TABLE OF CONTENTS I. COMPANY INFORMATION..................................................................................................... 2

II. COMPANY SITE LOCATION .................................................................................................... 3

A. OFFICE ....................................................................................................................................... 5

B. MAIN WAREHOUSE .................................................................................................................. 5

III. BRIEF COMPANY HISTORY ..................................................................................................... 6

IV. MISSION AND VISION ........................................................................................................... 6

V. CERTIFICATES OF REGISTRATION ........................................................................................... 7

A. Philippine Contractors Accreditation Board (PCAB) License ................................................... 7

B. Securities and Exchange Commission (SEC) Registration ........................................................ 8

C. Certificate of Registration (2303) ............................................................................................. 9

D. Unified Registration Record ................................................................................................... 10

E. SSS Certificate of Registration ................................................................................................ 11

F. Pag-Ibig Certificate of Employer’s Registration ..................................................................... 12

G. Business Permit ...................................................................................................................... 13

H. Certificate of PHILGEPS Registration (Blue Membership) ..................................................... 15

VI. FINANCIAL INFORMATION .................................................................................................. 15

VI. FINANCIAL INFORMATION .................................................................................................. 16

A. Income Tax Return (ITR) and Audited Financial Statement (AFS) ......................................... 16

VII. ORGANIZATION .................................................................................................................. 17

A. BOARD OF DIRECTORS ........................................................................................................... 17

B. LIST OF OFFICERS .................................................................................................................... 17

D. TEAM BUILDING ..................................................................................................................... 21

E. CHRISTMAS PARTY ................................................................................................................. 23

F. MAJOR CLIENTS .................................................................................................................. 25

VIII. LIST OF TOOLS AND EQUIPMENT ......................................................................................... 26

IX. LIST OF COMPLETED PROJECT ............................................................................................. 31

X. LIST OF ON-GOING PROJECT ........................................................................................ 45

Page 3: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 2 of 49

I. COMPANY INFORMATION

Company Name: Megacity General Construction and

Development Corporation

Principal Office Address: Briola St., Mercedes Camarines Norte

Business Address: 2F, JM Business Center Bldg. Zansibar St.

Cor. Rockefeller St., Brgy. San Isidro,

Makati City, 1234, Philippines

Main Warehouse: Quirinal St., Brgy. Palanan,

Makati City, 1235, Philippines

Contact Number: (632) 805-4674

Fax Number: (632) 844-6347

Email Address: [email protected]

Date Established: June 18, 2015

PCAB License No: 42354

SEC Registration No: CS201511961

T.I.N.: 009-065-579

Website: www.megacity.com.ph

https://www.facebook.com/mgcdc2015/

Page 4: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 3 of 49

II. COMPANY SITE LOCATION

A. MEGACITY MAIN OFFICE (NEW) Address: 2/F JMBC Bldg., Zansibar St. corner Rockefeller St., Brgy. San Isidro, Makati City Floor Area: 542 Sq. meters

B. MEGACITY – MAIN WAREHOUSE Address: Quirinal St., Makati City Floor Area: 600 Sq. meters

Page 5: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 4 of 49

Page 6: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 5 of 49

A. OFFICE

B. MAIN WAREHOUSE

Page 7: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 6 of 49

III. BRIEF COMPANY HISTORY Our corporation is privately held company and initially operating as subsidiary of KEMPAL

Construction and Supply Corporation (KCSC for brevity), duly registered corporation, existing for more

than eighteen (18) years offers mechanical, civil, and engineering services.

Through the profit from the company activities, were reinvested back in the business to meet

the expanding demand of the market. Thereat, Megacity General Construction and Development

Corporation, a new company was established on June 18, 2015.

The people who make up the team has all capabilities, technical know –how and experience

in engineering; it embodies our values of strength, performance and passion .Our employees adhere

to these ideals, which contributed meaningfully to the leadership, development and success of our

company.

Our ultimate competitive advantage is the technical know-how and passion of our people to

undertake your construction requirement. We are motivated to achieve the elements needed to

provide project success that will leave a good and lasting impression for our clients and society.

IV. MISSION AND VISION

MISSION

1. To ensure the customers’ complete satisfaction with the entire construction experience. 2. To remain focused on controlled organizational growth, effective management, and

excellence in every aspect to meet customers’ stringent requirements on quality, on-time delivery, safety and environmental concerns.

3. To establish lasting relationship with our customers by exceeding their expectations and gaining their trust through exceptional performance by every member of the organization.

VISION

1. To be a contractor and employer of choice, with a balance of work across the public and private sectors and a reputation for local knowledge and delivery.

2. To be a company with strong management, technical and commercial performance. 3. To provide its employees an opportunity to enhance and develop skills, personality and talent;

rewarding hard work and achievements with proper compensation for them to live a successful lives.

4. A company with reputation built on performance.

Page 8: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 7 of 49

V. CERTIFICATES OF REGISTRATION

A. Philippine Contractors Accreditation

Board (PCAB) License

Page 9: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 8 of 49

B. Securities and Exchange Commission (SEC) Registration

Page 10: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 9 of 49

C. Certificate of Registration (2303)

Page 11: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 10 of 49

D. Unified Registration Record

Page 12: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 11 of 49

E. SSS Certificate of Registration

Page 13: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 12 of 49

F. Pag-Ibig Certificate of Employer’s

Registration

Page 14: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 13 of 49

G. Business Permit

Page 15: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 14 of 49

Page 16: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 15 of 49

H. Certificate of PHILGEPS Registration

(Blue Membership)

VI. FINANCIAL INFORMATION

Page 17: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 16 of 49

VI. FINANCIAL INFORMATION A. Income Tax Return (ITR) and Audited

Financial Statement (AFS)

Page 18: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 17 of 49

VII. ORGANIZATION

A. BOARD OF DIRECTORS

MR. PEPITO P. LO - CHAIRMAN

MS. BRENDA C. SOLITARIO - MEMBER

MR. JOHN LEROY S. LO - MEMBER

ENGR. PEPITO S. LO JR. - MEMBER

MS. KATHLENE MAE S. LO - MEMBER

B. LIST OF OFFICERS MR. PEPITO LO - PRESIDENT

MR.JOHN LEROY S. LO - VICE-PRESIDENT/MANAGING DIRECTOR

MS. BRENDA SOLITARIO - FINANCE MANAGER

MS. KATHLENE MAE S. LO - ASSISTANT FINANCE MANAGER

ENGR. PEPITO S. LO JR. - OPERATIONS MANAGER

ADMIN DEPARTMENT MR. RICHARD GONZALES - LEGAL HEAD

MR. GIL BRYAN BARION - ADMIN., LOGISTIC & WAREHOUSE HEAD

MS. GRACE ANN PINEDA - ADMIN. OFFICER

MS. MARICEL BOLOS - RECORDS & DATA SPECIALIST

ENGR. NIJARA KATHLEEN GADO - PROJECT MANAGEMENT COORDINATOR

ENGR. GERILYN MACALINDONG - PURCHASING STAFF

MR. MARK ANTHONY DUQUE - LIAISON OFFICER 1

MR. NINO LAJARA - LIASON OFFICER 2

Page 19: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 18 of 49

ENGINEERING DEPARTMENT ENGR. ALWIN R. CAY - PROJECT- IN-CHARGE

ENGR. RYAN CABUNGCAL - PROJECT- IN-CHARGE

ENGR. SONNIFER SONNY BANTIGUE - PROJECT- IN-CHARGE

ENGR. CHESTER GANOTICE - PROJECT- IN-CHARGE

ENGR. MANOLITO FERRERAS - PROJECT ENGINEER I

ENGR. RALPH JUSTINE GUINTO - PROJECT ENGINEER I

ENGR. MELVIN UDARBE - PROJECT ENGINEER I

ENGR. CARLO RAZA - SITE ENGINEER I

ENGR. JUSUA GARNACE - SITE ENGINEER III

ENGR. PRILLSON DERRAMAS - SITE ENGINEER I

ENGR. WINSTON LLARENAS - SITE ENGINEER I

ENGR. FAROUK NINOY BASILAN - SITE ENGINEER I

MS. ALFHIE SEPRIA - ADMIN ASSISTANT

MS. PRINCESS DE JESUS - ADMIN ASSISTANT

MS. JESSA ABAYA - ADMIN ASSISTANT

ENGR. MARIE MALACOCO - ADMIN ASSISTANT

MR. RODEL OLICIA - FOREMAN SUPERVISOR

MR. NORBERTO OLICIA - FOREMAN

MR. CELSO OLICIA - FOREMAN

MR. GOMER OLICIA - FOREMAN

MR. ROBERT LACANARIA - FOREMAN

MR. ANECITO BATULA - FOREMAN

QA/QS/QC DEPARTMENT ENGR. NIJARA KATHLEEN GADO - COST ENGINEER

ENGR. ABBEY BAUTISTA - CIVIL ESTIMATOR

ENGR. NOHNELYN RENDON - ELECTRICAL ESTIMATOR

ENGR. ALVIN PAUL SULIT - PLUMBING & FIRE PRO ESTIMATOR

ENGR. REDEN PINGOL - CAD OPERATOR

ENGR. MICHAEL BERTOS - CAD OPERATOR

ENGR. EDISON SUMCIO - CAD OPERATOR

Page 20: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 19 of 49

ACCOUNTING DEPARTMENT MS. TEODORA C. DEOCARIZA - CHIEF ACCOUNTANT

MS. MARY VALENTINE PABON - FINANCE HEAD

MS. MARICRIS ALTARES - ACCOUNTS PAYABLE

MS. JOENA INOJALES - ACCOUNTS RECEIVABLE

MS. KAREN AGCARACAR - JR. BOOK KEEPER ACCOUNTANT

MR. ADRIANO COSTAMBINES - PAYROLL OFFICER

MR. CELESTINO DIAZ, JR. - INVENTORY ASSISTANT

HUMAN RESOURCES DEPARTMENT

MS. RICHELLE YBARDOLAZA - HR HEAD

MS. GIAN KARLA REYNO - HR OFFICER-ORIENTATION, TRAINING & DEV’T

MS. SARAH JANE DELA CRUZ - HR OFFICER-COMPENSATION & BENEFITS

MR. BENEL AMPU-AN - HR OFFICER-MANPOWER

LOGISTIC DEPARTMENT MR. GIL BRYAN BARION - LOGISTIC HEAD

MR. CHRISTOPHER UNTALASCO - LOGISTIC ASSISTANT

MR. JONATHAN VERGARA - MAINTENANCE SUPERVISOR

MR. JOVEN BARQUILLA - AUTOMOTIVE TECHNICIAN

MR. REXEL SALAZAR - AUTOMOTIVE TECHNICIAN

MR. JOSELITO POSTRANO - HEAVY EQUIPMENT MECHANIC

MR. DIOSDADO ESTAVILLO - DRIVER/OPERATOR

MR. RONALD MALLO - DRIVER/OPERATOR

MR. GERARDO MAKILING - DRIVER

MR. JOMAR PELAYO - DRIVER

WAREHOUSE DEPARTMENT MR. GIL BRYAN BARION - WAREHOUSE HEAD

MR. KIRBY COBILLO - WAREHOUSEMAN

MR. RICHARD PADILLA - WAREHOUSEMAN

MR. FRANDY NINING - WAREHOUSEMAN

MR. JOJO SAMACO - WAREHOUSEMAN

MR. BASIL ANTHONY GATCHALIAN - WAREHOUSEMAN

MR. SEVERINO CATAUSAN - WAREHOUSEMAN

Page 21: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 20 of 49

C. ORGANIZATION CHART

Page 22: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 21 of 49

D. TEAM BUILDING Coral View Beach Resort, Bataan

July 16 & 17, 2016

Page 23: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 22 of 49

Treasures of Bolinao

June 17 & 18, 2017

Page 24: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 23 of 49

E. CHRISTMAS PARTY

JM Building II, Makati City December 16, 2015

Page 25: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 24 of 49

Tramway, Pasay City December 16, 2016

Page 26: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 25 of 49

F. MAJOR CLIENTS

MEGACITY General Construction & Development Corporation (MGCDC) is supplier and service provider for

large industries in the Philippines. A great majority of our satisfied clients are major players in the business field

of mining, shipping, land and air transportation, as well as, large power plants within the country. A few of these

large corporations served by MEGACITY General Construction & Development Corporation are:

0

Page 27: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 26 of 49

VIII. LIST OF TOOLS AND EQUIPMENT

1. BACKHOE W/ BREAKER 2. SKID LOADER

3. WALK BEHIND COMPACTOR (DOUBLE DRUM) 4. HYDRAULIC HAND BREAKER

Page 28: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 27 of 49

NO. DESCRIPTION UNIT QTY

A. POWER TOOLS

1 SMALL GRINDER GWS 8-100C BOSCH UNITS 35

2 SANDER GSS 140 A BOSCH UNITS 20

3 SANDER GSS 230 BOSCH UNITS 15

4 DEMOLITION HAMMER GSH 16-30 BOSCH UNITS 15

5 ELECTRIC DRILL GBM 10 BOSCH UNITS 35 6 ROTARY HAMMER GBH 2-28 DFV BOSCH UNITS 10

7 DEMOLITION HAMMER GSH 11 E BOSCH UNITS 15

8 LARGE ANGLE GRINDER GWS 20-180 BOSH UNITS 5

9 JIG SAW GST 80PB BOSCH UNITS 5

10 RAMSET FASTENING TOOLS TS750P UNITS 5

11 DEMOLITION HAMMER GSH 27 VC BOSCH UNITS 7

12 CORING CUTTER MODEL 0200 SKIL UNITS 3

13 CORE BIT 62MM DIA. TYROLIT UNITS 3

14 HEATING GUN GHG 600-3 BOSCH UNITS 5

15 THREADING MACHINE MODEL 300 COMPACT RIDGID UNITS 1

16 CIRCULAR SAW MODEL GSK 190 BOSCH UNITS 5

17 PLANNER MODEL GHO 10-82 BOSCH UNITS 10

18 TRIMMER GMR 1 BOSCH UNITS 2

19 AIR COMPRESSOR VESPA BRAND TAIWAN MADE 2HP W/ 5M HOSE UNITS 6

20 VACUUM CLEANER MODEL GAS 11-21 BOSCH UNITS 5

21 ROTARY HAMMER GBH 2-20 RE BOSCH UNITS 10

22 CORDLESS DRILL GSR 1800 V-LI BOSCH UNITS 30

B. HAND TOOLS

1 RIVETER STANLEY HEAVY DUTY PCS 50

2 LEVEL BAR 3FT STANLEY PCS 20

3 AVIASION SNIP STANLEY PCS 50

4 COMBINATION WRENCH 17MM SET 20

5 VENUS WRENCH 18 X 19 SET 10

6 VENUS WRENCH 16X 17 SET 10

7 CEMENT TROWEL PCS 10

8 SCORING KNIFE PCS 20

9 CLAW BAR 36" PCS 20

10 SHOVEL TOMBO FLAT PCS 150

11 SHOVEL TOMBO POINTED PCS 150

12 STRAIGHT BAR 5FT PCS 15

13 KALAYKAY PCS 5

14 CONCRETE BUGGY PCS 20

15 PIPE WRENCH 18" MADE IN TAIWAN SET 20

16 SPATULA PCS 20

17 TILE TROWEL RUBI PCS 2

18 GLASS SUCKER 3-PODS( GLASS HANDLING VACUME) PCS 8

C. WELDING TOOLS

1 FUSION MACHINE 20-63MM W/PIPE CUTTER UNITS 2

2 TIG WELDING MACHINE 200 AMPS.WITH ARGON REGULATOR, TORCH ASSEMBLEY, CABLE W/GROUND CLAMP, HOSE & TUNGSTEN. NIHON (INVERTER TYPE)

UNITS 2

Page 29: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 28 of 49

3 WELDING MACHINE FOR SMAW AC-300 AMP. TRANSFORMER TYPE, W/WELDING CABLE FOR GROUNDING CLAMP-3MTRS, HOLDER, WELDING CABLE

UNITS 2

4 WELDING MACHINE FOR SMAW AC-300 AMP. TRANSFORMER TYPE,W/WELDING CABLE FOR GROUNDING CLAMP-3MTRS, HOLDER, WELDING CABLE =4MTRS, MITSU (INVERTER TYPE)

5 WELDING MACHINE FOR ARC WELDING 300 AMP. YAMATO BRAND UNITS 2

6 WELDING MACHINE 300 AMP ARC INVERTER NIHON BRAND UNITS 8

7 WELDING MACHINE 300 AMP ARC INVERTER MITSUDEN BRAND UNITS 4

D. MEASURING TOOLS

1 LINE LASER GLM 100C BOSCH UNITS 4

2 SURFACE LASER GSL 2 BOSCH UNITS 2

3 TILE LASER BOSCH GTL 3 BOSCH UNITS 1

4 DIGITAL INCLINOMETER GIM 60L BOSCH UNITS 2

5 LINE LASER GLL 3X BOSCH UNITS 1

6 TRIPOD BS 150 BOSCH UNITS 1

7 LINE LASER LEVEL GLL 3-80 P BOSCH UNITS 1

E. LIFTHING AND FORMING EQUIPMENTS

1 PULLEY 6" PCS 10

2 CASTER WHEEL RUBBER HEAVY DUTY W/ STOPPER PCS 4000

3 CASTER WHEEL RUBBER HEAVY DUTY NO STOPPER PCS 100

4 CATWALK -COMER PCS 500

5 H-FRAME 1.7M X 102M -COMER PCS 1200

6 X-BRACE-COMER PCS 1200

7 JOIN PIN PCS 4000

8 SWIVEL CLAMP PCS 6000

9 SLING BELT 2M 3TONS CAPACITY PCS 6

10 SHOCKLE 3/8" PCS 2

11 SHOCKLE 1/2" PCS 2

12 CASTER WHEEL RUBBER 8" HEAVY DUTY W/ STOPPER PCS 50

13 ALUMA BEAM 140 PCS 125

14 ALUMA BEAM 122 PCS 80

15 A CLAMP PCS 800

16 TIE ROD 12MMX0.6M PCS 250

17 FLANGE NUT BALL THREADED 12MM PCS 240

18 ADJUSTABLE U HEAD 1 1/4DIA.X600MM PCS 370

19 ADJUSTABLE BASE JACK 1 1/4"DIAX600MM PCS 370

20 ADJUSTABLE SHORING JACK 3.80M FULL EXT PCS 50

F. LIGHTING TOOLS

1 TROUBLE LIGHT W/ 15MTRS CORD COOPES PCS 6

2 FLOOD LIGHT 1500 WATTS FIREFLY PCS 4

3 FLOOD LIGHT 300 WATTS FIREFLY PCS 3

4 METAL HALIDE FLOOD LIGHT 400 WATTS FIREFLY PCS 35

G. EXTENSION WIRE

1 ROYAL CORD # 10/2 DURAFLEX (75MTRS/BOX) BOXES 20

2 WELDING CABLE 2/0 15MTRS ROLL 15

3 FLAT CORD DUPLEX 1.25mm (no. 16, 150m/roll)Columbia BOXES 25

4 WELDING CABLE 2/0 40MTRS. ROLL 35

Page 30: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 29 of 49

5 2.6mm2 (#10) THHN STRANDED WIRE YELLOW COLUMBIA (150MTRS/BOX) BOXES 10

6 FLAT CORD 3.5MM DUPLEX (150M.ROLL)COLUMBIA BOXES 15

H. SAFETY

1 WELDING MASK PCS 50

2 WELDING GLOVES PCS 200

3 WELDING APRON PCS 20

4 EAR PLUG PCS 200

5 SAFETY VEST REFLECTORIZED PCS 300

6 RUBBER BOOTS 8" PAIRS 300

7 RUBBER BOOTS 9" PAIRS 300

8 RUBBER BOOTS 10" PAIRS 300

9 BLINKER/WARNING LIGHT CHINA MADE PCS 2

10 FULL BODY HARNESS PCS 100

11 SAFETY HARD HAT (BLUE EAGLE) BLUE PCS 500

12 SAFETY GOGGLES PCS 100

13 PROTECTION CAP FOR ACETYLENE PCS 3

14 PROTECTION CAP FOR OXYGEN PCS 6

15 PROTECTION CAP FOR ARGON PCS 2

16 ACETYLENE HOSE FLUSHBACK ARRESTOR FPR TORCH PCS 2

I. TANKS

1 ARGON TANK NEW UNITS 2

2 ACETYLENE TANK NEW UNITS 10

3 OXYGEN TANK NEW UNITS 20

4 GASUL TANK 11KGS UNITS 4

5 FIRE EXTINGUISHER 10 LBS DRY CHEMICAL UNITS 5

J. PADLOCKS

1 YALE PADLOCK 60MM PCS 15

2 YALE PADLOCK 40MM PCS 15

3 YALE PADLOCK 30MM PCS 15

4 MASTER PADLOCK 40MM PCS 15

K. CUTTING TOOLS/EQUIPMENTS

1 PLASMA CUTTER CUT-60 NIHON UNITS 1

2 CONCRETE CUTTER W/ 16" DIA. DIAMOND CUTTING DISC DSK, WITH 7.5 HP ROBIN ENGINE

UNITS 1

3 CUTTING OUT FIT HARRIS BRAND MADE IN US UNITS 5

4 BAR CUTTER MANUAL (MAX. 25MM DIA. G-40) UNITS 2

5 HACKSAW FRAME UNITS 10

6 LPG TORCH KAWAGUCHIE TAIWAN UNITS 2

7 TILE CUTTER SPEED 62 RUBI PCS 5

8 CUTTING TIP FOR ACETYLENE TORCH HARRIS BRAND PCS 10

9 CUT-OFF SAW GCO 2000 BOSCH UNITS 2

10 CUT-OFF SAW GCO 2400 J BOSCH UNITS 6

L. CONCRETING TOOLS/QUIPMENTS

1 CONCRETE MIXER 1 BAGGER, A-FRAME TYPE WITH 7.5 HP ROBIN ENGINE LOW SPEED

UNITS 6

2 CONCRETE VIBRATOR WITH HOSE MADE IN KOREA AND I UNIT ROBIN ENGINE 5HP SWIVEL TYPE ENGINE BASE

UNITS 2

3 POWER TROWEL W/ 5HP ROBIN ENGINE UNITS 2

Page 31: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 30 of 49

M. COMPACTOR EQUIPMENTS

1 VIBRATORY COMPACTOR WITH 5HP ROBIN ENGINE MODEL VC-1; 540MM X 460MM X 924MM (OBERLY)

UNITS 3

N. OTHERS

1 BLUE DRUM 200 LTRS. PCS 30

2 CONCRETE CYLINDER MOLD 6" X 12" PCS 6

3 MULTI PURPOSE ALUMINUM LADDER 16FT HOME CARE BRAND (4-FOLDS) PCS 6

4 MIXING PADDLE BITONET BRAND PCS 5

5 NYLON ROPE ROLL 10

Page 32: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 31 of 49

IX. LIST OF COMPLETED PROJECT

PROJECT NAME: SM MUNTINLUPA REDEVELOPMENT LOCATION: National Road, Tunasan, Muntinlupa CLIENT: SM Prime Holdings, Inc. FINAL PROJECT COST: 18,689,529.97 SCOPE: Civil Works DATE COMPLETED: July 28, 2017

Item Project name Scope Client Final Project Cost Status

1 SM Muntinlupa Redevelopment

Civil Works SM Prime Holdings, Inc. 17,000,000.00 Completed

2 SM Muntinlupa Dropwall @ RDU

Civil Works SM Prime Holdings, Inc. 449,000.00 Completed

3 SM Muntinlupa Concrete Cover for Retrofitted Below Floor Line

Civil Works SM Prime Holdings, Inc. 440,000.00 Completed

4 SM Muntinlupa Parking Re-layout

Civil Works SM Prime Holdings, Inc. 342,632.57 Completed

5 SM Muntinlupa Temporary Board-up at Old Bingo

Civil Works SM Prime Holdings, Inc. 253,202.40 Completed

6 SM Muntinlupa Temporary Board-up at Cyberzone Area

Civil Works SM Prime Holdings, Inc. 79,695.00 Completed

7 Civil works ramp at employees and drywall at walkalator

Civil Works SM Prime Holdings, Inc. 71,000.00 Completed

8 Restoration Works at Jollibee Civil Works SM Prime Holdings, Inc. 54,000.00 Completed

TOTAL 18,689,529.97

Page 33: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 32 of 49

PROJECT NAME: HENAN BEACH RESORT EXPANSION LOCATION: Alona Beach Rd, Panglao, Bohol CLIENT: GRAND LEGACY BUILDERS CONS. & DEV. CORP. FINAL PROJECT COST: 14,875,000.00 SCOPE: Civil Works DATE COMPLETED: December 16, 2014

Item Project name Scope Client Final Project Cost Status

1 HENNAN BEACH RESORT EXPANSION

Civil Works GRAND LEGACY 14,875.000.00 Completed

TOTAL 14,875.000.00

Page 34: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 33 of 49

PROJECT NAME: SM PAMPANGA BUS TERMINAL LOCATION: Pampanga CLIENT: SM Prime Holdings, Inc. FINAL PROJECT COST: 13,171,081.80 SCOPE: Plumbing Works DATE COMPLETED: November 30, 2016

Item Project name Scope Client Final Project Cost Status

1 SM Pampanga Bus Terminal Structural Works SM Prime Holdings, Inc. 11,000,000.00 Completed

2 SM Pampanga Bus Terminal Additional Works-Plumbing

Plumbing Works SM Prime Holdings, Inc. 450,000.00 Completed

3 SM Pampanga Bus Terminal Additional Works 1

Civil Works SM Prime Holdings, Inc. 452,703.9 Completed

4 SM Pampanga Bus Terminal Additional Works 2

Civil Works SM Prime Holdings, Inc. 390,000.00 Completed

5 SM Pampanga Bus Terminal Additional Works 3

Civil Works SM Prime Holdings, Inc. 66,000.00 Completed

6 SM Pampanga Bus Terminal Additional Works 4

Civil Works SM Prime Holdings, Inc. 491,660.00 Completed

7 SM Pampanga Bus Terminal Additional Works 5

Civil Works SM Prime Holdings, Inc. 320,717.90 Completed

TOTAL 13,171,081.80

Page 35: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 34 of 49

PROJECT NAME: SM SAN MATEO PROPOSED TWO STOREY BUILDING LOCATION: San Mateo, Rizal CLIENT: SM Prime Holdings, Inc. FINAL PROJECT COST: 10,200,000.00 SCOPE: Civil Works DATE COMPLETED: November 30, 2016

Item Project name Scope Client Final Project Cost Status

1 SM San Mateo Proposed Two Storey Building

Civil Works SM Prime Holdings, Inc. 10,200,000.00 On-going

TOTAL 10,200,000.00

Page 36: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 35 of 49

PROJECT NAME: SM BATANGAS DOWNSIZING LOCATION: Pastor Village, Brgy. Pallocan Kanluran, Batangas CLIENT: SM Prime Holdings, Inc. FINAL PROJECT COST: 7,587,881.70 SCOPE: Civil Works DATE COMPLETED: July 31, 2017

Item Project name Scope Client Final Project Cost Status

1 SM Batangas SVI Downsizing to Additional Works

Civil Works SM Prime Holdings, Inc. 6,630,396.30 Completed

2 SM Batangas SVI Façade & Site Development

Civil Works SM Prime Holdings, Inc. 600,000.00 Completed

3 SM Batangas CHB 6” Laying at Toy Kingdom

Civil Works SM Prime Holdings, Inc. 357,485.40 Completed

TOTAL 7,587,881.70

Page 37: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 36 of 49

PROJECT NAME: SM MEGAMALL LOCATION: Epifanio de los Santos Ave, Ortigas Center, Mandaluyong CLIENT: First Asia Realty Development Corp. FINAL PROJECT COST: 28,101,195.25 SCOPE: Civil Works DATE COMPLETED: July 19, 2017

Item Project name Scope Client Final Project Cost Status

1 Temporary Board up, Demolition of CHB wall, Exhaust cladding & Repair & replacement of ceiling on 4F Bldg. B Fort Wink

Civil Works First Asia Realty Development Corp.

10,397,372.35

Completed

2 Temporary Board up, Atrium ceiling repair, Civil works for glass railing full height, Repair of Echostop ceiling, CCTV room renovation at SMMG, CHB partition at SM Megamall Agatha

Civil Works First Asia Realty Development Corp.

4,959,961.45 Completed

3 Food court back alley rehabilitation

Civil Works First Asia Realty Development Corp.

2,012,607.70 Completed

4 Construction of UG 5th level slab arcade side

Civil Works First Asia Realty Development Corp.

1,600.000.00 Completed

5 Rehabilitation of Asphalt at the perimeter pavement

Civil Works First Asia Realty Development Corp.

1,200,000.00 Completed

6 Rentable storage repair works Civil Works First Asia Realty Development Corp.

750,000.00 Completed

7 Installation of board up & dismantling of escalator cladding

Civil Works First Asia Realty Development Corp.

660,000.00 Completed

8 Rentable storage unit 1-42 Civil Works First Asia Realty Development Corp.

625,000.00 Completed

Page 38: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 37 of 49

9 Rentable storage unit 43-75 Civil Works First Asia Realty Development Corp.

625,000.00 Completed

10 Helipad Concrete Topping Civil Works First Asia Realty Development Corp.

610,000.00 Completed

11 Stairs Convention to slab @ Arcade

Civil Works First Asia Realty Development Corp.

478,559.27 Completed

12 Additional works for SM Helipad

Civil Works First Asia Realty Development Corp.

470,559,.27 Completed

13 Stairs Conversion to slab (Yoshinoya)

Civil Works First Asia Realty Development Corp.

420,000.00 Completed

14 Board up of escalator renovation Bldg. B

Civil Works First Asia Realty Development Corp.

410,000.00 Completed

15 AHU Replacement Civil Works First Asia Realty Development Corp.

408,940.00 Completed

16 Restoration of curb gutter & PWD ramps & painting works

Civil Works First Asia Realty Development Corp.

400,638.00 Completed

17 Restoration of chiller, genset and MCC pads at EMB-A and EMB-B

Civil Works First Asia Realty Development Corp.

308,963.65 Completed

18 Repaiting of ceiling at 5th floor

Civil Works First Asia Realty Development Corp.

516,600.00 Completed

19 Repair and replacement of ceiling on 4f Bldg. B Forty Winks

Civil Works First Asia Realty Development Corp.

187,666.00 Completed

20 Rectification of Giordano Civil Works First Asia Realty Development Corp.

167,347.00 Completed

21 Rectification of Travel Club Civil Works First Asia Realty Development Corp.

108,063.36 Completed

22 Rectification of ceiling at 4th floor

Civil Works First Asia Realty Development Corp.

145,789.00 Completed

23 Supply and installation of green wall bracket

Civil Works First Asia Realty Development Corp.

159,569.91 Completed

24 Replacement of damage G.I pipe

Civil Works First Asia Realty Development Corp.

60,882.68 Completed

25 RDU food court, kultura, mega clinic cement topping

Civil Works First Asia Realty Development Corp.

104,151.04 Completed

26 Temporary board up for veranda @ stairway side

Civil Works First Asia Realty Development Corp.

137,720.00 Completed

27 Dismantling and reinstallation of kiosk at Bldg. D

Civil Works First Asia Realty Development Corp.

63,584.00 Completed

28 Piano flat form Civil Works First Asia Realty Development Corp.

76,152.38 Completed

29 Temporary board up Le couer de france

Civil Works First Asia Realty Development Corp.

63,850.00 Completed

30 Temporary board at bank drive

Civil Works First Asia Realty Development Corp.

172,200.00 Completed

31 Rectification of jamba juice Civil Works First Asia Realty Development Corp.

70,481.66 Completed

32 Condenser pump cover Civil Works First Asia Realty Development Corp.

266,903.71 Completed

33 Additional works for const. UG 5th level slab

Civil Works First Asia Realty Development Corp.

226,122.40 Completed

34 Temporary board up LGF 5th Carpark Bldg. B

Civil Works First Asia Realty Development Corp.

111,790.25 Completed

35 Repainting of ceiling at LGF 5f (Additional for escalator

cladding)

Civil Works First Asia Realty Development Corp.

165,766.61 Completed

Page 39: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 38 of 49

36 Elevated Pedestrian crossing Civil Works First Asia Realty Development Corp.

245,000.00 Completed

37 Concrete pouring at Veranda Project

Civil Works First Asia Realty Development Corp.

219,322.25 Completed

38 Demolition of slab and walls for exhaust/ fresh air riser of Sambokojin including installation of concrete zocallo

Civil Works First Asia Realty Development Corp.

162,333.08 Completed

39 Demolition & restoration of walls for CH3A with steel door

Civil Works First Asia Realty Development Corp.

114,935.00 Completed

40 Temporary board up Cinderella

Civil Works First Asia Realty Development Corp.

102,057.80 Completed

41 Chapel projection room Civil Works First Asia Realty Development Corp.

100,000.00 Completed

42 SM Megamall – STP Concreting works

Civil Works First Asia Realty Development Corp.

85,864.70 Completed

28,101,195.25 Total

36 Elevated Pedestrian crossing Civil Works First Asia Realty Development Corp.

245,000.00 Completed

37 Concrete pouring at Veranda Project

Civil Works First Asia Realty Development Corp.

219,322.25 Completed

38 Demolition of slab and walls for exhaust/ fresh air riser of Sambokojin including installation of concrete zocallo

Civil Works First Asia Realty Development Corp.

162,333.08 Completed

39 Demolition & restoration of walls for CH3A with steel door

Civil Works First Asia Realty Development Corp.

114,935.00 Completed

40 Temporary board up Cinderella

Civil Works First Asia Realty Development Corp.

102,057.80 Completed

41 Chapel projection room Civil Works First Asia Realty Development Corp.

100,000.00 Completed

42 SM Megamall – STP Concreting works

Civil Works First Asia Realty Development Corp.

85,864.70 Completed

28,101,195.25 Total

36 Elevated Pedestrian crossing Civil Works First Asia Realty Development Corp.

245,000.00 Completed

37 Concrete pouring at Veranda Project

Civil Works First Asia Realty Development Corp.

219,322.25 Completed

38 Demolition of slab and walls for exhaust/ fresh air riser of Sambokojin including installation of concrete zocallo

Civil Works First Asia Realty Development Corp.

162,333.08 Completed

39 Demolition & restoration of walls for CH3A with steel door

Civil Works First Asia Realty Development Corp.

114,935.00 Completed

40 Temporary board up Cinderella

Civil Works First Asia Realty Development Corp.

102,057.80 Completed

41 Chapel projection room Civil Works First Asia Realty Development Corp.

100,000.00 Completed

42 SM Megamall – STP Concreting works

Civil Works First Asia Realty Development Corp.

85,864.70 Completed

TOTAL 28,101,195.25

Page 40: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 39 of 49

PROJECT NAME: ALFAMART AZARES BAYAN LUMA 6 LOCATION: IMUS, CAVITE/ CABUYAO, LAGUNA/ TAGUIG CLIENT: Alfa mart Trading Phils. Inc. FINAL PROJECT COST: 9,085,000.00 SCOPE: Civil Works DATE COMPLETED: December 23, 2015

Item Project name Scope Client Final Project Cost Status

1 Alfamart Azares Bayan Luma 6

Civil Works SM Prime Holdings, Inc. 3,300,000.00 Completed

2 Alfamart – Brgy. Baclaran Cabuyao Laguna

Civil Works SM Prime Holdings, Inc. 3,100,000.00 Completed

3 Alfamart – Ibayo Tipas, Taguig

Civil Works SM Prime Holdings, Inc. 2,685,000.00 Completed

TOTAL 9,085,000.00

Page 41: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 40 of 49

PROJECT NAME: SM MOA REVELOPMENT LOCATION: Sea side Boulevard, Pasay City CLIENT: SM Prime Holdings, Inc. FINAL PROJECT COST: 17,759,606.24 SCOPE: Civil Works DATE COMPLETED: July 3, 2017

Item Project name Scope Client Final Project Cost Status

1 South Parking Bldg. B Civil Works SM Prime Holdings, Inc. 2,800,000.00 Completed

2 Construction of additional tank & relocation of machine room of sewage treatment plant at SMBY

Civil Works SM Prime Holdings, Inc. 2,100,000.00 Completed

3 SM Moa parking bldg.. expansion & escalator works

Civil Works SM Prime Holdings, Inc. 1,454,130.38 Completed

4 Transformer pad Civil Works SM Prime Holdings, Inc. 1,000,000.00 Completed

5 SMBY Conversion to parking

Civil Works SM Prime Holdings, Inc. 730,000.00 Completed

6 Snack time Civil Works SM Prime Holdings, Inc. 569,251.40 Completed

7 ISR new box/ players bench

Civil Works SM Prime Holdings, Inc. 490,000.00 Completed

8 Temporary board up for expansion

Civil Works SM Prime Holdings, Inc. 418,656.00 Completed

9 Civil works at SMX Bridgeway

Civil Works SM Prime Holdings, Inc. 399,775.91 Completed

10 Installation of ceiling at Conrad

Civil Works SM Prime Holdings, Inc. 393,000.00 Completed

11 Additional works for SMX meeting room

Civil Works SM Prime Holdings, Inc. 632,628.22 Completed

12 CHB Wall with Wiremesh @ SM MOA Cabalen

Civil Works SM Prime Holdings, Inc. 354,183.88 Completed

13 Supply and Installation of CHB @ SM MOA S Maison Batch 34

Civil Works SM Prime Holdings, Inc. 352,643.20 Completed

14 Expansion and partitioning of EM117

Civil Works SM Prime Holdings, Inc. 325,067.60 Completed

15 Cinema Admin Relocation Civil Works SM Prime Holdings, Inc. 300,000.00 Completed

Page 42: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 41 of 49

16 Civil works at Conrad clinic Civil Works SM Prime Holdings, Inc. 298,000.00 Completed

17 Installation of CHB at SM MOA’s maison batch 34

Civil Works SM Prime Holdings, Inc. 281,299.00 Completed

18 Mitsubishi expansion Civil Works SM Prime Holdings, Inc. 263,256.00 Completed

19 Dismantling and re-installation of acoustic ceiling at SMX bridgeway

Civil Works SM Prime Holdings, Inc. 238,246.50 Completed

20 CHB Partition Civil Works SM Prime Holdings, Inc. 228,000.00 Completed

21 Painting work at STP north Architectural Works

SM Prime Holdings, Inc. 200,937.34 Completed

22 Construction of temporary admin office

Civil Works SM Prime Holdings, Inc. 197,842.40 Completed

23 Proposed waterline & sanitary line 2nd floor explorium

Plumbing Works

SM Prime Holdings, Inc. 166,976.38 Completed

24 Additional works at Conrad 3rd floor

Civil Works SM Prime Holdings, Inc. 166,377.23 Completed

25 Civil Works at SM MOA Storage (New Orleans and Claw Daddy)

Civil Works SM Prime Holdings, Inc. 145,765.76 Completed

26 KFC banner Civil Works SM Prime Holdings, Inc. 140,672.00 Completed

27 Dismantling and installation of ceiling and cove light @ brownies 2nd floor main

Civil Works SM Prime Holdings, Inc. 135,990.85 Completed

28 Dismantling of glass CHB laying

Civil Works SM Prime Holdings, Inc. 133,114.24 Completed

29 GRR wall partitioning (Additional works)

Civil Works SM Prime Holdings, Inc. 132,300.00 Completed

30 GRR wall partitioning (Additional works)

Civil Works SM Prime Holdings, Inc. 129,018.40 Completed

31 Supply and Installation of Concrete Culvert Cover

Civil Works SM Prime Holdings, Inc. 127,680.00 Completed

32 Demolition at explorium Civil Works SM Prime Holdings, Inc. 121,072.00 Completed

34 Electrical layout at sand box

Electrical Works

SM Prime Holdings, Inc. 126,889.36 Completed

35 Replacement of ACP at SM MOA South Parking Arcade Footbridge

Civil Works SM Prime Holdings, Inc. 108,672.48 Completed

36 Temporary board up storage area for bowling lanes

Civil Works SM Prime Holdings, Inc. 104,160.00 Completed

37 Additional works supply and installation of canopy for IMAX signage

Architectural Works

SM Prime Holdings, Inc. 104,084.96 Completed

38 Dismantling of AC Ducting and Electrical Wirings @ SM MOA Old Photoline Space

Civil Works SM Prime Holdings, Inc. 105,644.00 Completed

39 Temporary board up for SMBY hooter

Civil Works SM Prime Holdings, Inc. 102,000.00 Completed

40 Board up at Bldg. F Civil Works SM Prime Holdings, Inc. 101,696.00 Completed

41 Relocation of Sprinkler Heads @ Cinema Ticketbooth

Civil Works SM Prime Holdings, Inc. 100,863.13 Completed

Page 43: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 42 of 49

42 Repainting & restoration works at SM appliance

Architectural Works

SM Prime Holdings, Inc. 100,000.00 Completed

43 Additional works for bowling downsizing

Civil Works SM Prime Holdings, Inc. 93,165.97 Completed

44 Rentable Storage 101B & 103B – 115B @ S’ Maison

Civil Works SM Prime Holdngs, Inc. 93,010.50 Completed

45 Rentable Storage Civil Works SM Prime Holdings, Inc. 93,000.00 Completed

46 Supply and installation of canopy for imax signage

Civil Works SM Prime Holdings, Inc. 91,235.00 Completed

47 Cinema Admin Relocation Civil Works SM Prime Holdings, Inc. 90,000.00 Completed

48 Lamp post at SMBY Civil Works SM Prime Holdings, Inc. 89,756.80 Completed

49 Additional works for temporary board up storage for bowling

Civil Works SM Prime Holdings, Inc. 89,488.00 Completed

50 CHB Parapet wall 3rd floor south & north

Civil Works SM Prime Holdings, Inc. 87.360.00 Completed

51 Buffer green wall at employee’s CR (eggshell finished)

Civil Works SM Prime Holdings, Inc. 80,254.72 Completed

52 SM Moa parking expansion: Corner guard

Civil Works SM Prime Holdings, Inc. 77,019.60 Completed

53 Reconstruction of board up 5th floor rentable

Civil Works SM Prime Holdings, Inc. 76,720.00 Completed

54 Demolition of wall between swensens and karate kid

Civil Works SM Prime Holdings, Inc. 76,558.16 Completed

55 Proposed North & South Parking Bldg. Access Steel Door with Steel Door Jamb

Civil Works SM Prime Holdings, Inc.

74,097.41

Completed

56 Mitsubishi expansion additional works (cove light)

Civil Works SM Prime Holdings, Inc. 68.320.00 Completed

57 Restoration of Fire Exit Door

Civil Works SM Prime Holdings, Inc. 67,000.00 Completed

58 Temporary board-up at SMBY Bldg. G

Civil Works SM Prime Holdings, Inc. 64,153.60 Completed

59 Addl' works (slop sink) for bowling center-revised

Civil Works SM Prime Holdings, Inc. 60,242.56 Completed

60 Temporary board-up admin office for cinema & ISR-electrical works

Electrical Works

SM Prime Holdings, Inc. 60,226.88 Completed

61 Tiling works Civil Works SM Prime Holdings, Inc. 58,782.42 Completed

62 IMAX ticket booth at SM MOA

Civil Works SM Prime Holdings, Inc. 45,000.00 Completed

TOTAL 17,759,606.24

Page 44: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 43 of 49

PROJECT NAME: SM MAKATI LOCATION: Edsa, Ayala Makati CLIENT: SM Prime Holdings, Inc. FINAL PROJECT COST: 12,938,722.72 SCOPE: Civil Works DATE COMPLETED: March 3, 2017

Item Project name Scope Client Final Project Cost Status

1 Re-painting of ceilings, walls, and utilities at basement and RDU

Civil Works SM Prime Holdings, Inc.

3,386,328.00 Completed

2 Repainting of ceiling, walls and utilities at basement & RDU

Civil Works SM Prime Holdings, Inc.

1,100,000.00

Completed

3 Roof deck rectification Civil Works SM Prime Holdings, Inc.

1,050,433.44 Completed

4 Fire exit create & barel Civil Works SM Prime Holdings, Inc.

670,884.21 Completed

5 Masonry Works Civil Works SM Prime Holdings, Inc.

650,000.00 Completed

6 Demolition, restoration & repainting of concrete gutter

Civil Works SM Prime Holdings, Inc.

611,088.80 Completed

7 SM Makati exterior additional works (miscellaneous item of works at arcade/ façade)

Civil Works SM Prime Holdings, Inc.

528,779.98 Completed

8 Toilet extension at basement civil works

Civil Works SM Prime Holdings, Inc.

472,892.00 Completed

9 Dismantling, rectification, replacement of ceiling at Annex side main entrance including painting

Civil Works SM Prime Holdings, Inc.

466,257.74 Completed

Page 45: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 44 of 49

10 Supply and installation of temporary drop ceiling for FCU (8 units) at 3F

Civil Works SM Prime Holdings, Inc.

450,000.00 Completed

11 4 Tenant beams Civil Works SM Prime Holdings, Inc.

445,256.00 Completed

12 SM Makati Bridge link to Park Square

Civil Works SM Prime Holdings, Inc.

390,000.00 Completed

13 Painting works of existing exterior ceiling at Bridge way and steel doors along perimeter of main building

Civil Works SM Prime Holdings, Inc.

354,608.61 Completed

14 Additional works for crate & barrel

Civil Works SM Prime Holdings, Inc.

293,574.40 Completed

15 ACU grill cladding repair Civil Works SM Prime Holdings, Inc.

274,106.11 Completed

16 Gypsum cladding at lighting boxes

Civil Works SM Prime Holdings, Inc.

236,527.83 Completed

17 Supply and installation of steel door (including hard wares)

Civil Works SM Prime Holdings, Inc.

236,488.00 Completed

18 Additional works for toilet extension

Civil Works SM Prime Holdings, Inc.

194,066.45 Completed

19 Installation of ficem / gypsum board at 3F show windows/ light boxes for temporary replacement of frosted glass

Civil Works SM Prime Holdings, Inc.

187,599.00 Completed

20 Billboard enclosure Civil Works SM Prime Holdings, Inc.

180,000.00 Completed

21 Plumbing works at 5th floor Plumbing Works SM Prime Holdings, Inc.

175,235.00 Completed

22 SM Makati Annex Board-up Civil Works SM Prime Holdings, Inc.

150,241.92 Completed

23 Repainting of existing ceiling at Glorietta Entrance

Civil Works SM Prime Holdings, Inc.

129,596.43 Completed

24 Restoration of wall near H & M Civil Works SM Prime Holdings, Inc.

117,420.80 Completed

25 SM Makati interior additional works (Package & information counter)

Civil Works SM Prime Holdings, Inc.

105,102.00 Completed

26 Installation, painting & dismantling of temporary board up at stair entrance (Glorietta Side) for Marble Installation & Rescue Ceiling Works at 3rd Floor

Civil Works SM Prime Holdings, Inc.

82,236.00 Completed

TOTAL 12,938,722.72

Page 46: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 45 of 49

PROJECT NAME: SM VALENZUELA WAREHOUSE AT PARKING AREA LOCATION: MacArthur Highway, Valenzuela CLIENT: SM Prime Holdings, Inc. FINAL PROJECT COST: 3,655,976.86 SCOPE: Mansory Works DATE COMPLETED: May 2, 2017

Item Project name Scope Client Final Project Cost Status

1 SM Valenzuela Mall Renovation

Masonry Works SM Prime Holdings, Inc.

1,748,658.36 Completed

2 SM Valenzuela Mall Renovation

Masonry Works SM Prime Holdings, Inc 808,000.00 Completed

3 SM Valenzuela Civil Works @ Parking Area

Civil/Masonry Works SM Prime Holdings, Inc.

751,318.50 Completed

4 SM Valenzuela Board-up

Civil Works SM Prime Holdings, Inc.

348,000.00 Completed

TOTAL 3,655,976.86

Page 47: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 46 of 49

X. LIST OF ON-GOING PROJECTS PROJECT NAME: SM MANILA

LOCATION: Manila

CLIENT: SM Prime Holdings, Inc.

FINAL PROJECT COST: 5,092,199.58

SCOPE: Painting Works

DATE STARTED: May 15, 2017

Item Project name Scope Client Final Project Cost Status

1 SM Manila Interior Painting Works SM Prime Holdings, Inc.

4,750,000.00 On-going

2 SM Manila drip pan

Fit-out SM Prime Holdings, Inc.

207,895.20 On-going

3 Replacement of damage metal framing for ceiling 4f

Fit-out SM Prime Holdings, Inc.

116,242.00 On-going

4 Replacement of damage metal framing for ceiling 5f

Fit-out SM Prime Holdings, Inc.

98,959.00 On-going

5 Installation of osm ceiling manhole

Fit-out SM Prime Holdings, Inc.

70,000.00

On-going

6 SM Manila Addl Works 4f ceiling painting

Architectural SM Prime Holdings, Inc.

56,998.58

On-going

TOTAL 5,092,199.58

PROJECT NAME: VISTA MALL LOCATION: Manila CLIENT: Crown Asia Properties FINAL PROJECT COST: 1,240,000.00 SCOPE: Painting Works DATE STARTED: June 8, 2017

Item Project name Scope Client Final Project Cost Status

1 Vistamall Antipolo Construction of MRF

Civil, Architectural, Plumbing and Electrical Works

Crown Asia Properties 650,000.00 On-going

2 Vista mall Antipolo camella space demolition

Civil Works Crown Asia Properties 470,000.00 On-going

3 Vista mall daang hari chb laying at laybare

Masonry Works Crown Asia Properties 120,000.00 On-going

TOTAL 1,240,000.00

Page 48: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 47 of 49

PROJECT NAME: SM CHERRY ANTIPOLO LOCATION: Marikina-Infanta Hwy, Antipolo Rizal CLIENT: SM Prime Holdings, Inc. FINAL PROJECT COST: 2,029,940.96 SCOPE: Mansory Works DATE STARTED: June 1, 2017

Item Project name Scope Client Final Project Cost Status

1 SM Cherry Antipolo Drywall Partition

Fit-out Works SM Prime Holdings, Inc. 2,029,940.96 On-going

TOTAL 2,029,940.96

PROJECT NAME: SM MEGAMALL

LOCATION: Epifanio de los Santos Ave, Ortigas Center, Mandaluyong

CLIENT: First Asia Realty Development Corp.

FINAL PROJECT COST: 8,260,118.10

SCOPE: Civil Works

DATE STARTED: April 7, 2017

Item Project name Scope Client Final Project Cost Status

1 Plastering of Walls from Rough to Smooth Finish

Architectural Works First Asia Realty Development Corp.

3,350,000.00 62% Finish

2 Foodcourt Back Alley Rehabilitation

Civil Works First Asia Realty Development Corp.

2,012,607.70 New Award

3 SM Megamall Civil works for glass railing full height

First Asia Realty Development Corp.

1,800,000.00 On-going

4 SM Megamall MRF rehabilitation at SMMG

First Asia Realty Development Corp.

900,000.00 On-going

5 SM Megamall Temporary board up set - A create & barrel

First Asia Realty Development Corp.

46,543.00 On-going

6 SM Megamall Temporary board up set B-1 create & barrel

First Asia Realty Development Corp.

29,174.00 On-going

7 SM Megamall Temporary board up set B-2 create & barrel

First Asia Realty Development Corp.

32,677.50 On-going

8 SM Megamall Temporary Board-up @ Kamay Kainan

First Asia Realty Development Corp.

17,380.90 On-going

9 SM Megamall Temporary board-up @ Papa John's

First Asia Realty Development Corp.

22,343.00 On-going

10 SM Megamall Repair of echostop ceiling @ SM Megamall 5F Bldg. B

First Asia Realty Development Corp.

49,392.00 On-going

TOTAL 8,260,118.10

Page 49: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 48 of 49

PROJECT NAME: A. P. CARGO MARKETING & SALES OFFICE LOCATION: Domestic Road, Pasay CLIENT: A. P. Cargo FINAL PROJECT COST: 3,800,000.00 SCOPE: Structural Works DATE STARTED: August 3, 2017

Item Project name Scope Client Final Project Cost Status

1 A.P. Cargo Marketing & Sales Office

Structural Works A.P. Cargo 3,800,000.00 On-going

TOTAL 3,800,000.00

PROJECT NAME: INTERIOR PAINTING AT AMAIA STEPS ALABANG LOCATION: Alabang Zapote Road, Almanza Uno, Las Piñas City CLIENT: MDC Build Plus FINAL PROJECT COST: 3,402,836.20 SCOPE: Architectural Works DATE STARTED: August 1, 2017

Item Project name Scope Client Final Project

Cost Status

1 Amaia Steps – Aria Bldg. Architectural Works MDC Build Plus 3,402,836.20 On-going

TOTAL 3,402,836.20

PROJECT NAME: PROPOSED CHB LAYING (LABOR ONLY) LOCATION: AMAIA SKIES SHAW, Shaw Boulevard cor. Samat St., Mandaluyong City CLIENT: MDC Build Plus FINAL PROJECT COST: 1,952,386.52 SCOPE: Architectural Works DATE STARTED: August 1, 2017

Item Project name Scope Client Final Project

Cost Status

1 Proposed CHB Laying (Labor Only)

Masonry Works MDC Build Plus 1,952,386.52 On-going

TOTAL 1,952,386.52

PROJECT NAME: PLASTERING WORKS LOCATION: AMAIA SKIES SHAW, Shaw Boulevard cor. Samat St., Mandaluyong City CLIENT: MDC Build Plus FINAL PROJECT COST: 1,999,550.00 SCOPE: Civil Works DATE STARTED: September 14, 2017

Item Project name Scope Client Final Project

Cost Status

1 Plastering Works Civil Works MDC Build Plus 1,999,550.00 On-going

TOTAL 1,999,550.00

Page 50: MGCDC COMPANY PROFILE MARCH 2017 Page of

MGCDC COMPANY PROFILE MARCH 2017 Page 49 of 49

PROJECT NAME: MDCBP-MULTI-PURPOSE HALL FIT-OUT WORKS LOCATION: AMAIA SKIES SHAW, Shaw Boulevard cor. Samat St., Mandaluyong City CLIENT: MDC Build Plus FINAL PROJECT COST: 703,000.00 SCOPE: Architectural Works DATE STARTED: September 12, 2017

Item Project name Scope Client Final Project

Cost Status

1 MDCBP-Multi-Purpose Hall Fit-Out Works

Architectural Works MDC Build Plus 703,000.00 On-going

TOTAL 703,000.00

PROJECT NAME: MDC VERTIS NORTH – AVIDA TOWER VITA LOCATION: Quezon City CLIENT: Makati Development Corporation (MDC) FINAL PROJECT COST: 3,652,684.50 SCOPE: Civil Works DATE STARTED: September 26, 2017

Item Project name Scope Client Final Project

Cost Status

1 MDC Vertis North – Avida Tower Vita 34th Floor

Civil Works Makati Development Corporation (MDC)

1,826,342.25 On-going

1 MDC Vertis North – Avida Tower Vita 35th Floor

Civil Works Makati Development Corporation (MDC)

1,826,342.25 On-going

TOTAL 3,652,684.50

PROJECT NAME: MEGATRADE HALLS 1, 2 & 3 RENOVATION LOCATION: SM Megamall CLIENT: SM Prime Holdings Inc. FINAL PROJECT COST: 1,850,000.00 SCOPE: Architectural Works DATE STARTED: October 2 2017

Item Project name Scope Client Final Project

Cost Status

1 Megatrade Halls 1, 2 & 3 Renovation

Architectural Works SM Prime Holdings Inc.

1,850,000.00 On-going

TOTAL 1,850,000.00