972
14560.5
116.65276 0 0 19170 0 0
Narmada 18
Straggred Contour trenching(Terrace Talavadi) rmt
203153
111.811 2900 0 56890 5556 2.23
MGNREGA
167125
81.4931 0 0 38065 0 0
Nar 19 OTHERS 0 0 0 0 0 0 0 0 0 0 0 0 0 0
mada
(Specifiy activities )
Narmada 20
Water Way (Diversation of water Draingae) 3 2.01 0 0 1428 0 0
MGNREGA 3
1.9278 0 0 1428 0 0
Narmada 3
Water Harvesting Structure 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 1
Cause way cum Chek dam No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 2
Check dam No. 316
1053.52
2203348
29065.24777
1838211 78
369.91 52
201.89058
476500
185.9029657 21159 0 0
Narmada 3
Village/Community Pond No. 9
19.49 12410
4.924012158 167 2 6.26 3 9.75 4300
1.705714286 0 0 0
Narmada 4
Farm Pond No. 116
147.58
207200.5
33954.621 7353 4 10.5 41
55.55093 86336
37.42726444 0 0 0
Narmada 5
Percolation Tank No. 1 0.2 937.5
0.39893617 0 0 0 1 0.2 937.5
0.39893617 0 0 0
Narmada 6
Pond Inlet No. 2 2.4 0 0 539 0 0 0 0 0 0 0 0 0
Nar 7 Pond No. 2 2.4 0 0 539 0 0 0 0 0 0 0 0 0
mada
Outlet
Narmada 8
OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 4
Existing/Old Water Harvesting Structure Maintance (Renovation & Repair) 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 1
Deepening/Desiltation Of Pond No. 22
41.286 76607
66.43665957 5897 3 8.5 2
7.03436 5640
10.97021277 214 0 0
Narmada 2
Deepening Of Percolation Tank No. 14 2 25200
10.72340426 0 0 0 0 0 0 0 0 0 0
Narmada 3
De-siltation of Checkdam No. 35
38.39
218691
91.82553191 16010 14 19.5 4
4.08449
3679.720721
1.565838605 0 0 0
Narmada 4
Repairing of Checkda No. 37
59.28
146030
98.75574468 8949 3 5.94 4
6.92356 7350
6.821276596 606 0 0
m
Narmada 5
OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 5
Ground Water Recharging Structures 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 1
Dugwell Recharge structure No. 106
39.09 3693 45.75 3790 10 4.11
MGNREGA 24
6.38708 2461 30.5 881 0 0
Narmada 2
Farm Recharge Filter No. 0 0 0 0 0 0 0
Agri. Dept. 0 0 0 0 0 0 0
Narmada 3
Holiya in farm/Field No. 0 0 0 0 0 0 0
Agri. Dept. 0 0 0 0 0 0 0
Narmada 4
Pond Recharge structure No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 5
OTHERS (Specifiy activities ) 0 0 0 0 0 0 0
Agri. Dept. 0 0 0 0 0 0 0
Narmada 9 Total
520803
5777.82
5876054.46
104611.613
2644757
58501.265
1315.0538 0
334070
1947.06391
1505085.741
6744.912091 227345 0 0 0
Narmada
LH & ME & Producti 0 0 0 0 0 0 0 0 0 0 0 0 0 0
on System
Narmada 1
AGRICULTURE ACTIVITIES 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 1
Agro Center No. 20
39.13 0 0 0 7 14.5
Agri. Dept. 0 0 0 0 0 0 0
Narmada 2
Agricultural Implements No. 333
153.55 0 0 0 58 35.84
Agri. Dept. 109
53.99035 0 13 1088 0 0
Narmada 3
Agro- Forestry 11
32.43 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 4
Crop Demonstration Plot No.
197.1
153.4 0 0 0 36 44.07
Agri. Dept. 15
11.74149 0 3 3 0 0
Narmada 5
Fishery Development No. 22
35.27 0 0 0 4 3.5
Fishery Dept. 3
1.39095 0 1 2 0 0
Narmada 6
Floriculture Development Ha.
21.3
32.97 0 0 0 8 6.4
Agri. Dept. 3 4.47 0 0 0 0 0
Narmada 7
Fodder Bank Development 2 0.5 0 0 0 2 0.5
Agri. Dept. 0 0 0 0 0 0 0
Narmad 8
Green House No. 53
39.43 0 0 0 14 20.69
Agri. Dept. 7 3.24 0 0 0 0 0
a
Narmada 9
Horticulture Plantation Ha.
145.5
176.517 0 0 0 16 19.83
Agri. Dept. 125
37.511 0 4 2 0 0
Narmada 10
Kitchen Garden 15
20.32 0 0 0 1 1.5
Agri. Dept. 5
3.64402 0 2 2 0 0
Narmada 11
Nursery raising 55
73.31 0 0 0 4 4.05 GGRC 26
29.5723 0 4 2 0 0
Narmada 12
Vermi compost 76
127.16 0 0 0 4 7 GGRC 56
95.51521 0 0 0 0 0
Narmada 13
INPUT SUPPORT 0 0 0 0 0 0 0 GGRC 0 0 0 0 0 0 0
Narmada 14
Promoting Micro-Irrigation Systems like drip and Sprinkler Irrigation No.
185.5
69.29 0 0 0 81 84.56 GGRC 11 1 0 1 1 0 0
Narmada 15
Sprinkler Demo. 1 0.5 0 0 0 1 0.35 GGRC 0 0 0 0 0 0 0
Narmada 16
Vegetable Nursery Raising with drip irrigation 111
213.52 0 0 0 34 73.78 GGRC 15
13.325 0 3 5 0 0
Narmada 17 OTHERS 1 5.02 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 18
Low Cost Poly House 7 8.19 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 19
Lift Irrgation 52
47.66 0 0 0 12 20.67 GGRC 3 1.51 0 13 8 0 0
Narmada 20
Paddy Trasing Machine 1 0.75 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 21
Creeper Vegetable Production
152.5
102.27 0 0 0 24 19.26 GGRC 1 1.034 0 14 16 0 0
Narmada 22
Rotavator 1 0.5 0 0 0 0 0.5
Agri. Dept. 0 0 0 0 0 0 0
Narmada 23
Power Weeder 3 1.2 0 0 0 0 1.2
Agri. Dept. 0 0 0 0 0 0 0
Narmada 24
Chaffcuter No. 53
12.93 0 0 0 1 1.08
Agri. Dept. 8 2.7 0 0 0 0 0
Narmada 25
Mini Tractor with rotary and cultivator No. 10 29 0 0 0 0 0 0 0 0 1 3 0 0
Nar 26 Thresher No. 15 24.3 0 0 0 0 1.5 Other 0 0 0 2 3 0 0
mada
Machine 8
Narmada 27
Organic Manual No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 28
Spray pump No. 17 1.05 0 0 0 0 0.6 0 0 0 0 0 0 0
Narmada 29
Vegetable Production No.
23.4
26.83 0 0 0 15.2 26.12 GGRC 0 0 0 0 0 0 0
Narmada 30
Multi crop harverter 1 0.5 0 0 0 0 0.5 0 0 0 0 0 0 0
Narmada 2
AGRO PROCESSING ACTIVITIES No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 1
Dal Making Unit No. 16
28.75 0 0 0 4 14 0 0 0 0 0 0 0
Narmada 2
Flour & Dal/Rice Processing unit 80
92.92 0 0 1002 0 4.99 13
12.9785 0 12 219 0 0
Narmada 3
Garam Masala 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 4
Grading and packagin No. 1 0.5 0 0 0 0 0 0 0 0 1 1 0 0
g of agricultural produces,
Narmada 5
Jam-jelly making No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 6
Microenterprises based on Minor Forest Produce (MFP) 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 7
Oil extraction mill 14 32.5 0 0 1400 0 0 4
4.34108 0 0 0 0 0
Narmada 8
Value added products from milk 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 9
Package Food Products 4 1.81 0 0 100 1 2.5 0 0 0 0 0 0 0
Narmada 10
Pulp making 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 11 Rice mill 51
105.04 0 0 100 3 9.5
Ah Dept 9
11.11608 0 2 2 0 0
Narmad 12
OTHERS (Specifiy 8
21.39 0 0 0 0 0 0 0 0 0 0 0 0
a activities )
Narmada 13
Sugar cane Juice Machine 3 0.75 0 0 0 0 0.75
Ah Dept 0 0 0 0 0 0 0
Narmada 12
Chilly Powder Unit 11 8.7 0 0 0 0 2.7
Ah Dept 0 0 0 0 0 0 0
Narmada 13
Papad making unit 2 1 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 3
Animal Husbandry 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 1
Cattle Feed and Nutrition Store 7 2.5 0 0 0 0 0 6 1.5 0 0 0 0 0
Narmada 2
Animal Health camps 161
50.7483 0 0 147 87 47.05
Animal Dept. 6
1.69182 0 0 0 0 0
Narmada 3
Animal Travis (Pinjaru) 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 4
Apiculture (Bee keeping) 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 5
Artificial insemination 0 0 0 0 0 3 2.5 Other 0 0 0 0 0 0 0
Narmad 6
Back-yard 2 2.9 0 0 0 0 1.4 Other 0 0 0 0 0 0 0
a poultry
Narmada 7
Dairy cooperative promotion, No. 4 6.5 0 0 0 1 1 0 0 0 0 0 0 0
Narmada 8
Cattle Shed No. 152
43.165 0 0 0 0 1.245
Animal Dept. 28 7.75 0 0 0 0 0
Narmada 9
Pasture development No. 2 6.5 0 0 0 1 0.3 0 0 0 0 0 0 0
Narmada 10
Poultry Farming to individuals No. 2 3.5 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 11
Sericulture No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 12
Small ruminants 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 13
Veterinary Aid for livestock 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 14
OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 4
Establishing linkages 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 1
Credit linkages 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 2
Linkages with Future Markets, No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 3
Market linkages, 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 4
Raw material supply channel, 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 5
OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 5
Local traditional handicraft 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 1
Bamboo based products, 3 5.8 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 2
Kutchi Bandhini, 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 3 Pottery 0 0 0 0 3 3 0 0 0 0 0 0 0 0
Nar 4 OTHERS 0 0 0 0 2 0.4 0 0 0 0 0 0 0 0
mada
(Specifiy activities )
Narmada 6
Minor Activities 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 1
Embroidery Unit 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 2
Handicraft Unit No 2 0.61 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 3
Vegetable shop 1 0.5 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 4
Provision Store 2 1.18 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 5
stiching machine 16 4 0 0 0 1 0.5 3 0.5 0 0 0 0 0
Narmada 6
Up Gradation of centering materials 13
10.85 0 0 0 1 2.1 0 0 0 0 0 0 0
Narmada 7
OTHERS (Specifiy activities ) No 2 0.68 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 8
Musical instrument 5 8.62 0 0 0 0 0 2 1.917 0 0 0 0 0
Narmada 9
Madap Decoration 74
108.84 0 0 0 0 1.82 24 34.22 0 0 0 0 0
Narmada 10
Catering Set 68 93.2 0 0 1601 0 0 26
35.07968 0 0 379 0 0
Narmada 11
ConcreteMixure Machine 7 8.25 0 0 0 0 1.2 1 1.65 0 0 0 0 0
Narmada 12
Pepar dish& bowl making unit 23
19.03 0 0 0 0 0 7 4.929 0 0 0 0 0
Narmada 13
Vegetable Trolley 13 2.5 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 14
Carpenter instrument 4 1.5 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 15
Construction instrument 2 0.3 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 16
Canteen House 6 6.17 0 0 0 1 1 3 3 0 0 0 0 0
Narmada
Tyre Repairing Unit 1 0.2 0 0 0 0 0 0 0 0 0 0 0 0
Narmad 17
Non-conventi 0 0 0 0 0 0 0 0 0 0 0 0 0 0
a onal Energy Sources
Narmada 18
Bio gas plant, 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 19
Bio-fuel plantation, 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 20
energy conservation measures, 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 21
Wind energy production, 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 22
Solar energy promotion, 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Narmada 23
OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 2348.3
2109.48 0 0 4355 428.6
482.555 0 519
381.31748 0 76 1734 0 0
Narmada
Capacity Building
319.182 0 0 0 0 0 0 0 132.6 0 0
46910.37736 0 0 0
Narmad
Evaluation &
106.34 0 0 0 0 0 0 0 7.28 0 0 0 0 0 0
a Monitoring
Narmada
Administration
1063.38 0 0 0 0 0 0 0
575.93 0 0 0 0 0 0
Narmada
Consolidation Phase
378.63 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total
Planning of the works for Narmada District Irrigation Plan (DIP) & Annual Action Plan for SLSC
District Sr.No Activity Unit
Physical Target for FY (2016-17)
Unit
Cost (In Lakhs) IWMP
Storage Volumes (Cubic Meter)
Command Area/ Irrigation Potential (Ha.)
Person days/Mandays Planned
Convergence
Unit
Amount (In Lakhs) Name of Schemes
Narmada 1 EPA 0 0 0 0 0
Narmada 1 Animal camp No. 4 0.99984 0 0 0 0 0
Narmada 2 Animal water trough (Havada) No. 0 0 0 0 0 0 0 Agri. Dept.
Narmada 3 Causeway on connecting roads No. 7 8.67 0 0 1948 0 0 Agri. Dept.
Narmada 4 Check / Protection wall No. 4 4.1 0 0 921 0 0
Narmada 5 Demonstration for Agricultural / Animal No. 0 0 0 0 0 0 0 Agri. Dept.
Husbandry Productivity Enhancement
Narmada 6
Drainage line correction (To prevent flooding of Gamtal) rmt 1 0.5 0 0 112 0 0 Fishery Dept.
Narmada 7 Drinking water facility No. 36 13.4202 0 0 2903 0 0 Agri. Dept.
Narmada 8 Fencing for protection from wild animals rmt. 0 0 0 0 0 0 0 Agri. Dept.
Narmada 9 Grassland/Gauchar Development Ha. 0 0 0 0 0 0 0 Agri. Dept.
Narmada 10
Improvised and energy efficient smashan gruh (Cemetery ) No. 0 0 0 0 0 0 0 Agri. Dept.
Narmada 12 Panchayat Well Repair & Pump Room No. 2 0.8066 0 0 181 0 0 Agri. Dept.
Narmada 13 Rain water harvesting system No. 1 0.59 0 0 133 0 0 GGRC
Narmada 14 Recharge / Repair of open wells No. 3 1.9 0 0 427 0 0 GGRC
Narmada 15
Repair / development of artificial water bodies No. 0 0 0 0 0 0 0 GGRC
Narmada 16
Revival of natural water bodies with recharge activities No. 0 0 0 0 0 0 0 GGRC
Narmada 17
Sanitation facilities/Sewerage line rmt 0 0 0 0 0 0 0 GGRC
Narmada 18 Use solar power for productive activities No. 0 0 0 0 0 0 0
Narmada 19 Wind energy development No. 0 0 0 0 0 0 0
Narmada 20 OTHERS (Specifiy activities ) No. 2 1.30896 0 0 294 0 0 GGRC
Narmada 21 Vegitable kits Distribution No. 0 0 0 0 0 0 0 GGRC
Narmada 22 Anganwadi Repairing No. 0 0 0 0 0 0 0
Narmada 23 Dhobi Ghat No. 0 0 0 0 0 0 0 GGRC
Narmada 24 chotro Repairing No. 0 0 0 0 0 0 0 GGRC
Narmada 25 Samsan fencing No. 0 0 0 0 0 0 0
Narmada 26 Kitchen Garden kits No. 0 0 0 0 0 0 0 GGRC
Narmada 27 Books For School Library No. 0 0 0 0 0 0 0
Narmada 28 Afforestation No. 0 0 0 0 0 0 0 GGRC
Narmada 29 Fancing & Plantation in Gramvatika No. 0 0 0 0 0 0 0
Narmada 30 Fancing & Plantation in Aanganwadi 0 0 0 0 0 0 0
Narmada 31 Community hall Repairing 0 0 0 0 0 0 0 GGRC
Narmada 32 Floriculture Development 1 1.5 0 0 0 0 0 GGRC
Narmada Total 61 33.7956 0 0 6920 0 0
Narmada 1 LAND DEVELOPMENT
Narmada 1 Farm Bunding rmt. 47921 44.75375 0 0 18784 14120 15.9252 MGNREGA
Narmada 2 Afforestation Ha. 19.2 37.28 0 0 2864 5 5.44 MGNREGA
Narmada 3 Agriculture Demo No. 0 0 0 0 0 0 0
Narmada 4 Agro Forestry Ha. 0 0 0 0 0 0 0
Narmada 5 Horticulture Ha. 0 0 0 0 0 121.03 48.41 MGNREGA
Narmada 6 Land leveling Ha. 775.88 211.29584 0 0 0 82.77 28.8703 MGNREGA
Narmada 7 Pasture development Ha. 0 0 0 0 0 0 0
Narmada 8 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0
Narmada 9 Bambu Bottling 1300.5 21.14899 0 0 0 0 0
Narmada 10 Border/forest plantation 0 0 0 0 0 150 2.5 Ah Dept
Narmada 2 Soil & Moisture Conservation
Narmada 1 Check wall No. 1043 765.8865 931967.9 399.2524 165107 160 212.16 MGNREGA
Narmada 2 Earthen bund No. 0 0 0 0 0 6 5 MGNREGA
Narmada 3 Protection Wall No. 83 55.59 116820 0 12557 3 2.75 MGNREGA
Narmada 4 Waste weir No. 220 184.96538 111905.1 283.04 21161 115 106.58
Narmada 5 Bench Terracing cumec 0 0 0 0 0 0 0
Narmada 6 Bori bandh No. 0 0 0 0 0 0 0 MGNREGA
Narmada 7 Brushwood Checks No. 0 0 0 0 0 0 0
Narmada 8 Countour Bunding rmt. 0 0 0 0 0 0 0
Narmada 9 Countour Trenches rmt. 40899 42.65 0 0 28112 0 0
Narmada 10 Earthern Dam No. 0 0 0 0 0 0 0
Narmada 11 Field Outlet No. 457 171.53012 0 0 14330 0 0
Narmada 12 Gabion structure No. 513 211.34942 0 510 37351 37 17.62 MGNREGA
Narmada 13 Graded Bunding rmt. 0 2.79 0 0 0 0 0
Narmada 14 Gully plug No. 0 0 0 0 7 0 0
Narmada 15 Loose boulder Checks No. 0 0 0 0 0 32 27.44 MGNREGA
Narmada 16 Nala Plug No. 256 138.927 0 0 24490 2 4.4 MGNREGA
Narmada 17 Stone bunding rmt. 18618 125.7442 0 0 39877 7177.7 27.682 MGNREGA
Narmada 18
Straggred Contour trenching(Terrace Talavadi) rmt 36026 24.1279 0 0 15607 1 1.38 MGNREGA
Narmada 19 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0
Narmada 20
Water Way (Diversation of water Draingae) 0 0.08 0 0 0 0 0
Narmada 3 Water Harvesting Structure 0 0 0 0 0 0 0
Narmada 1 Cause way cum Chek dam No. 0 0 0 0 0 14 72.39 MGNREGA
Narmada 2 Check dam No. 221 677.26942 1183488 575.2455 1796940 13 90.84 MGNREGA
Narmada 3 Village/Community Pond No. 3 4.74 1150 0.42 167 1 1.25 MGNREGA
Narmada 4 Farm Pond No. 46 46.37907 36007 34.39426 3273 0 0
Narmada 5 Percolation Tank No. 0 0 0 0 0 0 0
Narmada 6 Pond Inlet No. 2 2.4 0 0 539 0 0
Narmada 7 Pond Outlet No. 2 2.4 0 0 539 0 0
Narmada 8 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0
Narmada 4
Existing/Old Water Harvesting Structure Maintance (Renovation & Repair) 0 0 0 0 0 0 0
Narmada 1 Deepening/Desiltation Of Pond No. 12 26.05564 53687 48.11336 1079 2 6
Narmada 2 Deepening Of Percolation Tank No. 14 2 25200 10.7234 0 0 0
Narmada 3 De-siltation of Checkdam No. 18 18.5 54900 23.3617 3370 0 3.44 MGNREGA
Narmada 4 Repairing of Checkdam No. 14 23.07644 72780 46.74468 3852 0 0
Narmada 5 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0
Narmada 5 Ground Water 0 0 0 0 0 0 0
Recharging Structures
Narmada 1 Dugwell Recharge structure No. 79 31.58 1232 0 2909 7 2.8 MGNREGA
Narmada 2 Farm Recharge Filter No. 0 0 0 0 0 0 0
Narmada 3 Holiya in farm/Field No. 0 0 0 0 0 0 0
Narmada 4 Pond Recharge structure No. 0 0 0 0 0 0 0
Narmada 5 OTHERS (Specifiy activities ) 1 0.5 0 0 0 5781 224.07 Ah Dept
Narmada 9 Total 148544 2873.0 2589137 1931.3 2192914 27831 906.948
Narmada LH & ME & Production System 0 0 0 0 0 0 0
Narmada 1 AGRICULTURE ACTIVITIES 0 0 0 0 0 0 0
Narmada 1 Agro Center No. 9 10.77 0 0 0 3 4 Agri. Dept.
Narmada 2 Agricultural Implements No. 194 88.708867 0 0 1000 20.5 10.5175 Agri. Dept.
Narmada 3 Agro- Forestry 11 32.43 0 0 0 0 0
Narmada 4 Crop Demonstration Plot No. 119 117.6735 0 0 0 12 27.1 Agri. Dept.
Narmada 5 Fishery Development No. 19 33.87905 0 0 0 2 1.5 Fishery Dept.
Narmada 6 Floriculture Development Ha. 13 25.07 0 0 0 2 2 Agri. Dept.
Narmada 7 Fodder Bank Development 2 0.5 0 0 0 2 0.5 Agri. Dept.
Narmada 8 Green House No. 18 20.19 0 0 0 11 16.84 Agri. Dept.
Narmada 9 Horticulture Plantation Ha. 102 124.0958 0 0 0 6 8.17 Agri. Dept.
Narmada 10 Kitchen Garden 9 16.67788 0 0 0 1 1.5 Agri. Dept.
Narmada 11 Nursery raising 27 42.1377 0 0 0 1 1 GGRC
Narmada 12 Vermi compost 19 30.14407 0 0 0 2 3.5 GGRC
Narmada 13 INPUT SUPPORT 0 0 0 0 0 0 0
Narmada 14
Promoting Micro-Irrigation Systems like drip and Sprinkler Irrigation No. 163.5 59.11 0 0 0 9 44.92 GGRC
Narmada 15 Sprinkler Demo. 1 0.5 0 0 0 1 0.35 GGRC
Narmada 16
Vegetable Nursery Raising with drip irrigation 90 189.01496 0 0 0 34 73.78 GGRC
Narmada 17 OTHERS 1 5.02 0 0 0 0 0
Narmada 18 Low Cost Poly House 7 8.19 0 0 0 0 0
Narmada 19 Lift Irrgation 35 41.35 0 0 0 3 19.42 GGRC
Narmada 20 Paddy Trasing Machine 1 0.75 0 0 0 0 0
Narmada 21 Creeper Vegetable Production 59.5 45.706 0 0 0 5 10.28 GGRC
Narmada 22 Rotavator 1 0.5 0 0 0 0 0.5 Agri. Dept.
Narmada 23 Power Weeder 0 0 0 0 0 0 0 0
Narmada 24 Chaffcuter No. 22 5.13 0 0 0 1 1.08 Agri. Dept.
Narmada 25 Mini Tractor with rotary and cultivator No. 7 21 0 0 0 0 0
Narmada 26 Thresher Machine No. 11 21.02 0 0 0 0 0
Narmada 27 Organic Manual No. 0 0 0 0 0 0 0
Narmada 28 Spray pump No. 17 1.05 0 0 0 0 0.6 GGRC
Narmada 29 Vegetable Production No. 18.4 22.12 0 0 0 10.2 19.86 GGRC
Narmada 30 Multi crop harverter 0 0 0 0 0 0 0 0
Narmada 2 AGRO PROCESSING ACTIVITIES No. 0 0 0 0 0 0 0 0
Narmada 1 Dal Making Unit No. 9 23.85 0 0 402 1 3
Narmada 2 Flour & Dal/Rice Processing unit 37 48.6255 0 0 100 0 0 0
Narmada 3 Garam Masala 0 0 0 0 0 0 0 0
Narmada 4
Grading and packaging of agricultural produces, No. 1 0.5 0 0 0 0 0 0
Narmada 5 Jam-jelly making No. 0 0 0 0 0 0 0 0
Narmada 6
Microenterprises based on Minor Forest Produce (MFP) 1 0.5 0 0 0 0 0 0
Narmada 7 Oil extraction mill 8 23.15892 0 0 1000 0 0 0
Narmada 8 Value added products from milk 0 0 0 0 0 0 0 0
Narmada 9 Package Food Products 3 1.31 0 0 100 1 2 Ah Dept
Narmada 10 Pulp making 0 0 0 0 0 0 0 0
Narmada 11 Rice mill 34 82.92392 0 0 100 1 3 Ah Dept
Narmada 12 OTHERS (Specifiy activities ) 8 21.39 0 0 0 0 0 0
Narmada 13 Sugar cane Juice Machine 0 0 0 0 0 0 0 0
Narmada 12 Chilly Powder Unit 0 0 0 0 0 0 0 0
Narmada 13 Papad making unit 2 1 0 0 0 0 0 0
Narmada 3 Animal Husbandry 0 0 0 0 0 0 0 0
Narmada 1 Cattle Feed and Nutrition Store 0 1 0 0 0 20 10.65 0
Narmada 2 Animal Health camps 56 25.66648 0 0 154 27 20.6 Animal he
Narmada 3 Animal Travis (Pinjaru) 0 0 0 0 0 0 0 0
Narmada 4 Apiculture (Bee keeping) 0 0 0 0 0 0 0 0
Narmada 5 Artificial insemination 0 0 0 0 0 3 2.5 other
Narmada 6 Back-yard poultry 1 1.5 0 0 0 0 0 0
Narmada 7 Dairy cooperative No. 3 6.5 0 0 0 0 0 0
promotion,
Narmada 8 Cattle Shed No. 66 19.26 0 0 2 0 0 0
Narmada 9 Pasture development No. 2 6.5 0 0 0 1 0.3
Narmada 10 Poultry Farming to individuals No. 1 2 0 0 0 0 0 0
Narmada 11 Sericulture No. 0 0 0 0 0 0 0 0
Narmada 12 Small ruminants 0 0 0 0 0 0 0 0
Narmada 13 Veterinary Aid for livestock 0 0 0 0 0 0 0 0
Narmada 14 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0
Narmada 4 Establishing linkages 0 0 0 0 0 0 0 0
Narmada 1 Credit linkages 0 0 0 0 0 0 0 0
Narmada 2 Linkages with Future Markets, No. 0 0 0 0 0 0 0 0
Narmada 3 Market linkages, 0 0 0 0 0 0 0 0
Narmada 4 Raw material supply channel, 0 0 0 0 0 0 0 0
Narmada 5 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 5 Local traditional handicraft 0 0 0 0 0 0 0 0
Narmada 1 Bamboo based products, 3 5.8 0 0 0 0 0 0
Narmada 2 Kutchi Bandhini, 0 0 0 0 0 0 0 0
Narmada 3 Pottery 0 0 0 0 0 0 0 0
Narmada 4 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 6 Minor Activities 0 0 0 0 0 0 0 0
Narmada 1 Embroidery Unit 0 0 0 0 0 0 0 0
Narmada 2 Handicraft Unit No 2 0.61 0 0 0 0 0 0
Narmada 3 Vegetable shop 1 0.5 0 0 0 0 0 0
Narmada 4 Provision Store 0 0 0 0 0 0 0 0
Narmada 5 stiching machine 6 1 0 0 0 0 0 0
Narmada 6 Up Gradation of centering materials 9 9 0 0 0 0 0 0
Narmada 7 OTHERS (Specifiy activities ) No 0 0 0 0 0 0 0 0
Narmada 8 Musical instrument 3 6.703 0 0 0 0 0 0
Narmada 9 Madap Decoration 27 45.22 0 0 0 0 0 0
Narmada 10 Catering Set 26 35.65032 0 0 1222 0 0 0
Narmada 11 ConcreteMixure Machine 1 0.001 0 0 0 0 0 0
Narmada 12 Pepar dish& bowl making unit 10 6.131 0 0 0 0 0 0
Narmada 13 Vegetable Trolley 0 0 0 0 0 0 0 0
Narmada 14 Carpenter instrument 0 0 0 0 0 0 0 0
Narmada 15 Construction instrument 0 0 0 0 0 0 0 0
Narmada 16 Canteen House 1 1.57 0 0 0 0 0 0
Narmada Tyre Repairing Unit 0 0 0 0 0 0 0 0
Narmada 17 Non-conventional Energy Sources 0 0 0 0 0 0 0 0
Narmada 18 Bio gas plant, 0 0 0 0 0 0 0 0
Narmada 19 Bio-fuel plantation, 0 0 0 0 0 0 0 0
Narmada 20 energy conservation measures, 0 0 0 0 0 0 0 0
Narmada 21 Wind energy production, 0 0 0 0 0 0 0 0
Narmada 22 Solar energy promotion, 0 0 0 0 0 0 0 0
Narmada 23 OTHERS (Specifiy 0 0 0 0 0 20 10.65 0
activities )
Total 1297.4 1340.608 0 0 4071 179.7 289.468 0
Narmada
Capacity Building 0 103.6 0 0 36650.9 0 0 0
Narmada
Evaluation & Monitoring 0 51.02 0 0 0 0 0 0
Narmada Administration 0 273.1266 0 0 0 0 0 0
Narmada Consolidation Phase 0 149.04 0 0 0 0 0 0
Total 576.7866
District Sr.No Activity Unit
Physical Target for FY (2017-18)
Unit
Cost (In Lakhs) IWMP
Storage Volumes (Cubic Meter)
Command Area/ Irrigation Potential (Ha.)
Person days/Mandays Planned
Convergence
Unit
Amount (In Lakhs) Name of Schemes
Narmada 1 EPA
Narmada 1 Animal camp No. 0 0 0 0 0 0 0 0
Narmada 2 Animal water trough (Havada) No. 0 0 0 0 0 0 0 0
Narmada 3 Causeway on connecting roads No. 0 0 0 0 0 0 0 0
Narmada 4 Check / Protection wall No. 0 0 0 0 0 0 0 0
Narmada 5
Demonstration for Agricultural / Animal Husbandry Productivity Enhancement No. 0 0 0 0 0 0 0 0
Narmada 6
Drainage line correction (To prevent flooding of Gamtal) rmt 0 0 0 0 0 0 0 0
Narmada 7 Drinking water facility No. 0 0 0 0 0 0 0 0
Narmada 8 Fencing for protection from wild animals rmt. 0 0 0 0 0 0 0 0
Narmada 9 Grassland/Gauchar Development Ha. 0 0 0 0 0 0 0 0
Narmada 10
Improvised and energy efficient smashan gruh (Cemetery ) No. 0 0 0 0 0 0 0 0
Narmada 12 Panchayat Well Repair & Pump Room No. 0 0 0 0 0 0 0 0
Narmada 13 Rain water harvesting system No. 0 0 0 0 0 0 0 0
Narmada 14 Recharge / Repair of open wells No. 0 0 0 0 0 0 0 0
Narmada 15
Repair / development of artificial water bodies No. 0 0 0 0 0 0 0 0
Narmada 16
Revival of natural water bodies with recharge activities No. 0 0 0 0 0 0 0 0
Narmada 17
Sanitation facilities/Sewerage line rmt 0 0 0 0 0 0 0 0
Narmada 18 Use solar power for productive activities No. 0 0 0 0 0 0 0 0
Narmada 19 Wind energy development No. 0 0 0 0 0 0 0 0
Narmada 20 OTHERS (Specifiy No. 0 0 0 0 0 0 0 0
activities )
Narmada 21 Vegitable kits Distribution No. 0 0 0 0 0 0 0 0
Narmada 22 Anganwadi Repairing No. 0 0 0 0 0 0 0 0
Narmada 23 Dhobi Ghat No. 0 0 0 0 0 0 0 0
Narmada 24 chotro Repairing No. 0 0 0 0 0 0 0 0
Narmada 25 Samsan fencing No. 0 0 0 0 0 0 0 0
Narmada 26 Kitchen Garden kits No. 0 0 0 0 0 0 0 0
Narmada 27 Books For School Library No. 0 0 0 0 0 0 0 0
Narmada 28 Afforestation No. 0 0 0 0 0 0 0 0
Narmada 29 Fancing & Plantation in Gramvatika No. 0 0 0 0 0 0 0 0
Narmada 30 Fancing & Plantation in Aanganwadi 0 0 0 0 0 0 0 0
Narmada 31 Community hall Repairing 0 0 0 0 0 0 0 0
Narmada 32 Floriculture Development 0 0 0 0 0 0 0 0
Narmada Total 0 0 0 0 0 0 0 0
Narmada 1 LAND DEVELOPMENT
Narmada 1 Farm Bunding rmt. 33545 82.0219 0 0 22493 426 27.3532 MGNREGA
Narmada 2 Afforestation Ha. 4.4 5.27 0 0 112 2 2.5 MGNREGA
Narmada 3 Agriculture Demo No. 0 0 0 0 0 0 0 0
Narmada 4 Agro Forestry Ha. 0 0 0 0 0 0 0 0
Narmada 5 Horticulture Ha. 0 0 0 0 0 0 0 0
Narmada 6 Land leveling Ha. 895.6 159.226 0 0 42938 173.77 35.432 MGNREGA
Narmada 7 Pasture development Ha. 0 0 0 0 0 0 0 0
Narmada 8 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 9 Bambu Bottling 0 0 0 0 0 0 0 0
Narmada 10 Border/forest plantation 0 0 0 0 0 0 0 0
Narmada 2 Soil & Moisture Conservation
Narmada 1 Check wall No. 0 0 0 0 0 20 29.26 MGNREGA
Narmada 2 Earthen bund No. 0 0 0 0 0 0 0 0
Narmada 3 Protection Wall No. 65 26.67 0 0 5993 22 15.04 MGNREGA
Narmada 4 Waste weir No. 38 8.3 0 0 809 2 1.8 MGNREGA
Narmada 5 Bench Terracing cumec 0 0 0 0 0 0 0 0
Narmada 6 Bori bandh No. 0 0 0 0 562 0 0 0
Narmada 7 Brushwood Checks No. 0 0 0 0 0 0 0 0
Narmada 8 Countour Bunding rmt. 0 0 0 0 4494 0 6.666 MGNREGA
Narmada 9 Countour Trenches rmt. 0 0.02 0 0 0 0 0 0
Narmada 10 Earthern Dam No. 0 0 0 0 0 0 0 0
Narmada 11 Field Outlet No. 335 49.4439 0 0 8333 72 10.1263 MGNREGA
Narmada 12 Gabion structure No. 570 62.07 0 0 5358 6 2.4 MGNREGA
Narmada 13 Graded Bunding rmt. 0 0 0 0 0 0 0 0
Narmada 14 Gully plug No. 56 10.0612 0 0 581 0 1.35 MGNREGA
Narmada 15 Loose boulder Checks No. 0 0 0 0 0 0 0 0
Narmada 16 Nala Plug No. 46 67.3 0 0 0 0 0 0
Narmada 17 Stone bunding rmt. 12020 66.45 0 0 6118 329 34.79 MGNREGA
Narmada 18
Straggred Contour trenching(Terrace Talavadi) rmt 2 6.19 2900 0 3000 0 0 0
Narmada 19 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 20
Water Way (Diversation of water Draingae) 0 0 0 0 0 0 0 0
Narmada 3 Water Harvesting Structure 0 0 0 0 0 0 0 0
Narmada 1 Cause way cum Chek dam No. 0 0 0 0 0 0 0 0
Narmada 2 Check dam No. 0 0 0 30 105 15 61.03 MGNREGA
Narmada 3 Village/Community Pond No. 2 3.5 4320 2.8383 2 0 0
Narmada 4 Farm Pond No. 20 25.21 25110 16.14 4087 0 0 0
Narmada 5 Percolation Tank No. 0 0 0 0 0 0 0 0
Narmada 6 Pond Inlet No. 0 0 0 0 0 0 0 0
Narmada 7 Pond Outlet No. 0 0 0 0 0 0 0 0
Narmada 8 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0
Narmada 4
Existing/Old Water Harvesting Structure Maintance (Renovation & Repair) 0 0 0 0 0 0 0 0
Narmada 1 Deepening/Desiltation Of Pond No. 0 0 0 0 0 0 0 0
Narmada 2 Deepening Of Percolation Tank No. 0 0 0 0 0 0 0 0
Narmada 3 De-siltation of Checkdam No. 2 5.80551 0 0 0 0 0 0
Narmada 4 Repairing of Checkdam No. 17 24.63 14660 27 3710 1 1 MGNREGA
Narmada 5 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0
Narmada 5 Ground Water Recharging Structures 0 0 0 0 0 0 0 0
Narmada 1 Dugwell Recharge structure No. 2 0.6 0 0 0 0 0 0
Narmada 2 Farm Recharge Filter No. 0 0 0 0 0 0 0 0
Narmada 3 Holiya in farm/Field No. 0 0 0 0 0 0 0 0
Narmada 4 Pond Recharge structure No. 0 0 0 0 0 0 0 0
Narmada 5 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 9 Total 47620 602.8 46990 76.0 108694 1068.77 228.747 0
Narmada LH & ME & Production System 0 0 0 0 0 0 0 0
Narmada 1 AGRICULTURE ACTIVITIES 0 0 0 0 0 0 0 0
Narmada 1 Agro Center No. 11 28.36 0 0 0 4 10.5 Agri. Dept.
Narmada 2 Agricultural Implements No. 24 8.67917 0 0 0 18.5 9.0175 Agri. Dept.
Narmada 3 Agro- Forestry 0 0 0 0 0 0 0 0
Narmada 4 Crop Demonstration Plot No. 54.1 21.345 0 0 0 11 5.25 Agri. Dept.
Narmada 5 Fishery Development No. 0 0 0 0 0 0 0 0
Narmada 6 Floriculture Development Ha. 4.3 3.43 0 0 0 3 0.9 Agri. Dept.
Narmada 7 Fodder Bank Development 0 0 0 0 0 0 0 0
Narmada 8 Green House No. 28 16 0 0 0 1 3.85 Agri. Dept.
Narmada 9 Horticulture Plantation Ha. 18.5 14.91 0 0 0 8 9.16 Agri. Dept.
Narmada 10 Kitchen Garden 0 0 0 0 0 0 0 0
Narmada 11 Nursery raising 2 1.6 0 0 0 1 0.75 GGRC
Narmada 12 Vermi compost 1 1.5 0 0 0 0 0 0
Narmada 13 INPUT SUPPORT 0 0 0 0 0 0 0 0
Narmada 14 Promoting Micro-Irrigation Systems like No. 11 9.18 0 0 0 4 23.44 GGRC
drip and Sprinkler Irrigation
Narmada 15 Sprinkler Demo. 0 0 0 0 0 0 0 0
Narmada 16
Vegetable Nursery Raising with drip irrigation 6 11.18 0 0 0 0 0 0
Narmada 17 OTHERS 0 0 0 0 0 0 0 0
Narmada 18 Low Cost Poly House 0 0 0 0 0 0 0 0
Narmada 19 Lift Irrgation 5 1.25 0 0 0 0 1.25 GGRC
Narmada 20 Paddy Trasing Machine 0 0 0 0 0 0 0
Narmada 21 Creeper Vegetable Production 94 55.53 0 0 0 19 8.98 GGRC
Narmada 22 Rotavator 0 0 0 0 0 0 0 0
Narmada 23 Power Weeder 2 0.8 0 0 0 0 0.8 Agri. Dept.
Narmada 24 Chaffcuter No. 23 5.1 0 0 0 0 0 0
Narmada 25 Mini Tractor with rotary and cultivator No. 3 8 0 0 0 0 0 0
Narmada 26 Thresher Machine No. 3 2.86 0 0 0 0 1 other
Narmada 27 Organic Manual No. 0 0 0 0 0 0 0 0
Narmada 28 Spray pump No. 0 0 0 0 0 0 0 0
Narmada 29 Vegetable Production No. 5 4.71 0 0 0 5 6.26 GGRC
Narmada 30 Multi crop harverter 0 0 0 0 0 0 0 0
Narmada 2 AGRO PROCESSING ACTIVITIES No. 0 0 0 0 0 0 0 0
Narmada 1 Dal Making Unit No. 5 3.9 0 0 0 0 1
Narmada 2 Flour & Dal/Rice Processing unit 24 28.33 0 0 0 0 2
Narmada 3 Garam Masala 0 0 0 0 0 0 0 0
Narmada 4
Grading and packaging of agricultural produces, No. 0 0 0 0 0 0 0 0
Narmada 5 Jam-jelly making No. 0 0 0 0 0 0 0 0
Narmada 6
Microenterprises based on Minor Forest Produce (MFP) 0 0 0 0 0 0 0 0
Narmada 7 Oil extraction mill 2 5 0 0 0 0 0 0
Narmada 8 Value added products from milk 0 0 0 0 0 0 0 0
Narmada 9 Package Food Products 0 0 0 0 0 0 0 0
Narmada 10 Pulp making 0 0 0 0 0 0 0 0
Narmada 11 Rice mill 7 10.5 0 0 0 0 0 0
Narmada 12 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 13 Sugar cane Juice Machine 0 0 0 0 0 0 0 0
Narmada 12 Chilly Powder Unit 6 4.2 0 0 0 0 0 0
Narmada 13 Papad making unit 0 0 0 0 0 0 0 0
Narmada 3 Animal Husbandry 0 0 0 0 0 0 0 0
Narmada 1 Cattle Feed and Nutrition Store 0 0 0 0 0 0 0 0
Narmada 2 Animal Health camps 45 18.51 0 0 0 1 0.3 animal
Narmada 3 Animal Travis (Pinjaru) 0 0 0 0 0 0 0 0
Narmada 4 Apiculture (Bee keeping) 0 0 0 0 0 0 0 0
Narmada 5 Artificial insemination 0 0 0 0 0 0 0 0
Narmada 6 Back-yard poultry 0 0 0 0 0 0 0 0
Narmada 7 Dairy cooperative promotion, No. 0 0 0 0 0 0 0 0
Narmada 8 Cattle Shed No. 21 6.5 0 0 0 0 0 0
Narmada 9 Pasture development No. 0 0 0 0 0 0 0 0
Narmada 10 Poultry Farming to individuals No. 1 1.5 0 0 0 0 0 0
Narmada 11 Sericulture No. 0 0 0 0 0 0 0 0
Narmada 12 Small ruminants 0 0 0 0 0 0 0 0
Narmada 13 Veterinary Aid for livestock 0 0 0 0 0 0 0 0
Narmada 14 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0
Narmada 4 Establishing linkages 0 0 0 0 0 0 0 0
Narmada 1 Credit linkages 0 0 0 0 0 0 0 0
Narmada 2 Linkages with Future Markets, No. 0 0 0 0 0 0 0 0
Narmada 3 Market linkages, 0 0 0 0 0 0 0 0
Narmada 4 Raw material supply channel, 0 0 0 0 0 0 0 0
Narmada 5 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 5 Local traditional handicraft 0 0 0 0 0 0 0 0
Narmada 1 Bamboo based products, 0 0 0 0 0 0 0 0
Narmada 2 Kutchi Bandhini, 0 0 0 0 0 0 0 0
Narmada 3 Pottery 0 0 0 0 0 0 0 0
Narmada 4 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 6 Minor Activities 0 0 0 0 0 0 0 0
Narmada 1 Embroidery Unit 0 0 0 0 0 0 0 0
Narmada 2 Handicraft Unit No 0 0 0 0 0 0 0 0
Narmada 3 Vegetable shop 0 0 0 0 0 0 0 0
Narmada 4 Provision Store 2 1.18 0 0 0 0 0 0
Narmada 5 stiching machine 5 0.5 0 0 2 1 0.5 0
Narmada 6 Up Gradation of centering materials 0 0 0 0 0 0 0 0
Narmada 7 OTHERS (Specifiy activities ) No 0 0 0 0 1 0 0 0
Narmada 8 Musical instrument 0 0 0 0 0 0 0 0
Narmada 9 Madap Decoration 12 15.37 0 0 12 0 0 0
Narmada 10 Catering Set 7 7.6 0 0 15 0 0 0
Narmada 11 ConcreteMixure Machine 1 0.6 0 0 5 0 0 0
Narmada 12 Pepar dish& bowl making unit 6 7.97 0 0 0 0 0 0
Narmada 13 Vegetable Trolley 13 2.5 0 0 0 0 0 0
Narmada 14 Carpenter instrument 2 0.8 0 0 1 0 0 0
Narmada 15 Construction instrument 2 0.3 0 0 0 0 0 0
Narmada 16 Canteen House 2 1.6 0 0 0 0 0 0
Narmada Tyre Repairing Unit 0 0 0 0 0 0 0 0
Narmada 17 Non-conventional Energy Sources 0 0 0 0 0 0 0 0
Narmada 18 Bio gas plant, 0 0 0 0 0 0 0 0
Narmada 19 Bio-fuel plantation, 0 0 0 0 0 0 0 0
Narmada 20 energy conservation measures, 0 0 0 0 0 0 0 0
Narmada 21 Wind energy production, 0 0 0 0 0 0 0 0
Narmada 22 Solar energy promotion, 0 0 0 0 0 0 0 0
Narmada 23 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Total 457.9 311.294 0 0 0 76.5 84.9575 0
Narmada
Capacity Building 0 68.862 0 0 24362 0 0 0
Narmada
Evaluation & Monitoring 0 39.69 0 0 0 0 0 0
Narmada Administration 0 154.143 0 0 0 0 0 0
Narmada Consolidation Phase 0 187.18 0 0 0 0 0 0
Total 449.875
District Sr.No Activity Unit
Physical Target for FY (2018-19)
Unit
Cost (In Lakhs) IWMP
Storage Volumes (Cubic Meter)
Command Area/ Irrigation Potential (Ha.)
Person days/Mandays Planned
Convergence
Unit
Amount (In Lakhs) Name of Schemes
Narmada 1 EPA
Narmada 1 Animal camp No. 0 0 0 0 0 0 0 0
Narmada 2 Animal water trough (Havada) No. 0 0 0 0 0 0 0 0
Narmada 3 Causeway on connecting roads No. 0 0 0 0 0 0 0 0
Narmada 4 Check / Protection wall No. 0 0 0 0 0 0 0 0
Narmada 5
Demonstration for Agricultural / Animal Husbandry Productivity Enhancement No. 0 0 0 0 0 0 0 0
Narmada 6
Drainage line correction (To prevent flooding of Gamtal) rmt 0 0 0 0 0 0 0 0
Narmada 7 Drinking water facility No. 0 0 0 0 0 0 0 0
Narmada 8 Fencing for protection from wild animals rmt. 0 0 0 0 0 0 0 0
Narmada 9 Grassland/Gauchar Development Ha. 0 0 0 0 0 0 0 0
Narmada 10
Improvised and energy efficient smashan gruh (Cemetery ) No. 0 0 0 0 0 0 0 0
Narmada 12 Panchayat Well Repair & Pump Room No. 0 0 0 0 0 0 0 0
Narmada 13 Rain water harvesting system No. 0 0 0 0 0 0 0 0
Narmada 14 Recharge / Repair of open wells No. 0 0 0 0 0 0 0 0
Narmada 15
Repair / development of artificial water bodies No. 0 0 0 0 0 0 0 0
Narmada 16
Revival of natural water bodies with recharge activities No. 0 0 0 0 0 0 0 0
Narmada 17
Sanitation facilities/Sewerage line rmt 0 0 0 0 0 0 0 0
Narmada 18 Use solar power for productive activities No. 0 0 0 0 0 0 0 0
Narmada 19 Wind energy development No. 0 0 0 0 0 0 0 0
Narmada 20 OTHERS (Specifiy No. 0 0 0 0 0 0 0 0
activities )
Narmada 21 Vegitable kits Distribution No. 0 0 0 0 0 0 0 0
Narmada 22 Anganwadi Repairing No. 0 0 0 0 0 0 0 0
Narmada 23 Dhobi Ghat No. 0 0 0 0 0 0 0 0
Narmada 24 chotro Repairing No. 0 0 0 0 0 0 0 0
Narmada 25 Samsan fencing No. 0 0 0 0 0 0 0 0
Narmada 26 Kitchen Garden kits No. 0 0 0 0 0 0 0 0
Narmada 27 Books For School Library No. 0 0 0 0 0 0 0 0
Narmada 28 Afforestation No. 0 0 0 0 0 0 0 0
Narmada 29 Fancing & Plantation in Gramvatika No. 0 0 0 0 0 0 0 0
Narmada 30 Fancing & Plantation in Aanganwadi 0 0 0 0 0 0 0 0
Narmada 31 Community hall Repairing 0 0 0 0 0 0 0 0
Narmada 32 Floriculture Development 0 0 0 0 0 0 0 0
Narmada Total 0 0 0 0 0 0 0 0
Narmada 1 LAND DEVELOPMENT
Narmada 1 Farm Bunding rmt. 0 0 0 0 0 0 0 0
Narmada 2 Afforestation Ha. 0 0 0 0 0 0 0 0
Narmada 3 Agriculture Demo No. 0 0 0 0 0 0 0 0
Narmada 4 Agro Forestry Ha. 0 0 0 0 0 0 0 0
Narmada 5 Horticulture Ha. 0 0 0 0 0 0 0 0
Narmada 6 Land leveling Ha. 0 0 0 0 0 0 0 0
Narmada 7 Pasture development Ha. 0 0 0 0 0 0 0 0
Narmada 8 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 9 Bambu Bottling 0 0 0 0 0 0 0 0
Narmada 10 Border/forest plantation 0 0 0 0 0 0 0 0
Narmada 2 Soil & Moisture Conservation
Narmada 1 Check wall No. 33 63.75 47520 20.2213 14325 0 0 0
Narmada 2 Earthen bund No. 0 0 0 0 0 0 0 0
Narmada 3 Protection Wall No. 0 0 0 0 0 0 0 0
Narmada 4 Waste weir No. 0 0 0 0 0 0 0 0
Narmada 5 Bench Terracing cumec 0 0 0 0 0 0 0 0
Narmada 6 Bori bandh No. 0 0 0 0 0 0 0 0
Narmada 7 Brushwood Checks No. 0 0 0 0 0 0 0 0
Narmada 8 Countour Bunding rmt. 0 0 0 0 0 0 0 0
Narmada 9 Countour Trenches rmt. 0 0 0 0 0 0 0 0
Narmada 10 Earthern Dam No. 0 0 0 0 0 0 0 0
Narmada 11 Field Outlet No. 0 0 0 0 0 0 0 0
Narmada 12 Gabion structure No. 0 0 0 0 0 0 0 0
Narmada 13 Graded Bunding rmt. 0 0 0 0 0 0 0 0
Narmada 14 Gully plug No. 0 0 0 0 0 0 0 0
Narmada 15 Loose boulder Checks No. 0 0 0 0 0 0 0 0
Narmada 16 Nala Plug No. 65 78.907 0 0 13299 0 4.85 MGNREGA
Narmada 17 Stone bunding rmt. 0 0 0 0 0 0 0 0
Narmada 18
Straggred Contour trenching(Terrace Talavadi) rmt 0 0 0 0 0 0 0 0
Narmada 19 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 20
Water Way (Diversation of water Draingae) 0 0 0 0 0 0 0 0
Narmada 3 Water Harvesting Structure 0 0 0 0 0 0 0 0
Narmada 1 Cause way cum Chek dam No. 0 0 0 0 0 0 0 0
Narmada 2 Check dam No. 30 104.86 0 0 0 0 0 0
Narmada 3 Village/Community Pond No. 1 1.5 0 0 0 0 0 0
Narmada 4 Farm Pond No. 3 2.91 6480 2.75745 0 1 3 MGNREGA
Narmada 5 Percolation Tank No. 0 0 0 0 0 0 0 0
Narmada 6 Pond Inlet No. 0 0 0 0 0 0 0 0
Narmada 7 Pond Outlet No. 0 0 0 0 0 0 0 0
Narmada 8 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0
Narmada 4
Existing/Old Water Harvesting Structure Maintance (Renovation & Repair) 0 0 0 0 0 0 0 0
Narmada 1 Deepening/Desiltation Of Pond No. 0 0 0 0 0 0 0 0
Narmada 2 Deepening Of Percolation Tank No. 0 0 0 0 0 0 0 0
Narmada 3 De-siltation of Checkdam No. 0 0 0 0 0 0 0 0
Narmada 4 Repairing of Checkdam No. 0 0 0 0 0 0 0 0
Narmada 5 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0
Narmada 5 Ground Water Recharging Structures 0 0 0 0 0 0 0 0
Narmada 1 Dugwell Recharge structure No. 0 0 0 0 0 0 0 0
Narmada 2 Farm Recharge Filter No. 0 0 0 0 0 0 0 0
Narmada 3 Holiya in farm/Field No. 0 0 0 0 0 0 0 0
Narmada 4 Pond Recharge structure No. 0 0 0 0 0 0 0 0
Narmada 5 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 9 Total 132 251.9 54000 23.0 27624 1 7.85 0
Narmada LH & ME & Production System 0 0 0 0 0 0 0 0
Narmada 1 AGRICULTURE ACTIVITIES 0 0 0 0 0 0 0 0
Narmada 1 Agro Center No. 0 0 0 0 0 0 0 0
Narmada 2 Agricultural Implements No. 5 2.15167 0 0 0 5 4.305 Agri. Dept.
Narmada 3 Agro- Forestry 0 0 0 0 0 0 0 0
Narmada 4 Crop Demonstration Plot No. 8.67 2.64 0 0 0 0 0 0
Narmada 5 Fishery Development No. 0 0 0 0 0 0 0 0
Narmada 6 Floriculture Development Ha. 0 0 0 0 0 0 0 0
Narmada 7 Fodder Bank Development 0 0 0 0 0 0 0 0
Narmada 8 Green House No. 0 0 0 0 0 0 0 0
Narmada 9 Horticulture Plantation Ha. 0 0 0 0 0 0 0 0
Narmada 10 Kitchen Garden 0 0 0 0 0 0 0 0
Narmada 11 Nursery raising 0 0 0 0 0 0 0 0
Narmada 12 Vermi compost 0 0 0 0 0 0 0 0
Narmada 13 INPUT SUPPORT 0 0 0 0 0 0 0 0
Narmada 14 Promoting Micro-Irrigation Systems like No. 0 0 0 0 0 68 16.2 GGRC
drip and Sprinkler Irrigation
Narmada 15 Sprinkler Demo. 0 0 0 0 0 0 0 0
Narmada 16
Vegetable Nursery Raising with drip irrigation 0 0 0 0 0 0 0 0
Narmada 17 OTHERS 0 0 0 0 0 0 0 0
Narmada 18 Low Cost Poly House 0 0 0 0 0 0 0 0
Narmada 19 Lift Irrgation 9 3.55 0 0 0 9 0 0
Narmada 20 Paddy Trasing Machine 0 0 0 0 0 0 0 0
Narmada 21 Creeper Vegetable Production 0 0 0 0 0 0 0 0
Narmada 22 Rotavator 0 0 0 0 0 0 0 0
Narmada 23 Power Weeder 1 0.4 0 0 0 0 0.4 Agri. Dept.
Narmada 24 Chaffcuter No. 0 0 0 0 0 0 0 0
Narmada 25 Mini Tractor with rotary and cultivator No. 0 0 0 0 0 0 0 0
Narmada 26 Thresher Machine No. 1 0.5 0 0 0 0 0.5 other
Narmada 27 Organic Manual No. 0 0 0 0 0 0 0 0
Narmada 28 Spray pump No. 0 0 0 0 0 0 0 0
Narmada 29 Vegetable Production No. 0 0 0 0 0 0 0 0
Narmada 30 Multi crop harverter 1 0.5 0 0 0 0 0.5 GGRC
Narmada 2 AGRO PROCESSING ACTIVITIES No. 0 0 0 0 0 0 0 0
Narmada 1 Dal Making Unit No. 0 0 0 0 0 0 0 0
Narmada 2 Flour & Dal/Rice Processing unit 0 0 0 0 0 0 0 0
Narmada 3 Garam Masala 0 0 0 0 0 0 0 0
Narmada 4
Grading and packaging of agricultural produces, No. 0 0 0 0 0 0 0 0
Narmada 5 Jam-jelly making No. 0 0 0 0 0 0 0 0
Narmada 6
Microenterprises based on Minor Forest Produce (MFP) 0 0 0 0 0 0 0 0
Narmada 7 Oil extraction mill 0 0 0 0 0 0 0 0
Narmada 8 Value added products from milk 0 0 0 0 0 0 0 0
Narmada 9 Package Food Products 1 0.5 0 0 0 0 0.5 ah.dep
Narmada 10 Pulp making 0 0 0 0 0 0 0 0
Narmada 11 Rice mill 1 0.5 0 0 0 0 0.5 ah.dep
Narmada 12 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 13 Sugar cane Juice Machine 3 0.75 0 0 0 0 0.75 ah.dep
Narmada 12 Chilly Powder Unit 5 4.5 0 0 0 0 2.7 ah.dep
Narmada 13 Papad making unit 0 0 0 0 0 0 0 0
Narmada 3 Animal Husbandry 0 0 0 0 0 0 0 0
Narmada 1 Cattle Feed and Nutrition Store 0 0 0 0 0 0 0 0
Narmada 2 Animal Health camps 48 4.88 0 0 0 3 1.2 ah.dep
Narmada 3 Animal Travis (Pinjaru) 0 0 0 0 0 0 0 0
Narmada 4 Apiculture (Bee keeping) 0 0 0 0 0 0 0 0
Narmada 5 Artificial insemination 0 0 0 0 0 0 0 0
Narmada 6 Back-yard poultry 0 0 0 0 0 0 0 0
Narmada 7 Dairy cooperative promotion, No. 0 0 0 0 0 0 0 0
Narmada 8 Cattle Shed No. 0 0 0 0 0 0 0 0
Narmada 9 Pasture development No. 0 0 0 0 0 0 0 0
Narmada 10 Poultry Farming to individuals No. 0 0 0 0 0 0 0 0
Narmada 11 Sericulture No. 0 0 0 0 0 0 0 0
Narmada 12 Small ruminants 0 0 0 0 0 0 0 0
Narmada 13 Veterinary Aid for livestock 0 0 0 0 0 0 0 0
Narmada 14 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0
Narmada 4 Establishing linkages 0 0 0 0 0 0 0 0
Narmada 1 Credit linkages 0 0 0 0 0 0 0 0
Narmada 2 Linkages with Future Markets, No. 0 0 0 0 0 0 0 0
Narmada 3 Market linkages, 0 0 0 0 0 0 0 0
Narmada 4 Raw material supply channel, 0 0 0 0 0 0 0 0
Narmada 5 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 5 Local traditional handicraft 0 0 0 0 0 0 0 0
Narmada 1 Bamboo based products, 0 0 0 0 0 0 0 0
Narmada 2 Kutchi Bandhini, 0 0 0 0 0 0 0 0
Narmada 3 Pottery 0 0 0 0 0 0 0 0
Narmada 4 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 6 Minor Activities 0 0 0 0 0 0 0 0
Narmada 1 Embroidery Unit 0 0 0 0 0 0 0 0
Narmada 2 Handicraft Unit No 0 0 0 0 0 0 0 0
Narmada 3 Vegetable shop 0 0 0 0 0 0 0 0
Narmada 4 Provision Store 0 0 0 0 0 0 0 0
Narmada 5 stiching machine 2 2 0 0 0 0 0 0
Narmada 6 Up Gradation of centering materials 0 0 0 0 0 0 0 0
Narmada 7 OTHERS (Specifiy activities ) No 2 0.68 0 0 0 0 0 0
Narmada 8 Musical instrument 0 0 0 0 0 0 0 0
Narmada 9 Madap Decoration 9 12.2 0 0 0 0 0 0
Narmada 10 Catering Set 9 14.87 0 0 0 0 0 0
Narmada 11 ConcreteMixure Machine 3 4.8 0 0 0 0 0 0
Narmada 12 Pepar dish& bowl making unit 0 0 0 0 0 0 0 0
Narmada 13 Vegetable Trolley 0 0 0 0 0 0 0 0
Narmada 14 Carpenter instrument 2 0.7 0 0 0 0 0 0
Narmada 15 Construction instrument 0 0 0 0 0 0 0 0
Narmada 16 Canteen House 0 0 0 0 0 0 0 0
Narmada Tyre Repairing Unit 0 0 0 0 0 0 0 0
Narmada 17 Non-conventional Energy Sources 0 0 0 0 0 0 0 0
Narmada 18 Bio gas plant, 0 0 0 0 0 0 0 0
Narmada 19 Bio-fuel plantation, 0 0 0 0 0 0 0 0
Narmada 20 energy conservation measures, 0 0 0 0 0 0 0 0
Narmada 21 Wind energy production, 0 0 0 0 0 0 0 0
Narmada 22 Solar energy promotion, 0 0 0 0 0 0 0 0
Narmada 23 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Total 111 56.1217 0 0 0 85 27.555 0
Narmada
Capacity Building 0 7.34 0 0 2596.7 0 0 0
Narmada
Evaluation & Monitoring 0 4.35 0 0 0 0 0 0
Narmada Administration 0 38.413 0 0 0 0 0 0
Narmada Consolidation Phase 0 18.5 0 0 0 0 0 0
Total 68.603
District Sr.No Activity Unit
Physical Target for FY (2019-20)
Unit
Cost (In Lakhs) IWMP
Storage Volumes (Cubic Meter)
Command Area/ Irrigation Potential (Ha.)
Person days/Mandays Planned
Convergence
Unit
Amount (In Lakhs) Name of Schemes
Narmada 1 EPA
Narmada 1 Animal camp No. 0 0 0 0 0 0 0 0
Narmada 2 Animal water trough (Havada) No. 0 0 0 0 0 0 0 0
Narmada 3 Causeway on connecting roads No. 0 0 0 0 0 0 0 0
Narmada 4 Check / Protection wall No. 0 0 0 0 0 0 0 0
Narmada 5
Demonstration for Agricultural / Animal Husbandry Productivity Enhancement No. 0 0 0 0 0 0 0 0
Narmada 6
Drainage line correction (To prevent flooding of Gamtal) rmt 0 0 0 0 0 0 0 0
Narmada 7 Drinking water facility No. 0 0 0 0 0 0 0 0
Narmada 8 Fencing for protection from wild animals rmt. 0 0 0 0 0 0 0 0
Narmada 9 Grassland/Gauchar Development Ha. 0 0 0 0 0 0 0 0
Narmada 10
Improvised and energy efficient smashan gruh (Cemetery ) No. 0 0 0 0 0 0 0 0
Narmada 12 Panchayat Well Repair & Pump Room No. 0 0 0 0 0 0 0 0
Narmada 13 Rain water harvesting system No. 0 0 0 0 0 0 0 0
Narmada 14 Recharge / Repair of open wells No. 0 0 0 0 0 0 0 0
Narmada 15
Repair / development of artificial water bodies No. 0 0 0 0 0 0 0 0
Narmada 16
Revival of natural water bodies with recharge activities No. 0 0 0 0 0 0 0 0
Narmada 17
Sanitation facilities/Sewerage line rmt 0 0 0 0 0 0 0 0
Narmada 18 Use solar power for productive activities No. 0 0 0 0 0 0 0 0
Narmada 19 Wind energy development No. 0 0 0 0 0 0 0 0
Narmada 20 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0
Narmada 21 Vegitable kits Distribution No. 0 0 0 0 0 0 0 0
Narmada 22 Anganwadi Repairing No. 0 0 0 0 0 0 0 0
Narmada 23 Dhobi Ghat No. 0 0 0 0 0 0 0 0
Narmada 24 chotro Repairing No. 0 0 0 0 0 0 0 0
Narmada 25 Samsan fencing No. 0 0 0 0 0 0 0 0
Narmada 26 Kitchen Garden kits No. 0 0 0 0 0 0 0 0
Narmada 27 Books For School Library No. 0 0 0 0 0 0 0 0
Narmada 28 Afforestation No. 0 0 0 0 0 0 0 0
Narmada 29 Fancing & Plantation in Gramvatika No. 0 0 0 0 0 0 0 0
Narmada 30 Fancing & Plantation in Aanganwadi 0 0 0 0 0 0 0 0
Narmada 31 Community hall Repairing 0 0 0 0 0 0 0 0
Narmada 32 Floriculture Development 0 0 0 0 0 0 0 0
Narmada Total 0 0 0 0 0 0 0 0
Narmada 1 LAND DEVELOPMENT
Narmada 1 Farm Bunding rmt. 0 0 0 0 0 0 0 0
Narmada 2 Afforestation Ha. 0 0 0 0 0 0 0 0
Narmada 3 Agriculture Demo No. 0 0 0 0 0 0 0 0
Narmada 4 Agro Forestry Ha. 0 0 0 0 0 0 0 0
Narmada 5 Horticulture Ha. 0 0 0 0 0 0 0 0
Narmada 6 Land leveling Ha. 0 0 0 0 0 0 0 0
Narmada 7 Pasture development Ha. 0 0 0 0 0 0 0 0
Narmada 8 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 9 Bambu Bottling 0 0 0 0 0 0 0 0
Narmada 10 Border/forest plantation 0 0 0 0 0 0 0 0
Narmada 2 Soil & Moisture Conservation
Narmada 1 Check wall No. 0 0 0 0 0 0 0 0
Narmada 2 Earthen bund No. 0 0 0 0 0 0 0 0
Narmada 3 Protection Wall No. 0 0 0 0 0 0 0 0
Narmada 4 Waste weir No. 0 0 0 0 0 0 0 0
Narmada 5 Bench Terracing cumec 0 0 0 0 0 0 0 0
Narmada 6 Bori bandh No. 0 0 0 0 0 0 0 0
Narmada 7 Brushwood Checks No. 0 0 0 0 0 0 0 0
Narmada 8 Countour Bunding rmt. 0 0 0 0 0 0 0 0
Narmada 9 Countour Trenches rmt. 0 0 0 0 0 0 0 0
Narmada 10 Earthern Dam No. 0 0 0 0 0 0 0 0
Narmada 11 Field Outlet No. 0 0 0 0 0 0 0 0
Narmada 12 Gabion structure No. 0 0 0 0 0 0 0 0
Narmada 13 Graded Bunding rmt. 0 0 0 0 0 0 0 0
Narmada 14 Gully plug No. 0 0 0 0 0 0 0 0
Narmada 15 Loose boulder Checks No. 0 0 0 0 0 0 0 0
Narmada 16 Nala Plug No. 0 0 0 0 0 0 0 0
Narmada 17 Stone bunding rmt. 0 0 0 0 0 0 0 0
Narmada 18
Straggred Contour trenching(Terrace Talavadi) rmt 0 0 0 0 0 0 0 0
Narmada 19 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 20
Water Way (Diversation of water Draingae) 0 0 0 0 0 0 0 0
Narmada 3 Water Harvesting 0 0 0 0 0 0 0 0
Structure
Narmada 1 Cause way cum Chek dam No. 0 0 0 0 0 0 0 0
Narmada 2 Check dam No. 13 69.5 117000 49.7872 9761 2 17.3 MGNREGA
Narmada 3 Village/Community Pond No. 0 0 0 0 0 0 0 0
Narmada 4 Farm Pond No. 6 17.53 12960 5.51489 0 2 4.5 MGNREGA
Narmada 5 Percolation Tank No. 0 0 0 0 0 0 0 0
Narmada 6 Pond Inlet No. 0 0 0 0 0 0 0 0
Narmada 7 Pond Outlet No. 0 0 0 0 0 0 0 0
Narmada 8 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0
Narmada 4
Existing/Old Water Harvesting Structure Maintance (Renovation & Repair) 0 0 0 0 0 0 0 0
Narmada 1 Deepening/Desiltation Of Pond No. 8 8.196 0 0 4604 1 2.5 MGNREGA
Narmada 2 Deepening Of Percolation Tank No. 0 0 0 0 0 0 0 0
Narmada 3 De-siltation of Checkdam No. 11 10 36000 15.3191 5618 12 17.5 MGNREGA
Narmada 4 Repairing of Checkdam No. 2 4.65 9000 3.82979 784 0 0 0
Narmada 5 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0
Narmada 5 Ground Water Recharging Structures 0 0 0 0 0 0 0 0
Narmada 1 Dugwell Recharge structure No. 0 0 0 0 0 0 0 0
Narmada 2 Farm Recharge Filter No. 0 0 0 0 0 0 0 0
Narmada 3 Holiya in farm/Field No. 0 0 0 0 0 0 0 0
Narmada 4 Pond Recharge structure No. 0 0 0 0 0 0 0 0
Narmada 5 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 9 Total 40 109.9 174960 74.5 20767 17 41.8 0
Narmada LH & ME & Production System 0 0 0 0 0 0 0 0
Narmada 1 AGRICULTURE ACTIVITIES 0 0 0 0 0 0 0 0
Narmada 1 Agro Center No. 0 0 0 0 0 0 0 0
Narmada 2 Agricultural Implements No. 0 0 0 0 0 0 0 0
Narmada 3 Agro- Forestry 0 0 0 0 0 0 0 0
Narmada 4 Crop Demonstration Plot No. 0 0 0 0 0 0 0 0
Narmada 5 Fishery Development No. 0 0 0 0 0 0 0 0
Narmada 6 Floriculture Development Ha. 0 0 0 0 0 0 0 0
Narmada 7 Fodder Bank Development 0 0 0 0 0 0 0 0
Narmada 8 Green House No. 0 0 0 0 0 0 0 0
Narmada 9 Horticulture Plantation Ha. 0 0 0 0 0 0 0 0
Narmada 10 Kitchen Garden 0 0 0 0 0 0 0 0
Narmada 11 Nursery raising 0 0 0 0 0 0 0 0
Narmada 12 Vermi compost 0 0 0 0 0 0 0 0
Narmada 13 INPUT SUPPORT 0 0 0 0 0 0 0 0
Narmada 14
Promoting Micro-Irrigation Systems like drip and Sprinkler Irrigation No. 0 0 0 0 0 0 0 0
Narmada 15 Sprinkler Demo. 0 0 0 0 0 0 0 0
Narmada 16
Vegetable Nursery Raising with drip irrigation 0 0 0 0 0 0 0 0
Narmada 17 OTHERS 0 0 0 0 0 0 0 0
Narmada 18 Low Cost Poly House 0 0 0 0 0 0 0 0
Narmada 19 Lift Irrgation 0 0 0 0 0 0 0 0
Narmada 20 Paddy Trasing Machine 0 0 0 0 0 0 0 0
Narmada 21 Creeper Vegetable Production 0 0 0 0 0 0 0 0
Narmada 22 Rotavator 0 0 0 0 0 0 0 0
Narmada 23 Power Weeder 0 0 0 0 0 0 0 0
Narmada 24 Chaffcuter No. 0 0 0 0 0 0 0 0
Narmada 25 Mini Tractor with rotary and cultivator No. 0 0 0 0 0 0 0 0
Narmada 26 Thresher Machine No. 0 0 0 0 0 0 0 0
Narmada 27 Organic Manual No. 0 0 0 0 0 0 0 0
Narmada 28 Spray pump No. 0 0 0 0 0 0 0 0
Narmada 29 Vegetable Production No. 0 0 0 0 0 0 0 0
Narmada 30 Multi crop harverter 0 0 0 0 0 0 0 0
Narmada 2 AGRO PROCESSING ACTIVITIES No. 0 0 0 0 0 0 0 0
Narmada 1 Dal Making Unit No. 2 1 0 0 0 0 1 AGRI DEPT
Narmada 2 Flour & Dal/Rice Processing unit 6 2.99 0 0 0 0 2.99 AGRI DEPT
Narmada 3 Garam Masala 0 0 0 0 0 0 0 0
Narmada 4
Grading and packaging of agricultural produces, No. 0 0 0 0 0 0 0 0
Narmada 5 Jam-jelly making No. 0 0 0 0 0 0 0 0
Narmada 6
Microenterprises based on Minor Forest Produce (MFP) 0 0 0 0 0 0 0 0
Narmada 7 Oil extraction mill 0 0 0 0 0 0 0 0
Narmada 8 Value added products from milk 0 0 0 0 0 0 0 0
Narmada 9 Package Food Products 0 0 0 0 0 0 0 0
Narmada 10 Pulp making 0 0 0 0 0 0 0 0
Narmada 11 Rice mill 0 0 0 0 0 0 0 0
Narmada 12 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 13 Sugar cane Juice Machine 0 0 0 0 0 0 0 0
Narmada 12 Chilly Powder Unit 0 0 0 0 0 0 0 0
Narmada 13 Papad making unit 0 0 0 0 0 0 0 0
Narmada 3 Animal Husbandry 0 0 0 0 0 0 0 0
Narmada 1 Cattle Feed and Nutrition Store 0 0 0 0 0 0 0 0
Narmada 2 Animal Health camps 0 0 0 0 0 0 0 0
Narmada 3 Animal Travis (Pinjaru) 0 0 0 0 0 0 0 0
Narmada 4 Apiculture (Bee keeping) 0 0 0 0 0 0 0 0
Narmada 5 Artificial insemination 0 0 0 0 0 0 0 0
Narmada 6 Back-yard poultry 1 1.4 0 0 0 0 1.4 other
Narmada 7 Dairy cooperative promotion, No. 0 0 0 0 0 0 0 0
Narmada 8 Cattle Shed No. 37 9.655 0 0 0 0 1.245 Animal Dept.
Narmada 9 Pasture development No. 0 0 0 0 0 0 0 0
Narmada 10 Poultry Farming to individuals No. 0 0 0 0 0 0 0 0
Narmada 11 Sericulture No. 0 0 0 0 0 0 0 0
Narmada 12 Small ruminants 0 0 0 0 0 0 0 0
Narmada 13 Veterinary Aid for livestock 0 0 0 0 0 0 0 0
Narmada 14 OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0
Narmada 4 Establishing linkages 0 0 0 0 0 0 0 0
Narmada 1 Credit linkages 0 0 0 0 0 0 0 0
Narmada 2 Linkages with Future Markets, No. 0 0 0 0 0 0 0 0
Narmada 3 Market linkages, 0 0 0 0 0 0 0 0
Narmada 4 Raw material supply channel, 0 0 0 0 0 0 0 0
Narmada 5 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 5 Local traditional handicraft 0 0 0 0 0 0 0 0
Narmada 1 Bamboo based products, 0 0 0 0 0 0 0 0
Narmada 2 Kutchi Bandhini, 0 0 0 0 0 0 0 0
Narmada 3 Pottery 0 0 0 0 0 0 0 0
Narmada 4 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Narmada 6 Minor Activities 0 0 0 0 0 0 0 0
Narmada 1 Embroidery Unit 0 0 0 0 0 0 0 0
Narmada 2 Handicraft Unit No 0 0 0 0 0 0 0 0
Narmada 3 Vegetable shop 0 0 0 0 0 0 0 0
Narmada 4 Provision Store 0 0 0 0 0 0 0 0
Narmada 5 stiching machine 0 0 0 0 0 0 0 0
Narmada 6 Up Gradation of centering materials 4 1.85 0 0 0 0 1.85 AGRI DEPT
Narmada 7 OTHERS (Specifiy activities ) No 0 0 0 0 0 0 0 0
Narmada 8 Musical instrument 0 0 0 0 0 0 0 0
Narmada 9 Madap Decoration 2 1.83 0 0 0 0 1.82 AGRI DEPT
Narmada 10 Catering Set 0 0 0 0 0 0 0 0
Narmada 11 ConcreteMixure Machine 2 1.2 0 0 0 0 1.2 AGRI DEPT
Narmada 12 Pepar dish& bowl making unit 0 0 0 0 0 0 0 0
Narmada 13 Vegetable Trolley 0 0 0 0 0 0 0 0
Narmada 14 Carpenter instrument 0 0 0 0 0 0 0 0
Narmada 15 Construction instrument 0 0 0 0 0 0 0 0
Narmada 16 Canteen House 0 0 0 0 0 0 0 0
Narmada Tyre Repairing Unit 1 0.2 0 0 0 0 0 0
Narmada 17 Non-conventional Energy Sources 0 0 0 0 0 0 0 0
Narmada 18 Bio gas plant, 0 0 0 0 0 0 0 0
Narmada 19 Bio-fuel plantation, 0 0 0 0 0 0 0 0
Narmada 20 energy conservation measures, 0 0 0 0 0 0 0 0
Narmada 21 Wind energy production, 0 0 0 0 0 0 0 0
Narmada 22 Solar energy promotion, 0 0 0 0 0 0 0 0
Narmada 23 OTHERS (Specifiy activities ) 0 0 0 0 0 0 0 0
Total 55 20.125 0 0 0 0 11.505 0
Narmada
Capacity Building 0 6.78 0 0 2398.58 0 0 0
Narmada
Evaluation & Monitoring 0 4 0 0 0 0 0 0
Narmada Administration 0 21.777 0 0 0 0 0 0
Narmada Consolidation Phase 0 23.9 0 0 0 0 0 0
Total 56.457
BANANA