MRO&U Capability and Partnering Progress · 2010-11-15 · PA # JSF-10-01 F-35 Program Information...

11
© 2010 Lockheed Martin Aeronautics Company F-35 Program Information Non Export Controlled Information Releasable to Foreign Persons Rate Repair Capability Development and Establishment US Public-Private Partnering Completed Initial MRO&U Implementation Planning 16 of 46 Systems to Began in LRIP 3 78% Complete MRO&U Sources of Repair Selected (36 of 46 Systems) First F-35 MRO&Us Stand Up 2012 Begin Iterative Global Expansion Evaluations in 2010 F-35 Joint Partnering Agreement Complete US Sustainment Implementation Agreements Template 99% Complete Focus Working Group Approach Global Commercial Contracting for International MRO&U MRO&U Capability and Partnering Progress Development Progress Supports Global Capability MRO&U Implementation Plan USG MRO&U Source of Repair Decisions Global MRO&U Capability Expansion Timeline F-35 Partnering Agreement Sustainment Implementation Agreement F-35 Lightning II DEPOT PARTNERING AGREEMENT among F-35 Joint Strike Fighter Program Office, Naval Air Systems Command, Air Force Materiel Command, and Lockheed Martin Aeronautics Company, Pratt & Whitney Division, and GE-Rolls-Royce Fighter Engine Team, LLC PA # JSF-10-01 F-35 Program Information Non-Export Controlled Information Releasable to Foreign Persons Lockheed Martin Proprietary Information 1 AS P F-35 Operational Footprint -35 Bases -22 Ships Iwakuni Williamtown Tindal Amberly Lossiemouth Rota Grottaglie Konya Leeuwarden Amendola Juan Carlos CVF CVN LHD Pax Beaufort Eglin Ft. Worth Nellis LukeYuma Edwards Lemoore Bodo Orland Decimomannu Skrydstrup PACAF (Kadena) Volkel Eskisehir USAFE (Germany) Bagotville Cold Lake Hill Fallon Mirimar Shaw Cherry Point Oceana St. Istrana (Italy) St. Ghedi (Italy) CONUS OPS 5 (location: TBD) Global MRO&U Capability Will be Sized and Located to Support the Fleet ITS Cavour FOR OFFICIAL USE ONLY // REL TO USA, GBR MOD, ITA MOD, NLD MOD, TUR MND, CAN DND, AUS DOD, DNK MOD, and NOR MOD 1 Timing 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Study Study Study Study Study BCA BCA BCA BCA BCA Decision Decision Decision Decision Identify Funding in Support of Global MRO&U Decisions Global PA in Place Global DSOR Activation Global Industrial Base Capability Iterative Expansion Process Studies and BCAs Continue as Global Footprint Grows 1 F-35 Program Information Non Export Controlled Information Releasable to Foreign Persons Depot Implementation Plan Rev 3b 1 F-35 Program Information Non Export Controlled Information Releasable to Foreign Persons USG Depot Stand Up Schedule 2012 2013 2014 2015 OO-ALC Air Vehicle LM AERO Doors, Panels & Covers LM AERO/NGC/BAE RadomeLM AERO Landing Gear Goodrich Control Surfaces & Edges LM AERO Canopy System LM AERO FRIU GE Aviation MRIU GE Aviation HMDS VSI PCD L3 EDI S&RES ITT (EDO) Canopy Actuator MPC AME Marvin Gun General Dynamics SFDS GE Aviation WR-ALC RIO GE Aviation VMC BAE GPS Raytheon EW CM BAE AMS GE Aviation Cockpit Equip & Layout Sirio Panel Lighting LSI CNI NG CNDMS ICP LM MS2 EODAS NG ES Common Components Harris TNS Honeywell INS Honeywell OC-ALC Life Support System Honeywell Yeovil FRCE Air Vehicle LM AERO Doors, Panels & Covers LM AERO/NGC/BAE RadomeLM AERO Control Surfaces & Edges LM AERO Canopy System LM AERO PTMS Honeywell Engine Lift System Rudder Pedal Pacific Scientific HPGS Eaton UA&CV Eaton WBDDS Goodrich Actuation Ejection Seat Martin Baker ADS Goodrich Sensors In-flight Ice Detection Goodrich Sensor Systems FRCSE Radar NG ES EOTS LM M&FC Fuel Parker Hannifin AIS BAE CSMU L3 Arresting Gear Stork FRCSW LEFAS Moog LEFDS Curtiss Wright EPG&C Hamilton Sundstrand EPMS GE Aviation EHAS Moog/Parker WFAS Moog Note: All Red entries are awaiting final approval Depot Implementation Plan Rev 3b 1 F-35 Program Information Non Export Controlled Information Releasable to Foreign Persons JSF Public Private Partnerships Challenges Common Language / Processes Partnering Agreement Implementing Agreements Business Arrangement Direct Sales Workshare IA Tempo Cost Accounting Depot Incentives Legacy Mindset Existing Processes Amount of Work Title X Perceptions Roles and Responsibilities Opportunities Leverage of Best from Partners Depot Technician Skills Contractor System Knowledge Payments Pay as you Perform Depot Pre-Payment Contract Type & Length Prime Period of Performance OEM/Depot Period of Performance Depot Labor Adjustments Annual versus Contract Period FOR OFFICIAL USE ONLY // REL TO USA, GBR MOD, ITA MOD, NLD MOD, TUR MND, CAN DND, AUS DOD, DNK MOD, and NOR MOD 1 USG Depot Source of Repair Decisions For F-35 to Date OO-ALC FRC-SW FRC-E FRC-SE OC-ALC WR-ALC TYAD Airframe Landing Gear S&RES AME Gun SMS Canopy Actuator HMDS PCD SFDS F135 F136 Life Support System RIO VMC Cockpit Equip. Lighting CNI GPS Common Comp. Airframe Lift Fan ADS Rudder Pedal HUA WBDDS Ejection Seat EHAS LEFAS EPG&C EPMS WFAS F135 F136 AIS CSMU Arresting Gear Radar To Be Determined TNS PTMS Ice Detection AMS Fuel System EOTS EODAS INS EW CM ICP 1 F-35 Program Information Non Export Controlled Information Releasable to Foreign Persons Schedule of Sustainment IAs Systems 2011 2012 2013 2014 2015 2016 Airframe Systems Air Vehicle, Doors, Panels, & Covers, Canopy System, Radome 2 6 [2] [6] Vehicle Systems AIS, CSMU, EHAS, ADS, TNS, LEFAS, Rudder Pedal, EPGC, EPMS, PTMS, Inflight Ice Detection, Landing Gear, Arresting Gear, HPGS, UA&CV, WBDDS, WFAS, Fuel, RIO, VMC, ADS 4 4 [4] 2 [4] 10 [2] [10] Mission Systems S&RES, AME, Gun, SMS, Cockpit Equipment, Canopy Actuator, Ejection Seat, Life Support System, HMDS, PCD, SFDS, Lighting, EOTS, EODAS, CNI, Radar, EW/CW, Common Comp, ICP, AMS, GPS, FRIU, MRIU 3 11 [3] 0 [11] 8 [0] [8] USG Depot IA Development Distribution OO 1 FR1 - 1 OO 5 WR - 3 FR1 5 OO 4 WR - 6 FR1 1 FR2 - 1 FR3 3 FR1 - 2 OO 5 WR 4 FR1 4 FR2 3 FR3 - 2 USG Depot IA Execution Distribution OO 1 FR1 1 OO 5 WR - 3 FR1 5 OO 4 WR - 6 FR1 1 FR2 - 1 FR3 3 FR1 - 2 OO 5 WR 4 FR1 4 FR2 3 FR3 - 2 n = Sustainment IA Development Year [n] = Sustainment IA Execution Year Legend: OO = OO-ALC FR1 = FRCE FR2 = FRCSE FR3 = FRCSW WR = WR-ALC 1 F-35 Program Information Non Export Controlled Information Releasable to Foreign Persons Sustainment IA Template Development Sustainment Implementation Agreement Development and Execution 2010 Sustainment IA Development LM ALGS Service Depot PBL Supplier (as required) 2011 - 2015 Sustainment IA Execution 2012+ Source Data Depot Partnering Agreement (PA) & Site Activation IA’s Development of IA template to follow same path as PA, collaboration between all stakeholders 1 F-35 Program Information Non Export Controlled Information Releasable to Foreign Persons Partnering Strategy (Jan 25, 2010) US Service Depots Non PBL Suppliers LM PBL Supplier BAE Systems (Principal Subcontractor) Northrop Grumman (Principal Subcontractor) AFMC NAVAIR Lockheed Martin PSP Funding and Contractual Flow Joint Strike Fighter Program Office (JSFPO) Prime PBL Contract sPBL sPBL sPBL Contract PA/IA Legend: PSC 3 Party IA (supplier signature) 2 Party IA (no supplier signature) F-35 PA F-35 Business Model 1 F-35 Program Information Non Export Controlled Information Releasable to Foreign Persons Commodities Traditional JSF Industrial Sustainment Business Model Prime Contracts Supplier Contracts Suppliers Incentivized Traditional Commodities Supply Chain ASC Air System Requirements Performance Based Agreements Funding Source PBA JSFPO Warfighters US Depot (s) Title 10 PSC In House Out Source Non-Title 10 F L O W D O W N Associate Contractors Agreement Suppliers Incentivized F L O W D O W N

Transcript of MRO&U Capability and Partnering Progress · 2010-11-15 · PA # JSF-10-01 F-35 Program Information...

Page 1: MRO&U Capability and Partnering Progress · 2010-11-15 · PA # JSF-10-01 F-35 Program Information Non-Export Controlled Information ± Releasable to Foreign Persons ± Lockheed Martin

© 2010 Lockheed Martin Aeronautics Company

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

Rate Repair Capability Development and Establishment

US Public-Private Partnering

Completed Initial MRO&U

Implementation Planning

• 16 of 46 Systems to Began in LRIP 3

78% Complete MRO&U Sources of

Repair Selected (36 of 46 Systems)

First F-35 MRO&Us Stand Up 2012

Begin Iterative Global Expansion

Evaluations in 2010

F-35 Joint Partnering Agreement

Complete

US Sustainment Implementation

Agreements Template 99% Complete

• Focus Working Group Approach

Global Commercial Contracting for

International MRO&U

MRO&U Capability and Partnering

Progress

Development Progress Supports Global Capability

MRO&U

Implementation Plan

USG MRO&U Source

of Repair Decisions

Global MRO&U Capability

Expansion Timeline

F-35 Partnering Agreement

Sustainment

Implementation Agreement

F-35 Lightning II

DEPOT PARTNERING

AGREEMENT

among

F-35 Joint Strike Fighter

Program Office,

Naval Air Systems Command,

Air Force Materiel Command,

and

Lockheed Martin Aeronautics

Company,

Pratt & Whitney Division, and

GE-Rolls-Royce Fighter Engine

Team, LLC

PA # JSF-10-01

F-35 Program Information

Non-Export Controlled Information – Releasable to Foreign Persons – Lockheed Martin Proprietary Information

1

AS

P

F-35 Operational Footprint

-35 Bases

-22 Ships

Iwakuni

Williamtown

Tindal

Amberly

Lossiemouth

Rota

GrottaglieKonya

LeeuwardenAmendola

Juan Carlos

CVF

CVNLHD

PaxBeaufort

Eglin

Ft. WorthNellis

LukeYuma

Edwards

Lemoore

Bodo

Orland

Decimomannu

Skrydstrup

PACAF

(Kadena)

Volkel

Eskisehir

USAFE(Germany)

Bagotville

Cold LakeHill

FallonMirimar

Shaw

Cherry Point

Oceana St. Istrana (Italy)

St. Ghedi(Italy)

CONUS OPS 5 (location: TBD)

Global MRO&U Capability Will be Sized and Located to

Support the Fleet

ITS Cavour

FOR OFFICIAL USE ONLY // REL TO USA, GBR MOD, ITA MOD, NLD MOD, TUR MND, CAN DND, AUS DOD, DNK MOD, and NOR MOD 1

Timing

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

Study Study Study Study Study

BCA BCA BCA BCA BCA

Decision Decision Decision Decision

Identify Funding in Support of Global MRO&U Decisions

Global PA in

Place

Global DSOR Activation

Global Industrial Base Capability

Iterative Expansion Process

Studies and BCAs Continue

as Global Footprint Grows

1

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

Depot Implementation Plan

Rev 3b

1

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

USG Depot Stand Up Schedule

2012 2013 2014 2015

OO-ALC Air Vehicle – LM AERO

Doors, Panels & Covers – LM

AERO/NGC/BAE

Radome – LM AERO

Landing Gear – Goodrich

Control Surfaces & Edges – LM

AERO

Canopy System – LM AERO

FRIU – GE Aviation

MRIU – GE Aviation

HMDS – VSI

PCD – L3 EDI

S&RES – ITT (EDO)

Canopy Actuator – MPC

AME – Marvin

Gun – General Dynamics

SFDS – GE Aviation

WR-ALC RIO – GE Aviation

VMC – BAE

GPS – Raytheon

EW CM – BAE

AMS – GE Aviation

Cockpit Equip & Layout – Sirio

Panel

Lighting – LSI

CNI – NG CNDMS

ICP – LM MS2

EODAS – NG ES

Common Components – Harris

TNS – Honeywell

INS – Honeywell

OC-ALC Life Support System – Honeywell

Yeovil

FRCE Air Vehicle – LM AERO

Doors, Panels & Covers – LM

AERO/NGC/BAE

Radome – LM AERO

Control Surfaces & Edges – LM

AERO

Canopy System – LM AERO

PTMS – Honeywell

Engine Lift System Rudder Pedal – Pacific Scientific

HPGS – Eaton

UA&CV – Eaton

WBDDS – Goodrich Actuation

Ejection Seat – Martin Baker

ADS – Goodrich Sensors

In-flight Ice Detection – Goodrich

Sensor Systems

FRCSE Radar – NG ES EOTS – LM M&FC Fuel – Parker Hannifin AIS – BAE

CSMU – L3

Arresting Gear – Stork

FRCSW LEFAS – Moog

LEFDS – Curtiss Wright

EPG&C – Hamilton Sundstrand

EPMS – GE Aviation

EHAS – Moog/Parker

WFAS – Moog

Note: All Red entries are awaiting final approval Depot Implementation Plan Rev 3b

1

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

JSF Public – Private Partnerships

Challenges

• Common Language / Processes

– Partnering Agreement

– Implementing Agreements

• Business Arrangement

– Direct Sales

– Workshare

– IA Tempo

– Cost Accounting

– Depot Incentives

• Legacy Mindset

– Existing Processes

– Amount of Work

– Title X Perceptions

– Roles and Responsibilities

Opportunities

• Leverage of Best from Partners

– Depot Technician Skills

– Contractor System Knowledge

• Payments

– Pay as you Perform

– Depot Pre-Payment

• Contract Type & Length

– Prime Period of Performance

– OEM/Depot Period of

Performance

• Depot Labor Adjustments

– Annual versus Contract Period

FOR OFFICIAL USE ONLY // REL TO USA, GBR MOD, ITA MOD, NLD MOD, TUR MND, CAN DND, AUS DOD, DNK MOD, and NOR MOD 1

USG Depot Source of Repair Decisions

For F-35 to Date

OO-ALC

FRC-SW

FRC-E

FRC-SE

OC-ALCWR-ALC

TYAD

Airframe

Landing Gear

S&RES

AME

Gun

SMS

Canopy Actuator

HMDS

PCD

SFDS

F135

F136

Life Support System

RIO

VMC

Cockpit Equip.

Lighting

CNI

GPS

Common Comp.

Airframe

Lift Fan

ADS

Rudder Pedal

HUA

WBDDS

Ejection SeatEHAS

LEFAS

EPG&C

EPMS

WFAS F135

F136

AIS

CSMU

Arresting Gear

Radar

To Be Determined

TNS PTMS

Ice Detection AMS

Fuel System EOTS

EODAS INS

EW CM ICP

1

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

Schedule of Sustainment IAs

Systems 2011 2012 2013 2014 2015 2016

Airframe Systems – Air Vehicle, Doors, Panels, & Covers,

Canopy System, Radome

2 6

[2] [6]

Vehicle Systems – AIS, CSMU, EHAS, ADS, TNS, LEFAS,

Rudder Pedal, EPGC, EPMS, PTMS, Inflight Ice Detection,

Landing Gear, Arresting Gear, HPGS, UA&CV, WBDDS, WFAS,

Fuel, RIO, VMC, ADS

4 4

[4]

2

[4]

10

[2] [10]

Mission Systems – S&RES, AME, Gun, SMS, Cockpit

Equipment, Canopy Actuator, Ejection Seat, Life Support

System, HMDS, PCD, SFDS, Lighting, EOTS, EODAS, CNI,

Radar, EW/CW, Common Comp, ICP, AMS, GPS, FRIU, MRIU

3 11

[3]

0

[11]

8

[0] [8]

USG Depot IA Development Distribution OO – 1

FR1 - 1

OO – 5

WR - 3

FR1 – 5

OO – 4

WR - 6

FR1 – 1

FR2 - 1

FR3 – 3

FR1 - 2 OO – 5

WR – 4

FR1 – 4

FR2 – 3

FR3 - 2

USG Depot IA Execution Distribution OO – 1

FR1 – 1

OO – 5

WR - 3

FR1 – 5

OO – 4

WR - 6

FR1 – 1

FR2 - 1

FR3 – 3

FR1 - 2 OO – 5

WR – 4

FR1 – 4

FR2 – 3

FR3 - 2

n = Sustainment IA Development Year

[n] = Sustainment IA Execution Year

Legend:

OO = OO-ALC

FR1 = FRCE

FR2 = FRCSE

FR3 = FRCSW

WR = WR-ALC

1

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

Sustainment

IA Template

Development

Sustainment Implementation Agreement

Development and Execution

2010

Sustainment

IA

Development

LM ALGS

Service Depot

PBL Supplier (as required)

2011 - 2015

Sustainment

IA

Execution

2012+

Source DataDepot Partnering

Agreement (PA)

&

Site Activation

IA’s

Development of IA

template to follow

same path as PA,

collaboration between

all stakeholders

1

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

Partnering Strategy (Jan 25, 2010)

US

Service

Depots

Non PBL Suppliers

LM PBL

Supplier

BAE

Systems(Principal Subcontractor)

Northrop Grumman

(Principal Subcontractor)

AFMC

NAVAIR

Lockheed

Martin

PSP

Funding and Contractual Flow

Joint Strike Fighter Program Office

(JSFPO)

Prime PBL Contract

sPBLsPBL

sPBL

Contract PA/IA

Legend:

PSC

3 Party IA (supplier signature)

2 Party IA (no supplier signature)

F-35 PA

F-35 Business Model

1

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

Commodities

Traditional

JSF Industrial Sustainment Business

Model

Prime

Contracts

Supplier

Contracts

Suppliers

Incentivized

Traditional

Commodities Supply Chain

ASC

• Air System Requirements

• Performance Based Agreements

• Funding SourcePBA

JSFPO

Warfighters

US Depot (s)

Title 10

PSC

In House

Out Source

Non-Title 10

F

L

O

W

D

O

W

N

Associate Contractors

Agreement

Suppliers

Incentivized

F

L

O

W

D

O

W

N

Page 2: MRO&U Capability and Partnering Progress · 2010-11-15 · PA # JSF-10-01 F-35 Program Information Non-Export Controlled Information ± Releasable to Foreign Persons ± Lockheed Martin

2

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

Depot Implementation Plan

Rev 3b

Page 3: MRO&U Capability and Partnering Progress · 2010-11-15 · PA # JSF-10-01 F-35 Program Information Non-Export Controlled Information ± Releasable to Foreign Persons ± Lockheed Martin

3

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

USG Depot Source of Repair Decisions

For F-35 to Date

OO-ALC

FRC-SW

FRC-E

FRC-SE

OC-ALC WR-ALC

TYAD

Airframe

Landing Gear

S&RES

AME

Gun

SMS

Canopy Actuator

HMDS

PCD

SFDS

F135

F136

Life Support System

RIO

VMC

Cockpit Equip.

Lighting

CNI

GPS

Common Comp.

Airframe

Lift Fan

ADS

Rudder Pedal

HUA

WBDDS

Ejection Seat EHAS

LEFAS

EPG&C

EPMS

WFAS F135

F136

AIS

CSMU

Arresting Gear

Radar

To Be Determined

TNS PTMS

Ice Detection AMS

Fuel System EOTS

EODAS INS

EW CM ICP

Page 4: MRO&U Capability and Partnering Progress · 2010-11-15 · PA # JSF-10-01 F-35 Program Information Non-Export Controlled Information ± Releasable to Foreign Persons ± Lockheed Martin

4

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

USG Depot Stand Up Schedule

2012 2013 2014 2015

OO-ALC Air Vehicle – LM AERO

Doors, Panels & Covers – LM

AERO/NGC/BAE

Radome – LM AERO

Landing Gear – Goodrich

Control Surfaces & Edges – LM

AERO

Canopy System – LM AERO

FRIU – GE Aviation

MRIU – GE Aviation

HMDS – VSI

PCD – L3 EDI

S&RES – ITT (EDO)

Canopy Actuator – MPC

AME – Marvin

Gun – General Dynamics

SFDS – GE Aviation

WR-ALC RIO – GE Aviation

VMC – BAE

GPS – Raytheon

EW CM – BAE

AMS – GE Aviation

Cockpit Equip & Layout – Sirio

Panel

Lighting – LSI

CNI – NG CNDMS

ICP – LM MS2

EODAS – NG ES

Common Components – Harris

TNS – Honeywell

INS – Honeywell

OC-ALC Life Support System – Honeywell

Yeovil

FRCE Air Vehicle – LM AERO

Doors, Panels & Covers – LM

AERO/NGC/BAE

Radome – LM AERO

Control Surfaces & Edges – LM

AERO

Canopy System – LM AERO

PTMS – Honeywell

Engine Lift System Rudder Pedal – Pacific Scientific

HPGS – Eaton

UA&CV – Eaton

WBDDS – Goodrich Actuation

Ejection Seat – Martin Baker

ADS – Goodrich Sensors

In-flight Ice Detection – Goodrich

Sensor Systems

FRCSE Radar – NG ES EOTS – LM M&FC Fuel – Parker Hannifin AIS – BAE

CSMU – L3

Arresting Gear – Stork

FRCSW LEFAS – Moog

LEFDS – Curtiss Wright

EPG&C – Hamilton Sundstrand

EPMS – GE Aviation

EHAS – Moog/Parker

WFAS – Moog

Note: All Red entries are awaiting final approval Depot Implementation Plan Rev 3b

Page 5: MRO&U Capability and Partnering Progress · 2010-11-15 · PA # JSF-10-01 F-35 Program Information Non-Export Controlled Information ± Releasable to Foreign Persons ± Lockheed Martin

5

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

Timing

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

Study Study Study Study Study

BCA BCA BCA BCA BCA

Decision Decision Decision Decision

Identify Funding in Support of Global MRO&U Decisions

Global PA in

Place

Global DSOR Activation

Global Industrial Base Capability

Iterative Expansion Process

Studies and BCAs Continue

as Global Footprint Grows

Page 6: MRO&U Capability and Partnering Progress · 2010-11-15 · PA # JSF-10-01 F-35 Program Information Non-Export Controlled Information ± Releasable to Foreign Persons ± Lockheed Martin

6

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

AS

P

F-35 Operational Footprint

-35 Bases

-22 Ships

Iwakuni

Williamtown

Tindal

Amberly

Lossiemouth

Rota

Grottaglie Konya

Leeuwarden Amendola

Juan Carlos

CVF

CVN LHD

Pax Beaufort

Eglin

Ft. Worth Nellis

Luke Yuma

Edwards

Lemoore

Bodo

Orland

Decimomannu

Skrydstrup

PACAF

(Kadena)

Volkel

Eskisehir

USAFE (Germany)

Bagotville

Cold Lake Hill

Fallon Mirimar

Shaw

Cherry Point

Oceana St. Istrana (Italy)

St. Ghedi (Italy)

CONUS OPS 5 (location: TBD)

Global MRO&U Capability Will be Sized and Located to

Support the Fleet

ITS Cavour

Page 7: MRO&U Capability and Partnering Progress · 2010-11-15 · PA # JSF-10-01 F-35 Program Information Non-Export Controlled Information ± Releasable to Foreign Persons ± Lockheed Martin

7

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

Commodities

Traditional

JSF Industrial Sustainment Business

Model

Prime

Contracts

Supplier

Contracts

Suppliers

Incentivized

Traditional

Commodities Supply Chain

ASC

• Air System Requirements

• Performance Based Agreements

• Funding Source PBA

JSFPO

Warfighters

US Depot (s)

Title 10

PSC

In House

Out Source

Non-Title 10

F

L

O

W

D

O

W

N

Associate Contractors

Agreement

Suppliers

Incentivized

F

L

O

W

D

O

W

N

Page 8: MRO&U Capability and Partnering Progress · 2010-11-15 · PA # JSF-10-01 F-35 Program Information Non-Export Controlled Information ± Releasable to Foreign Persons ± Lockheed Martin

8

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

Partnering Strategy (Jan 25, 2010)

US

Service

Depots

Non PBL Suppliers

LM PBL

Supplier

BAE

Systems (Principal Subcontractor)

Northrop Grumman

(Principal Subcontractor)

AFMC

NAVAIR

Lockheed

Martin

PSP

Funding and Contractual Flow

Joint Strike Fighter Program Office

(JSFPO)

Prime PBL Contract

sPBL sPBL

sPBL

Contract PA/IA

Legend:

PSC

3 Party IA (supplier signature)

2 Party IA (no supplier signature)

F-35 PA

Page 9: MRO&U Capability and Partnering Progress · 2010-11-15 · PA # JSF-10-01 F-35 Program Information Non-Export Controlled Information ± Releasable to Foreign Persons ± Lockheed Martin

9

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

Sustainment

IA Template

Development

Sustainment Implementation Agreement

Development and Execution

2010

Sustainment

IA

Development

LM ALGS

Service Depot

PBL Supplier (as required)

2011 - 2015

Sustainment

IA

Execution

2012+

Source Data Depot Partnering

Agreement (PA)

&

Site Activation

IA’s

Development of IA

template to follow

same path as PA,

collaboration between

all stakeholders

Page 10: MRO&U Capability and Partnering Progress · 2010-11-15 · PA # JSF-10-01 F-35 Program Information Non-Export Controlled Information ± Releasable to Foreign Persons ± Lockheed Martin

10

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

Schedule of Sustainment IAs

Systems 2011 2012 2013 2014 2015 2016

Airframe Systems – Air Vehicle, Doors, Panels, & Covers,

Canopy System, Radome

2 6

[2]

[6]

Vehicle Systems – AIS, CSMU, EHAS, ADS, TNS, LEFAS,

Rudder Pedal, EPGC, EPMS, PTMS, Inflight Ice Detection,

Landing Gear, Arresting Gear, HPGS, UA&CV, WBDDS, WFAS,

Fuel, RIO, VMC, ADS

4 4

[4]

2

[4]

10

[2]

[10]

Mission Systems – S&RES, AME, Gun, SMS, Cockpit

Equipment, Canopy Actuator, Ejection Seat, Life Support

System, HMDS, PCD, SFDS, Lighting, EOTS, EODAS, CNI,

Radar, EW/CW, Common Comp, ICP, AMS, GPS, FRIU, MRIU

3 11

[3]

0

[11]

8

[0]

[8]

USG Depot IA Development Distribution OO – 1

FR1 - 1

OO – 5

WR - 3

FR1 – 5

OO – 4

WR - 6

FR1 – 1

FR2 - 1

FR3 – 3

FR1 - 2 OO – 5

WR – 4

FR1 – 4

FR2 – 3

FR3 - 2

USG Depot IA Execution Distribution OO – 1

FR1 – 1

OO – 5

WR - 3

FR1 – 5

OO – 4

WR - 6

FR1 – 1

FR2 - 1

FR3 – 3

FR1 - 2 OO – 5

WR – 4

FR1 – 4

FR2 – 3

FR3 - 2

n = Sustainment IA Development Year

[n] = Sustainment IA Execution Year

Legend:

OO = OO-ALC

FR1 = FRCE

FR2 = FRCSE

FR3 = FRCSW

WR = WR-ALC

Page 11: MRO&U Capability and Partnering Progress · 2010-11-15 · PA # JSF-10-01 F-35 Program Information Non-Export Controlled Information ± Releasable to Foreign Persons ± Lockheed Martin

11

F-35 Program Information

Non Export Controlled Information – Releasable to Foreign Persons

JSF Public – Private Partnerships

Challenges

• Common Language / Processes

– Partnering Agreement

– Implementing Agreements

• Business Arrangement

– Direct Sales

– Workshare

– IA Tempo

– Cost Accounting

– Depot Incentives

• Legacy Mindset

– Existing Processes

– Amount of Work

– Title X Perceptions

– Roles and Responsibilities

Opportunities

• Leverage of Best from Partners

– Depot Technician Skills

– Contractor System Knowledge

• Payments

– Pay as you Perform

– Depot Pre-Payment

• Contract Type & Length

– Prime Period of Performance

– OEM/Depot Period of

Performance

• Depot Labor Adjustments

– Annual versus Contract Period