MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam...

15

Transcript of MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam...

Page 1: MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam tailing... · MMG ROSEBERY MINE FUTURE TAILINGS STORAGE FEASIBILITY STUDY WATER BALANCE FLOW
Page 2: MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam tailing... · MMG ROSEBERY MINE FUTURE TAILINGS STORAGE FEASIBILITY STUDY WATER BALANCE FLOW

MMG ROSEBERY MINE

FUTURE TAILINGS STORAGE FEASIBILITY STUDY

WATER BALANCE FLOW DIAGRAM

Date: 7/08/2015 Job No: 107031.33 FIGURE 14.1www.atcwilliams.com.au

J:\2007\107031 Rosebery Bobadil FY 07-09\33 Bobadil 2-5 Dam Feasibility Study\Data and Calcs\DMR\LOM Water Balance\Water Balance Report Figures.xlsx Figure 14.1 - Flow Diagram

Page 3: MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam tailing... · MMG ROSEBERY MINE FUTURE TAILINGS STORAGE FEASIBILITY STUDY WATER BALANCE FLOW

Date: 7/08/2015 Job No: 107031.33 FIGURE 14.2

MMG ROSEBERY MINE

FUTURE TAILINGS STORAGE FEASIBILITY STUDY

DAILY DECANT DISCHARGE - MINIMUM YEAR CLIMATE CASE

www.atcwilliams.com.au

0

1,000

2,000

3,000

4,000

5,000

6,000

0 1 2 3 4 5 6 7

Decant Discharge (m³/day)

Life of Mine (Years)

Daily Decant Discharge - Minimum Climate Case

Average Daily Discharge per Year

J:\2007\107031 Rosebery Bobadil FY 07-09\33 Bobadil 2-5 Dam Feasibility Study\Data and Calcs\DMR\LOM Water Balance\Water Balance Report Figures.xlsx Figure 14.2 - Decant Dis Min

Page 4: MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam tailing... · MMG ROSEBERY MINE FUTURE TAILINGS STORAGE FEASIBILITY STUDY WATER BALANCE FLOW

Date: 7/08/2015 Job No: 107031.33 FIGURE 14.3

MMG ROSEBERY MINE

FUTURE TAILINGS STORAGE FEASIBILITY STUDY

DAILY DECANT DISCHARGE - AVERAGE YEAR CLIMATE CASE

www.atcwilliams.com.au

0

1,000

2,000

3,000

4,000

5,000

6,000

0 1 2 3 4 5 6 7

Decant Discharge (m³/day)

Life of Mine (Years)

Daily Decant Discharge - Average Climate Case

Average Daily Discharge per Year

J:\2007\107031 Rosebery Bobadil FY 07-09\33 Bobadil 2-5 Dam Feasibility Study\Data and Calcs\DMR\LOM Water Balance\Water Balance Report Figures.xlsx Figure 14.3 - Decant Dis Ave

Page 5: MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam tailing... · MMG ROSEBERY MINE FUTURE TAILINGS STORAGE FEASIBILITY STUDY WATER BALANCE FLOW

Date: 7/08/2015 Job No: 107031.33 FIGURE 14.4

MMG ROSEBERY MINE

FUTURE TAILINGS STORAGE FEASIBILITY STUDY

DAILY DECANT DISCHARGE - MAXIMUM YEAR CLIMATE CASE

www.atcwilliams.com.au

0

1,000

2,000

3,000

4,000

5,000

6,000

0 1 2 3 4 5 6 7

Decant Discharge (m³/day)

Life of Mine (Years)

Daily Decant Discharge - Maximum Climate Case

Average Daily Discharge per Year

J:\2007\107031 Rosebery Bobadil FY 07-09\33 Bobadil 2-5 Dam Feasibility Study\Data and Calcs\DMR\LOM Water Balance\Water Balance Report Figures.xlsx Figure 14.4 - Decant Dis Max

Page 6: MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam tailing... · MMG ROSEBERY MINE FUTURE TAILINGS STORAGE FEASIBILITY STUDY WATER BALANCE FLOW

Date: 7/08/2015 Job No: 107031.33 FIGURE 14.5

MMG ROSEBERY MINE

FUTURE TAILINGS STORAGE FEASIBILITY STUDY

DAILY DECANT DISCHARGE - MAXIMUM YEAR CLIMATE CASE WITH REDUCED TAILINGS PERMEABILITY

www.atcwilliams.com.au

0

1,000

2,000

3,000

4,000

5,000

6,000

0 1 2 3 4 5 6 7

Decant Discharge (m³/day)

Life of Mine (Years)

Daily Decant Discharge - Maximum Climate Case with Reduced Tailings Permeability

Average Daily Discharge per Year

J:\2007\107031 Rosebery Bobadil FY 07-09\33 Bobadil 2-5 Dam Feasibility Study\Data and Calcs\DMR\LOM Water Balance\Water Balance Report Figures.xlsx Figure 14.5 - Decant Dis Max Re

Page 7: MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam tailing... · MMG ROSEBERY MINE FUTURE TAILINGS STORAGE FEASIBILITY STUDY WATER BALANCE FLOW

MMG ROSEBERY MINE

FUTURE TAILINGS STORAGE FEASIBILITY STUDY

TAILINGS AND POND WATER ELEVATION WITH TIME - AVERAGE CLIMATE

Date: 7/08/2015 Job No: 107031.33 FIGURE 14.6www.atcwilliams.com.au

140.0

145.0

150.0

155.0

160.0

165.0

170.0

175.0

180.0

0 1 2 3 4 5 6 7

Elevation (m)

Life of Mine (Years)

Tailings and Pond Elevation - Average Climate

Decant Pond Elevation

Tailings Elevation

Embankment Crest

Spillway Crest

J:\2007\107031 Rosebery Bobadil FY 07-09\33 Bobadil 2-5 Dam Feasibility Study\Data and Calcs\DMR\LOM Water Balance\Water Balance Report Figures.xlsx Figure 14.6 - Pond and Tails EL

Page 8: MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam tailing... · MMG ROSEBERY MINE FUTURE TAILINGS STORAGE FEASIBILITY STUDY WATER BALANCE FLOW

Date: 7/08/2015 Job No: 107031.33 FIGURE 14.7

MMG ROSEBERY MINE

FUTURE TAILINGS STORAGE FEASIBILITY STUDY

SEEPAGE COLLECTION POND - VOLUME VERSUS TIME

www.atcwilliams.com.au

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

0 1 2 3 4 5 6 7

Pond Volume (m³)

Life of Mine (Years)

Seepage Collection Pond - Volume Versus Time

Minimum Climate Case Average Climate Case Maximum Climate Case

J:\2007\107031 Rosebery Bobadil FY 07-09\33 Bobadil 2-5 Dam Feasibility Study\Data and Calcs\DMR\LOM Water Balance\Water Balance Report Figures.xlsx Figure 14.7 - Seep Pond Vol

Page 9: MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam tailing... · MMG ROSEBERY MINE FUTURE TAILINGS STORAGE FEASIBILITY STUDY WATER BALANCE FLOW

Date: 7/08/2015 Job No: 107031.33 FIGURE 14.8

MMG ROSEBERY MINE

FUTURE TAILINGS STORAGE FEASIBILITY STUDY

SEEPAGE COLLECTION POND - DEPTH VERSUS TIME

www.atcwilliams.com.au

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

0 1 2 3 4 5 6 7

Pond Depth (m)

Life of Mine (Years)

Seepage Collection Pond - Depth Versus Time

Minimum Climate Case Average Climate Case Maximum Climate Case

J:\2007\107031 Rosebery Bobadil FY 07-09\33 Bobadil 2-5 Dam Feasibility Study\Data and Calcs\DMR\LOM Water Balance\Water Balance Report Figures.xlsx Figure 14.8 - Seep Pond Depth

Page 10: MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam tailing... · MMG ROSEBERY MINE FUTURE TAILINGS STORAGE FEASIBILITY STUDY WATER BALANCE FLOW

MMG ROSEBERY MINE

FUTURE TAILINGS STORAGE FEASIBILITY STUDY

AVERAGE WIND SPEED (NORMAL AND LOG-NORMAL DISTRIBUTION GRAPH) PLOT

Date: 7/08/2015 Job No: 107031.33 FIGURE 15.1www.atcwilliams.com.au

0

2

4

6

8

10

12

14

16

18

20

1 10 100 1000

Av

era

ge

An

nu

al W

ind

Sp

ee

d f

rom

a N

ort

h W

est

Dir

ect

ion

(k

ph

)

Annual Return Interval (ARI)

West Speed - Normal and Log-Normal Distributions

"Input Data" Log Normal Distribution Fit Line Normal Distribution Fit Line

J:\2007\107031 Rosebery Bobadil FY 07-09\33 Bobadil 2-5 Dam Feasibility Study\Data and Calcs\AM\Design\Figures\Figures.xls FIGURE 15.1

Page 11: MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam tailing... · MMG ROSEBERY MINE FUTURE TAILINGS STORAGE FEASIBILITY STUDY WATER BALANCE FLOW

MMG ROSEBERY MINE

FUTURE TAILINGS STORAGE FEASIBILITY STUDY

SPILLWAY INFLOW - OUTFLOW HYDROGRAPH

Date: 7/08/2015 Job No: 107031.33 FIGURE 15.2www.atcwilliams.com.au

0

10

20

30

40

50

60

0 5 10 15 20 25 30 35 40

Dis

ch

arg

e (

m3/s

)

Time (hrs)

3 hr Inflow - Outflow Hydrograph

Outflow

Inflow

Peak Outflow = 23.4 m³/s

Flow Depth = 0.77 m

Freeboard at Peak Outflow = 0.23 m

J:\2007\107031 Rosebery Bobadil FY 07-09\33 Bobadil 2-5 Dam Feasibility Study\Data and Calcs\AM\Design\Figures\Figures.xls FIGURE 15.2

Page 12: MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam tailing... · MMG ROSEBERY MINE FUTURE TAILINGS STORAGE FEASIBILITY STUDY WATER BALANCE FLOW
Page 13: MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam tailing... · MMG ROSEBERY MINE FUTURE TAILINGS STORAGE FEASIBILITY STUDY WATER BALANCE FLOW

MMG ROSEBERY MINE

FUTURE TAILINGS STORAGE FEASIBILITY STUDY

PERMANENT POND DEPTH - CLEAN WATER DIVERSION DRAIN RETAINED AT CLOSURE

Date: 16/06/2015 Job No: 107031.33 FIGURE 18.2www.atcwilliams.com.au

168.00

168.50

169.00

169.50

170.00

170.50

171.00

171.50

172.00

172.50

173.00

0 20 40 60 80 100 120

Pond Depth (m)

Life of Mine (Years)

Pond RL (mean) - 2.0E-8 Permeability

Pond RL (mean) - 6.0E-8 Permeability

Pond RL (mean) - 1.1E-7 Permeability

Pond RL (mean) - 2.0E-7 Permeability

Tailings Level

Spillway Invert

Embankment Crest

2m water depth

J:\2007\107031 Rosebery Bobadil FY 07-09\33 Bobadil 2-5 Dam Feasibility Study\Data and Calcs\DMR\Closure Water Balance\Case 3 - Wet Closure\Wet Closure Figures.xlsx Figure 18.2 Pond RL W Diversion

Page 14: MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam tailing... · MMG ROSEBERY MINE FUTURE TAILINGS STORAGE FEASIBILITY STUDY WATER BALANCE FLOW

MMG ROSEBERY MINE

FUTURE TAILINGS STORAGE FEASIBILITY STUDY

PERMANENT POND DEPTH - CLEAN WATER DIVERSION DRAIN BREACHED AT CLOSURE

Date: 16/06/2015 Job No: 107031.33 FIGURE 18.3www.atcwilliams.com.au

168.00

168.50

169.00

169.50

170.00

170.50

171.00

171.50

172.00

172.50

173.00

0 20 40 60 80 100 120

Pond Depth (m)

Life of Mine (Years)

Pond RL (mean) - 6.0E-8 Permeability

Pond RL (mean) - 1.1E-7 Permeability

Pond RL (mean) - 2.0E-7 Permeability

Tailings Level

Spillway Invert

Embankment Crest

2m water depth

J:\2007\107031 Rosebery Bobadil FY 07-09\33 Bobadil 2-5 Dam Feasibility Study\Data and Calcs\DMR\Closure Water Balance\Case 3 - Wet Closure\Wet Closure Figures.xlsx Figure 18.3 Pond RLNo Diversion

Page 15: MMG ROSEBERY MINE - epa.tas.gov.auepa.tas.gov.au/documents/mmg australia limited, 2 5 dam tailing... · MMG ROSEBERY MINE FUTURE TAILINGS STORAGE FEASIBILITY STUDY WATER BALANCE FLOW

Date: 16/06/2015 Job No: 107031.33 FIGURE 18.4

MMG ROSEBERY MINE

FUTURE TAILINGS STORAGE FEASIBILITY STUDY

SPILLWAY FLOW k = 1.1E-7 m/s, CLEAN WATER DIVERSION DRAIN BREACHED AT CLOSURE

www.atcwilliams.com.au

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

0 10 20 30 40 50 60 70 80 90 100

Spillway Flow (m³/day)

Life of Mine (Years)

Diversion Drain Breached CaseTailings Permeability = 1.1E-7

J:\2007\107031 Rosebery Bobadil FY 07-09\33 Bobadil 2-5 Dam Feasibility Study\Data and Calcs\DMR\Closure Water Balance\Case 3 - Wet Closure\Wet Closure Figures.xlsx Figure 18.4 Spillway Flow