STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1
CE/C/I-JP
Dy. CE/C/I-JP
1 NWR/SC/JP
-RGS-
CHURU/CIV
IL-
101140502
Dismantling of existing MG
track, Laying and linking of
Broad gauge main line,
looplines / Sidings including
points and crossings in
yards, spreading of ballast,
tamping of track,
transportation of P. Way
materials and other
ancillary works in Zone-I
(Km. 0.00 to Km. 48.70),
including Sikar, Laxmangarh
Sikar & Fatehpur
shekhawati yards in Sikar -
Churu section in connection
with Jaipur-Sikar- Loharu &
Sikar - Churu Gauge
conversion project.
Open
tender
28.8.15 Single Packet
system
30.9.15 05 - - - 42/ NWR/Dy.
CE/C-GC/JP
/2014-15/JP-
SIKR-CUR & SIKR-
LHU dt. 26.12.15.
M/s ISC Project Pvt. Ltd.,
“S-2,” The Meropole,
Adjacent to INOX, Bund
Garden Road, Pune – 411
001
948.07 Lakhs 08.5.2017
Ext. 31.10.17
12.11.15 31.10.17 Final bill under
process.
2 NWR/SC/JP
-RGS-
CHURU/CIV
IL-
101140505
Dismantling of existing MG
track, Laying and linking of
Broad gauge main line, loop
lines / Sidings including
points and crossings in
yards, spreading of ballast,
tamping of track,
transportation of P. Way
materials and other
ancillary works in Zone-II
(Km. 48.70 to Km. 90.46),
including Ramgarh
shekhawati, Bissau & Churu
yards in Sikar -Churu section
in connection with Jaipur-
Sikar- Loharu & Sikar -
Churu Gauge conversion
project.
Open
tender
15.9.15 Single Packet
system
19.10.15 02 - - - 45/ NWR/Dy.
CE/C-GC/JP
/2015-16/JP-
SIKR-CUR & SIKR-
LHU dt. 22.02.16.
M/s Bhanwar Lal Bijarnia,
Village -Rajpura, Post-
Prewari, Teh- Nawa, Distt.-
Nagaur
808.49 Lakhs 11.5.2017
31.12.17
20.11.15 28.12.17 Final
measurement
under process.
3. DY.
CE/C/GC/N
WR/2015/T
-55
Flash Butt Welding of 52Kg.
/ 60Kg. New/SH rails at
depot / site using Mobile
Flash Butt Welding Plant in
Jaipur –Sikar - Churu section
in connection with Jaipur –
Sikar – Loharu & Sikar –
Churu GC project.
Open
tender
29.6.15 Single Packet
system
20.08.15 03 - - - 46/ NWR/Dy.
CE/C-GC/JP
/2016-17/JP-
SIKR-CUR & SIKR-
LHU dt.
22.09.2016.
M/s Navketan Pvt. Ltd., 1 A.
J. C. Bose Road, Kolkata –
700 020.
814.56 Lakhs 22.12.17
Ext. 30.6.18
25.5.2016 Work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2
4. NWR/SC/JP
-SIKR-
CHURU/Civi
l/10130001
003
Construction of Road under
Bridge / Limited Height Sub-
Way in lieu of 24 Nos. level
crossing in Sikar-Dundlod
Mukandgarh Section & 16
Nos. level crossing and 4
Nos. Balancing culverts in
Sikar – Laxmangarh Sikar
Section.
Open
tender
21.11.15 Two bid
system
23.12.15 06 01 M/s
Gurukrupa
Kalyan JV
2A,2nd
Floor,Navnath
Soc-2, B/H,
Shradhadeep
Soc, Nr.
Sharda
School,
Singanpor-
Causway
Road, Surat-
395004.
Yes NWR/S&C/
CA/153, Dt.
15.6.2016
M/s AE-MHK (JV)
First Floor, Divine India
Building, Near R.T.O Office,
By Pass Road, Post-Savgadh
(Panpur), Himmatnagar-
383001
Dist. S.K. (Gujarat).
6363.98 Lakhs 22.3.2018
Ext
20.8.2018
1.5.2016 Final
measurement
under process.
5. NWR/SC/JP
-SIKR-
CHURU/Civi
l/10130001
004
Construction of Road under
Bridge / Limited Height Sub-
Way in lieu of 33 Nos. level
crossing and 4 Nos. of
Bridges along with 7 Nos
Balancing culverts in
Laxmangarh Sikar - Churu
Section.
Open
tender
21.11.15 Two bid
system
23.12.15 03 - - Yes NWR/S&C/
CA/154, Dt.
23.6.2016
M/s Supreme - Modi (JV) 9,
Leela Mansion,
Raj Bhawan Road,
Civil Line - Jaipur 302006
5876.06 Lakhs 22.3.2018 24.3.16 17.02.18 Final
Measurement
under process.
6. NWR/SC/JP
-RGS-
Churu/Civil
-
101141806
Construction of 60 nos staff
quarters in Sikar-Churu
section, Construction of
running room at CUR,
construction of PF & PF
shelters & extension of
FOB, RCC OH tank and other
miscellaneous Civil work at
Sikar, Civil works related to
L-xings and related Electric
works in Sikar-Churu section
and other ancillary works in
connection with SIKR-CUR
Gauge Conversion project.
Open
tender
26.2.16 Two bid
system
30.3.16 04 01 M/s Rajendra
Singh
Bhamboo
Infra Pvt. Ltd.
108, First
Floor, Neel
kanth,
Neelkanth
Building ,
Gandhipath,
Vaishali
Nagar, Jaipur
yes NWR/S&C/
CA/159, Dt.
28.9.2016
M/s Gurukrupa Enterprises,
2A,2nd Floor,Navnath Soc-2
B/H, Shradhadeep Soc,
Nr. Sharda School,
Singanpor-Causway Road,
Surat
1948.67 Lakhs 15.9.2017
18.7.16 Work
terminated on
6.6.17
Final bill under
process. Case is
under
arbitration.
7. NWR/SC/JP
-RGS-
Churu/Civil
-
101140507
Providing in situ Glued
joints of G-3 (L) type as per
RDSO drawings for 60 kg &
52 kg rails with all fittings
etc complete in Jaipur -
Sikar - Churu section in
connection with Jaipur -
Sikar - Loharu & Sikar -
Churu Gauge Conversion
project.
Open
tender
18.5.16 Single Packet
system
22.06.16 05 01 M/s Diamond
Steel
Industries,
Plot No. 879,
Sector-16,
Faridabad
Yes 48/ NWR/Dy.
CE/C-GC/JP
/2016-17/JP-
SIKR-CUR & SIKR-
LHU dt.
11.01.2017.
M/s Creative Engineers,
F/189, Road No. 5,
Indraprastha Industrial
Area,
Kota
160.21 Lack 14.3.2019 18.10.16 Work in
progress.
8. NWR/SC/JP
-RGS-
Churu/Civil
-
101140508
Welding of Rail Joints by
SKV process in Jaipur- Sikar
& Sikar-Churu section in
connection with Jaipur-
Sikar-Loharu and Sikar-
Churu Gauge Conversion
project.
Open
tender
10.6.16 Single Packet
system
14.07.16 02 - - Yes 49/ NWR/Dy.
CE/C-GC/JP
/2016-17/JP-
SIKR-CUR & SIKR-
LHU dt.
11.01.2017.
M/s Oberoi Thermit
Pvt., Ltd. Plot No.3,
Sector 8B, IIE, Sidcul,
Haridwar -249403
349.73 Lacks 18.10.18 26.12.16 Work is under
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
3
9. NWR/SC/JP
-RGS-
Churu/Civil
-
101141612
Balance / left over works of
Construction of 60 nos staff
quarters in Jaipur-Sikar-
Churu section, Construction
of running room at Churu,
construction of PF & PF
shelters & extension of FOB,
RCC OH tank and other
miscellaneous Civil work at
Sikar, Civil works related to
L-xings works in Sikar-
Churu section and other
ancillary works in
connection with Jaipur-
SIKR-CUR Gauge Conversion
project.
Open
tender
25.7.17 Two Packet
system
28.817 02 01 M/s AIEN
MEREN
ENTERPRISES-
DIMAPUR, N.
S.T. Colony,
Circular Road,
Dimapur
Yes NWR/S&C/
CA/171, Dt.
08.12.2017.
M/S V. K.
CONSTRUCTION
COMPANY-
SRIGANGANAGAR, 2-
D-37, Jawahar Nagar,
Sriganganagar
2185.03 Lakhs 31.12.18 15.10.17 Work in
progress.
10. NWR/SC/JP
-RGS-
Churu/
Civil-
10114110R
Residual civil works of Sikar
–Churu section including
construction of PWI Office
& store, trolley huts,
boundary wall, toe walls &
pitching, tool box for gangs
etc temporary diversion for
level crossings, Road Work
and Earth Work etc. in
connection with
Commissioning of Sikar
Churu section.
Open
tender
4.8.2017 Two Packet
system
8.9.2017 02 NIL - Yes 52/ NWR/Dy.
CE/C-I/JP /2018-
19/JP-SIKR-CUR
& SIKR-LHU dt.
26.04.2018
M/S K. B. Enterprises,
Plot No. 2, Mantra
Chaya, Opp. Chambal
Power House, Hawa
Sadak, Jaipur.
1182.01 Lakhs 14.1.19 25.02.18 Work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
4
DY. CE/C/II-JP
1 NWR/S&
C/JP-
SIKR/T/7
Supplying & stacking 65
mm gauge stone
ballast…. JP-SIKR section.
Open
tender
2.9
.20
15
Two packet
system
14
.10
.20
15
7 4 3 Yes Dy
CE/C/II/CA/N
WR/S&C/JP-
SIKR/T/7/01
Dated
17.3.2016
M/s MFL-Sidharth-
Parikshit Chandra Das
(JV) Gurgaon.
9.84 Cr. 1.12.15 1.1.2016 30.11.18 Work in
progress.
2 NWR/S&
C/JP-
SIKR/T
/10
Construcion of major &
Minor Bridges in C/w GC
of JP-SIKR section.
Open
tender
-
Two packet
system
18
.8.2
01
5 13 7 6 Yes, NWR/S&C/CA/
152 dated
25.2.2016
M/s Sona Builders,
Unjha (Guj.)
37.14 Cr. 17.11.15 1.12.15 31.10.18 Work in
progress .
3 NWR/S&
C/JP-
SIKR/T
/11
Earth work inembankment
cutting etc. and
construction /alteration of
service building JP-SIKR
section.
Open tender
Two packet
system
25
.8.2
01
5 14 7 7 Yes NWR/S&C/CA/
150 dated
29.1.2016-
M/s Jandu Construction
Company, Hisar.
34.18 Cr. 17.11.15 25.11.15 31.10.18 Work in
progress .
4 NWR/SC
/JP-RGS-
Churu/
Civil-
1021410
01
Construction of LHS Sub
way(LHS)/RUB---LC(52
nos) between JP-SIKR
section.
Open
tender
Two packet
system
9.1
2.1
5 9 6 3 Yes NWR/S&C/CA/
151 dated
01.7.2016
M/s SGCCL-MMPL (JV)
Jaipur.
68.65
Cr.
23.3.16 1.4.16 31.12.18 Work in
progress .
5 NWR/SC
/JP-RGS-
Churu/
Civil-
1021408
01
Dismantling of existing of
MG track, Laying and
Linking of BG main line-----
-Jaipur to Sikar GC work
Open
tender
Two packet
system
- 8 5 3 Yes NWR/S&C/CA/
161 dated
19.10.2016
M/s KIEL-BLB (JV), Jaipur 26.21 Cr 8.8.2016 8.8.2016 31.12.18 Work in
progress .
6 NWR/SC
/JP
/Civil-
1021606
01R
Construction of PF, FOB PF
shelter ----JP Yard
remodeling & JP-SIKR GC.
Open
tender
Two packet
system
-26
.7.2
01
6 6 5 4 Yes NWR/SC/JP
/Civil-
102160601R/0
1 date
11.11.2016
M/s Sanjeev Brothers
Jaipur
18.48 Cr 30.9.16 30.9.16 31.12.18 Work in
progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
5
Dy. CE/C/III-JP
Dy. CE/C/IV-JP
1 NWR/S&C
/LHS/RE-
FL-
Madar/T/1
Construction of road
under bridges / limited
height subways (35
Nos) in Rewari–
Phulera( RPC) section
Open
tender
Two packet
system
- Yes NWR/S&C/C
A/143 dated
08.7.2015
M/s S.B. Poonia
Const. Co. (JV),
Hissar.
51.06 Crore. 28.4.17 5.5.2015 30.6.2018 Work in
progress.
2 NWR/S&C
/LHS/RE-
FL-
Madar/T/2
Construction of road
under bridges / limited
height subways (32
Nos) in Rewari –
Phulera( RPC) section
Open
tender
Two packet
system
- Yes NWR/S&C/C
A/144 dated
16.7.2015
M/s S.B. Poonia
Const. Co. (JV),
Hissar.
43.74 Crore. 28.4.17 10.5.15 30.6.2018 Work in
progress.
3 NWR/SC/
MD-FL-
RGS/Civil-
10399801
Residual composite
work for Construction of
118 Nos Staff quarters
between RE-RGS-FL
section.
Open
tender
Two packet
system
- Yes NWR/SC/M
D-FL-
RGS/Civil-
10399801/C
A/03 dated
21.11.2016
M/s Sammer Const.
Co. 15/65 West
Punjabi Bagh New
Delhi
11.41 Cr. 21.6.2017 28.6.16 30.10.2018 Work in
progress
4 Construction of Club
House at Jagatpura
jaipur
Open
tender
Two packet
system
- Yes NWR/S&C/C
A/168 dated
8.5.2017
M/s P.K.Jain , Jaipur 19.00 Cr. 16.2.18 1.3.17 30.9.2018 Work in
progress
1. Tender No.NWR/SC/JP/ Civil-102990301
RGS Detour in
connection with DFCCIL
work- Construction of
Viaduct (157x18.30m),
Major (5x18.30m &
3x18.30) and Minor
Bridges, earth work in
bank/cutting including
Blanketing material,
Track works for Broad
Gauge line, Supplying &
putting ballast in track,
Transportation of P.
Way materials and
other ancillary works in
Ringus- in connection
with RGS Detour.
Open
tender
6.3.2016 Two bid
system
12.4.2016 9 7 - Yes NWR/S&C/
CA/158
Dated
9.9.2016
M/s AT PLT MHK (JV)
First Floor, Divine
India Building, Nr.
RTO Office, By Pass
Road, Himatnagar-
383001, Dist- S.K.
(Gujrat)
108.92 Cr 23.6.18 20.7.16 31.12.2018 Work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
6
CE/C/II-JP
Dy. CE/C/I-UDZ
1 UDZ-
HMT/
GC/EW/T/
4
Construction of Minor
bridges & earthwork
form Km. 207/0 to 250/0
in connection with UDZ-
HMT section GC Project .
Open 02.01.11 Single 04.02.11 7 Yes NWR/S&C/
CA/113 dtd.
21.10.11
M/s Rahee-Triveni
(J/V), Kolkatta
2286.41 Lakhs
07.02.13
31.07.14
31.03.15
31.12.15
30.06.16
30.12.16
31.07.17
31.01.18
31.10.18
23.08.11 Work in
Progress
2 UDZ-HMT/
GC/MB/T-
13-R-1
Substructures of major
bridges from Udaipur to
Dungarpur.
Open 13.11.14 Two bid
system
17.12.14 05 02 Yes NWR/S&C/
CA/ 142 dtd.
30.06.15
M/s Murali Krishna
Const. Co, Hyderabad
7318.07 Lakhs 23.04.17
31.12.17
31.10.18
09.05.15 Work in
progress
3 UDZ-HMT/
GC/EW/T-
20
Construction of Minor
bridges & earthwork
from Km. 121/0 to160/0
in c/w UDZ-HMT section
GC Project
Open 08.05.15 Two bid
system
12.06.15 03 02 Yes NWR/S&C/
CA/ 145 dtd.
23.11.2015
M/S M.G. Contractors, Pvt., Ltd., Panchkula
9485.41 Lakhs 13.03.17
30.06.17
31.12.17
30.04.18
30.11.18
28.09.15 Work in
Progress
4 NWR/SC/
UDZ-HMT
(GC)/Civil-
204140627
Construction of station
buildings, S&T structures,
and ancillary works in
connection with UDZ-
HMT GC project
Open 05.04.16 Two bid
system
11.05.16 01 01 Yes NWR/S&C/
CA/ 162 dtd.
24.10.16
M/s Jainsons
Construction Co. JV,
Jodhpur
5871.42 Lakhs 31.08.18
30.11.18
14.09.16 Work in
Progress
5 NWR/SC/
UDZ-HMT
(GC)/Civil-
204140426
Supply & stacking 50 mm
stone track ballast in UDZ-
HMT section
Open 06.0216 Two bid
system
16.03.16 04 02 Yes Dy.
CE/C/UDZ/CA
/34 dated
20.10.17
M/s Choyash Infra
Solution Joint Venture
Pvt. Ltd, Dungarpur
1345.41 Lakhs 30.06.18
31.01.19
10.09.16 Work in
Progress
6 NWR/SC/
UDZ-HMT
(GC)/Civil-
204141129
Transportation of PSC
sleepers from sleeper
factory to site in UDZ-
HMT section
Open 05.06.16 Single
packet
19.07.16 04 04 No Dy.
CE/C/UDZ/CA
/35 dated
24.12.2016
M/s J.K Construction
Co., New Market
Nokha
267.84 Lakhs 24.04.17
25.12.17
31.08.18
31.10.18
19.04.17 Work in
Progress
7 NWR/SC
/
UDZ-
HMT
(GC)/Civi
l-
20414012
8
Balance work of
construction, minor
bridges and earth work in
UDZ-HMT section.
Open 30.05.16 Two bid
system
05.07.16 02 02 Yes NWR/S&C/
CA/ 163 dtd.
08.12.1016
M/s Ravi Infrabuild
Projects Pvt. Ltd, ,
Udaipur
4526.41 Lakhs 30.08.18
30.04.19
15.09.16 Work in
Progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
7
8 NWR/SC/
UDZ-HMT
(GC)/Civil-
204140124
Construction of minor
bridges and earth work in
cutting and filling
between Umra and Zawar
stations in connection
with UDZ-HMT GC Project
Open 02.06.16 Two bid
system
12.07.16 05 02 Yes NWR/S&C/
CA/ 164 dtd.
08.12.2016
M/s Ravi Infrabuild
Projects Pvt. Ltd, ,
Udaipur
6980.98 Lakhs 11.09.2018
10.09.2019
01.10.16 Work in
Progress
9 NWR/SC/
Constructio
n/Civil-
204300010
30
Construction of 49 Nos.
Road Under Bridges and 8
Nos. Road Over Bridges in
UDZ-HMT section
Open 14.09.16 Two bid
system
18.10.16 04 03 Yes NWR/S&C/
CA/ 166 dtd.
14.03.2017
M/s Rachana - MI (JV),
Ahmedabad-(Gujarat).
8103.80
Lakhs
22.12.18 01.01.17 Work in
progress
10 NWR/SC/
UDZ-HMT
(GC)/Civil-
204140334
Constriction of Super
structure of 32 Nos Major
bridge in UDZ-HMT
section
Open 04.12.16 Two bid
system
11.01.17 04 04 Yes NWR/S&C/
CA/ 1697dtd.
09.04.17
M/s Rachana - MI (JV),
Ahmedabad-(Gujarat).
5674.62 Lakhs 26.02.19 08.03.17 Work in
progress
11 NWR/SC/
UDZ-HMT
(GC)/Civil-
204140533
Providing in situ Glued
joints of G-3 (L) type in
UDZ-HMT section
Open 20.10.16 Single
Packet
07.12.16 05 05 Yes Dy. CE/C/
UDZ/CA/41
dated
16.05.2017
M/s. Tirupati Metal
Fabricators, Faridabad
148.97 Lakhs 15.02.19 Work yet to
start
12 NWR/SC/
UDZ-HMT
(GC)/Civil-
204140535
Supply of stone Ballast in
UDZ-HMT section
Open 21.12.20 Single
Packet
25.01.17 06 06 Yes Dy. CE/C/
UDZ/CA/26
dated
26.05.2017
M/s. B. B. Construction,
Khurja-Distt.
Bulandshahr
801.13 Lakhs 02.09.2018
02.04.2019
24.03.17 Work in
progress
13 NWR/SC/U
DZ-
HMT(GC)/
Civil-
204140538
Flash butt welding of Rails
in UDZ-HMT section
Open 31.12.16 Single
Packet
08.03.17 02 02 Yes Dy. CE/C/
UDZ/CA/49
dated
28.10.17
M/s ITC, Kanpur 648.34 Lakhs 30.11.18 --- Work yet to
start
14 NWR/SC/
UDZ-HMT
(GC)/Civil-
205140539
Laying and linking of track
in UDZ-HMT section.
Open 31.12.16 Single
Packet
10.02.17 02 02 Yes Dy. CE/C/
UDZ/CA/40
dated 17.04.17
M/s Ravi Infrabuild
Projects Pvt. Ltd,
Udaipur
861.39 Lakhs 31.12.18 28.03.17 Work in
progress
15 NWR/SC/
UDZ-HMT
(GC)/Civil-
204140839
Laying and linking of track
in UDZ-HMT section. from
Km 160 to Km 225 In UDZ-
HMT section
Open 29.12.16 Two packet 02.02.17 04 04 Yes Dy. CE/C/
UDZ/CA/45
dated 26.09.17
M/s BLB--SNCC JV,
Jodhpur (Raj)-342001
1128.55 Lakhs 02.04.19 16.05.17 Work in
progress
16 T.NO.UDZ
-HMT-GC-
MB-T-43-R
Fabrication, transporting
assembling and erection of
superstructures
Open 19.07.17 Two packet 24.08.17 03 02 Yes Dy. CE/C/
UDZ/CA/53
dated 15.02.18
M/s Dynamic Engineers
Infratrack Pvt.,Ltd.,
Kota
1510.59 Lakhs 15.01.19 Work in
progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
8
17 T.NO.UDZ
-HMT-GC-
BLDG/T-
44
Construction of staff
Quarters & SSE/C/P.Way
office in UDZ-HMT section
Open 09.06.17 Single 12.07.17 03 03 Yes Dy. CE/C/
UDZ/CA/46
dated 20.09.17
M/s Ravi Infrabuild
Projects Pvt. Ltd, ,
Udaipur
389.88 Lakhs 31.01.18
30.06.18
30.11.18
Work in
progress
18 T.NO.UDZ
-HMT-GC-
Civil/T-47
Earth work and minor
bridges between UDZ-
Umra in UDZ-HMT section
Open 18.08.17 Single packet 20.09.17 02 02 Yes Dy.CE/C/
UDZ/CA/51
dated 20.01.18
M/s Ravi Infrabuild
Projects Pvt. Ltd,
Udaipur
1206.73 Lakhs 10.06.18
10.11.18
01.11.17 Work in
progress
19 T. No.
UDZ-
HMT-GC-
P.way-T-
46-R
Laying and linking of track
in UDZ-HMT section. from
Km 111 to Km 160 In UDZ-
HMT section
Open 11.11.17 Two packet 18.12.17 03 03 Yes M/s B.S. Sangwan,
Sonepat
1466.98 Lakhs 19.08.19 26.02.18 Work in
progress
20 T. No.
UDZ-
HMT-GC-
Miscl-T-49
Const. of toe walls,
retaining walls, trolley
refuges, etc. b/w KRCD &
DNRP stations
Open 23.05.18 Two packet 28.06.18 07 06 Yes M/s S.K. Builders,
Gautam Buddha Nagar,
U.P.
3507.92 Lakhs 12.02.20 Yet to start
21 T. No.
UDZ-
HMT-GC-
Tunnel-T-
50
Const. of BG tunnel b/w
KRCD and Zawar stations
Open 23.05.18 Two packet 28.06.18 08 04 Yes M/s ABCI Infrastructure
Pvt. Ltd, Kolkata
4180.85 Lakhs 19.05.20 Yet to start
22 T. No.
UDZ-
HMT-GC-
Stn-T-51
Const. of stn bldgs, PF,
FOBs at Zawar, Semari,
KDLG, RDD, Kotana and
JYM stns.
Open 30.05.18 Two packet 04.07.18 06 05 Yes M/s Prem Fabricators,
Ahmedabad
2157.37 Lakhs 12.08.19 Yet to start
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
9
Dy. CE/C/II-UDZ
1. T.No. NWR/SC/AII-COR-UDZ/Civil-204141902
Tender No. NWR/SC/AII-COR-UDZ/Civil-204141902 – Earth work in bank/ cutting including blanketing material, construction strengthening, rebuilding, extension of
Major bridges, Minor bridges ……..and other ancillary works, in Mavli (incl)- Barisadri (incl) section in connection with Mavli Junction to Barisadri to Barisadri GC Project.
Open 19.02.16 Two Packet
20.04.16 13 Nos. 5 NIL YES Contract agreement No. NWR/S&C/CA/160 dated 30.09.16
M/s Gurukrupa Kalyan JV 2A, 2nd Floor, Navnath Sec-2, B/H, Shradhadeep Society, Nr. Sharda School, Singanpore-Causway Road
Rs. 137.40 Cr 15.06.18 01.07.16 Work terminated on 25.09.17
Due to slow progress and work stopped by agency work terminated.
2 T. No. NWR/SC/AII-COR-UDZ/Civil-304140803-R
Flash Butt Welding of 60Kg / 52Kg New / SH Rails at Depot / Site using Mobile Flash Butt Welding Plant in Mavli – Bari Sadri section in connection with Mavli–Badi Sadri gauge conversion project
Open 10.10.16 Single Packet
25.11.16 2 Nos. 01 No 01 No Yes Acceptance letter No.UDZ/ MVJ-BI/GC /Welding/T-3R Dated 20.02.17
M/s Railtech Infraventure Pvt.Ltd., 147/91-A Old Bairahana, Allahabad-211003 (UP)
Rs.03.93 Cr 19.08.18 31.03.19
yet to start
3 T.No.UDZ-MVJ-BI-GC- Ballast-T-5
T.No.UDZ-MVJ-BI-GC-Ballast-T-5- Supply & stacking 65 mm machine crushed, stone track ballast conforming to Railway specifications in stacks on cess along the track & in yards at stations between Mavli (including) & Bhinder
(including) stations from Ch. 0.000 to Ch 41000 and at temporary ballast depot at Bhinder or any station between MVJ-BNNR station in connection with Mavli-Barisadri Gauge Conversion project
Open E -Tender
25.10.17 Two Packet
30.11.17 2 Nos. 2 NIL YES Dy.
CE/C/UDZ/
CA/54
dated
05.03.2018
M/s J.K. Construction Co., Naya Bazar, Nokha (Bikaner)-334803
Rs. 6.94 Cr 27.12.18 29.12.17 In progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
10
4 T.No.UDZ-MVJ-BI-GC- Ballast-
T-6
T.No.UDZ-MVJ-BI-GC-Ballast-T-6- Supply & stacking 65 mm machine crushed, stone
track ballast conforming to Railway specifications in stacks on cess along the track & in yards at stations between Bhinder (excluding) & Barisadri (including) stations from Ch.41000 to Ch 82405 and at temporary ballast depot at Barisadri or any station between Bhinder-Barisadri stations in connection with Mavli-Barisadri Gauge Conversion project.
Open E -Tender
25.10.17 Two bid 01.12.17 2 Nos. 4 NIL YES Dy.
CE/C/UDZ/
CA/55
dated
07.03.2018
M/s J.K. Construction Co., Naya Bazar, Nokha (Bikaner)-334803
Rs. 6.82 Cr 08.01.19 13.01.18 In progress
5 T. No. UDZ-MVJ-BI-GC-LHS-T-7
T. No. UDZ-MVJ-BI-GC-LHS-T-7- Balance work of construction of 42 Nos. Road Under Bridges (RUB/LHS) in lieu of level crossings and all other ancillary works like approach road works, retaining walls, drainage works, height gauges, etc. between Mavli - Bhinder stations (from Ch 0 to 41000) in connection with Mavli- Bari Sadri GC Project.
Open
E-
tender
25.10.17 Two
Packet
27.11.17 4 Nos. NIL NIL Yes NWR/S&C/
CA/175
dated
28.05.18
M/s Ravi Infrabuid
Projects Pvt. Ltd, 95
Hiran magri- Sector-
11 Udaipur-313002
Rs. 33.37 Cr. 11.09.2019 25.03.18 In
progress.
6 T. No. UDZ-MVJ-BI-GC-LHS-T-8
T. No. UDZ-MVJ-BI-GC-LHS-T-8 -Balance work of construction of 47 Nos. Road Under Bridges (RUB/LHS) in lieu of level crossings and all other ancillary works like approach road works, retaining walls, drainage works, height gauges, etc. between Bhinder-Bari Sadri stations (from Ch 41000 to 82610) in connection with Mavli- Bari Sadri GC Project.
Open E
tender
25.10.17 Two
Packet
28.11.17 5 Nos. 01 No.
( D.K.
CONSTRUC
TIONS-
MOHALI)
Nil YES NWR/S&C/
CA/176
dated
28.05.18
M/s Rachana- MCPL-
JV Bikaner Road,
NOKHA 334803 Distt
Bikaner Raj.
40.48 Cr. 11.09.2019 25.03.2018 Work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11
7 T.No.UDZ-MVJ-BI-GC-T-9
T.No.UDZ-MVJ-BI-GC-T-9 - Balance work of “Construction, extension,
strengthening, rebuilding of existing major & minor bridges, Earthwork in cuttings and filling including blanketing material for widening of existing MG formation for making formation width as per BG standard profile ,construction of station building, S&T structures, platform wall, PF shelters, FOB, circulating area, retaining wall, boundary wall, approach road, etc.& all other ancillary works from Ch.0 to Ch.41000 between Mavli Jn. and Bhinder stations in connection with Mavli Jn.-Barisadri Gauge Conversion Project”.
Open E
tender
25.10.17 Two
Packet
27.11.18 3 Nos. NIL NIL YES No.
NWR/S&C/
CA/177
dated
28.05.18
M/s Ravi Infrabuid
Projects Pvt. Ltd, 95
Hiran magri- Sector-
11 Udaipur-313002
54.32 Cr. 11.09.2019 25.03.18 Work in
progress.
8 T.No.UDZ-MVJ-BI-GC-T-10
T.No.UDZ-MVJ-BI-GC-T-10- Balance work for “Construction, extension, strengthening, rebuilding of existing minor bridges, Earthwork in cuttings and filling including blanketing material for widening of existing MG formation for making
formation width as per BG standard profile, construction of station building, S&T structures, platform wall, PF shelters, FOB, circulating area, retaining wall, boundary wall, approach road, etc.& all other ancillary works from Ch.41000 to Ch.82610 between Bhinder and Bari Sadri stations in connection with Mavli Jn.- Barisadri Gauge Conversion Project”
Open E
tender
25.10.17 Two
Packet
28.11.17 3 Nos. NIL NIL YES NWR/S&C/
CA/178
dated
28.05.18
M/s Ravi Infrabuid
Projects Pvt. Ltd, 95
Hiran magri- Sector-
11 Udaipur-313002
60.84 Cr. 11.09.2019 25.03.18 Work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
12
9 Tender No. UDZ-MVJ-BI-GC-T-11
Tender No. UDZ-MVJ-BI-GC-T-11:- Dismantling of balance existing MG track, laying and linking of Broad gauge main line, loop lines / sidings including points and crossings, SEJs, etc. in yards, spreading of ballast, tamping of track, Pre NI/NI works in Mavli station yard and other ancillary works from Mavli (including) - Bhinder (Including)- Ch. 0.000 to Ch.41000.00 and transportation of P. Way materials in connection with Mavli -Barisadri Gauge conversion project.
Open E
tender
24.10.17 Single
Packet
5.12.17 2 Nos. NIl NIL Yes Acceptance
letter No.
NWR/S&C/
UDZ-
474461463
dated
13.03.18
M/s Jhawar Sales
Corporation, Rani
Bazar, Bikaner-
334001(Raj)
7.23 Cr. 12.06.2019 Work in
progress.
10 Tender No. UDZ-MVJ-BI-GC-T-12
Tender No. UDZ-MVJ-BI-GC-T-12 Dismantling of balance existing MG track, laying and linking of Broad gauge main line, loop lines / sidings including points and crossings, SEJs, etc. in yards, spreading of ballast, tamping of
track, and other ancillary works from Bhinder (excluding) - Bari Sadri (Including)- Ch. 41.000 to Ch.82610.00 and transportation of P. Way materials in connection with Mavli -Barisadri Gauge conversion project.
Open E
tender
24.10.17 Single
Packet
6.12.17 2 Nos. NIl NIL Yes Acceptance
letter No.
NWR/S&C/
UDZ-
474461464
dated
13.03.18
M/s B.S.Sangwan
4GF, Harry Plaza,
Subash Chowk,
Sonipat - 131001
Haryana
7.56 Cr. 12.06.2019 Work in
progress.
11 Dy. CE-C-BNSW-T-12R
Tender No. Dy. CE-C-BNSW-T-12RCarrying out final location survey, geotechnical studies, design, preparation drawings & other preliminary activities and work out actual realistic cost & ROR estimated in connection with Gauge conversion project between Marwar-Mavli (152KM)
Open E- tender
07.11.2017 Single Packet
12.12.17 5 Nos. NIl NIL Yes Acceptance letter No. NWR /BNSW/S&C/484266032 Vol-0 dated 19.05.18
M/s PIONEER SURVEYORS KOLKATA
2.91 Cr. 18.05.2019 Work in progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
13
Dy. CE/C/Dungarpur
1. Dy.CE/C/
UDZ/
DNRP-
RTM/FLS/
2011/T/1
Carrying out final
location of survey &
….other preliminary
activities in connection
with new BG line
between DNRP-RTM via
Banswara
Open 1/6/11 &
30/6/11
(NIT & First
corrig.)
Single 15-07-
2011
10 NA NA Yes NWR/S&C/
CA/114 Dt.
27-02-12
M/s S.M.Consultants,
Bhubneswar
4.99 Cr
Excl. 1st 0.60
Cr.
13/11/12
Extended
up to
30.06.2018
14/11/2011 -
Work in
progress
2. Dy.
CE/C/DN
RP/ RTM-
DNRP/EW
/ NL/T-8
E/W in cutting and
filling for formation &
all other ancillary works
etc. from Km. 0.00 to
Km. 17.00 between
Dungarpur-Nawa Gaon
station in c/with DNRP-
RTM New BG Rail Line
Project.
Open 23-01-2013 Two
Packet
06-03-
2013
15 5 10 Yes NWR/S&C/
CA/129
Dt. 31-10-
13
M/s Nayak
Infrastructure Pvt.
Ltd., Guwahati
56.74 Cr.
Ex.SCA
8.05 Cr.
09-07-15
Further
extended
upto
09.07.2017
06-11-2013 - Project
freeze.
Final bill
signed
under
protest.
3. T. No.
Dy. CE/C/
DNRP/
RTM-
DNRP/MB
/NL/T/ 10
– Const. of minor
bridges, RUB & other
ancillary works etc.
from Km. 0.00 to 17.00
bet. Dungarpur to
Nawa Gaon stations in
c/with DNRP-RTM New
BG Rail Line Project.
Open 10-09-2013 Two
Packet
23-10-
2013
8 6 2 Yes NWR/S&C/
CA/137 Dt.
30-06-
2014
M/s Gannon Dunkerley & Co. Ltd., Ahmedabad
38.06 Crore 0.42 Crore
03-04-2016
Extended
upto
30.06.18 &
31.10.2018
14.11.2014 - Project
freezed.
Some work
to be
executed
to close
the work.
4 T. No.
UDZ-
HMT/GC/E
W/T-3R
UDZ-HMT GC PROJ.
Construction of Minor
bridges & earthwork
from Km. 270/0 to
320/0 in connection
with UDZ-HMT section
GC Project
Open 08.05.15 Two bid
system
12.06.15 06 01 05 Yes NWR/S&C/
CA/148
dated
12.01.2016
M/s Royal Infra
Engineering Pvt. Ltd., Surat
2706.07
Lakhs
4.02 Cr. 1st
SCA
0.29 Cr. 2nd
SCA.
19.04.17
Extended
upto
31.07.2018
31.10.2018
27.11.15 - Work in
Progress
5 NWR/SC/
UDZ-
HMT/GC/Ci
vil/204140
532
Flash Butt welding of
60 Kg/52 Kg. New / SH
Rails at Depot/ Site
using Mobile Flash Butt
Welding Plant in DNRP-
HMT Section.
Open Single
Packet
23.11.16 02 01 01 Yes Under
execution M/s Railtech
Infraventure Pvt. Ltd. 147/91-A, Old Bairahana Allahabad – 211003 (UP)
531.70 Lakhs 21.08.2018
22.05.2019
Yet to be
commenced.
-- Yet to be
started.
6 NWR/SC/
UDZ-
HMT/GC/Ci
vil/205140
541
Dismantling of existing
MG track, laying and
linking of BG ML, LL
etc. bet. Km. 270.00 to
Km. 320.00 in c/with
DNRP-HMT Section.
Open - Single 01.02.2017 04 Nos. 1 1 Yes Dy.
CE/C/DNRP
/CA/17 Dt.
27.06.2017
M/s Bhanwar Lal Bijarnia, Vill. Rajpura, Post Prewari, Tehsil Nawa, Distt. Nagaur (Raj.)
890.85 Lakhs 27.02.2018
Extended upto
31.12.18
05.04.2017 -- Work in
progress.
7. UDZ-HMT/
GC/
205140838
-R1
Transportation of all
types of free rails, P&C
etc. between DNRP-
HMT Section in c/w
UDZ-HMT GC Project.
Open
tender
01.05.2017 Single
Packet
12.06.2017 2 Nos. NA NA Yes Dy. CE/ C/
DNRP/CA/1
9 Dt.
15.10.2017
M/s Shree Nahar Construction Co., A-328, Shastri Nagar, Jodhpur (Rajasthan)
6.28 Crores 17.08.2018
Extended
upto
31.03.2019
31.08.2017 - Work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
14
DY. CE/C/RTM
1. Dy.CE/C/RTM/ DNRP-RTM/NL/T-2
Construction of minor bridges ,Road under bridges (RUB) & other ancillary works from 142.85 to 163.00 km between Chotti Sarvan -Shivgarh stations in c/w Construction of DNRP-RTM via Banswara.New BG Rail line project
Open 15.06.2014 Two bid 23.07.14 5 Nos. 01No 04(four) Yes NWR/S&C/CA/141 dated 16.03.2015 & 31.05.18
M/S Gannon Dunkerley & Co.Ltd. 301-303,Prema Acrcade,3rd Floor, Opp Doctor House, Near Parimal Crossing,C.G.Road,Ahemdabad-380006
Rs.4288.78 Lakhs
17.12.2016 31.03.2018 30.11.2018
10.08.2015 - The work have also been approved for closure after completing certain works which are already in progress.
CE/C/III-JP
Dy. CE/C/I-Ajmer
1
AII
/BN
GM
-RAS/N
L/T
/11 R
2
Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P-way materials, construction of station building & platform and other
ancillary works between Bangurgram and Ras stations in connection with Bangurgram-Ras New Broad Gauge Line Project.
Open 05.10.12 Single 09.11.12 1 Nos. - - Yes
Dy. CE(C)/AII /BNGM-RAS/CA/85 dated 20/11/2013
M/s. Bhanwar Lal Bijarnia, Village-Rajpura, Tehsil-Nawa, District-Nagaur (Raj.)
6674.98 Lakhs
17/09/2013, 28/02/2014, 31/05/2014, 30/09/2014, 31/01/2015, 31/05/2015, 30/10/2015 & 31/12/2015
02/09/13 -
Work completed. Final variation sanctioned. Final bill passed.
8. UDZ-HMT/
GC/
205141142
Const. of duty huts,
road works at level
crossing, etc. in the
section of Dy.
CE/C/DNRP in c/with
UDZ-HMT GC Project.
Open
tender
14.08.2017 Single
Packet
18.09.2017 1 NA NA Yes Dy. CE/C/
DNRP/CA/
22 Dt.
24.01.2018
M/s R.K. Constructions, Village –Nawada, Sector-20, Greater Noida, Distt . Gautam Budh Nagar.
7.63 Crores 17.10.2018 02.11.2017 - Work in
progress.
9. NWR/SC/
UDZ-HMT/
GC/ Civil –
205140436
Supply & stacking of
stone track ballast etc.
bet. Km. 260 to Km.
320 etc. in c/with UDZ-
HMT GC Project.
Open
tender
08.12.2016 Two
packet
18.01.2017 4 4 - Yes Dy. CE/C/
DNRP/CA/
18 dated
15.07.2017
M/s YSCC-YKS-HID
(JV), Vill. Mothala, Abu Road, Distt. Sirohi
10.87 Crores 17.10.2018 08.05.2017 - Work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
15
2
AII
/Const.
/DFCCIL
/T/3
-R2
Shifting of track between Madar & Durai stations & shifting MG yard at Marwar Jn. i.c.w. DFC.
Open 17.04.13 Two Bid 02.04.13 4 Nos. 1 No. 1 No. Yes NWR/S&C/CA/60 dated 26/12/2013
M/s. Ravi Infra build Pvt. Ltd., 95, Hiran Magri, Sector-11, Udaipur
3216.99 Lakhs
04/02/2015,
30/04/2016, 31/12/2016, 30/06/2018 & 31/12/2018
14/12/13 - Work in progress.
3
AII
/Const.
/DFCCIL
/T/6
Construction of station building & staff quarters in c/w shifting of utilities for DFCCIL.
Open 10.01.13 Two Bid 15.02.13 9 Nos. 5 Nos. 5 Nos. Yes NWR/S&C/CA/61 dated 27/12/2013
M/s. Rama Construction company, H-240, Ashok Vihar Phase-I New Delhi
4117.03 Lakhs
05/03/2015, 31/12/2015, 30/06/2016, 31/12/2016, 30/06/2017, 31/12/2017, 31/03/2018, 30/06/2018
& 31/07/2018
15/09/13 - Work under completed.
4
AII
/Const.
/LH
S/T
/3 Providing Limited Height
Subways in lieu of existing Level Crossings between Madar & Haripur stations of Madar - Marwar Section in connection with elimination of existing level crossing gates.
Open 10.06.13 Two Bid 17.07.13 01 Nos. - - Yes NWR/S&C/CA/64 dated 20/02/2014
M/s. Lall Construction Co. AA-105, Shalimar Bagh, Delhi-110088
4577.17 Lakhs
15/12/2015, 31/03/2017, 31/10/2017, 30/06/2018
& 31/01/2019
18/02/14 - Work under progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
16
5
AII
/Const.
/Loco/M
od/T
/7
Improvement to drainage system in Loco Workshop by the construction of drain using mostly pre-cast RCC units including launching. Work also includes construction of traverser path and other ancillary works in connection with Modernisation of Loco Workshop, Ajmer
Open 21/10/14 Two Bid 26/11/14 07 (Seven)
04 (Four)
1.0 JCC Infra Projects Pvt. Ltd.,
761/30, Aklank House, Tikam Ganj, Ajmer (Raj.) 2.0 Bharat Spun Pipe & Construction Company, 43, Industrial Area, Jhotwara, Jaipur-302012 3.0 M/s. B. L. Infra Projects Pvt. Ltd., B-8/6, Sector-3, Rohini, New Delhi -110085. 4.0 M/s. Satish & Amit Infra Structure 2/108, Royal Green, Near Sirsi Mod, Post office Sirsi, Jaipur.
Yes NWR/S&C/ CA/70 dated 29/07/2015
Prem Fabricator's, 426, Near Jyoti Power, Behind Steel Town, Moriya, Chandgodar, Ahmedabad-382110
1326.88 Lakhs
04/02/2016, 30/06/2016, 30/08/2016, 31/10/2016
& 15/12/2016
17/02/15 -
Work completed. Final variation sanctioned. Final bill pending for want of re-appearing of work in Pink book.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
17
6
AII
/Const.
/C&
W/M
od./
T/6
Improvement to drainage system in C&W Workshop by the construction of drain using mostly pre-cast RCC units including launching. Work also includes construction of traverser path and other ancillary works in connection with Modernisation of C&W Workshop, Ajmer
Open 23/10/14 Two Bid 26/11/14 06 (Six) 04 (Four)
1.0 Varaha Infra Limited, Umesh
Smriti-6, Jalam Vilas Scheme, Poata B. Road, Jodhpur (Raj.)-342006. 2.0 Bharat Spun Pipe & Construction Company, 43, Industrial Area, Jhotwara, Jaipur-302012. 3.0 JCC Infra Projects Pvt. Ltd., 761/30, Aklank House, Tikam Ganj, Ajmer (Raj.) 4.0 M/s. Raj Kumar Gupta Contractors, III-J/59, Nehru Nagar, Ghaziabad-201001.
Yes
Dy. CE(C)/AII/CA/91 dated 30/07/2015
Prem Fabricator's, 426, Near Jyoti Power, Behind Steel Town, Moriya, Chandgodar, Ahmedabad-382110
948.74 Lakhs
21/01/2016, 31/12/2016, 30/06/2017, 31/10/2017, 15/01/2018, 15/03/2018
& 31/07/2018
04/02/15 - Work in progress.
7
NW
R/S
C/A
II-B
NG
M/C
ivil -
308151801
Earth work in bank/cutting including Blanketing material, Construction of Major/Minor Bridges, Construction of Quarters, S&T structures & Miscellaneous structures, Dismantling of existing Buildings, Platforms & Steel structures etc., .... in connection with Ajmer-Bangurgram BG Doubling project.
Open 02/03/16 Double packet
12/04/2016
06 (Six) 02 (Two)
M/s. Rajendra
Singh Bhamboo Infra Pvt. Ltd. 108, First Floor, Neel Kanth Building, Gandhi Path, Vaishali Nagar, Jaipur – 302021 and M/s. Balajee-Modi (JV), 9, Leela Mension, Raj Bhawan Road, Civil
Yes NWR/S&C/CA/74 dated 30/08/2016
M/s. Shivakriti-Shri Mohangarh (JV), 7th Floor, Ajmer Puliya, Jaipur-302006
11337.76 Lakh
23/06/2018 &
28/02/2019 20/07/16 -
Work in progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
18
Lines, Jaipur-302006 Jaipur-
302006
8
NW
R/S
C/B
angurg
ram
-Guriya-P
atc
h/C
ivil-3
08151801
Earth work in bank/cutting including Blanketing materials, Construction of Major/Minor Bridges, Construction of Quarters, S&T structures & Miscellaneous structures, dismantling
of existing buildings, platforms & steel structures etc., ... in connection with Bangurgram - Guriya BG Doubling project.
Open 28/06/16 Double packet
10/08/2016
05 (Five) 01 (One)
VPRPL-RBIPL "Guriya" (JV) H-1, First Floor Shivalik Complex, Near Gol
Building, Sardarpura, Jodhpur (Rajasthan) 342001
Yes NWR/S&C/CA/76 dated 24/01/2017
M/s. H.S. Mehta Infra – JCC Infra Projects (JV), 761/30, Aklank House, Tikam Ganj
Ajmer – 305001
16161.54 Lakh
10/11/2018 20/11/16 - Work in progress.
9
NW
R/S
C/M
D-/
Civ
il-3
08421801
Providing pit line with or without catwalk, washing apron, overhead water tank, extension of existing bridges, extension of existing shed, construction of service buildings and dismantling of existing track, laying & linking of new track & turnouts etc. in Madar yard in connection with shifting
of coach maintenance facility from Ajmer to Madar project
Open 29/04/16 Double packet
28/06/16 7 (Seven) 2 (One)
M/s. Ali Mohd. Abdul Mazid, Near Jama Masjid, Mohalla Vyaparian, Bikaner-334001 (Raj.) Varindera Constructions Limited, 408-409, Suneja
Tower-I, District Cenre, Janakpuri, New Delhi.
Yes NWR/S&C/CA/75 dated 29/09/2016
M/s. M. H. Khanusiya, First Floor, Divine India Building, Near RTO office, By Pass Road, Post-Savgadh, (Panpur) Himmatnagar-383001 Dist.-S.K. (Gajarat)
2643.75 Lakh
06/09/2017, 31/01/2018, 31/05/2018
& 31/07/2018
15/09/16 - Work in completed.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
19
Dy. CE/C/II-Ajmer
1 AII/Const.
/LHS/T/2
Construction of
Limited Height
Subway in lieu of
existing LC No. 58,
60, 61, 62, 64, 65,
66, 67, 68, 69, 71, 72
& 73(13 Nos)
between stations
Marwar to Rani of
Marwar-Palanpur
Section in connection
with elimination of
level crossing gates.
Open 21.02.2013 Single 28.03.2013 01 Nos.
1st Lowest
M/s. Ravi
Infrabuild
Projects Pvt.
Ltd. Office
95, Hiran
Magri Sector-
11, Udaipur-
313002
(Raj.).
NIL Yes
NWR/S&C/CA/5
8 dated
18/11/2013
M/s. Ravi Infrabuild
Projects Pvt. Ltd.
Office 95, Hiran Magri
Sector-11, Udaipur-
313002 (Raj.).
1790.49 Lakhs
31/12/2014,
30/09/2015,
30/09/2016,
30/09/2016,
31/12/2016,
31/05/2017 &
30/11/2017
14/09/2013 - Work
Completed.
2
AII/GRI-
MJ/BGD/T
/1
Earthwork in
embankment for
cutting & filling,
Blanketing for bank,
Addition, alteration
and construction of
S&T structures, Pass.
Platform, Platform
Shelters, station
Building, staff
Quarters, water Huts,
toilets, Hand Pumps,
FOBs, TMC Rest
house etc. between
Guriya–Marwar Jn.
stations (both excl.)
and Officer Rest
House at Mawar Jn.
Station in connection
with Guriya-Marwar
Jn. BG Patch Doubling
Project.
Open 30.08.12 Single 16.10.12 07 Nos.
1st Lowest
M/s. Braham
Prakash Modi,
74
Sudarshanpur
a, Industrial
Area,
Baisgodam,
Jaipur-06
NIL Yes
NWR/S&C/CA/5
1 dated
14/03/2013
M/s. Braham Prakash
Modi, 74
Sudarshanpura,
Industrial Area,
Baisgodam, Jaipur-06
3541.71 Lacs.
30/09/2014,
30/04/2015,
31/07/2015,
30/10/2015,
31/12/2015,
30/04/2016,
30/06/2016,
31/12/2016,
31/03/2017 &
30/06/2017
31/12/2012 30/06/17 Work
completed.
3
AII/GRI-
MJ/BGD/T
/2
Construction of
Important/Major
Bridges including
earthwork, blanketing
on the approaches
between stations
Guriya to Marwar
Junction with
Railway’s/Contractor’s
design & drawing in
connection with
Guriya-Marwar
Junction BG Patch
Doubling Project.
Open 21.01.2013 Single 26.02.2013 06 Nos.
1st Lowest
M/s.PNC
Infratech
Ltd.-Jain
Construction
Company
(JV) 761/30,
Aklank
House, Near
Mal Godown,
Tikam Ganj,
Ajmer
NIL Yes
NWR/S&C/CA/6
2 dated
06/01/2014
M/s. PNC Infratech
Ltd.-Jain Construction
Company (JV) 761/30,
Aklank House, Near
Mal Godown, Tikam
Ganj, Ajmer
3240.43 Lakhs
28/01/2015,
31/12/2015,
30/09/2016,
31/12/2016,
15/02/2017 &
31/07/2017
06/12/2013 -
Work
completed,
final bill
passed.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
20
4 AII/Const.
/FLS/T/1
Marking out of center
line, taking levels
including all details,
Carrying out Geotech
investigation,
designing of
foundation and sub –
structures / super
structure of Minor /
Major bridges/LHS,
preparation of land
plans & proposal,
Preparation of L-
section & yard plans
etc. & submitting
detailed working
drawings in
connection with
Bangurgram to Guriya
& Marwar to Rani
Doubling projects and
Various shifting of
utility works of
DFCCIL & LHS works
between Kishangarh
& Palanpur stations.
Open 17.09.2012 Single 09.11.2012 03 Nos.
2nd Lowest
M/s. S. M.
Consultants,
Plot No.-130,
S.M. Tower,
Mancheswar
Industrial
Estate,
Rasulgarh,
Bhubneshwar
(Odisha)
M/s. BPC
India, Nataraj
Bhawan,
P.O.Khamarch
andi, P.S.
Haripal, Dist.-
Hooghly, West
Bengal
Yes
NWR/S&C/CA/
57 dated
07/11/2013
M/s. S. M.
Consultants, Plot No.-
130, S.M. Tower,
Mancheswar Industrial
Estate, Rasulgarh,
Bhubneshwar (Odisha)
183.38 Lakhs
06/07/2013,
30/11/2013,
31/03/2014,
31/10/2014,30/0
4/2015,
31/08/2015,
31/12/2015,
30/04/2016,
31/08/2016 &
30/04/2017
02/02/2013 - Work
completed.
5 AII/Const/
FBW/T/1
Flash butt Welding of
60/52 Kg.
New/SH,(72/90 UTS )
Rail joints by using
mobile flash butt
welding plant in
connection with
various sanctioned
works of Ajmer unit of
construction
organization.
Open 11.10.2012 Single 19.11.2012 01 No.
1st Lowest
M/s. The
India Thermit
Corpn. Ltd.,
84/22, Fazal
Ganj,
Kanpur-
208012.
NIL Yes
Dy.
CE(C)/AII/FBW/
CA/85 dated
21/10/2013
M/s. The India Thermit
Corpn. Ltd., 84/22,
Fazal Ganj, Kanpur-
208012
699.04 Lakhs
18/03/2015,
18/03/2016,
18/03/2017 &
18/03/2018
13/11/2013 - Work in
progress
6 AII/Const.
/LHS/T/4
Providing Limited
Height Subway (17
Nos.) in lieu of
existing level
crossings between
Haripur & Marwar Jn.
stations of Ajmer -
Marwar Jn. section in
connection with
elimination of existing
level crossing gates.
Open 11.07.14 Two packet
system 13.08.2014 07 Nos.
1st Lowest
M/s. PNC
Infratech
Ltd.-JCC
Infraprojects
Pvt. Ltd. (JV)
761/30,
Aklank
House, Near
Mal Godown,
Tikam Ganj,
Ajmer
04 (Four) Yes
NWR/S&C/CA
/68 Dt. 09-03-
2015
M/s. PNC Infratech
Ltd.-JCC Infraprojects
Pvt. Ltd. (JV) 761/30,
Aklank House, Near
Mal Godown, Tikam
Ganj, Ajmer
3529.60
Lakhs
18/05/2016
30/06/2017
31/10/2018
11/09/2015 - Work under
progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
21
7 AII/Const.
/LHS/T/5
Providing Limited
Height Subways (19
Nos.) in lieu of
existing level
crossings between
Rani & Keshavganj
stations of Marwar Jn.
– Palanpur section in
connection with
elimination of existing
level crossing gates.
Open 21.02.2013 Two packet
system 13.08.2014 04Nos.
1st Lowest
M/s. Ravi
Infrabuild
Projects Pvt.
Ltd. Office
95, Hiran
Magri Sector-
11, Udaipur-
313002
(Raj.).
03 (Three) Yes
NWR/S&C/CA/6
6 Dt. 27-02-
2015
M/s. Ravi Infrabuild
Projects Pvt. Ltd.
Office 95, Hiran Magri
Sector-11, Udaipur-
313002 (Raj.).
Rs.3908.17
Lacs
18/05/2016,
13/03/2017
31/12/2017
31/10/2018
03/12/2014 - Work under
progress
8 AII/Const.
/LHS/T/6
Providing Limited
Height Subways in
lieu of existing level
crossings between
Swaroopganj &
Palanpur stations of
Marwar Jn. - Palanpur
section in connection
with elimination of
existing level crossing
gates.
Open 21.02.2013 Two packet
system 13.08.2014 04 Nos.
1st Lowest
M/s. Ravi
Infrabuild
Projects Pvt.
Ltd. Office
95, Hiran
Magri Sector-
11, Udaipur-
313002
(Raj.).
03 (Three) Yes
NWR/S&C/CA/6
7 dated
27/02/2015
M/s. Ravi Infrabuild
Projects Pvt. Ltd.
Office 95, Hiran Magri
Sector-11, Udaipur-
313002 (Raj.).
Rs.3873.36
Lacs.
18/05/2016,
31/03/2017
31/03/2018
31/12/2018
18/12/2014 - Work under
progress
9
AII/GRI-
MJ/BGD/T
/6
Construction of Minor
Bridges including
other ancillary work
between station
Guriya (excluding) -
Marwar Jn.
(excluding) in
connection with
Guriya - Marwar
Junction BG patch
doubling project.
Open 07/07/2014 Two packet
system 13/08/2014 04 Nos. 1.0 (One)
1.0 M/s.
Ashish
Construction
Co.- SP
Infracon (JV)
211, Shivam
Complex, Opp.
Hetarth Party
Plot, Science
City Road,
Sola,
Ahmedabad -
380061.
Yes
NWR/S&C/CA
/69 dated
09/03/2015.
M/s. JCC InfraProjects
Pvt. Ltd., 761/30,
"Aklank House", Tikam
Ganj, Ajmer (Raj.).
2169.63 Lakhs
29/02/2016,
30/06/2016,
31/12/2016,
31/07/2017 &
31/12/2017
01/03/2015 - Work
completed.
10
AII/GRI-
MJ/BGD/T
/8-R
Dismantling of
existing BG track,
laying and linking of
Broad gauge main
line, loop lines
including points and
crossings at various
yards, spreading of
ballast, tamping of
track, transportation
of P-Way materials
and other ancillary
works between Guriya
– Marwar Jn. Section
in connection with
Guriya - Marwar Jn.
BG Patch Doubling
Project.
Open 28/07/2015 Single packet
system 31/08/2015 5 Nos. 1.0 (One)
1.0 JCC Infra
Projects Pvt.
Ltd., 761/30,
Aklank House,
Tikam Ganj,
Ajmer
No -
M/s. Jhawar Sales
Corporation, Rani
Bazar, Bikaner-
334001 (Raj.)
Rs. 976.32
Lakhs
28/05/2017 &
31/07/2017 - 30/06/17
Work
completed.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
22
11
AII/MJ-
RN/BGD/T
/1
Earth work in
bank/cutting including
Blanketing material,
Construction of
Important/Major/Mino
r Bridges,
Construction of
Quarters, S&T
structures &
Miscellaneous
structures on stations
and in section,
Dismantling of
various Buildings,
Platforms & Steel
structures etc, Track
works for Broad
Gauge line, Supplying
& putting ballast in
track, Transportation
of P. Way materials
and other ancillary
works in Marwar
Junction to Rani
section in connection
with Marwar Jn.-Rani
(both including) BG
Patch Doubling
project.
Open 09/08/2015 Two packet
system 06/10/2015 13 Nos. 7.0 (Seven)
1.0 M/s.
Gawar –
Lakhlan (JV)
402, Diamond
Tower, Purani
Chungi, Ajmer
Road,
Jaipur2.0 M/s.
Kalindee –
Paras JV, 2nd
Floor Building
No. 9 A, Cyber
City, DLF
Phase – III,
Gurgaon –
1220023.0
M/s. Ravi - HG
(JV) 95, Hiran
Magri, Sector-
11, Udaipur –
3130024.0
M/s. Gannon
Dunkerley &
Co. Ltd. 301-
303, Prerna
Arcade, Opp.
Doctor House,
Near parimal
Crossing, C.G.
Road,
Ahmedabad-
3800065.0
M/s. VRC – SIL
(JV), 16, Opp.
Metro Pillar
No. 190,
Paschim Vihar
Extension,
Rohtak Road,
Delhi
1100636.0
M/s. BPL-BCPL
(JV) Ekta
House, Nr.
Shripath
Apartment,
Jalaram-II,
University
Road, Rajkot –
360007
Yes
NWR/S&C/CA
/71 dated
22/02/2016
M/s. VPRPL – RBIPL
(JV) H-1, first Floor
Shivalik Complex,
Near Gol Building,
Sardarpura, Jodhpur
(Raj.) – 342001
15262.94 Lakh
29/12/2017
31/12/2018
25/02/2016 - Work under
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
23
12
NWR/SC/
Guriya-
Marwar/Ci
vil-
30915110
9
Miscellaneous works
between Guriya to
Marwar Jn. doubling
project.
Open 20/09/2016 Single packet
system 24/10/2016 04 Nos. 04 (Four) NIL Yes
Dy.CE(C)/AII/C
onst./GRI-
MJ/CA/4 dated
30/03/2017
M/s K.B. Enterprises,
2, Matra Chhaya,
Opp. Chambal Power
House, Hawa Sarak,
Jaipur-302006
Rs.814.54
Lakhs
20/05/2017 &
19/08/2017 03/12/2016 -
Work
completed.
13 AII/Const./
LHS/T/9
Providing leftover Limited
height subway in lieu of
existing level crossings
in Marwar Jn.-Palanpur
section in connection
with elimination of
existing level crossing
gates.
Open 08/09/2016 Two Packet
System 14/10/2016 03 Nos. 03 (Three) NIL Yes
Dy.CE(C)/AII/
Const./LHS/CA
/06
Dated
06/09/2017
M/s Radhe Associate,
137-1st Floor Kensvilla
Complex, Nr.
Ramosana Circle,
Mehsana-Unjha
Highway Road-384002
895.23
Lakhs
26/01/2018,
30/06/2018 &
28/02/2019
09/02/2017 - Work in
progress
14
NWR/SC/
Rani-
Marwar/
Civil-
309150802
-R
Flash butt welding of
60/52 Kg. New/SH
(72/90 UTS) Rail joints
by using Mobile flash
butt welding plant in
connection with Marwar
Jn.-Rani BG patch
doubling and Thaiyat-
Hamira-Sanu new BG
line project.
Open 15/07/2016 Single packet
system 22/08/2016 01 No. 01 (One) NIL Yes
Dy.CE(C)-
II/AII/CA/7 dated
25/11/2017
M/s Railtech
Infraventure Pvt. Ltd.,
147/91-A, Old
Bairahana, Allahabad-
211003
660.66
Lakhs
16/03/2018,
15/09/2018 &
31/12/2018
25/12/2017 - Work in
progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
24
CE/C/IV-JP
Dy. CE/C/I-Jodhpur
1. JU/Const./T
-22/14-
15/Std.IIR/
MTD-BKN
All Civil & P.Way work
c/with Std-II work in
MTD-BKN & RKB-PLC sec
Open
Tender
21.11.14 Single
Tender
23.12.14 02 Nos. M/s Bhanwar
Lal Bijarnia,
Village-
Rajpura,
Post-
Prewari,
Tehsil- Nawa,
Distt.
Nagour
(Rajasthan)
M/s Jai Mata De Energy System,
Laxmangarh
sikar
L-1 Dy.CE/C/
JU/14/2015-
16/Std-IIR,
dtd. 11.06.15.
M/s Bhanwar Lal
Bijarnia,
Village-Rajpura, Post-
Prewari,
Tehsil- Nawa, Distt.
Nagour
(Rajasthan)
715.80 lacs. 03.10.16
31.03.17
31.08.17
31.03.18
30.08.18
15.10.18
10.04.15 Work in
progress
-
2. JU/Const./7
4-W-
26/2015-
16/Std.IIR/
RKB-PLC
Supplying and stacking of
20800 cum Stone ballast
for Std.IIR work in RKB-
PLC section
Open
Tender
05.06.15 Single
Tender
10.07.15 04 Nos. M/s J.K.
Const.Co.
Nokha,
• A.K. Gupta & Co., , DELHI
• M/s Hanuman
Const. Co., Nokha
• M/s Shree Shyam Engineering Co, Churu
L-1 Dy.CE/C/
JU/19/ 2015-
16/Std.IIR/
RKB-PLC, dtd.
30.01.16
M/s J.K. Construction
Co.,
New Market, Nokha,
District – Bikaner
142.84 lacs. 10.05.16
31.07.16
15.11.16
.09.2015 18.07.17 Work
completed &
final bill
awaited due
to non
deposition of
mining NOC.
3. JU/Const./
T-27/2015-
16/Std.IIR/
RKB-PLC
All Civil & P.Way work
c/with Std-II work in
RKB-PLC sec
Open
Tender
11.06.15 Single 15.07.15 01 No. M/s Bhanwar
Lal Bijarnia,
Village-
Rajpura,
Post-
Prewari,
Tehsil- Nawa,
Distt.
Nagour
(Rajasthan)
- L-1 Dy.CE/C/
JU/18/ 2015-
16/Std.IIR,
dtd. 06.01.16
M/s Bhanwar Lal
Bijarnia,
Village-Rajpura, Post-
Prewari,
Tehsil- Nawa, Distt.
Nagour
(Rajasthan)
679.84 lacs. 15.03.17
08/2017
31.03.18
31.08.18
18.09.15 Work in
progress
Proposal for
extension of
DOC is in
process.
4. JU/Const./T
-25/2015-
16/Std IIR
Providing “IN SITU” Glued
Insulated Joints of G-3 (L)
type for 52 kg/60 kg rails
in c/w StdIIR work in
MTD-BKN & RKB-PLC
section.
Open
Tender
05.06.15 Single 10.07.15 03 M/s Tirupati
Metal
Fabricators,
1433 Sector
16,
Faridabad-
121002
(Haryana)
• Dynamic Engineers Kota.
• Creative Engineers Kota -
L-1 Dy.CE/C/
JU/17/ 2015-
16/Std.IIR,
dtd. 06.01-
2016
M/s Tirupati Metal
Fabricators,
1433 Sector 16,
Faridabad-121002
(Haryana)
320.01 lacs. 31.03.18
30.06.18
30.08.18
17.12.15 Work in
progress
-
5. NWR/SC/M
TD-
DEMU/Civil-
310161801
Construction of all Civil
Works and all allied work
for DEMU maintenance
facilities at Merta Road
Open
tender
31.07.15 Single 04.09.15 08 (Eight) • M/s Kalu Ram Contractor Jodhpur (JV)
• M/s Spacechem Keraram Amit (JV) Jodhpur.
• M/s PMP
• M/s M.H. Khanusiya, Himmat nagar
• M/s Shree Harsha Const Sanjeev Brothers (JV) Jaipur
• M/s T.S.R. Manushree
L-1 NWR/S&C/
CA-68, dated
05.01.2016
M/s Prem Fabricators,
Moriya, Changodar,
Ahmedabad
16.47 Cr. 06.06.17
30.10.17
31.01.18
31.03.18
11.12.15 - Work
completed &
handed over
to Jodhpur
divn on
04.07.18
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
25
Infratech Pvt Ltd Sole ADI.
• M/s Bharat Sun Pipe & Const. Co. Jaipur.
(JV) Hyderabad
6. NWR/SC/R
KB-
JSM/Civil-
310300010
04
LN-MJ sec. -RUBs in lieu
of LCs (12 Nos LCs under
Pink Book item No. 93 of
2015-16)
Open
tender
09.12.15 Single 12.01.16 07 (Seven) • M/s Rachana-SNCC JV
• M/s Jay Jawan Const. Co
• M/s Satish Kera Ram Amit
• M/s Mohanlal Managanlal Kakrecha
• M/s JCC Infra
• M/s M.H. Khanusiya
• M/s Rama Kishan
• M/s Rachana-SNCC JV
• M/s Jay Jawan Const. Co
• M/s Satish Kera Ram Amit
• M/s Mohanlal Managanlal Kakrecha
• M/s JCC Infra
• M/s Rama Kishan
L-1 Dy.CE/C/
JU/23/ 2016-
17/LHS/ LN-
MJ, dtd.
12.07.16
M/s M.H.Khanusiya,
Himantnagar-383001
Dist- S.K.(Gujrat)
12.71 Cr. 01.11.17
31.03.18
31.10.18
12.05.16 Work is in
progress
-
7. NWR/SC/M
TD-
BKN/CIVIL-
310300010
02-R
MTD-BKN section- RUB in
lieu of LCs, (16 Nos. of
LCs under Pink Book item
No. 97 & 104 of 2016-17)
Open
tender
17.07.16 Two packet
system
19.08.16 04 (Four) • M/s Shree Karni Traders, Bikaner
• M/s M.H. Khanusiya, Himatnagar
• M/s JMES – MGC (JV) V.P.O. – Narodara
• M/s PCC – Harita Construction Co. (JV), Hisar
• M/s Shree Karni Traders, Bikaner
• M/s JMES – MGC (JV) V.P.O. – Narodara
• M/s PCC – Harita Construction Co. (JV), Hisar
L-1 NWR/S&C/CA/
77 dated
15.02.2017
M/s M.H. Khanusiya,
Himatnagar
1823.45 Lakhs 05.11.18 10.01.17 Work in
progress
8. NWR/SC/
RKB-
JSM/Civil-
310300010
03-R
RKB-JSM section- RUB in
lieu of LCs, (20 Nos. LCs
under Pink Book item No.
98 & 108 of 2016-17).
Open
tender
03.08.16 Two packet
system
06.09.16 04 (Four) • M/s Rachana – SNCC JV, Jodhpur.
• M/s Shree Karni Traders, Bikaner
• M/s M.H. Khanusiya, Sunshine Infrastucther (JV), Himatnagar
• M/s SB – Jagtaji (JV), New Delhi – 110018
• M/s Shree Karni Traders, Bikaner
• M/s M.H. Khanusiya, Sunshine Infrastucther (JV), Himatnagar
• M/s SB – Jagtaji (JV), New Delhi – 110018
L-1 NWR/S&C/CA/
78 dated
05.06.2017
M/s Rachana – SNCC
JV, Jodhpur
2162.34 Lakhs 13.06.18
31.03.19
15.01.17 Work in
progress
-
9. NWR/SC/R
UB/Civil-
410300010
NWR/SC/RUB/Civil-
41030001007 Samdari-
Barmer section - Road
Open
tender
06.11.2016 Two packet
system
08.12.16 04 • M/s M.H. Khanusiya, Himatnagar
• M/s Shree Karni Traders,
L-1 NWR/S&C/CA
/ 79 dated
19.07.2017
M/S Rama kishan
Ashok kumar (JV) 205,
Sardarpura JU.
2241.33
Lakhs
06.10.18 10/2017 Work in
progress
-
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
26
07 under bridges in lieu of
Level Crossings (13 No.
LCs under PB item No. 73
of 2016-17 & 04 No. LCs
under PB item No. 100 of
2016-17)
• M/s Shree Karni Traders, Bikaner
• M/s JMES – MGC (JV) V.P.O. – Narodara
• M/s Rama kishan Ashok kumar (JV) JU.
Bikaner •
2246.65
(Revised)
10. NWR/SC/R
OB/Civil-
410300009
086
NWR/SC/ROB/Civil-
410300009086
construction of complete
ROB including Approaches
in lieu of existing LC No.
C- 56 at JM: 77/2-3 and
C- 109 at KM: 145/9 –
146/0 on SMR-BLDI
section
Open
tender
Two packet
system
10.03.17 08 • M/s M.H. Khanusiya, Himatnagar
• M/s Rachana Ankleshwar
• M/s Shree Karni Traders, Bikaner
• Lal Const. Company
• M/S Sona Builders- RC Patel JV Mehsana
• Ravi infra build projects Pvt. Ltd. Udaipur
• Radhe associates Mehsana
• VPRPL- RBIPL Samdari JV
• M/s Shree Karni Traders, Bikaner
• M/s Rachana Ankleshwar
• VPRPL- RBIPL Samdari JV
• Radhe associates Mehsana
L-1 NWR/S&C/
CA/81 dated
19.12.17
• M/S Sona Builders- RC Patel JV Mehsana
3699.14
Lakhs
04.07.19 26.09.17 Work in
progress
-
11. NWR/SC/R
UB/Civil-
410300010
09
Merta Road - Bikaner
section - Road under
bridges in lieu of LC (21
Nos. LCs under Pink Book
item No. 106 of 2017-18
& 02 Nos LCs under Pink
book item No.113 of
2017-18 )
Open
tender
04.08.17 Two packet
system
11.09.17 03 M/s Rachana Construction Company, AT & PO Maktupur, Ta. Unjha, Mehsana (Gujrat).
• M/s Shree Karni Traders, Bikaner
• M/s Pragat Const. Co. New Delhi
L-1 NWR/S&C/
CA/83, dated
10.04.2018
M/s Rachana Construction Company, AT & PO Maktupur, Ta. Unjha, Mehsana (Gujrat).
5225.26 Lakhs
10.11.19 11.01.18 Work in
progress
-
12. NWR/SC/R
UB/Civil-
410300010
11
DNA-MTD & RTGH-DNA
section - Road under
bridges in lieu of LC (20
Nos. LCs under Pink Book
item No. 122 of 2017-18,
01 No LC under Pink book
Open
tender
04.08.17 Two packet
system
11.09.17 03 M/s Rachana Construction Company, AT & PO Maktupur, Ta. Unjha,
• Mehta Const. Co Karnal
• M/s Pragat Const. Co. New Delhi
L-1 NWR/S&C/
CA/84, dated
10.04.2018
M/s Rachana Construction Company, AT & PO Maktupur, Ta. Unjha, Mehsana (Gujrat).
5306.07 Lakhs
10.11.19 09.03.18 Work in
progress
-
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
27
item No. 112 of 2017-18
)
Mehsana (Gujrat).
13. NWR/SC/R
UB/Civil-
410300010
10
MTD-JU, PPR-BARA
section - RUB in lieu of LC
(19 Nos. LCs under P B
item No. 112 of 2017-18,
01 No LC under Pb item
No. 117 of 2017-18 )
Open
tender
04.08.17 Two packet
system
11.09.17 02 • M/s Shree Karni Traders, Bikaner
• M/s Pragat Const. Co. New Delhi
L-1 NWR/S&C/
CA/82 dated
09.04.2018
M/s Shree Karni
Traders, Bikaner.
4939.74 Lakhs
02.01.20 01.04.18 Work in
progress
-
Dy. CE/C/II-JU
1. NWR/SC/Thaiyat/Civil-310111802
Construction of
all Civil work & all
other misc. works
between THM–
Sanu new BG line
project (56.250
kms.).
Open
temder
11.09.15 Two packet
17.11.15 07 M/s SCC JV PMP
Infratech, A-
Block, A-104,
Ganesh
Meridian,
Ahmedabad
4 Nos
M/s DRD MI JV
M/s Bhaniyana
Const. JV
M/S Apex Termic
PVT (JV)
M/S Ravi-HG (JV)
L-1 NWR/SC
/CA/73 dt.
17.08.16
M/s SCC JV PMP
Infratech, A-Block,
A-104, Ganesh
Meridian,
Ahmedabad
11733.94
Lakhs
22.03.18
30.09.18
27.04.16 Work in
progress
2. NWR/SC/Thiyat/
Civil-319110604
Work of
modification of
existing rooms
for office set up
at Jaisalmer
under Dy.CE(C)-
II/ Jodhpur’s unit
Open
tender
04.03.16 Single 12.04.16 02 M/s B.S.
Constructions,
New Delhi-
110092
01
M/s S.D.Builders
Jaisalmer
L-1
Dy.CE/C/
JU/CA/02, dtd.
25.08.16
M/s B.S.
Constructions, New
Delhi-110092
105.50 Lakh 26.02.17
05.05.18
08.07.16 Work
physically
completed
-
3. NWR/SC/Thiyat/
Civil-319110507-R
Providing “IN
SITU” Glued
Insulated Joint in
c/w. Thaiyat
Hamira–Sanu
new BG line
project & Marwar
Jn.-Rani section
in MJ-Rani BG
Patch Doubling
project
Open
tender
27.12.16 Singal 02.02.17 5 M/s Creative
Engineers, F-
189, Road No.
5, Indraprasth
lnd Area, Kota
(Raj.) 324005
1.M/sDynamic
Engineers
2 M/s Kushal
Engineering
3 .M/s Tirupati
Metal Fabricators
4. M/s Diamond
Steel Ind.
L-1 Dy.CE/C/
JU/CA04/
dtd. 18.08.17
M/s Creative
Engineers, F-189,
Road No. 5,
Indraprasth lnd
Area, Kota (Raj.)
324005
173.15
Lakhs
30.05.19 22.11.17 Work shall be
started with
track work
in
THM-Sanu.
Work in
progress MJ-
Rani.
-
4. NWR/SC/FL-
DNA/Civil-
410152001
Construction of
Doubling work
between Phulera
– Degana
(108.75 Kms.)
on Phulera-
Degana Railway
line.
EPC 13.12.16 EPC 02.08.17 5 M/s Punj
Lloyd Limited,
Plot No.78,
Institutional
Area,
Sector-32,
Gurgaon
PIN-122003
Haryana
1. M/s IRCON
International
Limited,
2. Jaiprakash
Associates
Limited,
NOIDA
3. Larsen &
Toubro Limited
MUMBAI
4. AFCONS
Infrastructure
Limited
L-1 NWR/S7C/CA/
80
dt.28.8.17
M/s Punj Lloyd
Limited,
Plot No.78,
Institutional
Area,
Sector-32,
Gurgaon
PIN-122003
Haryana
477.50
Cr.
13.03.20 26.9.17
(Appointed
date)
Work
awarded on
09.08.17.
Termination
issued on
24.09.2018
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
28
MUMBAI
5. NWR/SC/JU/Civil 41930000612
Special repairs to Construction office electric work etc. at Jodhpur.
Open
tender
14.02.18 Singal 20.03.18 M/s Shree Ram
Const.
Company, Plot
No. 3-A, Paota C
Road NR,
Aakash Vani,
Jodhpur (Raj.)
1. M/s Suraj
Prajapat, 205 First C
Road, Sardarpura-
Jodhpur (Raj.)
L-1 Dy.CE/C/
JU/CA-10/
dtd
04 .06.18
M/s Shree Ram
Const. Co., Plot
No. 3-A, Paota C
Road NR, Aakash
Vani, Jodhpur
(Raj.)
39.94
Lakh
03.10.18 17.04.18 Work in
progress
Dy. CE/C/BKN
1 Tender No. NWR/SC/BNW/Civil-412161111 dated 02.01.16
Earthwork in embankment, construction of minor bridge & S & T structure, supplying of stone ballast and linking of track and other ancillary works in connection with “Provision of Bhiwani Bye Pass Railway line.
Open tender
06.01.16 Single Bid 10.02.16 05 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 32/NWR/Dy CE/C/BKN/2016-17 Dated 30.08.2016
M/S Shree Shyam Engineering Co.,29, Poonia Colony, Churu (Rajasthan)
Rs 136.08 lakhs
01.11.2016 02.05.2016 25.10.2018 Work physically completed on 25.10.2018
2 Tender No. NWR/SC/EI at BNW, STD & LGH/2016-17/Civil-412160503 dated 05.07.2016
Providing in Situ Glued Insulated Joints of G-3 (L) type for 52 kg/60 kg rails as per RDSO drawing No. T-671/T-2572 and confirming to the specfication as per instructions contained in Manual for Glued insulated rails joints in connection with EI works at Bhiwani and Satrod and RRI work at Lalgarh and at any other location in the jursidiction of Bikaner Construction unit.
Open tender
08.07.16 Single Bid 10.08.16 04 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 34/NWR/ Dy.CE/C/BKN/2016-17 dated 28.11.2016
M/S Tirupati Metal Fabricators, 1433, Sector -16, Faridabad (Haryana)-121002
Rs 102.58 lakhs
23.04.2017 24.09.2016 14.10.2018 work is in progess.
3 Tender No. NWR-SC-BKN-13-2017-18 Dated 30.09.2017
Construction of Limited height subway ( 1x 4.0m x3.60m) with covering in lieu of existing level crossing No C-4 at km 6/7-8 between Rewari- Kishangarh Balawas station on Rewari- Hisar section of Bikaner division in connection with elimination of level crossing gate.
Open tender
30.09.17 Single Bid 06.11.17 02 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 39-NWR/Dy.CE/C/BKN/2017-18 Dated: 13.04.2018
M/S Punia Construction Co. 30,Sector-13, Part-2 Hisar-125001( Haryana)
Rs178.67 lakhs
15.06.2018 16.12.2017 31.10.2018 Work in progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
29
4 Tender No. NWR/SC/ROB/Civil
-41230000305/2017-18 Dated 01.08.2017
Construction of 02 lane Road Over Bridge ( single span over Railway tracks) with
RCC deck slab on composite girder super structure & pile foundation in lieu of level crossing no. 80 at Km 119/6-7 on Rewari – Hisar section at Hansi – Nalwa – Umra Road in Hisar District
Open tender
01.08.17 Single Bid 08.09.17 05 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 46-NWR/Dy.CE/C/BKN/2018-19
Dated: 10.08.18
M/S Mohla Construction Co.,476, Sector-15-A Hisar-125001
Rs 448.58 lakhs
15.12.2018 23.07.2018 15.12.2018 Work in progress
5 Tender No. NWR-SC-BKN-03(R)-2017-18dated 14.08.2017
Construction of Road Under Bridges in lieu of 14 No existing Level Crossings on Lalgarh- Phalodi, Sadulpur-Bikaner , Suratgarh-Bikaner, Suratgarh Anupgarh and Suratgarh Bye pass sections of Bikaner division in connection with elimination of level crossing gate
Open tender
22.08.2017 Single Bid 20.09.2017
01 no Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes NWR/S&C/CA/85 dated 31.05.2018
M/s Shree Karni Traders, C-171, Kanta Khaturia Colony, Bikaner -334001 ( Rajasthan)
Rs 2696.94 lakhs
15.07.2019 16.01.2018 15.07.2019 Work in progress
6 Tender No. NWR-SC-BKN-008-2017-18 Dated 09.10.2017
Supplying and stacking 110980 cum 65 mm gauge stone ballast machine crushed ( hard stone) confirming to RDSO specifications at Birdhwal station and between takeoff point chainage 0.00 to implant yard in connection with Providing Railway track link to Unit No 7 & 8 ( 2x 660 MW) at Suratgarh Supercritical Thermal Power station
Open tender
12.10.2017 Two Bid 14.11.2017
05 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 41-NWR/Dy.CE/C/BKN/2018-19 Dated: 25.05.2018
Devender Singh Contractor,H.No.7, Partap Nagar, Saket Colony, Rajgarh Road, Hisar -125001( Haryana)
Rs 1104.74 lakhs
19.11.2018 20.02.2018 19.04.2019 Work in progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
30
7 Tender No. NWR-SC-BKN-16-2017-
18 dated 13.12.2017
Construction of 02 lane Road Over Bridge (single span over Railway track – 1 x
36m steel composite girder and three span on viaduct 3x18 m PSC girder ) with RCC substructure & pile foundation in lieu of level crossing no C-105 at km 159.500 near Birdhwal station on Suratgarh-Lalgarh section on approach Road connecting NH-15 to Suratgarh Thermal Power Station on Deposit terms
Open tender
13.12.2017 Single Bid 19.01.2018
09 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 45-NWR/Dy.CE/C/BKN/2018-19
Dated: 06.08.2018
M/S Pawansut Infra Projects Private Limited, 4/12, RHB Colony,
Hanumangarh-335512 (Rajasthan)
Rs 850.97 Lakhs
09.04.2019 Work in progress
09.04.2019 Work in progress
8 Tender No. NWR-SC-BKN-17-2017-18 dated 03.01.2018
Construction of 04 nos Road Over Bridge (7x36 m + 2x30 m+ 1x18 m + 1x24 m span over Railway tracks) with RCC deck slab on composite girder super structure / PSC girder with RCC substructure & pile foundation along with Limited Height Subway in lieu of level crossing No. 54-A at km 85/2-3, 76 A at km 115/3-4, 123 at km 189/3-4 on Rewari - Hisar - Bathinda section and level crossing No. C-4-A at km 3/7-8 on Hisar - Sadulpur section of Bikaner division.
Open tender
03.01.2018 Two Bid 09.02.2018
03 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes NWR/S&C/CA/86 dated 12.06.2018
M/S Vishnu Prakash R Punglia Ltd., H-1, First Floor, Shivalik Complex, Near Gol Building , Sardarpura, Jodhpur-342003
Rs 4291.59 Lakhs
05.10.2019 Work in progress
05.10.2019 Work in progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
31
9 NWR-SC-BKN-10 (R)-2017-18 dated
11.01.2018
Earth work in bank / cutting including Blanketing materials, toe wall with pitching,
buildings for Station Master, Commercial staff, yard master, Loco shed, end loading ramp, connecting roads / pathways and other ancillary works at Birdhwal station and from takeoff point chainage 0.00 to Implant yard in connection with providing Railway Track link to Unit No. 7 & 8 (2 x 660 MW) at Suratgarh Supercritical Thermal Power station
Open tender
11.01.2018 Two Bid 16.02.2018
09 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 44-NWR/Dy.CE/C/BKN/2018-19
Dated: 13.08.2018
M/S JMES JMDE (JV),VPO- Narodara, Tehsil- Laxmangarh, Sikar- 332311
(Rajasthan)
Rs 1690.65 lakhs
16.04.2019 10.05.2018 16.04.2019 Work in progress
10 Tender No. NWR-SC-BKN -18-2017-18 dated 03.02.2018
Construction of 09 Nos Road Under Bridge in lieu of existing Level Crossing no 79,84,86,90,93,96,108,109-A and 139 on Rewari- Sadulpur sections of Bikaner division in connection with elimination of level crossing gate
Open tender
03.02.2018 Two Bid 12.03.2018
03 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes NWR/S&C/CA/87 dated 18.09.18
M/S Mohla Construction Co.,476, Sector-15-A Hisar-125001
Rs 2668.75 lakhs
05.01.2020 23.07.2018 05.01.2020 Work in progress
11 Tender No. NWR/SC/SURP-HMH-SGNR/Civil-412140106 (R-1)/2017-18 dated
03.02.2018
Earthwork in cutting and filling, toe wall, pitching , Construction of Road Under Bridges, S&T Structure at takeoff point, Suratpura station and other ancillary works for Sadulpur Bye Pass line in connection with Suratpura –
Hanumangarh- Sri Ganganagar gauge conversion project
Open tender
03.02.2018 Single Bid 12.03.2018
02 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes PG submitted.
M/S Jai Mata Di Energy System, Narodara, Laxmangarh, Sikar- 332311 (Rajasthan)
Rs 991.52 lakhs
01.07.2019 Work in progress
01.07.2019 Work in progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
32
12 Tender No NWR-SC-BKN-01-2018-
19 Dated 09.05.2018
Dismantling of existing BG track, laying and linking of Broad Gauge main line , loop lines
including points and crossings in yards, spreading of ballast , tamping of track , transportation of p.way materials and other ancillary works from takeoff point chainage 0.00 to implant yard (including Birdhwal station yard) in connection with providing Railway track link to Unit no 7 & 8 ( 2 x 660 MW) at Suratgarh Supercritical Thermal Power station.
Open tender
09.05.2018 Single Bid 14.06.2018
04 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 47-NWR/ Dy CE/C/BKN/2018-19 dated
05.10.2018
M/S Jhawar Sales Corporation, Rani Bazar, Bikaner -334001 (Raj)
Rs 750.91 lakhs
30.07.2019 16.08.2018 30.07.2019 Work is in progress
13 Tender No. NWR-SC-BKN -03-2018-19 dated 15.05.2018
Construction of 11 Nos Road Under Bridge in lieu of existing Level Crossing no 5,7,15,16,21,23,30,47,71,74 and 77 on Rewari- Hisar sections of Bikaner division in connection with elimination of level crossing gate
Open tender
15.05.2018 Two Bid 21.06.2018
02 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes NWR/S&C/CA/88 dated 25.10.2018
M/S JMES-JDC(JV), VPO-Dahar, Near Tata Mobile Tower, Distt Paipat-132103 , Haryana
Rs 3298.60 lakhs
05.02.2020 Work is in progress
05.02.2020 Work is in progress
14 Tender No. NWR-SC-BKN -02-2018-19 dated 11.05.2018
Construction of 03 lane Road Over Bridge in Railway portion ( Four span of 36m over railway tracks) with RCC deck slab on composite girder super structure with RCC substructure & pile foundation along with Limited height subway ( 1 x 4.50m x 2.50m for 3 track) in lieu of level crossing no 100 at km 151/8-9 on Hisar – Ghursal Road and level crossing No 112-A at km 170/6-7 on Barwala – Agroha- Adampur- Bhadra Road (SH -10) in Hisar District on Hisar- Bathinda section.
Open tender
11.05.2018 Two Bid 18.06.2018
08 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes PG not submitted.
M/S Punia Construction Co., 30, Sector-13, Part-2 Hisar-125001 (Haryana)
Rs 1821.24 lakhs
17.09.2019 Work is under mobilisation.
05.02.2020 Work is under mobilisation.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
33
CE/C/HQ-JP
Dy. CE/C/I & II-DO
1 DO/GGC/
NL/18
Construction of Broad
Gauge Formation & Minor
Bridges from Chainage
41000.00 to 45000.00
between Dausa and Lalsot
in connection with Dausa-
Gangapur City New Broad
Gauge line project.
Open t
ender
Single packet
system
14/1
1/2
007 Yes NWR/S&C/CA/9
7 dated
03/03/2008
M/s Atlanta-
ARSS (JV)
Bhubneshwar
(Orissa)
17.95 Crore 30/07/09
extended
upto
30/06/2014
14/03/08 - Work short
closed vide
HQ’s letter
dated
18/06/2014.
Final
measurement
s under
process
2 DO/GGC/
NL/21
Construction of BG
formation and Minor Bridge
from chanaige 45000 to
60000 bet. Lalsot and
Gangapur City in connection
with DO-GGC New B G line
Project O
pen
tender
24/0
9/2
007
Single Packet
system
02/1
1/2
007 3 Yes NWR/S&C/CA/9
5 dated
18/02/2008
M/s. ARSS
Infrastructur
e Projects
Limited,
Bhubaneshw
ar
8.41
Crores
20/03/09
Extended
upto
30/06/15
15/03/08 - Contract has
been short
closed. Final
bill under
process
3 DO/GGC/
NL/30
Construction of single line
13 standard straight
alignment tunnel in soil and
rock including cut and cover
portion between chainage
38/720 to 40/840 including
side drain and other
approaches of tunnel
between Didwana- Lalsot
Railway station in
connection with Dausa-
Gangapurcity new BG line
project. Open t
ender
Single packet
system 27/0
7/2
009
12 - - Yes NWR/S&C/CA/1
06 dated
29/12/10
M/s Valecha-
Transtonelstr
oey (J/V)
Mumbai
53.02 Crore 27/09/2012.
Extended
upto
31/12/2015
- - Work
terminated
on
07/07/2015.
Final bill is
under
technical
check..
4 DO/GGC/
NL/40
Laying and linking of BG
track and transportation of
P.Way material, PSC
sleepers etc between
Dausa- Deedwana section in
connection with Dausa-
Gangapurcity new BG line
project. Open t
ender
28/0
3/2
011
Single packet
system
18/0
5/2
011
6 - - Yes
Dy.CE/C/DO/CA/
56 dated
18/10/11
M/s Goel
Brothers Rail
Infra Pvt.
Ltd., Bareilly.
5.66 Crore 01/08/2012.
Extended
upto
31/10/2014
13/09/11 Work short
closed. Final
bill under
process
5 DO/GGC/
NL/10(R&
C)R
Construction of broad gauge
formation from chainage
15000 to 28000 in
connection with Dausa
Gangapurcity new line
project(Risk & cost tender). Open t
ender
Single packet
system
11/0
1/2
013
2
- - Yes Dy.CE/C/DO/CA/
68 dated
16/04/13
M/s MCD Pvt.
Ltd., &
Aastha
Construction
Co.(JV),
Jaipur
3.30 Crore 05/07/13
Extended
upto
15/10/2014
08/04/2013 - Completed.
Final
measurement
s under
process.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
34
6 DO/GGC/
NL/53
Construction of 3 nos Low
Over Pass at LC No. 4, 26
& 27 on Dausa-
Gangapurcity secton
Open t
ender
Two packet
system
06/0
9/1
3
4 - - Yes NWR/S&C/CA/1
36 dated
03/06/2014
M/s Bharat
Spun Pipe &
Construction
Co., Jaipur
Rs.10.44 Crore 08/04/15
extended
upto
30/09/18
further
extension
under
process
- - Work in
progress.
7 DO/GGC/
NL/57
Construction of Road Over
Bridge at LC No. 24B on
Dausa- Gangapurcity
section O
pen t
ender
Two packet
system
06/0
9/1
3
4 - - Yes NWR/S&C/CA/1
35 dated
19/05/2014
M/s Bharat
Spun Pipe &
Construction
Co., Jaipur
Rs.13.75 Crore 09/07/15
Extended
upto
30/09/18
Further
extension
under
process
- - MoRTH
approval has
been
received.
Further
activities
under
process as
per MorTH
approval
8 AWR-
BKI/Doubl
ing/T/2
Earthwork in bank/cutting
including blanketing
material, construction of
major/minor bridges
including drop/curtain
walls, LHS, construction
S&T structures, platform
walls, PF shelters, FOB,
water huts, Staff quarters
etc. supply of stone ballast
and dismantling of existing
BG track, laying and linking
of Broad gauge main line,
loop lines including points
and crossings of various
yards spreading of ballast,
tamping of track
transportation of P. Way
material and other ancillary
works between Alwar-
Bandikui section in
connection with AWR-BKI
Doubling project.
Open
Two packet
system
21/0
3/2
016
8 6 2 Yes
NWR/S&C/CA/1
57 dated
05/09/2016
M/s NG
Project Ltd.-
M/s. Deem
Construction
Co. Pvt. Ltd
(JV), Jaipur
Rs.118.24
Crore
17/05/18
Extended
upto
31/03/19
- - Work in
progress.
9 NWR/SC/
DO-
GGC/CIVI
L/514110
468
Supplying and stacking
machine crushed stone
ballast in stacks as per
Railway’s specifications
between Dausa &
Gangapurcity stations in
connection with Dausa-
Gangapurcity new line
project
open
Two packet
system
31/0
8/1
6
2 - 2 Yes
Dy.
CE/C/DOCA/81
dated
23/12/2016
M/s J.K.
Construction
Co., Nokha,
Distt Bikaner
Rs.14.33
Crore
06/04/18
Extended
upto
31/03/19
- - Work in
progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
35
10 NWR/SC/
DO-
GGC/CIVI
L/514111
804
Construction of balance work of single line BG standard straight alignment tunnel in soil and rock including cut & cover portion, side drains, protection works on approaches of tunnel and other ancillary works from chainage 38600 to 40900 between Didwana & Lalsot Railway stations in connection with Dausa- Gangapurcity new BG line project
Open
Two Packet
system
20/0
6/2
016
5 3 2 Yes
NWR/S&C/CA.16
5 dated
01/02/17
M/s TCL-UTM
JV, Gurgoan Rs.54.46 Crore
22/03/18
Extended
upto
31/12/18
- - Work in
progress
11 NWR/SC/L
HS/CIVIL/
51430001
001
Construction of kimited Height sub-way (08 nos) in lieu of level crossings in Dausa- Gangapurcity new line section in connection with elimination of level crossings O
pen
Two Packet
system
07/0
9/2
016
8 5 3 Yes
Dy. CE/
C/DO/CA/86
dated 10/03/17
M/s JMES-
KDC-
JPIS(JV),
Beawar,
Ajmer
Rs.10.00 Crore
04/02/18
extended
upto
31/12/18
- - Work in
progress
12 NWR/SC/
DO-
GGC/CIVI
L/514110
201
Misc. balance works like finishing work of quarters, station buildings, platforms and construction of LHS providing platform covering, cess repairing, circulating area etc. between Dausa & Deedwana stations in connection with Dausa- Gangapurcity new line project
Open
Two Packet
System
13/1
0/2
016
7 5 2 Yes
Dy. CE/
C/DO/CA/83
dated 28/01/17
M/s. MCDPL-
Sunrise Infra
Project (JV),
Ajmer Road,
Jaipur
Rs.9.70 Crore
15/05/17
Extended up
to 28/02/18
- - Final bill has
been passed.
13 NWR/SC/
Alwar-
Bandikui/
Civil/5141
50803-R
Flash butt welding of 60/ 53kg New/SH (72/90UTS) Rail joints by using mobile flash butt welding plant in connection with Alwar- Bandikui and Dausa- Gangapurcity new line project.
Open t
ender
Two packet
system
28/1
0/2
016
1 1 0 Yes
Dy. CE/
C/DO/CA/85
dated 06/03/17
M/s Railtech
Infraventure
Pvt. Ltd.
Allahabad
Rs.11.15 Crore
15/05/18
extended
upto
30/04/19
- - Work in
progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
36
14 NWR/SC/
DO-
GGC/CIVI
L/514110
869-R
Balance work of laying & linking of Broad Gauge main line loop lines including points & crossings in yards, spreading of ballast, tamping of track transportation of P-Way material and other ancillary works between Dausa- Gangapurcity new line project
Open
Single packet
system
23/1
1/2
016
- - - Yes
Dy. CE/
C/DO/CA/84
dated 17/02/17
M/s P.C.
Sharma,
Noida.
Rs.3.93 Crore
05/06/17
Extended
upto
31/10/17
- -
Work
completed.
Final
measurement
s under
process
15 NWR/SC/
DO-
GGC/CIVI
L/514110
170
Balance earthwork and blanketing work including side drain, trolley refuges pitching diversion road etc.
from chainage 67400 to 92670 between Piplai village and Gangapurcity in connection with Dausa- Gangapurcity new line project
Open
Two packet
system
17/0
4/2
017
2 1 1 Yes
Dy.
CE/C/DO/CA/89
dated
15/11/2017
M/s. KB-Shiv
Om (JV),
New Delhi.
Rs.13.60
Crore
20/06/18
Extended
upto
31/12/18
- - Work in
progress
16 NWR/SC/
RE-
JP/Civil/5
14300905
Construction of ROB at LC No. 69 on RE-JP section
Open
Single packet
system
09/1
0/2
017
- - - Yes
M/s Punia
Construction
Co., Hisar.
Rs.8.34 Crore
22/11/18
Further
extension
under
process
- - Work in
progress.
17 NWR/SC/
BKI-
AWR/Civil
/5143010
04
Construction of Limited Height Subway in lieu of existing level crossing between Alwar- Bandikui station of Jaipur- Rewari section in connection with elimination of level crossings (20 nos)
Open
Two packet
system
30/0
8/2
017
4 4 0 Yes
NWR/S&C/CA/1
72 dated
02/02/2018
Sanjeev-
Bharat (JV),
Jaipur
Rs.29.84 Crore 29/04/19 - - Work in
progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
37
18 NWR/SC/
DO-
GGC/Civil
/5141108
73
Laying and linking of Broad gauge main line, loop lines including points and crossings in yard, spreading of ballast, tamping of track transportation of P-ay materials and other ancillary works between Didwana & Gangapurcity stations and at Baniyana & Arnya Kala Salempura stations in connection with Dausa- Gangapurcity new line project.
Open
Two Packet
system
11/1
0/2
017
3 1 2 Yes
Dy. CE /C/
DO/CA/96 dated
10/05/2018
M/s Laxyo
Energy
Limited,
Ratlam
Rs.14.67 Crore 27/03/19 - - Work in
progress
19 NWR/SC/
DO-
GGC/Civil
/5141101
74
Balance earthwork and blanketing work including side drains, trolley refuges, pitching, toe wall etc. from
chainage 36000 to 45000 between Didwana and Lalsot stations in connection with Dausa- Gangapurcity new line project.
Open
Two Packet
system
25/1
0/2
017
5 3 2 Yes
NWR/S&C/CA/1
74 dated
26/03/2018
M/s Varaha
Infra Limited,
Jodhpur
Rs.34.03 Crore 26/03/19 - - Work in
progress
20 NWR/SC/
DO-
GGC/Civil
/5141102
77
Balance work of minor bridges, Road Under Bridge, like PSC slabs, bed blocks, returns, toe wall, pitching, drop & curtain wall, height gauge, road work etc. and construction of Limited Height Subway between Didwana to Gangapurcity stations in connection with Dausa-
Gangapurcity new Line Project
Open
Two Packet
System
27/1
0/2
017
2 1 1 Yes
NWR/S&C/CA/1
73 dated
26/03/2018
M/s. Lall
Construction
Co. Delhi
Rs.46.41 Crore 26/06/19 - - Work
progress
21 NWR/SC/
DO-
GGC/Civil
/5141101
75
Balance earthwork and blanketing work including side drains, trolley refuges, pitching, toe wall etc. from chainage 45000 to 67400 between Lalsot and stations
Open
Two Packet
system
27/1
0/2
017
3 1 2 Yes
Dy.
CE/c/DO/CA/94
dated
31/03/2018
M/s Meenesh
Contractor &
Developers
Pvt. Ltd.,
Jaipur
Rs.10.35 Crore 19/12/18 - - Work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT RS. 1 CROVE ABOVE UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2018
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
38
For CAO/C/JP
22 NWR/SC/
DO-
GGC/Civil
/5141106
76
Miscellaneous works like construction of station buildings, providing FOB, platform covering, circulating area, balance work of platforms etc. from Lalsot to Gangapurcity in connection with Dausa-Gangapurcity New Line Project.
Open
Two Packet
system
27/1
0/2
017
6 3 3 Yes
Dy. CE /C/
DO/CA/93 dated
24/03/2018
M/s MCDPL-
Sunrise Infra
(JV), Jaipur
Rs.17.95 Crore 19/03/19 - - Work in