BRUSSELS 30 TH JANUARY TO 3 RD FEBRUARY 2012 FREDERICO HENRIQUES - IST JOANA NOGUEIRA ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF P ARKING SCHEME

Transcript of MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA...

Page 1: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

BRUSSELS 30TH JANUARY TO 3RD FEBRUARY 2012

FREDERICO HENRIQUES - IST JOANA NOGUEIRA – ISPA

IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME

Page 2: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

CONTENTS

I. Introduction

II. Proposed Site

III. Our Idea

IV. Assessment Methodology

V. Timeline

VI. Partners

VII.Difficulties

VIII.Expected Results

Page 3: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

Percentage change in road deaths between 2001 and 2010 (ETSC, 2010)

I. INTRODUCTION – PORTUGUESE CONTEXT

CHANGE IN ROAD DEATHS 48% PT 43% EU

Page 4: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

Percentage share of road deaths per road type (2007-2009 average) (ETSC, 2010)

I. INTRODUCTION – PORTUGUESE CONTEXT

DEATHS INSIDE URBAN AREAS 45% PT 38% EU

Page 5: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

I. INTRODUCTION – MAIN GOAL

Change drivers perception and lead them to adapt their speed to urban environment in order to increase road safety

Reduce speed inside urban areas

Page 6: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

II. PROPOSED SITE – URBAN CHARACTERISTICS

Campo de Ourique

Neighbourhood

Coelho da Rocha Street

Campo de Ourique Neighbourhood

Coelho da Rocha Street

Page 7: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

II. PROPOSED SITE – URBAN CHARACTERISTICS

Residential neighbourhood Shopping street High travel demand for all the transport modes (Private, BUS, Tram) High parking pressure Current speed limit: 50km/h One way street (200m long) There are no pedestrian crosses (except on traffic light)

Page 8: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

II. PROPOSED SITE – URBAN CHARACTERISTICS

Page 9: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

II. PROPOSED SITE - ACCIDENTOLOGY

Collision type: • multiple collision

1 casualty; 1 slight injury • running over

3 casualties; 3 slight injuries

Collisions (2004-2007) Involving vehicles Involving pedestrians

Data collected from SACRA research project carried out at IST

Page 10: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

III. OUR IDEA – PLAN A BU

ILD

ING

S

AN

GLED P

AR

KIN

G

PA

RA

LLEL P

AR

KIN

G

SID

EW

ALK

BU

ILD

ING

S

AN

GLED P

AR

KIN

G

PA

RA

LLEL P

AR

KIN

G

SID

EW

ALK

AN

GLED P

AR

KIN

G

PA

RA

LLEL P

AR

KIN

G

BIK

E P

AR

KIN

G

Chicane implementation & Proposed parking scheme Current parking scheme

Implement chicanes, pedestrians crosses and 30km/h zone

Page 11: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

III. OUR IDEA – PLAN A

What do we need? Vertical barriers Vertical traffic signs Paint for parking lines Paint for pedestrians crosses

Page 12: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

III. OUR IDEA – PLAN B

Pedestrians crosses and 30km/h zone

Page 13: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

IV. ASSESSMENT METHODOLOGY

Traffic Speed Traffic demand Pedestrian crossings

Environment Noise Emissions

Perceptions Pedestrian questionnaire Drivers questionnaire

SPEED MANAGEMENT

IMPACT

What material do we need? Speed radars Questionnaires Equipment to measure noise and emissions

Page 14: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

V. TIMELINE

Activities

Contact Sponsors & Partners

Identify the intervention site

Design the project

Assess actual situation

Middle term report

ETSC visit

Implement the project

Assess future situation

Analysis of results

Final report

JulFeb Mar Apr May Jun Aug Sep Oct Nov Dec

Page 15: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

VI. PARTNERS

Professors Ana Cardoso de Oliveira (psychology) Sílvia Costa Shrubsall (transportation) Local authorities Fernando Nunes da Silva (Mobility Councilman of Lisbon) Tiago Farias (President of Municipal Mobility and Parking

Company) Private Sponsors (e.g.: 3M, ACP – The Moto Club of Portugal,

CCFL-Carris – Transport Company of Lisbon) ETSC

Page 16: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

VII. DIFFICULTIES

Achieve an agreement with private sponsors

Speed radar

Equipment to measure noise and emissions

Significant sample size

Meet the timeline due to bureaucratic issues

Page 17: MPLEMENTATION OF CHICANES BY ECONVERSION OF PARKING … · 2018. 3. 30. · JOANA NOGUEIRA – ISPA IMPLEMENTATION OF CHICANES BY RECONVERSION OF PARKING SCHEME. CONTENTS I. Introduction

VIII. EXPECTED RESULTS

Reduce the speed

Increase pedestrians’ real and perceived safety

Reduce the number of collisions

To give awareness to the road safety issue in Portugal

Enough success to demonstrate the need of speed management on many Lisbon’s streets