Repair& DiagnosticMethods
for RCCStructures
E. GOPALKRISHNAN,Head-ADL Consultancy ServicesDr.Fixit Institute Structural Protection Rehabilitation
Chennai 20120210
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
2/33
Content
Introduction
Servicelife&Deterioration
CausesofRepairFailures AdvancedDiagnosticMethods
ApplicationofNDTforDurableRepair
Summary
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
3/33
Class Notional
Design
ServiceLife
(Years)
Example
1 1-5 TemporaryStructures
2 25 ReplaceableStructuralParts
3 50 BuildingStructuresandother
commonstructures
4 100 MonumentalBuildingStructures,
BridgesandotherCivil Engineering
Structures.
ServiceLifeRequirements
forConcreteStructures-ISO2394&EN1990
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
4/33
Durableconcrete
DesignDetail
Construction
Practice
Materials Mix
Proportions
DurableConcrete
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
5/33
CauseofDeterioration
Whether the cause is corroding rebar, poor
resistance, high impact, abrasion,
chemical attack or other reasons,addressing and correcting the cause of
deterioration is the primary requirement in
a durable repair.
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
6/33
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
7/33
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
8/33
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
9/33
SchematicStagesof Corrosion
InducedDeteriorationofaConcreteStructure
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
10/33
Corrosionprocess
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
11/33
Stagesofcorrosioninduced
InitiationPhase Conditionestablishedbymonitoring
Propagationphase DeteriorationestablishedthroughsurveyandNDT
11
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
12/33
CausesofRepair ailuresIt is very difficult to identify a singlecause for a particular failure, since,
frequently. There are several reasons
which are inter-related,Incorrectdesignoftherepair
Useofincorrectmaterials
PoorworkmanshipWrongdiagnosis
Otherfactors
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
13/33
UnsatisfactoryRepairs
Thefailureofrepairsareattributableto-
DesignorEvaluationerrors,
InstallationorApplicationerrors
MaterialsPerformance
* Source :- U.S.Army Corps of Engineers
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
14/33
ApproachtoRepair
Investigatethecauses&identifythe
problemsandunderstand
UseNDTmethodstounderstanddamagesanddefects
Considerstructuralandoperational
requirementstoselecttherepair
method
SelectionofrightRepairMaterials
withappropriatemethodology
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
15/33
NDTTechniques
Common Advanced NDTSchmidt Rebound
Hammer
Corrosion Analyser
UltrasonicPulseVelocity
InfraredThermography
Cover Meter Petrography
Cores
CarbonationDepth Pull offTest
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
16/33
SchmidtHammer
Simplest&Quickestestimationofsurfacehardnessofconcrete
Carbonationisnottheonlyimportantfactor
influencingreboundnumbers
Thestrengthestimatedfromthe
manufacturer'sregressioncurveistobe
multipliedbyatimefactor.
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
17/33
CorrosionAssessment
Chlorideionandcarbonationtestinghelptoestablishwhetherpassivefilmhasbeen
destroyed
Iffilmnotdestroyed,whenwillitbedestroyed?
Iffilmhasbeendestroyed,whatisstateof
corrosion?
Half-cellpotential
Concreteresistivity
Corrosionrate(polarizationresistance)
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
18/33
CorrosionRate!
Source:-StudyconductedbyCECRI,Karaikudi(1993 2003~33fieldstns)
Chennai2nd mostcorrosionpronecity 0.5
mm/y
Sriharikota1.6millimetresperyearmm/y
Marmogoa 0.45millimetersperyearmm/y
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
19/33
19
CorrosionAnalyser
Potentialmeasurement(potential mapping),
corrosion ratemeasurement,galvano static pulsetechnique (GPM)
Linear polarisationresistance technique(LPR) and servicelife estimate.
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
20/33
Rate of corrosion
measured oncircumference of the
column
Degrees
Half cell potentialmeasured on
circumference of
the column
= - 500 mV
At the marked point rate of corrosion was 220m.For 20 years [email protected] mm per year = 4.4 mm
Degrees
Height(cm)
Height(cm)
mailto:[email protected]:[email protected] -
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
21/33
Howtolocatevoidsand
delamination? Impact-Echo Impulse Response Method Ground Penetrating Radar Ultrasonic Measurements Infrared Thermography Petrography
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
22/33
UPVGoodforassessinguniformityand
identifyingareasforfurtherinvestigationToidentifythehoneycombs,voids&
cracksinsidetheconcrete
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
23/33
InfraredThermography
Potential
seepage
Potential
deboning
plaster
Potential
spalling
concrete
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
24/33
Potential
debonding
plastertobehackedand
restored
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
25/33
Seepagealong
groovelines
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
26/33
Facadein
good
condition,
donot
requirerepair
works
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
27/33
Polarised Optical Microscope
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
28/33
ApplicationofPetrographyinRepair
AlkaliSilicaReaction(ASR)
ChemicalAttack
DelayedEttringiteFormationFireDamage
CauseofCracking
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
29/33
Microscopephoto of air
entrained,
homogeneous concrete
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
30/33
Thephotograph
showsthecracked
oxidizedpyritegrainatthesurface
region,and
extensionof
crackingandreddishbrownironoxide
andhydroxide
oxidationproducts
intothe
neighboringpaste.
Fieldwidthsofall
photosare5mm
Photomicrographs of thin
sections of cores (in plane
polarized light mode)
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
31/33
Directtensilestrength
Evaluateconditionofconcretesurface
beforeapplicationofoverlayorrepair
Material
Measurebondstrengthofoverlayor
surfaceofrepairmaterials
Pull-offTestASTMC1583/C1583M
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
32/33
SummaryRegularInspections/Monitoringhelps
earlydetectionofanydeteriorationDiagnosisofdefectsandcondition
assessmentsareessentialprerequisites
forasuccessfulconcreterepairAdvanceNDTmethodhelpstolocate
exactlytheplaceofseepages,leakages,
defects,honeycombs,cracksinthestructuressothatrepairbecomesdurable
Repair cost increases without properdiagnosis
-
8/12/2019 Mr.E.gopalkrishnan FICCI Chennai
33/33
ThankYouforYour
KindAttention!