Modeling of Hydrogen Production Plant Using Aspen Hysys

1
Wed Jan 25 17:31:36 2017 Case: D:\6543 H2O2\Final Hydrogen Model\6543_H2Sim_Rev.19 (1400withWaterSaturation 5-DEC-2017).hsc Flowsheet: Case (Main) HYDROGEN RECYCLE MIX-100 NG + H2 C-101 A E-102 E-102 R-110 A/N TO R-103- TO E-103 S.S FROM E-103 S.S TO E-102 TS TO E-107 TS E-107 TO E-108 TS E-108 TO E-107 S.S MIX-101 E-111 INLET PSA UNIT TO H2 HANDLING B-101 INLET FLUE GASES PRE HEATED AIR E-111 FLUE GASES TO E-113 E-113 B FROM V-103 FLUE GASES TO E-115 E 113B TS Out E-115 IN E-106 TO E-106 TS TO TEE_107 MAKE-UP BFW TO V-105 TOP SIDE FCV-1 LCV-1 TEE-103 TO E-103 TS TCV-1 TO TCV-1 TO SHIFT CONVERTOR R-103 TO H2 SPLITTER H2 FOR HYDROTREATING CWR C-101 A/B Q R-103 T R-110 A/N T TO R-106 A/B DRAIN HC FEED GAS TO V-203 C-101 B Intercooler To Intercooler To Second Stage C-101 B Q Intercooler Q FROM TCV-1 TO E-111 INLET RECYCLE RCY-2 R B-101 RECYCLE TO PSA UNIT TO E-111 MIX-102 TO E-107 SHELL RCY-3 R E-107 S.S RECYCLE P-104 A/B Q E-106 S.S P-104 A/B TO P-104 AB V-203 PROCESS STEAM RCY-4 R AIR TO E-115 E-103 MIX-103 TEE-101 MIX-104 B-101 IN BURNER (B-101) C B-101 DRAIN H-101 (RAD) FLUE GASES TO E-111 REACTOR DUTY V-103B DUMMY P.D E-107 (S.S) ADJ-3 A MIX-105 TEE-105 TO E-102 (S.S) E-102 BY-PASS FROM E-102 (S.S) TCV-2 FROM E-102 BY-PASS PCV-3 TO HC / STEAM MIX FLUE GASES (DUMMY) TO R-110 A/N (DUMMY) PRE HEATED AIR (DUMMY) B-101 RECYCLE (DUMMY) E-111 INLET (DUMMY) FROM V-1403 (DUMMY) SET-3 S V-107 R-110 A/N Outlet E-111 Outlet Outlet R-106 A/B BED-2 R-106 A/B BED-1 C TO BED-2 BED-1 DRAIN H2S TO HEAT LOSS R-106 A/B OUT PIPE HEAT LOSS ADJ-6 A DEMIN BFW HC FUEL GAS FROM E-108 (T.S) E STEAM V-105 Tower Vap to Column From Column V-105 Drum RCY-5 R To Separator VENT STEAM L.P STEAM- TO P-104 AB Phase Comp Mass Flow (Overall-CO2) 0.0000 kg/h HC FEED GAS SATURATOR HC FEED (SAT) WATER IN HC FUEL GAS SATURATOR HC FUEL (SAT) WATER INLET AIR SATURATOR AIR (SAT) WATER INLE ADJ-4 A C-112 A/B FD FCV-1 IN C-112 A/B Q C-111 A/B ID C-111 A/B Q TO C-111 A/B FLUE GAS OUT TEE-107 BFW TO TCV 220 TCV 220 TO RECYCLE RCY-6 R TO V- 105 CWS HC FUEL GAS (DUMMY) TEE-104 SET-1 S SET-2 S CRV-100 C 2 3 TO E-103 TEE-108 E-113A To E113A TO E113A TS TEE-109 E 113 A TS Out To E113 B TS MIX-107 To Steam Drum VLV-100 BFW Dummy V-100 5AA 6AA 6A RCY-8 R 5A RCY-9 R ADJ-1 A

Transcript of Modeling of Hydrogen Production Plant Using Aspen Hysys

Page 1: Modeling of Hydrogen Production Plant Using Aspen Hysys

Wed Jan 25 17:31:36 2017 Case: D:\6543 H2O2\Final Hydrogen Model\6543_H2Sim_Rev.19 (1400withWaterSaturation 5-DEC-2017).hsc Flowsheet: Case (Main)

HYDROGENRECYCLE

MIX-100 NG+H2

C-101A

TOE-102

E-102

TOR-110A/N

TOR-103-

TOE-103S.S

FROME-103S.S

TOE-102TS

TOE-107TS

E-107

TOE-108TS

E-108

TOE-107S.S

MIX-101

E-111INLET

PSAUNIT

TO H2HANDLING

B-101INLET

FLUEGASES

PREHEATEDAIR

E-111

FLUEGASESTOE-113

E-113B

FROMV-103

FLUEGASESTOE-115

E113BTSOut

E-115AIRIN

E-106

TOE-106TS

TOTEE_107

MAKE-UPBFW

TOV-105TOPSIDE

FCV-1

LCV-1

TEE-103

TOE-103TS

TCV-1TOTCV-1

TO SHIFTCONVERTORR-103

TO H2SPLITTER

H2 FORHYDROTREATING

CWR

C-101A/B Q

R-103

TR-110A/N

T

TOR-106A/B

DRAIN

HCFEEDGAS

TOV-203

C-101B

IntercoolerToIntercooler

ToSecondStage

C-101B Q

IntercoolerQ

FROMTCV-1

TO E-111INLETRECYCLE

RCY-2

R

B-101RECYCLE

TOPSAUNIT

TOE-111

MIX-102

TOE-107SHELL

RCY-3

R

E-107 S.SRECYCLE

P-104A/B Q

TOE-106S.S

P-104A/BTO

P-104AB

V-203

V-103B

PROCESSSTEAM

RCY-4

R

AIRTOE-115

E-103

MIX-103

TEE-101

MIX-104

B-101IN

BURNER(B-101)

C

B-101DRAIN

H-101(RAD)

FLUEGASESTOE-111

REACTORDUTY

V-103BDUMMY

P.DE-107(S.S)

ADJ-3

AMIX-105TEE-105

TOE-102(S.S)

E-102BY-PASS

FROME-102(S.S)

TCV-2FROME-102BY-PASS

PCV-3

TO HC/STEAM MIX

H-101(DUMMY)

FLUEGASES(DUMMY)

TO R-110A/N(DUMMY)

PREHEATEDAIR(DUMMY) B-101

RECYCLE(DUMMY)

E-111INLET(DUMMY)

FROMV-1403(DUMMY)

SET-3

S

V-107

R-110A/NOutlet

E-111Outlet

E-113Outlet

R-106A/BBED-2

R-106A/BBED-1C

TOBED-2

BED-1DRAIN

H2S

TOHEATLOSS

R-106A/B OUTPIPE

HEATLOSS

ADJ-6

A

DEMINBFW

HCFUELGAS

FROME-108(T.S)

ESTEAM

V-105Tower

Vap toColumn

FromColumn

V-105Drum

RCY-5

RToSeparator

VENTSTEAM

L.PSTEAM-

TO P-104 ABPhase Comp Mass Flow (Overall-CO2) 0.0000 kg/h

HC FEEDGASSATURATOR

HCFEED(SAT)

WATERIN

HC FUELGASSATURATOR

HCFUEL(SAT)

WATERINLET

AIRSATURATOR

AIR(SAT)

WATERINLE

ADJ-4

A

C-112A/BFD

FCV-1IN

C-112A/B Q

C-111A/BID

C-111A/B Q

TOC-111A/B

FLUEGASOUT

TEE-107

BFW

TOTCV220

TCV220

TORECYCLE

RCY-6

R

TOV-105

CWS

HC FUELGAS(DUMMY)

TEE-104

SET-1

S

SET-2

S

1CRV-100

C

2

3

TOE-103

TEE-108

E-113A

ToE113A

TOE113ATS

TEE-109

E113ATSOut

ToE113B TSMIX-107

ToSteamDrum

VLV-100BFWDummy

V-100

5AA

6AA

6A

RCY-8

R

5A

RCY-9

R

4

ADJ-1

A

Yousaf.Muhammad1
Callout
MODEL OF HYDROGEN PLANT Complete Modeling Of Hydrogen Production Plant. Complete reactions Modeling at various reactors including Equilibrium & conversion reactions. Model was developed to Develop H & MB For Complete Plant. Two major findings were explored from this modeling. One regarding Duty of Compressor & Other in Take of Excess air which was the waste of energy. Model was developed to consider the behavior of plant on various production rates. & changed composition of Fuel gas.