MICE Coupling Coil Cryostat Update

7
MICE Coupling Coil Cryostat Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM37 at RAL, UK November 6, 2013

description

Allan DeMello Lawrence Berkeley National Laboratory. MICE Coupling Coil Cryostat Update. MICE CM37 at RAL, UK November 6, 2013. Status of Coupling Coil Cryostat. Cryostat Vacuum Vessel LBNL mechanical shop is fabricating the first cryostat vacuum vessel - PowerPoint PPT Presentation

Transcript of MICE Coupling Coil Cryostat Update

Page 1: MICE Coupling Coil  Cryostat  Update

MICE Coupling Coil Cryostat Update

Allan DeMelloLawrence Berkeley National Laboratory

MICE CM37 at RAL, UK November 6, 2013

Page 2: MICE Coupling Coil  Cryostat  Update

MICE RFCC Module – MICE Schedule Review at RAL, UK

Page 2Derun Li - Lawrence Berkeley National Lab – May 24, 2011

MICE CM37 Coupling Coil Cryostat Update

Page 2Allan DeMello- Lawrence Berkeley National Lab – November 6, 2013

Status of Coupling Coil Cryostat

• Cryostat Vacuum Vessel• LBNL mechanical shop is fabricating the first cryostat vacuum

vessel• Scheduled to finish the 2nd week of December

• Thermal Shield• Drawings have been finished at LBNL and need to be

reviewed by the LBNL superconductor group• LBNL mechanical shops will fabricate the first thermal shield

• Cooling Circuit• Drawings will be generated by LBNL• LBNL mechanical shops will fabricate the cooling circuit parts• LBNL will assemble components into sub-assemblies

Page 3: MICE Coupling Coil  Cryostat  Update

MICE CM37 Coupling Coil Cryostat Update

Page 3Allan DeMello- Lawrence Berkeley National Lab – November 6, 2013

Coupling Coil

Coupling coil magnet integrated into the RFCC

RFCC Module

Page 4: MICE Coupling Coil  Cryostat  Update

MICE CM37 Coupling Coil Cryostat Update

Page 4Allan DeMello- Lawrence Berkeley National Lab – November 6, 2013

Coupling Coil Sub-assemblies

Page 5: MICE Coupling Coil  Cryostat  Update

MICE CM37 Coupling Coil Cryostat Update

Page 5Allan DeMello- Lawrence Berkeley National Lab – November 6, 2013

Coupling Coil Cryostat Vacuum Vessel• LBNL mechanical shop is in the

process of fabricating the first cryostat vacuum vessel• Estimated completion early

December 2013• Drawings will be updated to reflect

the “as built” cryostat

Page 6: MICE Coupling Coil  Cryostat  Update

MICE CM37 Coupling Coil Cryostat Update

Page 6Allan DeMello- Lawrence Berkeley National Lab – November 6, 2013

Coupling Coil Thermal Shield

Remaining Tasks • Thermal shield design is nearly

complete• SINAP drawings are finished and will

be reviewed by the LBNL superconductor group

• LBNL shops will fabricate the first thermal shield

Page 7: MICE Coupling Coil  Cryostat  Update

MICE CM37 Coupling Coil Cryostat Update

Page 7Allan DeMello- Lawrence Berkeley National Lab – November 6, 2013

Cooling Circuit Assembly

Remaining Tasks • LBNL superconductor group will finalize

the cooling circuit design • Create detail fabrication drawings • Fabrication of component parts at LBNL• Assemble components into sub-

assemblies for shipment to Fermilab