SUBJECT:- MONTORING REPORT REGARDING " CONSTRUCTION/IMPROVEMENT
OF JUDICIAL LOCKUP (BAKSHI KHANA) IN KHYBER PAKHTUNKHWA
ADP NO!#/$$%&''/%$#-$&
SUB HEAD: - JUDICIAL LOCKUP IN DISTRICT SESSIONS COURT BUNER
S/No Analysis and recommendation Replies
1 The work which were going to be executed in the
sub- scheme were invited and advertised through
tenders in the only one o the local !ashto
Newspaper "#ahdat$ dated %&th September %'1%
which is against the rules( This should be
advertised in at least two national dailies one in
)nglish and other in *rdu as per !ublic
!rocurement Rules %''+, !ara-% o Rule-1%( t is
recommended that disciplinary action must be
taken against all the relevant sta o the executing
department or having such mismanagement andviolating the rules(
The tender or the works were invited rom the
bidders through !rint .edia and NT was
submitted to normation epartment !eshawar
or vide publicity under the Rules 0opy
attached2( t was the normation epartment to
ensure the proper advertisement o NT, and this
oice has no involvement in its publication as
such(
3owever, as per Advertisement 4ill submitted to
this oice by inormation epartment, the sub5ect
NT was published in 6-No News !aper 0opy oAdvertisement 4ill and News !aper attached2(
%- !roper 7uality test o the construction material and
satisactory results gives surety o the designed
strength and lie o the structure( 8n site when
monitoring team asked or the material test record,
no any record were ound with the department
which makes the 7uality o the construction
material 7uestionable( t is recommended or the
executing agency to have proper material test
record, also provide a copy to the monitoring team(
9aboratory test are being carried in routine or
every work along-with ield tests and visual
examinations o the material( All the necessary
tests have been done and record is available or
veriication( The test reports were not available at
site and instruction has been issued to ield sta
to maintain separate ile or all laboratory test at
site and copies thereo will be available to .:)
at site in uture(;- -t rom outside
and &(6-t rom inside which is as per approved
scope and allocated unds( The scheme has also
been handed over to istrict ?udiciary and height
o wall may be increased i desired by the istrict
?udiciary sub5ect to provision o additional unds(