Transcript of Mishref Pump Station
HSE - Moment
Staying Healthy with YOGA…benefits to develop
Balance
Flexibility
Strength
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
Rehabilitation of Mishref Pump Station (MPS)
First CH2M HILL Project with municipal sector since liberation of Kuwait in 1991
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
Presentation Covers
General Info
Process, site plan and section
Failure of MPS
Root cause
Emergency Action and remedies
Lessons implemented
Photos
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
General Information
Client - Kuwait Ministry of Public Works (MPW). MPS is located in Kuwait 10 km south of Kuwait City Built 33 m below the ground level. CH2M HILL OMBG provided consultancy services for the
Assessment, Evaluation and Rehabilitation of the MPS and 2 years of O&M oversight
CH2M HILL contract value to date: 4M KWD Total Rehab/O&M contract value: 15.1M KWD
MPS was… Designed by a JV of KEO International Consultants and Metcalf &
Eddy. Constructed by United Gulf Construction Company (UGCC) -2006
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
Process Diagram
Emrg.Pumps (560KW) – Cornell (46.8 m3/m)
M.Pumps (740 KW) - Cornell (73 m3/m @ 51m H)
Flow 308,202 m3 /day
Vortex Grit System –MASS
Aritma (1.75m3/s)
Conveyor -SPIRAC
Screen-MASS Aritma (3.7m3/s)
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
Lower Level Floor Plan
Wet well Area
Dry well Area
Emergency Pumps
Gravity Influent Flow
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
Midlevel – Plan
Odour Control Plant
– 175,000m3/h
r(16 air changes)
ELECTRICAL CONTROL ROOM
11 kv ABB VFD Drive
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
Plant section
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
Power Distribution Diagram
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
Failure of MPS
On 23 August 2009 the MPS stopped operating due to a cascading series of equipment failures.
Resulted in a catastrophic failure and flooding of the MPS. Failure of two critical items: the Main Pump Variable Frequency
Drives (VFD’s) and the Main Isolation Gate resulted in the flooding of the MPS.
In spite of all the efforts by Operator attempting to manually close the gate, chest deep in
sewage and eventually did not succeed. Presence onsite of VFD representatives efforts to restore the
failed VFDs back into operation.
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
33 m
20 m
Flooded Zone
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
MPS Failure – Root Cause and Contributing factor
VFDs began failing periodically months in advance of ultimate failure.
Due to chronic overheating (inefficient HVAC), humidity, dust and H2S gases plus poor maintenance - subsequent failure of the VFDs controlling the Main Pumps and Emergency Pumps.
Critical equipment (Electrical, MCC,VFD’s, and emergency pump controls) all located in high risk areas were considered as major contributing factor to the failure of the MPS.
Normal and desirable operating room temperatures are 25ºC to 29ºC. The temperatures recorded range from 41ºC to 44ºC in the VFD and the electrical control room.
Influent channel penstock gate got stuck and failed to close gate.
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
Emergency Actions and Remedies
A team of local consultants, contractors, and the U.S.Army Corps of Engineers assisted the MPW in identifying options for isolation and repair.
Sewage flow was redirected through the storm drain culvert to the Gulf in order to prevent sewage backing up into streets, commercial, and public housing areas.
Approximately one month after, the influent sewage was eventually blocked at a manhole upstream (sand bag) and was successfully diverted to the Gulf. Some of the sewage was hauled by tankers
Kharafi National (KN), a general contractor, was hired to drain, clean, sanitize and PS of residual raw sewage.
KN started Repair & Rehabilitation works in Feb. 2010.
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
Losses and after effect
The total financial losses are estimated at 21 M KWD. Dumping 180,000 cubic meters of untreated sewage to Kuwait
Bay. Violation of the international and local regulations on
environmental safety. Fishing and swimming was banned in affected areas. Indirect economic losses to the fishing. The Public Prosecution Department has charged the company
who executed the project, the O&M team AND the engineering consultant.
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
Capture the Lessons to improve asset performance
Resulted in relocation of all the critical equipment's above ground. Develop more comprehensive O&M procedure and emergency
response plan. O&M personnel require more comprehensive training. Replace the main isolation gate and include hydraulic actuator and
thimble mounting. Modify station access points for removal and replacement of large
equipment. Redesign and improve HVAC System.
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
Major findings
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
Major findings
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
Major findings
Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
Major findings