MIDTOWN DOWNTOWN PHOENIX UNDER CONSTRUCTION ......DESERT SKY MALL ± 3 MINS 0.8 MILES ± 4 MINS 1.0...
Transcript of MIDTOWN DOWNTOWN PHOENIX UNDER CONSTRUCTION ......DESERT SKY MALL ± 3 MINS 0.8 MILES ± 4 MINS 1.0...
PAGE
20 9 . 2 6 . 2 0 1 8HOPEWELL 67TH AND VAN BUREN
PHOENIX, AZ - PHX17-0070-00
PERSPECTIVE RENDERINGThis conceptual design is based upon a preliminary review of entitlement requirements and on unverified and possibly incomplete site and/or building information, and is intended merely to assist in exploring how the project might be developed. Signage shown is for illustrative purposes only and does not necessarily reflect municipal code compliance.
GARY ANDERSON+1 602 224 [email protected]
ALYSSA ALTOSINO+1 602 224 [email protected]
MIKE GILBERT+1 602 468 8540 [email protected]
NWC 67th Ave & Van Buren St | Phoenix, AZ 85043
UNDER CONSTRUCTIONEST. LATE 2019 COMPLETION
DOWNTOWNPHOENIX
MIDTOWNPHOENIX
DOWNTOWNSCOTTSDALE
DOWNTOWNTEMPE
VAN
BU
REN
STR
EET
67TH AVENUE
75TH AVENUE
59TH AVENUE
UNDER CONSTRUCTION | DELIVERING SPRING 2020
Nor
th±1 63 ,0 0 0 S F | 2 B U I L D I N G P R OJ E C T
PROJECT FEATURES
6880 W VAN BUREN ST | BUILDING 2
6750 W VAN BUREN ST | BUILDING 1
Project Location:Project Size:Zoning:Clear Height:Lighting:Sprinklers:Parking:Truck Court Depth:Truck Court:Floor Slab:Location:
Building Size:Divisibility:Office SF:Dock High Positions:Grade Positions:
Power: Building Depth:Column Spacing:Typical Bay SF:
78,150 SF18,000 SF
To Suit17 (2 per Bay)
6 (12’ x 14’) 2 (14’ x 14’)
3,000 Amps 277/480v180’
50’ x 60’±9,000 SF (180’ x 50’)
Building Size:Divisibility:Office SF:Dock High Positions:Grade Positions:
Power:Building Depth:Column Spacing: Typical Bay SF:
84,690 SF19,500 SF
To Suit24 (3 per Bay)
2 (12’ x 14’) 2 (14’ x 14’)
3,000 Amps 277/480v195’
50’ x 50’±9,750 SF (195’ x 50’)
NWC 67th Ave & Van Buren St.162,840 SF
CP/GCP (City of Phoenix)28’
LEDESFR
1.67/1,000 SF180’
Full Concrete7” Slab
0.8 Miles Interstate 10 1.0 Miles 202 Freeway
N. 67TH AVE
VAN
BU
REN
ST
North DOCK HIGH GRADE (12’ X 14’) GRADE (14’ X 14’)
1
2
BUILDING 1 78,150 SF
BUILDING 284,690 SF
195’
436’
50’
50’
180’
436’50’
60’
195’
436’
50’
50’
SPEC OFFICE PLANSpace SF:
Office SF:
Space Dimensions:
Clear Height:
Dock High Positions:
Grade Positions:
Column Spacing:
Warehouse Lighting:
Warehouse Cooling:
±27,885 SF
±1,500 SF
195’ x 143’
28’
8
1
50’ x 50’
LED Lights
EVAP | AC
CONCEPTUAL 3 BAY SPACE PLAN
North
GARY ANDERSON+1 602 224 [email protected]
ALYSSA ALTOSINO+1 602 224 [email protected]
MIKE GILBERT+1 602 468 8540 [email protected]
2
143’
195’
RESTROOMRESTROOM
XYXYXYXY
#*
MCDOWELL RD
VAN BUREN ST
59TH
AV
E
67TH
AV
E
75TH
AV
E
83RD
AV
E
FLOODDISTRICT
AK-CHINPAVILION
SUPERCENTER
DESERT SKY MALL
± 3 MINS0.8 MILES
± 4 MINS1.0 MILES
GARY ANDERSON+1 602 224 [email protected]
ALYSSA ALTOSINO+1 602 224 [email protected]
MIKE GILBERT+1 602 468 8540 [email protected]
Cushman & Wakefield Copyright 2019. The information contained herein was lawfully obtained from sources we consider reliable. Cushman & Wakefield is not responsible and expressly disclaims all liability, for errors, omissions, prior sales, withdrawal from the market or change in price. Seller (or Lessor, as the case may be) and broker make no representation as to the environmental condition of the property and recommend Purchaser’s (or Lessee’s) independent investigation.
2555 E. Camelback Rd, Suite 400 Phoenix, Arizona 85016
ph: +1 602 954 9000 | fx :+1 602 253 0528www.cushmanwakefield.com
1 Mile to Loop 202
20 Minutes to Sky Harbor Airport
0.8 Mile to I-10
5 Miles to Loop 101
LOCATION HIGHLIGHTS