MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power...

21
Seminar on the Joint Crediting Mechanism (JCM) Implementation in Chile Accelerating Promotion of Environmental Infrastructure through JCM MGM Innova Gruop – JCM Projects in Latin America Intercontinental Hotel, Santiago Chile, August 29th, 2019

Transcript of MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power...

Page 1: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

SeminarontheJointCreditingMechanism(JCM)ImplementationinChileAcceleratingPromotionofEnvironmentalInfrastructurethroughJCM

MGMInnovaGruop– JCMProjectsinLatinAmerica

IntercontinentalHotel,SantiagoChile,August29th,2019

Page 2: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

MGMInnovaEnergyServicesLLCisaprojectdevelopmentfirmfocusingontheidentification,design,technicalandfinancialstructuring,implementation,operationandmonitoringofenergyefficiencyandrenewableenergyprojects,aswellasthroughtheprovisionofenergyservices.

ThefirmservesastheenergyservicesarmoftheMGMInnovaGroup.

MGMInnovaConsultingspecializesinthedesign,development,promotionandimplementationofinnovativesolutionsthatenabletheirclientstoincorporatesustainableandclimatechangepracticesintheirproducts,projects,services,operationsandcorporatestrategies.

ThefirmservesastheclimatechangeconsultancyarmoftheMGMInnovaGroup.

MGMInnovaCapitalLLCisaprivateequityandgreeninfrastructureinvestmentfirmfocusingonsociallyresponsible,triplebottomline(financial,socialandenvironmental)investmentsinenergyefficiencyandrenewableenergyinLatinAmericaandtheCaribbean.

ThefirmservesasthefinancialarmofMGMInnovaGroup

Page 3: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

ENERGY EFFICIENCY

Municipal Efficiency

Commercial Efficiency

Industrial Efficiency

Distributed Generation/Hybrid

Hotels,hospitals,shoppingmalls,fastfoodchains,universities,yachtclubs.

*Targetlargebuildingsandapplymultiplemeasures

Airconditioning,highefficiencylighting,highefficiencysteamboilersandwaterheaters,solarwaterheating,controlandautomation.

Streetlighting.

*Streetlightingisoneofthelargestexpensesofmunicipalities.

*50%+savingswithLEDlights.

HighefficiencyLEDstreetlighting.

Foodandbeverage(biogastoenergy),agro-industry(biomasstoenergy),cement,glass,steel(wasteheattoenergy).

*Largersizeandgreatestsavingspotential,bothinelectricandthermalenergy.

Energycogenerationsystems,wasteheatrecoverytogenerateelectricity(OrganicRankineCycle),steamandhotair,biogasfromwastewatertreatmenttogenerateelectricity(biogas-poweredinternalcombustionengines),steamandhotwater(efficientboilers),highefficiencymotors.

Hotels,hospitals,supermarkets,shoppingcenters,TVstations.

*Seekopportunitiesincountrieswithaclearlydefinedregulatoryframeworkandattractiveretail/commercialelectricityprices.*Establishportfoliosofprojects.

Solarphotovoltaic(PV)generationforself-consumption.

Energy Efficiency: Investment Types, Strategy and Technologies

Page 4: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

RENEWABLE ENERGY

Utility Scale Solar

Biogas to Energy

Small Hydro Power

Landfillgasusedasfuelforsteamboilerstogenerateelectricitywithturbinesorthroughgasifierscombinedwithinternalcombustionengines.

Selectinnovativeopportunitieswithinterestingexitstrategies.

Generationofsolarphotovoltaic(PV)energyforsaletothegrid.

Enterprojectswithhighpotentialatearlystagestoaddvaluetolocaldevelopersandachievehigherreturns

Earlystageinvestmentsinhydrogeneration(smallscale)andrehabilitationofhydroelectricplants.

Selectopportunitiesinsituationswithnocompromisingsocialand/orenvironmentalconcerns.

Renewable Energy: Investment Types, Strategy and Technologies

Page 5: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

MGM Innova Group – JCM Experience

1

Pionner in JCM in Latin America

Implemented the first projects in Costa Rica, Mexico and Chile

5 JCM projects approved to date

3 projects fully implemented, 1 partially implemented and 1 to start implementation

List of projects:

5MWSolarPowerProjectinBelen,CostaRicaCoopeguanacaste (100%implemented)- 2016

HighEfficiencyChillerandtheExhaustHeatRecoverySysteminSanJose,CostaRicaWyndhamHotel(100%Implemented)- 2016

2.4MWPowerGenerationwithMethaneGasRecoverySysteminMexico,Energreen(partiallyimplemented)- 2016

1MWRooftopSolarPowerSysteminChile– UniversityFedericoSantaMaria(100%implemented)- 2016

2MWSolarPowerand4MWhStorageBatteryProjectinSanPedrodeAtacama,Chile(tobeimplemented)- 2018

Page 6: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

Costa Rica Projects

Page 7: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

SMAInverters - 2.2MW

Juanilama 5MW SPV in Belen

1

Installed PV capacity (kWp) 5,000

Inverter power (kW AC) 4,400(2x2.200)

HIT 325 Wp Modules 15,456

Annual Electricity (MWh) 9,680

Expected GHG Emission Reductions (tCO2e/yr) 2,504

JCM Subsidy 40%

Japanese Representative Partner NTTData

PanasonicHITPanels

Page 8: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

Plant Layout: Subsidized Items

1 3 2

8

10

4 5

Panel detail(1 array consists of 42 panels)

1

3

2

4

5

8

10

PV Module with structures

Inverter (incl. sub-station)

Combiner Boxes/Electric Materials (DC)

Electric Materials (MV)

Recloser

Pyranometer (Weather Station)

UPS

Equipment Q’ty

15,456

2

32

1 set

1

1

1

New transmission line to connect with existing point of Coope Guanacaste

Grid Connecting Point

8km

187,

600

mm(2

3 ro

ws)

269,272 mm(16 arrays per row)

1array=42panels42panelsX16X23rows=15,456panels

CB#1

CB#4CB#5

CB#6CB#7

CB#8

CB#9

CB#3CB#2

CB#10

CB#17

CB#20

CB#18

CB#14

CB#21

CB#22CB#23

CB#24

CB#25

CB#26CB#27

CB#28

CB#11

CB#12CB#13

CB#19

CB#29

CB#31CB#30

CB#16CB#15

CB#32

INV#1 INV#2

Page 9: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

Costa Rica 5MW SPV Belen – Aerial View

2

Page 10: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

Wyndham High Efficiency Chiller and the Exhaust Heat Recovery

1

Chiller EfficiencyOldCentrifugal

Efficient Magnectic

Hot Water System EfficiencyBunker OilBoiler

TemplifierHeatRecovery

Annual Electricity (MWh/yr) 1,116

Annual Bunker Oil savings (liters/yr) 185,682

Financial Savings Upto40%

Expected GHG Emission Reductions (tCO2e/yr) 402

JCM Subsidy 40%

Japanese Representative Partner NTTData

Page 11: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

High Efficiency Chiller and Heat Recovery

HighEfficiencyChiller

• Capacity– 400TR• ElectricitySavings– 769,184kWh/year• Financialsavings– 95,665US$/year• ExpectedEmissionReductions– 71.45tCO2/year

• Technology– DaikinMagneticChiller• Model–WMC400DC

BEFORE AFTER

Page 12: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

Exhaust Heat Recovery

BEFORE AFTER

ExhaustHeatRecovery

• Capacity– 1,088MBH• BunkerOilSavings– 185,682liters/year• Financialsavings– 55,286US$/year• ExpectedEmissionReductions– 330.67tCO2/year

• Technology– DaikinTemplifier• Model– TGZ060B

Page 13: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

Mexico Project

Page 14: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

Energreen LFG to Energy Mexico

1

Landfill gas recovery and power generation systems in 2 landfills in Mexico:

2 Landfills in Mexico StateAtizapan(operational)Mextepec(in progress)

Installed capacity (MW) 2,4

Nominal capacity (MW) 2,0

Fuji Eletric / 2G Gensets - 1,2 MW (units) 2

Annual Electricity (MWh/year) 28,400

Expected GHG Emission Reductions (tCO2e/yr) 185,000 estim.

JCM Subsidy 40%

Japanese Representative Partner NTTData

Page 15: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

Atizapan Landfill – 1,2 MW Installed Capacity

AtizapanLandfill

• Beginingofcommercialoperations– August2019• Regimen– SaleofElectricitytoCFEgrid

• Installedcapacity– 1,2MW• Nominalcapacity– 1,0MW• Annualgeneration– 12,000MWh/year• ExpectedEmissionReductions– 80,000tCO2/year(est.)

• Technology– 2GGensets (Germany)byFujiElectric• Model– AVUS1200

Page 16: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

Mextepec Landfill – 1,2 MW in progress

2

MextepecLandfill

• Beginingofcommercialoperations– January2020(planned)• Regimen– SaleofElectricitytoCFEgrid

• Installedcapacity– 1,2MW(Potentialexpansionto2,4MW)• Nominalcapacity– 1,0MW• Annualgeneration– 16,400MWh/year• ExpectedEmissionReductions– 105,000tCO2/year(est.)

• Technology– 2GGensets (Germany)byFujiElectric• Model– AVUS1200

Page 17: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

Chile Projects

Page 18: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

1MW Rooftop Solar Power system to University

1

PV power (kWp) 992

Inverter power (kW AC) 974

HIT 325 Modules 3.054

Annual Electricity (MWh) 1.628

Emission Factor (tCO2/MWh) 0,314

Expected GHG Emission Reductions (tCO2/yr) 511

Japanese Representative Partner Waseda

Page 19: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

2MW Solar Power and 4MWh Storage Battery Project

1

SPV and Storage Battery Project in Chile (Mining, Hotel and Utility)

Project under design and contract negotaiations phase

Project Location1SiteinTarapacáRegion2

SitesinAntofagasta

PV Power (kWp) 2,000

Battery capacity (kWh) 3,300

Sharp 370 Wp Modules (Japan) and Qinous Batteries (Germany)

Annual Electricity (MWh/year) 4,491

Expected GHG Emission Reductions (tCO2e/yr) 185,000 estim.

Japanese Representative Partner LiberalSolutions

Page 20: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

Marco G. Monroy María Pía IannarielloFounderandCEO|MGMInnova [email protected]

FounderandCOO|MGMInnova [email protected]

Gonzalo DiazCountryRepresentativeMGMInnovaCapitalChilegdiaz@sherpasgroup.cl

VPGlobalOperationsMGMInnova [email protected]

Alfredo Nicastro

www.mgminnovagroup.com

Page 21: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)

Thank you