N NW NE · dublin bus depot mayeston lawn future connection future connection future connection...

1
H H H H H H H H LS LS LS LS LS LS LS ES LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS ES LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS Ramp Long Term Car Park HORIZON LOGISTICS PARK Car Park Car Park Car Park Car Park LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS ES LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS Mh Mh Mh H Mh H Mh Long Term Car Park Spring Long Term Car Park LS Mayeston Clos Creston Mh Resevoir (Covered) MERRYFALLS Merryfalls MEAKSTOWN Baile Maidheac Sillogue Water Pumping Station. Water Tower Under Const. Tk Playground 63.1 64.6 Mayeston Green Mayeston Green Sports Ground Golf Course Golf Course Mh Mh Mhs Mh LS LS LS LS LS LS T LS LS T 10kv SILLOGE Saileog Car Park Car Park Steps Steps Steps Car Park Car Park Car Park Under Const. Sluice Gate 21 - 60 Dublin Bus Depot wn wn FUTURE CONNECTION FUTURE CONNECTION FUTURE CONNECTION PROPOSED CONSTRUCTION COMPOUND NO. 3 MH-14 MH-15 MH-18 MH-17 MH-16 MH-19 MH-21 MH-20 MH-22 MH-23 MH-24 MH-27 MH-26 MH-25 AP-6 AP-7A NE E SE S SW W NW N Ordnance Survey Ireland Licence number EN 0016018. © Ordnance Survey Ireland/Government of Ireland N O T E S : 1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. 2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE 3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES 4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND, BEFORE ANY WORK COMMENCES. 5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD Client: Project: Title: Scale @ A1: Prepared by: Checked: Date: Project Director: Drawing No.: Revision: Rev Date Description By Chkd. TOBIN Consulting Engineers will not be liable for any use of this document for any purpose other than that for which it was originally prepared and provided. Except where specifically and explicitly agreed in writing by TOBIN Consulting Engineers, as copyright holder, no part of this document may be reproduced or transmitted in any form and this document shall not be relied upon by any third party for any purpose. Drawing Status: 1:2,500 PROJECT ROUTE MAP - Sheet 5 of 14 - 1:2,500 A. O'Callaghan B. Downes June 2018 C. O'Keeffe Planning 32102902-2005 P01 P01 08.06.18 ISSUE FOR PLANNING AOC BD 0 150m 100m 50m 50m KEY PLAN: 5 OSI 1:5,000 Sheet No's: 7029 OSI 1:2,500 Sheet No's: 3062-D, 3063-C, 3063-D, 3064-B, 3064-C, 3064-D, 3065-A, 3065-B, 3065-C, 3065-D, 3066-A, 3066-C, 3130-A, 3130-B, 3130-C, 3130-D, 3131-A. OSI 1:1,000 Sheet No's: 3063-12, 3063-13, 3063-14, 3063-15, 3064-11, 3064-12, 3065-15, 3066-06, 3066-11, 3129-15, 3129-20, 3129-25, 3130-11, 3130-12, 3130-15, 3130-16, 3130-17, 3130-20, 3130-21, 3130-22, 3131-01, 3131-06, 3131-07. FOR CONTINUATION REFER TO DRG. NO.: 32102902-2006 FOR CONTINUATION REFER TO DRG. NO.: 32102902-2004 MANHOLE AIR VALVE SCOUR VALVE MH-1 AV-1 SCV-1 ACCESS CHAMBER AC-1 LEGEND: PLANNING BOUNDARY CONSTRUCTION COMPOUNDS PROPOSED ORBITAL SEWER ROUTE (GRAVITY) PROPOSED OUTFALL PIPELINE ROUTE (LAND BASED SECTION) PROPOSED OUTFALL PIPELINE ROUTE (MARINE SECTION) PROPOSED WWTP/PS PROPOSED ORBITAL SEWER ROUTE (RISING MAIN)

Transcript of N NW NE · dublin bus depot mayeston lawn future connection future connection future connection...

Page 1: N NW NE · dublin bus depot mayeston lawn future connection future connection future connection proposed construction compound no. 3 mh-14 mh-15 mh-18 mh-16 mh-17 mh-19 mh-20 mh-21

H

H

H

H

H

H

H

H

LS

LS

LS

LS

LS

LS LS

ES

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

ES

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

Ram

p

Long Term Car Park

HO

RIZ

ON

LO

GIS

TIC

S P

AR

K

Car

Park

Car Park

Car Park

Car Park

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

ES

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

LS

Mh

Mh

Mh

H

Mh

H

Mh

Long Term Car Park

Spring

Long Term Car Park

LS

M

a

y

e

s

to

n

C

lo

s

e

Creston

Mh

Resevoir

(Covered)

MERRYFALLS

Merryfalls

MEAKSTOWN

Baile Maidheac

Sillogue Water

Pumping Station.

Water Tower

Under Const.

Tk

Playground

63.1

64.6

Mayeston GreenMayeston Green

Sports Ground

Golf Course

Golf Course

Mh

Mh

Mhs

Mh

LS

LS

LS

LS

LS

LS

T

LS

LS

T

1

0

k

v

SILLOGE

Saileog

Car Park

Car Park

Steps

Steps

Steps

Car Park

Car Park

Car Park

Under Const.

Sluice Gate

21 - 6

0

Dublin Bus Depot

Mayeston Law

n

Mayeston Law

n

FUTURE CONNECTION

FUTURE CONNECTION

FUTURE CONNECTION

PROPOSED

CONSTRUCTION

COMPOUND NO. 3

MH-14

MH-15

MH-18

MH-17

MH-16

MH-19

MH-21MH-20

MH-22

MH-23

MH-24

MH-27

MH-26

MH-25

AP-6

AP-7A

PROPOSED

CONSTRUCTION

COMPOUND NO. 10

EXISTING

WALKWAY TO

BEACH TO BE

MAINTAINED

MH-65

MH-66

MH-68

MH-69

MH-70

MH-67 0+000

0+050

0+100

0+150

0+200

0+250

0+300

0+350

0+400

0+450

0+500

0+550

0+600

AP-7A

AP-7B

AP-7A

MH-71

N

E

E

S

E

S

S

W

W

N

W

N

DECLAN CUNNINGHAM 2004

Ordnance Survey Ireland Licence number EN 0016018. © Ordnance Survey Ireland/Government of Ireland

N O T E S :

1. FIGURED DIMENSIONS ONLY TO BE TAKEN

FROM THIS DRAWING.

2. ALL DRAWINGS TO BE CHECKED BY THE

CONTRACTOR ON SITE

3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS

APPROPRIATE, TO BE INFORMED BY THE

CONTRACTOR OF ANY DISCREPANCIES BEFORE

ANY WORK COMMENCES

4. THE CONTRACTOR SHALL UNDERTAKE A

THOROUGH CHECK FOR THE ACTUAL LOCATION

OF ALL SERVICES/UTILITIES, ABOVE AND BELOW

GROUND, BEFORE ANY WORK COMMENCES.

5. ALL LEVELS SHOWN RELATE TO ORDNANCE

SURVEY DATUM AT MALIN HEAD

Client:

Project:

Title:

Scale @ A1:

Prepared by: Checked: Date:

Project Director:

Drawing No.:

Revision:

Rev Date

Description

By

Chkd.

TOBIN Consulting Engineers will not be liable for any use of this document for

any purpose other than that for which it was originally prepared and provided.

Except where specifically and explicitly agreed in writing by TOBIN Consulting

Engineers, as copyright holder, no part of this document may be reproduced or

transmitted in any form and this document shall not be relied upon by any third

party for any purpose.

Drawing Status:

1:2,500

PROJECT ROUTE MAP

- Sheet 5 of 14 -

1:2,500

A. O'Callaghan B. DownesJune 2018

C. O'Keeffe

Planning

32102902-2005

P01

P01 08.06.18 ISSUE FOR PLANNING AOC BD

0 150m100m50m50m

KEY PLAN:

5

OSI 1:5,000 Sheet No's:

7029

OSI 1:2,500 Sheet No's:

3062-D, 3063-C, 3063-D, 3064-B, 3064-C, 3064-D, 3065-A,

3065-B, 3065-C, 3065-D, 3066-A, 3066-C, 3130-A, 3130-B,

3130-C, 3130-D, 3131-A.

OSI 1:1,000 Sheet No's:

3063-12, 3063-13, 3063-14, 3063-15, 3064-11, 3064-12,

3065-15, 3066-06, 3066-11, 3129-15, 3129-20, 3129-25,

3130-11, 3130-12, 3130-15, 3130-16, 3130-17, 3130-20,

3130-21, 3130-22, 3131-01, 3131-06, 3131-07.

FO

R C

ON

TIN

UA

TIO

N R

EF

ER

TO

D

RG

. N

O.: 32102902-2006

FO

R C

ON

TIN

UA

TIO

N R

EF

ER

TO

D

RG

. N

O.: 32102902-2004

MANHOLE

AIR VALVE

SCOUR VALVE

MH-1

AV-1

SCV-1

ACCESS CHAMBER

AC-1

LEGEND:

PLANNING BOUNDARY

CONSTRUCTION

COMPOUNDS

PROPOSED ORBITAL

SEWER ROUTE

(GRAVITY)

PROPOSED OUTFALL

PIPELINE ROUTE (LAND

BASED SECTION)

PROPOSED OUTFALL

PIPELINE ROUTE

(MARINE SECTION)

PROPOSED WWTP/PS

PROPOSED ORBITAL

SEWER ROUTE

(RISING MAIN)